CN207934393U - A kind of dust-proof transportation system of skyscraper rubbish - Google Patents

A kind of dust-proof transportation system of skyscraper rubbish Download PDF

Info

Publication number
CN207934393U
CN207934393U CN201820405452.1U CN201820405452U CN207934393U CN 207934393 U CN207934393 U CN 207934393U CN 201820405452 U CN201820405452 U CN 201820405452U CN 207934393 U CN207934393 U CN 207934393U
Authority
CN
China
Prior art keywords
rubbish
tube body
dust
channel
garbage transporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820405452.1U
Other languages
Chinese (zh)
Inventor
王法姿
郑建国
张智
王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
Zhongqi Jiaojian Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqi Jiaojian Group Corp Ltd filed Critical Zhongqi Jiaojian Group Corp Ltd
Priority to CN201820405452.1U priority Critical patent/CN207934393U/en
Application granted granted Critical
Publication of CN207934393U publication Critical patent/CN207934393U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model is related to building waste transportation arts,Especially a kind of dust-proof transportation system of skyscraper rubbish,Including more vertical tube bodies,And multiple bending tube bodies that garbage transporting channel is formed for connection that vertical tube body turns round repeatedly,Multiple rubbish pour spouts are equipped on garbage transporting channel,Garbage transporting vias inner walls in rubbish pour spout are equipped with the baffle for stopping airborne dust,It is equipped in garbage transporting the bottom of the channel and is used for rubbish delivery outlet,The spray port that the adjacent tube body of rubbish delivery outlet is equipped with,It is provided tiltedly with buffer board on the tube body of rubbish delivery outlet side,Building waste transport at present is mostly to use construction elevator,It is transformed based on lift well,It is time-consuming and laborious,And the volume of building waste and it is in irregular shape etc. due to,Airborne dust is easily caused in transportational process and ground or cleaning equipment are damaged,The utility model effectively buffers rubbish sinking speed,Prevent airborne dust from endangering,And it is simple in structure,It can be widely popularized.

Description

A kind of dust-proof transportation system of skyscraper rubbish
Technical field
The utility model is related to building waste transportation art, especially a kind of dust-proof transportation system of skyscraper rubbish.
Background technology
Building waste refers to that construction, unit in charge of construction or individual build all kinds of buildings, structures, pipe network etc., spread If or remove, generated dregs, spoir, rejected material, remaining mud and other wastes in reparative processes, with industrialization, urbanization The acceleration of process, construction industry is also fast-developing simultaneously, and the building waste generated together is increasing, the number of Chinese architecture rubbish Amount has accounted for 1/3 of municipal refuse total amount or more.
To ensure complete civilized construction, cleaning, the transport of floor building waste are essential, not then can occupy and apply Workshop, so that the limited construction site of script is become narrow, hinders the progress of normal construction.Traditional architecture storey rubbish cleaning Method is, by trolley to construction elevator, will transport and is stacked to specified place under building waste, this cleaning method exist with Lower defect:First, floor rubbish palpus elevator to be onstructed is installed to when stacking floor to descend to transport, and floor rubbish cannot be clear in time Reason, can not ensure the promptness of floor civilized construction;Secondly building waste amount is more, by being transported under construction elevator, occupies significantly The use of construction elevator, reduces the effective efficiency of construction elevator transport, and CN206319543U discloses a kind of skyscraper rubbish Rubbish vertically descends fortune system, solves the problems, such as to transport skyscraper rubbish without using construction elevator, but due to building waste In irregular shape, volume is larger, the impact to bottom transporting equipment is easily caused in dropping process, and be easy to cause airborne dust, Harm is brought to construction environment and workers ' health.
Invention content
In view of the deficiencies of the prior art, a kind of dust-proof transportation system of skyscraper rubbish is provided, is realizing high-rise rubbish While conveying, building waste can be effectively reduced and topple over the impact caused by transport system bottom, and effectively control airborne dust, tied Structure is simple, can wide popularization and application.
The technical scheme adopted by the utility model is that a kind of dust-proof transportation system of skyscraper rubbish, including built along high level It builds more vertical tube bodies that exterior wall is arranged from top to bottom and multiple forms rubbish for the vertical tube body to turn round repeatedly to connect The bending tube body of rubbish transport channel is equipped with multiple rubbish pour spouts corresponding with floor successively on garbage transporting channel, described Garbage transporting vias inner walls in rubbish pour spout are equipped with is used to prevent top rubbish with what garbage transporting channel was rotatablely connected Rubbish, which falls, in transport channel there is the baffle of airborne dust, is equipped in garbage transporting the bottom of the channel for rubbish to be delivered to outside channel Rubbish delivery outlet, the adjacent tube body of the rubbish delivery outlet is equipped with the spray port for reducing airborne dust, rubbish output One is provided tiltedly on the tube body of mouth side for buffering the buffer board that rubbish is fallen.
A kind of above-mentioned dust-proof transportation system of skyscraper rubbish, the bending tube body include one end and the vertical tube body in top The lateral tube body that the first metal bends and one end of connection are connect with the first metal bends other end, the transverse pipe The body other end connects the vertical tube body of lower part by the second metal bends, and the rubbish pour spout is set on lateral tube body.
A kind of above-mentioned dust-proof transportation system of skyscraper rubbish, the rubbish pour spout is equipped with to incline for closing rubbish The door body of mouth, is equipped with the hinge for connecting the two between the door body and rubbish pour spout, be equipped with and be used in door body The handle for opening door body is equipped with the bolt for preventing rubbish from overflowing for closing door body in handle both sides.
A kind of above-mentioned dust-proof transportation system of skyscraper rubbish, the buffer board are steel plate.
A kind of above-mentioned dust-proof transportation system of skyscraper rubbish, the short transverse of the tube body adjacent along rubbish delivery outlet are equal It is even to be equipped with multiple spray ports.
A kind of advantageous effect of the dust-proof transportation system of skyscraper rubbish of the utility model is, by being bent tube body by more Vertical tube body connection, forms garbage transporting channel, avoids when toppling over building waste into straight barrel type garbage chute, is caused to bottom Impact, on garbage transporting channel successively be equipped with multiple rubbish pour spouts corresponding with floor, facilitate each floor rubbish Topple over, the baffle being rotatablely connected with garbage transporting channel is equipped in the garbage transporting vias inner walls in rubbish pour spout, is avoided When dumping rubbish, airborne dust is endangered caused by the person of worker, is equipped in garbage transporting the bottom of the channel for conveying rubbish Rubbish delivery outlet outside to channel is arranged spray port on the adjacent tube body of rubbish delivery outlet, effectively reduces airborne dust, prevents pair The pollution of environment is arranged a buffer board in rubbish delivery outlet bottom angled, effectively reduces the speed of rubbish output first, avoid pair Garbage transporting device damages, and secondly can increase spray time of the spray port to rubbish, effectively reduces airborne dust, and third is convenient for rubbish Rubbish slides, and can prevent rubbish from blocking delivery outlet, the utility model is simple and practical in structure, facilitates installation, easy to disassemble, can be energetically It promotes the use of.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of door body;
Fig. 3 is the structural schematic diagram for being bent tube body;
Fig. 4 is the structural schematic diagram of spray port.
Specific implementation mode
Below in conjunction with attached drawing, elaborate to the utility model.
As shown in Figure 1,2,3, 4, a kind of dust-proof transportation system of skyscraper rubbish, including along external wall of high-rise building from upper and The vertical tube body 1 of more of lower setting and multiple connections that are used to repeatedly turn round vertical tube body 1 form the curved of garbage transporting channel Curved tube body 2 avoids when toppling over building waste into straight barrel type garbage chute, and impact, vertical tube body 1 can be used caused by bottom Plastic conduit, durable and tubing is light, and convenient for construction, price is low, economical and beautiful, cost-effective, and bending tube body 2 includes one The cross for holding the first metal bends 3 being connect with the vertical tube body in top and one end to be connect with 3 other end of the first metal bends To tube body 4, it is described transverse direction 4 other end of tube body by the second metal bends 5 connect lower part vertical tube body, the first metal bends with Second metal bends may be configured as 45 ° of metal bends, and convenient for connection, and metal material can effectively prevent transfer passage large-scale Building waste punctures, and is equipped with multiple rubbish pour spouts 6 being correspondingly arranged with floor successively on transport channel, facilitates each floor Rubbish is toppled over, and for ease of dumping rubbish, rubbish pour spout 6 can be set on lateral tube body 4, vertical tube body 1 and swan-neck By flanged joint, flange is easily attached, easy to disassemble, can be reused, and material, rubbish have been saved for body 2 and lateral tube body 4 Pour spout 6 is equipped with one and is used for by the closed door body 7 of rubbish pour spout, and the handle 8 for opening door body, in handle 8 Both sides are equipped with bolt 9, and hinge 10 for connecting the two is equipped on rubbish pour spout 6 and door body 7, prevent rubbish excessively from Overflow in rubbish pour spout, make troubles to construction site, be equipped in the garbage transporting vias inner walls in rubbish pour spout 6 with The rotation connection of garbage transporting channel for stopping the baffle 11 that airborne dust raises up, avoid when dumping rubbish, airborne dust is to worker's Harm caused by the person is equipped with the rubbish delivery outlet 12 for being delivered to rubbish outside channel in transfer passage bottom, can be by rubbish Rubbish transporting equipment is positioned at rubbish delivery outlet 12, and rubbish is directly fallen on transporting equipment, convenient for directly transporting, is removed without secondary Fortune saves manpower, the spray port 13 for reducing airborne dust is equipped on the adjacent tube body of rubbish delivery outlet 12, due to bottom airborne dust Larger, to reach good spraying effect, the short transverse of the tube body adjacent along rubbish delivery outlet is uniformly provided with multiple spray ports, Bottom airborne dust is effectively reduced, convenient for the processing of clearing of rubbish, one is provided tiltedly on the tube body of rubbish delivery outlet side for buffering The buffer board 14 that rubbish is fallen, buffer board may be configured as steel plate, durable, the impact of building waste can be effectively prevent, in rubbish A buffer board is arranged in rubbish delivery outlet bottom angled, effectively reduces the speed of rubbish output first, avoids making garbage transporting device It at damage, secondly can increase spray time of the spray port 13 to rubbish, effectively reduce airborne dust, third slides convenient for rubbish, can prevent Only rubbish blocks delivery outlet, ensure that the stability of the present apparatus, relative to installation elevator conveying rubbish, using this side Formula, is time saving and energy saving first, first by refuse bag or frames up without worker, then again in movement to elevator, then passes through elevator It is transported to ground, after building waste is transported to ground, it is also necessary to which rubbish is moved out elevator and is transported at stacking by worker;Secondly as By elevator traffic, single freight volume is small, and transportational process is also and discontinuous so that the transporting velocity of rubbish compared with Slowly;Furthermore, it should be noted that architectural engineering at present is generally constructed in floor just starts installation elevator to eight layers, usually It could be used in eleventh floor, before construction elevator normal use, the cleaning of floor rubbish cannot be kept up in time, still influence civilization Construction and airborne dust prevention, the utility model can be connected into plastic conduit and floor using metal bends according to story height The adaptable height of height not by story height lower limit, while establishing rubbish conveying without transformation skyscraper lift well Channel, time-consuming and laborious, the utility model is simple and practical in structure, facilitates installation, easy to disassemble, can vigorously promote the use.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, this The those of ordinary skill of technical field, in the essential scope of the utility model, the variations, modifications, additions or substitutions made, all The scope of protection of the utility model should be belonged to.

Claims (5)

1. a kind of dust-proof transportation system of skyscraper rubbish, which is characterized in that including being arranged from top to bottom along external wall of high-rise building More vertical tube bodies and multiple form the swan-neck in garbage transporting channel for the vertical tube body to turn round repeatedly to connect Body is equipped with multiple rubbish pour spouts corresponding with floor, the rubbish in the rubbish pour spout successively on garbage transporting channel Transport channel inner wall is equipped with is used to prevent rubbish in the garbage transporting channel of top from falling with what garbage transporting channel was rotatablely connected The baffle for airborne dust occur is equipped with the rubbish delivery outlet for being delivered to rubbish outside channel in garbage transporting the bottom of the channel, described The adjacent tube body of rubbish delivery outlet is equipped with the spray port for reducing airborne dust, is tilted on the tube body of rubbish delivery outlet side The buffer board fallen equipped with one for buffering rubbish.
2. a kind of dust-proof transportation system of skyscraper rubbish according to claim 1, characterized in that the bending tube body packet It includes the first metal bends that one end is connect with the vertical tube body in top and one end connect with the first metal bends other end Lateral tube body, the transverse direction tube body other end connect the vertical tube body of lower part, the rubbish pour spout by the second metal bends It is set on lateral tube body.
3. a kind of dust-proof transportation system of skyscraper rubbish according to claim 1, characterized in that the rubbish pour spout It is equipped with the door body for closing rubbish pour spout, the conjunction for connecting the two is equipped between the door body and rubbish pour spout Page is equipped with the handle for opening door body in door body, and be equipped in handle both sides prevents inserting for rubbish spilling for closing door body Pin.
4. a kind of dust-proof transportation system of skyscraper rubbish according to claim 1, characterized in that the buffer board is steel Plate.
5. a kind of dust-proof transportation system of skyscraper rubbish according to claim 1, characterized in that along rubbish delivery outlet phase The short transverse of adjacent tube body is uniformly provided with multiple spray ports.
CN201820405452.1U 2018-03-13 2018-03-13 A kind of dust-proof transportation system of skyscraper rubbish Expired - Fee Related CN207934393U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820405452.1U CN207934393U (en) 2018-03-13 2018-03-13 A kind of dust-proof transportation system of skyscraper rubbish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820405452.1U CN207934393U (en) 2018-03-13 2018-03-13 A kind of dust-proof transportation system of skyscraper rubbish

Publications (1)

Publication Number Publication Date
CN207934393U true CN207934393U (en) 2018-10-02

Family

ID=63655917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820405452.1U Expired - Fee Related CN207934393U (en) 2018-03-13 2018-03-13 A kind of dust-proof transportation system of skyscraper rubbish

Country Status (1)

Country Link
CN (1) CN207934393U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242014A (en) * 2019-07-09 2019-09-17 常州工程职业技术学院 A kind of high-rise house refuse transport device with cleaning function
CN115110715A (en) * 2022-06-29 2022-09-27 国网宁夏电力有限公司银川供电公司 Building rubbish discharging equipment for floor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242014A (en) * 2019-07-09 2019-09-17 常州工程职业技术学院 A kind of high-rise house refuse transport device with cleaning function
CN115110715A (en) * 2022-06-29 2022-09-27 国网宁夏电力有限公司银川供电公司 Building rubbish discharging equipment for floor

Similar Documents

Publication Publication Date Title
CN208830666U (en) A kind of skyscraper vertical garbage transportation system
CN206319543U (en) System is transported under skyscraper vertical garbage
CN207934393U (en) A kind of dust-proof transportation system of skyscraper rubbish
CN104234388B (en) Garbage chute for high-building construction
CN207934392U (en) The quick conveying device of skyscraper rubbish
CN213087334U (en) Building rubbish clearing device
CN207917764U (en) Lane device for skyscraper rubbish quick drain
CN210482895U (en) Garbage pipeline conveying and grading device for multi-storey building construction
CN208347245U (en) A kind of construction site floor refuse collection channel
CN214942027U (en) High-rise building rubbish transfer passage
CN206752961U (en) Rubbish storage case
CN207329582U (en) Building waste conveying device
CN206091206U (en) Building floor construction rubbish collecting channel
CN207568138U (en) For the building waste vertical transit system of high-rise building
CN215168139U (en) Concrete overhead hoist
CN113233032A (en) Building rubbish conveying and temporary storage device between floors
CN110254970A (en) A kind of urban building waste transhipment funnel
CN209618058U (en) A kind of Construction of High-rise multipurpose body feed tank
CN208668874U (en) A kind of novel building vertical garbage transportation system
CN216888339U (en) Building rubbish conveying and temporary storage device between floors
CN209907855U (en) Vertical transportation cleaning and pump pipe cleaning integrated system for building construction floor garbage
CN221031191U (en) Vertical conveying device for construction waste
CN218374950U (en) Floor garbage channel for newly-built building structure
CN114148651B (en) Construction waste classification and recovery method
CN204098438U (en) A kind of refuse chute for high-building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181002

Termination date: 20190313

CF01 Termination of patent right due to non-payment of annual fee