CN206091206U - Building floor construction rubbish collecting channel - Google Patents
Building floor construction rubbish collecting channel Download PDFInfo
- Publication number
- CN206091206U CN206091206U CN201620927049.6U CN201620927049U CN206091206U CN 206091206 U CN206091206 U CN 206091206U CN 201620927049 U CN201620927049 U CN 201620927049U CN 206091206 U CN206091206 U CN 206091206U
- Authority
- CN
- China
- Prior art keywords
- rubbish
- construction
- floor
- building
- festival
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a building floor construction rubbish collecting channel, has whole collection, a transportation special channel who transforms floor rubbish among the decoration construction of building at mainly used building under construction. By assemble the festival 2, assemble the festival 3, assemble the festival 9, the main entrance is constituteed through flange joint to gravity buffer board 5, set up along with building height in step the upper end of main entrance, and the lower extreme links to each other with rubbish storage facility, the main entrance is fixed on building subject by the support frame. The rubbish that produces on the floor is through setting up in appointed storage facility is directly carried floor rubbish to the input mouth of each layer. Rubbish collecting channel adopts polyethylene material, damages recoverable the recycling in back, and have stand wear and tear, shock resistance, noise low grade characteristics, really accomplished green construction requirements. Simultaneously also break away from the operational use time problem that occupies perpendicular transport machinery, improved perpendicular transportation work efficiency for the project progress.
Description
Technical field
The utility model is related to a kind of construction floor construction refuse collection passage.
Background technology
At present, a large amount of airborne dusts are produced in building construction process, environment is polluted, domestic construction flooring rubbish mainly passes through high-altitude
The methods such as throwing, construction elevator transport, tower crane handling.High-altitude throwing due to it is dangerous also not environmentally, by relevant government department
Forbid;Using elevator traffic, need first to install rubbish with woven bag, then cleared to ground by elevator, can so take elevator
Working time, directly affect construction speed;Using tower crane come handling flooring rubbish, needs are set up discharging platform, are entered in floor
Enter discharging platform after decoration stage and be also unfavorable for construction operation and the method inefficiency.
It is to solve flooring construction vertical garbage transport difficult, reduction cost of transportation, quickening engineering to enter for problem above
Degree, and devise a kind of construction floor construction refuse collection passage.
The content of the invention
The purpose of this utility model is to solve the collection of construction floor construction rubbish, clearing, it is to avoid cause airborne dust to be made
Into environmental pollution;Fall caused casualties or property loss;Using tower crane, construction elevator conveyer belt come low effect,
High cost, occupancy limited resources etc. will be by employing the following technical solutions realization:
Construction floor construction refuse collection passage, is to follow building height to increase segmentation installation to be attached to facing for external wall
When device, assembled section (accompanying drawing 3) of the passage by the assembled section (accompanying drawing 2) of standard and with garbage throw-in port connected shape by flange
Into;Entrance and gravity buffer device (accompanying drawing 5) are thrown in each storey setting rubbish, and by supporting adn fixing device (accompanying drawing 6)
It is fixed on building body.
Above-mentioned construction floor construction refuse collection passage, the assembled section main body of the garbage shaft is using in polyethylene injection
One layer of High-molecular rubber material of lining is made, and dispensing port is provided with seal cover board, is closed when not feeding intake.
The gravity buffer device is made using " rice " font reinforcement rubber slab, is arranged on the upper of floor garbage throw-in port
Side, the centre of two panels assembly flange, are locked by " L " the shape clamp (accompanying drawing 4).Effectively solving upper strata bulk rubbish is absolute
The release problem of gravitation energy under height, and the dust that rubbish is produced when throwing in is prevented to external diffusion.
The supporting adn fixing device is made using angle steel, is arranged on the centre of two panels assembly flange, will by " L " shape clamp
The assembled section locking of lower channel, the gravity load of passage, rubbish is thrown in the dynamic load for producing and is reached on building body.
The beneficial effects of the utility model:
1st, the utility model system simple structure, from heavy and light, assembled convenient;
2nd, the utility model can be iteratively repeated utilization, reduce production cost;
3rd, the assembled section of the utility model adopts polythene material, and recyclable recycling, is truly realized green construction after damage
Require;
4th, the utility model collection channel has the low feature of wear-resistant, shock resistance, noise;
5th, use of the present utility model can break away from the working time for taking vertical transportation machinery, improve vertical transport work
Efficiency;
6th, it is of the present utility model to use the refuse collection that at any time produced on flooring to specified location, it is ensured that working face
Place sanitation and hygiene, the standard for reaching civilized construction is required.
Description of the drawings
Accompanying drawing 1 is system organigram of the present utility model (flange is assembled).
Accompanying drawing 2 is the assembled section schematic diagram of standard of the present utility model (flange is assembled).
Accompanying drawing 3 is the assembled section schematic diagram of floor dispensing port of the present utility model (flange is assembled).
Accompanying drawing 4 is for adpting flange " L " shape clamp schematic diagram.
Accompanying drawing 5 is the gravity buffer device schematic diagram that the utility model is arranged on floor gap.
Accompanying drawing 6 is for the supporting adn fixing device schematic diagram between building.
Specific embodiment
【Embodiment 1】
Construction floor refuse collection channel system (accompanying drawing 1), including the assembled section 2 of standard, assembled section 3, assembled section 9;It is assembled
Entrance is thrown in the side of section 3 with rubbish, and assembly section 9 is garbage outlet and is connected with closing dustbin.
Entrance 7 is thrown in each storey setting rubbish, access road and main channel shape oblique angle upwards at 45 ° is thrown in, can be supported
Multiple spot feeds intake, it is to avoid broken particles splatter is hurted sb.'s feelings, and rubbish closes in time entrance after the completion of throwing in.Per layer is thrown in entrance upside flange
Gravity buffering reinforcement flexographic 5 is set, make input rubbish be always maintained at a floor fall away from gravity, be effectively reduced to master
The impact failure of passage.
Construction floor refuse collection channel system, the adjacent assembled section in main channel is connected using ring flange 4, and by " L " shape
Callipers locking gripping;It is connected with major structure of construction 8 using fixed support 6 at interval of a floor.
【Embodiment 2】
Construction floor refuse collection passage, it is adaptable to building agent structure, the refuse collection in decoration construction stage;Also can use
Construct in the overall decoration renovation of building.Refuse collection passage can be arranged in the outside of building, is possible with enforcement
Core Walls Structure, ventilating shaft, pipe well in building etc. are arranged;Can synchronously set up with project under construction according to demand, it is high also dependent on building
Degree is once set up and is completed.
Claims (2)
1. construction floor construction refuse collection passage, it is characterised in that:The passage is by the assembled section of standard and with garbage throw-in port
Assembly section connects to be formed by flange;Entrance and gravity buffer device are thrown in each storey setting rubbish, and it is solid by supporting
Determine device to be fixed on building body;The gravity buffer device is made using " rice " font reinforcement rubber slab, is arranged on floor
The top of garbage throw-in port, the centre of two panels assembly flange, by " L " the shape callipers locking gripping;The supporting adn fixing device is adopted
Made with angle steel, be arranged on the centre of two panels assembly flange, locked at the assembled section of lower channel by " L " shape clamp.
2. construction floor as described in claim 1 is constructed refuse collection passage, it is characterised in that:The garbage shaft is assembled
Section main body is made using polyethylene injection one layer of High-molecular rubber material of liner, and dispensing port is provided with seal cover board, when not feeding intake
It is closed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620927049.6U CN206091206U (en) | 2016-08-17 | 2016-08-17 | Building floor construction rubbish collecting channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620927049.6U CN206091206U (en) | 2016-08-17 | 2016-08-17 | Building floor construction rubbish collecting channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206091206U true CN206091206U (en) | 2017-04-12 |
Family
ID=58468982
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620927049.6U Expired - Fee Related CN206091206U (en) | 2016-08-17 | 2016-08-17 | Building floor construction rubbish collecting channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206091206U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110725507A (en) * | 2019-09-26 | 2020-01-24 | 珠海经济特区联谊机电工程有限公司 | Automatic door-closing metal tipping bucket capable of reducing vibration sound |
CN112209000A (en) * | 2020-09-14 | 2021-01-12 | 上海建工四建集团有限公司 | Vertical transportation channel for multi-storey building construction waste and use method thereof |
-
2016
- 2016-08-17 CN CN201620927049.6U patent/CN206091206U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110725507A (en) * | 2019-09-26 | 2020-01-24 | 珠海经济特区联谊机电工程有限公司 | Automatic door-closing metal tipping bucket capable of reducing vibration sound |
CN112209000A (en) * | 2020-09-14 | 2021-01-12 | 上海建工四建集团有限公司 | Vertical transportation channel for multi-storey building construction waste and use method thereof |
WO2022052457A1 (en) * | 2020-09-14 | 2022-03-17 | 上海建工四建集团有限公司 | Vertical transportation channel for multi-storey building construction waste, and usage method therefor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102602631B (en) | Waste transfer station for urban underground logistics system and transfer method of waste transfer station | |
CN206319543U (en) | System is transported under skyscraper vertical garbage | |
EP2188196B1 (en) | Method for conveying waste | |
CN111749430B (en) | Automatic conveying system for construction waste of high-rise building | |
CN208830666U (en) | A kind of skyscraper vertical garbage transportation system | |
WO2022052457A1 (en) | Vertical transportation channel for multi-storey building construction waste, and usage method therefor | |
CN108435417A (en) | A kind of building waste sorting device being conducive to environmental protection | |
CN206091206U (en) | Building floor construction rubbish collecting channel | |
CN109629795A (en) | A kind of intelligent construction garbage classification device | |
CN103590582B (en) | New-type refuse vehicle collects transfer arrangement | |
CN205380048U (en) | Three -layer screening plant | |
CN205637487U (en) | High -rise building garbage recycling device | |
CN204960243U (en) | Construction garbage shaft with buffer function | |
CN213087334U (en) | Building rubbish clearing device | |
CN103572945B (en) | Interlayer construction building waste is cleared system | |
CN210482895U (en) | Garbage pipeline conveying and grading device for multi-storey building construction | |
CN205475022U (en) | Subway tunnel rubbish cleaning device | |
CN204662883U (en) | A kind of building waste passage | |
CN204979890U (en) | Raw coal feed feed bin | |
CN208347245U (en) | A kind of construction site floor refuse collection channel | |
CN207568138U (en) | For the building waste vertical transit system of high-rise building | |
CN214942027U (en) | High-rise building rubbish transfer passage | |
CN207934393U (en) | A kind of dust-proof transportation system of skyscraper rubbish | |
CN202324541U (en) | Building waste pouring and flowing pipe | |
CN213329862U (en) | Construction rubbish transfer passage with buffer function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 Termination date: 20180817 |