CN103572945B - Interlayer construction building waste is cleared system - Google Patents
Interlayer construction building waste is cleared system Download PDFInfo
- Publication number
- CN103572945B CN103572945B CN201310612121.7A CN201310612121A CN103572945B CN 103572945 B CN103572945 B CN 103572945B CN 201310612121 A CN201310612121 A CN 201310612121A CN 103572945 B CN103572945 B CN 103572945B
- Authority
- CN
- China
- Prior art keywords
- funnel
- main body
- building waste
- body pipeline
- branch road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
- Refuse Collection And Transfer (AREA)
Abstract
The present invention relates to Architectural Equipment technical field, more particularly, particularly a kind of interlayer construction building waste is cleared system. This interlayer construction building waste is cleared system, comprises collector unit, and described collector unit includes main body pipeline and branch road, described branch road be arranged on the sidewall of described main body pipeline and with described main body pipeline connection; The described main body pipeline that described collector unit includes between two multiple, adjacent described collector units is connected. Interlayer construction building waste provided by the invention is cleared system, carry out refuse collection owing to no longer using manually by lift, not only can not take lift affects construction speed, is also convenient to very much clearing of building waste, reduces the labour intensity that employee clears building waste.
Description
Technical field
The present invention relates to Architectural Equipment technical field, more particularly, particularly a kind of everyLayer construction building waste is cleared system.
Background technology
At present, in high building project, the taked mode of clearing of building waste is: often buildIf complete one deck, just needs the staff of this layer that the building waste of this one deck is cleaned,And pile up in this layer, load and transport by dolly, then utilize lift by the building rubbish of this layerRubbish is transported to ground, is finally focusing on.
So, in building construction process, not only need to spend more manpower and remove to clear up rubbish,Can drag slow construction speed owing to repeatedly taking lift.
Summary of the invention
The object of the present invention is to provide a kind of interlayer construction building waste to clear system,To solve the above problems.
Provide in an embodiment of the present invention a kind of interlayer construction building waste to clear to beSystem, comprises collector unit, and described collector unit includes main body pipeline and branch road, described inBranch road be arranged on the sidewall of described main body pipeline and with described main body pipeline connection; Described receiptsCollection unit includes the described main body pipeline between two multiple, adjacent described collector unitsBe connected; Also include collection funnel; One end of described branch road and described main body pipeline connection,The other end of described branch road is provided with described collection funnel; Described collection funnel includes collectionFunnel big opening end and collection funnel osculum end, described collection funnel osculum end and described branch road connectConnect, described collection funnel big opening end is provided with the first filler cap, described the first filler cap and instituteState collection funnel hinged, between described the first filler cap and described collection funnel, be provided with firstBack-moving spring.
Preferably, the present invention also includes separator tube, two adjacent described main body pipelines itBetween be provided with described separator tube, described separator tube is obliquely installed.
Preferably, the outside of described main body pipeline is arranged with sound-insulating member.
Preferably, described sound-insulating member is rubber sleeve.
Preferably, whole described main body pipelines is interconnected and is formed with system trunk, described inThe top of system trunk is blind end, and the bottom of described system trunk is provided with clears funnel.
Preferably, described in, clearing funnel includes and clears funnel big opening end and clear funnel osculumEnd, described in clear funnel osculum end and described system Truck Connection, described in clear the large mouth of funnelEnd is provided with the second filler cap, and described the second filler cap and described system trunk are hinged, described inThe second filler cap and described in clear and between funnel, be provided with the second back-moving spring.
The invention provides a kind of interlayer construction building waste and clear system, comprise collectionUnit, collector unit includes main body pipeline and branch road, and branch road is arranged at main body pipelineOn sidewall and with main body pipeline connection; Collector unit includes multiple, two adjacent collectionsMain body pipeline between unit is connected. The present invention is applied in interlayer building, especiallyIn skyscraper, on each floor, be provided with a collector unit, in actual applications,Multiple collector units are interconnected, and its concrete structure is: main body pipeline is interconnected, respectivelyOn individual floor, be provided with one or more branch road. Interlayer building provided by the invention is executedWork building waste is cleared system and is designed by said structure, and interlayer is built in building course,If generation building waste, can directly throw away building waste on branch road building wasteEnter into main body pipeline and be transported to ground by branch road. Owing to no longer using manually and passing throughLift carries out refuse collection, and not only can not take lift affects construction speed, also veryBe convenient to clearing of building waste, reduce the labour intensity that employee clears building waste.
Brief description of the drawings
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, underFace will be briefly described the accompanying drawing of required use in embodiment or description of the Prior Art,Apparently, the accompanying drawing in the following describes is only some embodiments of the present invention, forThose of ordinary skill in the art, not paying under the prerequisite of creative work, all rightObtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is that in an embodiment of the present invention, interlayer construction building waste is cleared systemStructural representation;
Fig. 2 is the structural representation of collection funnel in an embodiment of the present invention;
In Fig. 1 and Fig. 2, the corresponding relation of component names and Reference numeral is:
Main body pipeline 1, branch road 2, collection funnel 3, the first filler cap 4,The first back-moving spring 5.
Detailed description of the invention
Also by reference to the accompanying drawings the present invention is done further in detail below by specific embodimentDescribe.
Please refer to Fig. 1 and Fig. 2, wherein, Fig. 1 is that in an embodiment of the present invention, interlayer is builtBuild the structural representation of construction building refuse collection system; Fig. 2 is an embodiment of the present inventionThe structural representation of middle collection funnel.
The invention provides a kind of interlayer construction building waste and clear system, comprise collectionUnit, collector unit includes main body pipeline 1 and branch road 2, and branch road 2 is arranged at main bodyOn the sidewall of pipeline 1 and with main body pipeline 1, be communicated with; Collector unit includes multiple, adjacentTwo collector units between main body pipeline 1 be connected.
The present invention is applied in interlayer building, especially in skyscraper, on each floorBe provided with a collector unit, collector unit includes main body pipeline 1 and branch road 2, mainBody pipeline 1 all adopts metal material to make with branch road 2. Because the present invention is for building rubbishClearing of rubbish, therefore, main body pipeline 1 and branch road 2 adopt metal material to make, its toolThere is higher structural strength, make the present invention there is longer service life.
The cross section of main body pipeline 1 adopts circle or ellipsoidal structure design, so canIncrease its area of section, ensure that building waste passes through glibly therein, reduce obstructing problemAppearance.
In actual applications, multiple collector units are interconnected, and its concrete structure is: main bodyPipeline 1 is interconnected, and is provided with one or more branch road 2 on each floor.Interlayer construction building waste provided by the invention is cleared system and is designed by said structure,Interlayer is built in building course, if produce building waste, and can building waste is straightConnect and throw away on branch road 2, building waste is entered into main body pipeline 1 and is carried by branch road 2To ground. Carry out refuse collection owing to no longer using manually by lift, not only can not account forAffect construction speed with lift, be also convenient to very much clearing of building waste, reduce employee coupleThe labour intensity that building waste is cleared.
For the ease of building waste being poured on branch road 2, in a concrete reality of the present inventionExecuting in mode interlayer construction building waste clears system and also includes collection funnel 3; ?The one end on road 2 is communicated with main body pipeline 1, and the other end of branch road 2 is provided with collection funnel 3.
To those skilled in the art, building waste unavoidably can produce clearing processRaw larger airborne dust, reduces airborne dust in order to do large degree, based on said structure design,In the present embodiment, collection funnel 3 is made to following structure qualification: collection funnel 3 includesCollection funnel 3 big opening ends and collection funnel 3 osculum ends, collection funnel 3 osculum end and branch roads2 connect, and collection funnel 3 big opening ends are provided with the first filler cap 4, the first filler caps 4 and receiveCollection funnel 3 is hinged, is provided with the first reset bullet between the first filler cap 4 and collection funnel 3Spring 5.
The first filler cap 4 is set on collection funnel 3, and the first filler cap 4 and collectionBetween funnel 3, be provided with the first back-moving spring 5, when employee falls building waste in the first leakageOn bucket cover 4 time, building waste promotes the first filler cap 4, the first funnels under Action of Gravity FieldLid 4 is to the interior rotation of collection funnel 3 and collection funnel 3 big opening ends are opened, building wasteEnter into branch road 2; In said process, the first filler cap 4 rotating opening collection funnelsWhen 3 big opening end, the first back-moving spring 5 compresses, when whole building wastes enters into branch road 2In after, the first filler cap 4 can under the effect of the first back-moving spring 5, reset sealing collectFunnel 3 big opening ends, the airborne dust that so building waste can be produced is closed in branch road 2,Reduce the dust emission in branch road 2 extraneous airs.
In said structure design, between main body pipeline 1, adopt inserting mode to connect, soArrange, be convenient to assembling of the present invention. In use, the system that main body pipeline 1 formsTrunk is the pipeline of through type, and so building waste is larger at decline process medium velocity, to everyThe percussion that layer construction building waste is cleared system is also larger. For can to buildingRubbish cushions, and the present invention also includes separator tube, adjacent two main body pipelines 1 itBetween be provided with separator tube, separator tube is obliquely installed. Separator tube adopts inclination mode to arrange, energyEnough hinder building waste and decline, thereby reduce its impact to main body pipeline 1, improve thisBright service life.
Building waste moves and unavoidably can touch with main body pipeline 1 in main body pipeline 1Hit the noise that generation is larger, in order to reduce the volume of noise, the outside of main body pipeline 1 is sheathedThere is sound-insulating member. Particularly, sound-insulating member is rubber sleeve. Certainly, sound-insulating member is all rightFor cotton etc. has flexible material, sound-insulating member is sheathed on to the outside energy of main body pipeline 1Enough absorption of noise, reach the effect of noise reduction.
In the present embodiment, whole main body pipelines 1 is interconnected and is formed with system trunk,The top of system trunk is blind end, and the bottom of system trunk is provided with clears funnel. ClearFunnel includes clears funnel big opening end and clear funnel osculum end, clear funnel osculum end withSystem Truck Connection, clears funnel big opening end and is provided with the second filler cap, the second filler cap withSystem trunk is hinged, the second filler cap and clear and be provided with the second back-moving spring between funnel.
The structural design of clearing funnel is similar to the structural design of collection funnel 3, please refer to receiptsCollection funnel 3, will no longer repeat clearing funnel at this.
These are only the preferred embodiments of the present invention, be not limited to the present invention, rightIn those skilled in the art, the present invention can have various modifications and variations. All at thisWithin the spirit and principle of invention, any amendment of doing, be equal to replacements, improvement etc., equalWithin should being included in protection scope of the present invention.
Claims (6)
1. interlayer construction building waste is cleared a system, it is characterized in that,
Comprise collector unit, described collector unit includes main body pipeline (1) and branch road (2),Described branch road be arranged on the sidewall of described main body pipeline and with described main body pipeline connection;
Described collector unit includes the institute between two multiple, adjacent described collector unitsStating main body pipeline is connected;
Also include collection funnel (3); One end of described branch road and described main body pipeline connection,The other end of described branch road is provided with described collection funnel;
Described collection funnel includes collection funnel big opening end and collection funnel osculum end, described inCollection funnel osculum end is connected with described branch road, and described collection funnel big opening end is provided with firstFiller cap (4), described the first filler cap and described collection funnel are hinged, described the first funnelBetween lid and described collection funnel, be provided with the first back-moving spring (5).
2. interlayer construction building waste according to claim 1 is cleared system, itsBe characterised in that,
Also include separator tube, between two adjacent described main body pipelines, be provided with described slowWashing pipe, described separator tube is obliquely installed.
3. interlayer construction building waste according to claim 1 is cleared system, itsBe characterised in that,
The outside of described main body pipeline is arranged with sound-insulating member.
4. interlayer construction building waste according to claim 3 is cleared system, itsBe characterised in that,
Described sound-insulating member is rubber sleeve.
5. interlayer construction building waste according to claim 1 is cleared system, itsBe characterised in that,
Whole described main body pipelines is interconnected and is formed with system trunk, described system trunkTop be blind end, the bottom of described system trunk is provided with clears funnel.
6. interlayer construction building waste according to claim 5 is cleared system, itsBe characterised in that,
The described funnel of clearing includes and clears funnel big opening end and clear funnel osculum end, described inClear funnel osculum end and described system Truck Connection, described in clear funnel big opening end and be provided withThe second filler cap, described the second filler cap and described system trunk are hinged, described the second funnelLid and described in clear and between funnel, be provided with the second back-moving spring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310612121.7A CN103572945B (en) | 2013-11-26 | 2013-11-26 | Interlayer construction building waste is cleared system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310612121.7A CN103572945B (en) | 2013-11-26 | 2013-11-26 | Interlayer construction building waste is cleared system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103572945A CN103572945A (en) | 2014-02-12 |
CN103572945B true CN103572945B (en) | 2016-05-11 |
Family
ID=50045598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310612121.7A Expired - Fee Related CN103572945B (en) | 2013-11-26 | 2013-11-26 | Interlayer construction building waste is cleared system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103572945B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234388B (en) * | 2014-09-12 | 2016-10-26 | 中国建筑一局(集团)有限公司 | Refuse chute for high-rise building construction |
CN110005172A (en) * | 2019-05-27 | 2019-07-12 | 六安职业技术学院 | A kind of assembling type buildings floor garbage shaft |
CN110861860B (en) * | 2019-11-14 | 2021-11-02 | 上海宝冶集团有限公司 | Interlayer building construction building rubbish clearing device |
CN112012430A (en) * | 2020-08-31 | 2020-12-01 | 祝红星 | Interlayer building construction building rubbish clearance system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2213713Y (en) * | 1994-12-04 | 1995-11-29 | 潘海明 | Funnel type rubbish apparatus |
CN2318315Y (en) * | 1997-02-18 | 1999-05-12 | 简顺清 | Pipeline garbage collecting and storage device |
CN2580020Y (en) * | 2002-11-07 | 2003-10-15 | 周永文 | Pipeline type recovering device for building garbage |
RU2257450C1 (en) * | 2004-03-22 | 2005-07-27 | ЗАО "М. Инженерная компания" | Metal refuse chute for multistory residential and public buildings |
CN202577903U (en) * | 2012-03-31 | 2012-12-05 | 中天建设集团有限公司 | Construction waste clearing channel during high-rise building construction |
CN203296340U (en) * | 2013-03-25 | 2013-11-20 | 湖州职业技术学院 | Residential building garbage collection pipeline |
-
2013
- 2013-11-26 CN CN201310612121.7A patent/CN103572945B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2213713Y (en) * | 1994-12-04 | 1995-11-29 | 潘海明 | Funnel type rubbish apparatus |
CN2318315Y (en) * | 1997-02-18 | 1999-05-12 | 简顺清 | Pipeline garbage collecting and storage device |
CN2580020Y (en) * | 2002-11-07 | 2003-10-15 | 周永文 | Pipeline type recovering device for building garbage |
RU2257450C1 (en) * | 2004-03-22 | 2005-07-27 | ЗАО "М. Инженерная компания" | Metal refuse chute for multistory residential and public buildings |
CN202577903U (en) * | 2012-03-31 | 2012-12-05 | 中天建设集团有限公司 | Construction waste clearing channel during high-rise building construction |
CN203296340U (en) * | 2013-03-25 | 2013-11-20 | 湖州职业技术学院 | Residential building garbage collection pipeline |
Also Published As
Publication number | Publication date |
---|---|
CN103572945A (en) | 2014-02-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103572945B (en) | Interlayer construction building waste is cleared system | |
CN107054945A (en) | A kind of closed type refuse classification room | |
CN203143445U (en) | Garbage truck provided with detachable carriage | |
CN103590582A (en) | Novel garbage collecting and dragging device | |
CN205380048U (en) | Three -layer screening plant | |
CN204433554U (en) | A kind of environmental sanitation refuse vehicle | |
CN204098436U (en) | A kind of transport of automatic output high-building construction rubbish and screening plant | |
CN206486855U (en) | Refuse collection vehicle | |
CN204662883U (en) | A kind of building waste passage | |
CN204626628U (en) | A kind of three-in-one dredging vehicle | |
CN205475022U (en) | Subway tunnel rubbish cleaning device | |
CN204433546U (en) | A kind of Novel dump type waste-skip | |
CN206091206U (en) | Building floor construction rubbish collecting channel | |
CN208932155U (en) | A kind of building waste channel | |
CN204355545U (en) | The ash conveying device of garbage power system | |
CN205145843U (en) | Air conduit's primary filter | |
CN212638670U (en) | Household garbage classified collection room | |
CN204433555U (en) | A kind of pure electronic self-dumping garbage truck | |
CN204433550U (en) | A kind of canned garbage transport trolley | |
CN107738847A (en) | A kind of peculiar smell remove device for garbage cleaning vehicle | |
CN203487497U (en) | Urban street multifunctional sanitation vehicle | |
CN204368832U (en) | Electric dust cart is closed in portable self-unloading | |
CN208152486U (en) | Multi-rise building refuse collection pipe-line system | |
CN105712018A (en) | Push pressure head of garbage compression equipment | |
CN204531297U (en) | A kind of building plastic solid waste classification recovery system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160511 Termination date: 20161126 |