CN204662883U - A kind of building waste passage - Google Patents
A kind of building waste passage Download PDFInfo
- Publication number
- CN204662883U CN204662883U CN201520370744.2U CN201520370744U CN204662883U CN 204662883 U CN204662883 U CN 204662883U CN 201520370744 U CN201520370744 U CN 201520370744U CN 204662883 U CN204662883 U CN 204662883U
- Authority
- CN
- China
- Prior art keywords
- staving
- bucket
- iron chains
- drainage cradle
- building waste
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to constructional engineering machinery field, especially a kind of building waste passage for building operations, comprise drainage cradle, several connect bucket and iron chains, it is characterized in that, it is suitable for reading that drainage cradle end opening is overlapped in connection bucket, iron chains reinforce the connection further drainage cradle be connected bucket, staving and the staving up/down perforation being connected bucket of described drainage cradle, iron chains two ends are provided with hook, and the hook of iron chains hangs on reinforced steel bar ring, is provided with the stiffener corresponding with gusset plate position inside staving, be provided with discharge gate outside the staving of drainage cradle, discharge gate edge is provided with bent angle.The utility model contributes to the position of fixing bucket, whole passage is stablized, convenient transport, install and dismounting, in the application life of extension device, reach the object being applicable to different floor, install and rapid dredging, avoid the generation of scale removal process contaminated environment and channel blockage situation, improve the speed of building waste transport, ensure carrying out smoothly of construction.
Description
Technical field
The utility model relates to constructional engineering machinery field, especially a kind of building waste passage for building operations.
Background technology
Building waste refers to that construction, unit in charge of construction or individual build all kinds of building, structure, pipe network etc., lay or remove, produce in reparative processes dregs, spoir, rejected material, remaining mud and other discarded objects, along with the acceleration of industrialization, urbanization process, builing industry is also simultaneously fast-developing, accompany and the building waste of generation is increasing, the quantity of Chinese architecture rubbish has accounted for more than 1/3 of municipal refuse total amount;
At present, in work progress, some building wastes are thrown everywhere on building site, cause dust in air, dust and sand flies upward and a large amount of noise, the environment around severe contamination building site; When multistory building is constructed, the building waste produced needs to be transported to ground timely and carries out transfer processing, otherwise can construction plant be taken, hinder the carrying out of normal construction, there is series of problems in the device of existing transport building waste: the rubbish pour spout design of the pipeline had is unreasonable, cause rubbish in the process of dumping rubbish to leak, contaminated environment, infringement constructor's is healthy; Some pipelines are integral type, because different floor is different to the height on ground, cause wasting resource; Some pipelines divide some joints, but often save and be all fixedly mounted on building side wall, the time-consuming effort of installing/dismounting, and the fit dimension often between joint requires high, overlaps the improper building waste that causes and leaks, contaminated environment; Some garbage shaft inside is provided with buffer board, although can cushion impulse force when rubbish falls, easily cause channel blockage, dredging process wastes time and energy, and affects the process of other building wastes simultaneously; It is improper that some pipeline materials are chosen, heavier-weight, brings very big inconvenience to transport and installation.
Summary of the invention
In order to overcome the deficiency of existing building garbage shaft technology, the utility model provides a kind of building waste passage, go for different floor, install and rapid dredging, avoid the generation of scale removal process contaminated environment and channel blockage situation, improve the speed of building waste transport, ensure carrying out smoothly of construction.
The utility model solves the technical scheme that its technical problem adopts, a kind of building waste passage, comprise drainage cradle, several connect bucket and iron chains, it is suitable for reading that drainage cradle end opening is overlapped in connection bucket, iron chains reinforce the connection further drainage cradle be connected bucket, staving and the staving up/down perforation being connected bucket of described drainage cradle, back cut diameter is large, lower port diameter is little, the outside of staving is provided with gusset plate, gusset plate is fixed with two reinforced steel bar rings one on the other, described iron chains two ends are provided with hook, the hook of described iron chains hangs on reinforced steel bar ring, the stiffener corresponding with gusset plate position is provided with inside described staving, inside described staving, centre position is provided with stiffening ring, described staving bottom outside is provided with rubber strip, discharge gate is provided with outside the staving of described drainage cradle, discharge gate edge is provided with bent angle.
The length of described staving can be determined according to story height, staving height
numerical valuebe between 1.0 ~ 2.0 meters, guarantee the quantity of the bucket that differing heights floor needs, convenient transport, install and dismounting.
The size of described discharge gate 11 is determined according to building site being used for the width of the small handcart clearing up rubbish, avoids artificial secondary transferring building waste, wastes time and energy.
The material selection engineering plastics of described staving, rigidity is large, and mechanical strength is high, long service life.
The beneficial effects of the utility model are, a kind of building waste passage, and by arranging suitable staving length, convenient transport, installs and dismounting; By arranging the bent angle at discharge gate place, contribute to the position of fixing bucket, whole passage being stablized, causing rubbish to reveal when preventing from dumping rubbish, by selecting the material of suitable staving, the application life of extension device, reach the object being applicable to different floor, install and rapid dredging, avoid the generation of scale removal process contaminated environment and channel blockage situation, improve the speed of building waste transport, ensure carrying out smoothly of construction.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is assembling schematic diagram of the present utility model.
Fig. 2 is the structural representation of drainage cradle.
Fig. 3 is the structural representation connecting bucket.
Fig. 4 is stiffener and stiffening ring distribution schematic diagram.
1. drainage cradle in figure, 2. connect bucket, 3. reinforced steel bar ring, 4. link up with, 5. gusset plate, 6. iron chains, 7. N+1 floor, 8. n-th layer building, 9. staving, 10. rubber strip, 11. discharge gates, 12. bent angles, 13. stiffeners, 14. stiffening rings.
Specific embodiment
With reference to accompanying drawing, a kind of building waste passage, comprise drainage cradle 1, several connect bucket 2 and iron chains 6, it is suitable for reading that drainage cradle 1 end opening is overlapped in connection bucket 2, iron chains 6 reinforce the connection further drainage cradle 1 be connected bucket 2, staving 9 and staving 9 up/down perforation being connected bucket 2 of described drainage cradle 1, back cut diameter is large, lower port diameter is little, contribute to rubbish in passage because deadweight is glided, be unfavorable for causing channel blockage, the outside of staving 9 is provided with gusset plate 5, gusset plate 5 is fixed with two reinforced steel bar rings 3 one on the other, described iron chains 6 two ends are provided with hook 4, the hook 4 of described iron chains 6 hangs on reinforced steel bar ring 3, the stiffener 13 corresponding with gusset plate 5 position is provided with inside described staving 9, inside described staving 9, centre position is provided with stiffening ring 14, described staving 9 bottom outside is provided with rubber strip 10, discharge gate 11 is provided with outside the staving 9 of described drainage cradle 1, discharge gate 11 edge is provided with bent angle 12, contribute to the position of fixing bucket, whole passage is stablized, rubbish is caused to reveal when preventing from dumping rubbish.
The length of described staving 9 can be determined according to story height, and numerical value is between 1.0 ~ 2.0 meters, guarantees the quantity of the bucket that differing heights floor needs, convenient transport, installs and dismounting.
The size of described discharge gate 11 is determined according to building site being used for the width of the small handcart clearing up rubbish, avoids artificial secondary transferring building waste, wastes time and energy.
The material selection engineering plastics of described staving 9, rigidity is large, and mechanical strength is high, long service life.
During use, determine to use floor, the quantity of bucket 2 is connected by drainage cradle 1 with several according to every floor drainage cradle 1, connection bucket 2 and iron chains 6 transport N+1 floor to, bucket to couple together and postpones to the garbage truck on ground from floor by the iron chains 6 that sequentially passes through being connected bucket 2 according to a drainage cradle 1 with several, the iron chains 6 of first bucket is fixed on N+1 floor, can by the discharge gate 11 of the drainage cradle 1 between N+1 floor and n-th layer building bent angle 12 stay hook hang over floor somewhere, when dumping rubbish, workman only need by refuse collection on small handcart, then the rubbish of small handcart is poured directly in discharge gate 11, due to garbage shaft hollow, do not intercept, building waste can enter garbage truck rapidly, time saving and energy saving, because each drainage cradle 1 is provided with rubber strip 10 with being connected bottom bucket 2, the flying dust in garbage shaft can be avoided to be revealed and contaminated environment by the gap between bucket.
Claims (4)
1. a building waste passage, comprise drainage cradle, several connect bucket and iron chains, it is characterized in that, it is suitable for reading that drainage cradle end opening is overlapped in connection bucket, iron chains reinforce the connection further drainage cradle be connected bucket, staving and the staving up/down perforation being connected bucket of described drainage cradle, back cut diameter is large, lower port diameter is little, the outside of staving is provided with gusset plate, gusset plate is fixed with two reinforced steel bar rings one on the other, described iron chains two ends are provided with hook, the hook of described iron chains hangs on reinforced steel bar ring, the stiffener corresponding with gusset plate position is provided with inside described staving, inside described staving, centre position is provided with stiffening ring, described staving bottom outside is provided with rubber strip, discharge gate is provided with outside the staving of described drainage cradle, discharge gate edge is provided with bent angle.
2. building waste passage according to claim 1, is characterized in that, the length of described staving can be determined according to story height, and numerical value is between 1.0 ~ 2.0 meters, guarantees the quantity of the bucket that differing heights floor needs.
3. building waste passage according to claim 1, is characterized in that, the size of described discharge gate is determined according to building site being used for the width of the small handcart clearing up rubbish.
4. building waste passage according to claim 1, is characterized in that, the material selection engineering plastics of described staving.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520370744.2U CN204662883U (en) | 2015-06-02 | 2015-06-02 | A kind of building waste passage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520370744.2U CN204662883U (en) | 2015-06-02 | 2015-06-02 | A kind of building waste passage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204662883U true CN204662883U (en) | 2015-09-23 |
Family
ID=54133278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520370744.2U Expired - Fee Related CN204662883U (en) | 2015-06-02 | 2015-06-02 | A kind of building waste passage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204662883U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106865103A (en) * | 2017-04-16 | 2017-06-20 | 王海朋 | A kind of easy-to-assemble suspension type building waste treatment channel |
CN112922270A (en) * | 2019-12-06 | 2021-06-08 | 中建四局第五建筑工程有限公司 | Floor garbage transportation method and device |
CN114313684A (en) * | 2022-01-18 | 2022-04-12 | 中建一局集团华南建设有限公司 | High-rise building garbage rapid treatment system and construction method thereof |
-
2015
- 2015-06-02 CN CN201520370744.2U patent/CN204662883U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106865103A (en) * | 2017-04-16 | 2017-06-20 | 王海朋 | A kind of easy-to-assemble suspension type building waste treatment channel |
CN112922270A (en) * | 2019-12-06 | 2021-06-08 | 中建四局第五建筑工程有限公司 | Floor garbage transportation method and device |
CN114313684A (en) * | 2022-01-18 | 2022-04-12 | 中建一局集团华南建设有限公司 | High-rise building garbage rapid treatment system and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204662883U (en) | A kind of building waste passage | |
CN111519734B (en) | Silt dredging method for river channel hidden culvert | |
CN103590582B (en) | New-type refuse vehicle collects transfer arrangement | |
CN204508249U (en) | A kind of cold mixer rim charge automatic feeding device | |
CN213087334U (en) | Building rubbish clearing device | |
CN208347245U (en) | A kind of construction site floor refuse collection channel | |
CN103572945B (en) | Interlayer construction building waste is cleared system | |
CN203034808U (en) | Amphibious pipe for floor garbage transportation and pump pipe cleaning | |
CN206707203U (en) | Building refuse collection passage | |
CN206827417U (en) | Can turnover type refuse collector | |
CN212002081U (en) | Building garbage channel and garbage channel system used as concrete pump pipe cleaning pipeline and pump pipe cleaning system | |
CN210482895U (en) | Garbage pipeline conveying and grading device for multi-storey building construction | |
CN206091206U (en) | Building floor construction rubbish collecting channel | |
CN206769315U (en) | A kind of building waste designated lane | |
CN219992986U (en) | Can have enough to meet need assembled floor rubbish passageway and wash pump waste fitting discharging concurrently | |
CN208152486U (en) | Multi-rise building refuse collection pipe-line system | |
CN202324541U (en) | Building waste pouring and flowing pipe | |
CN211114625U (en) | Vertical transport system of building rubbish assembled | |
CN208202459U (en) | A kind of building sets up construction waste discharge and clears special facilities | |
CN2530921Y (en) | Suspended construction garbage channel | |
CN206722319U (en) | Building waste clears device during skyscraper main structure construction | |
CN201433554Y (en) | External waste hoistway | |
CN111577365A (en) | Ventilation equipment for underground mine hole mining roadway | |
CN205276280U (en) | Building site mud and superficial half grey automatic collection device | |
CN212271519U (en) | Garbage fast channel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 Termination date: 20180602 |