CN208202459U - A kind of building sets up construction waste discharge and clears special facilities - Google Patents

A kind of building sets up construction waste discharge and clears special facilities Download PDF

Info

Publication number
CN208202459U
CN208202459U CN201820746227.4U CN201820746227U CN208202459U CN 208202459 U CN208202459 U CN 208202459U CN 201820746227 U CN201820746227 U CN 201820746227U CN 208202459 U CN208202459 U CN 208202459U
Authority
CN
China
Prior art keywords
pipe
clears
building
floor
waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820746227.4U
Other languages
Chinese (zh)
Inventor
杨跃文
马世德
左晓凤
王现
杨福润
李建仁
伏自航
邓家富
杜杰文
马敏嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Fifth Construction Co Ltd
Original Assignee
Yunnan Construction Investment Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Fifth Construction Co Ltd filed Critical Yunnan Construction Investment Fifth Construction Co Ltd
Priority to CN201820746227.4U priority Critical patent/CN208202459U/en
Application granted granted Critical
Publication of CN208202459U publication Critical patent/CN208202459U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

A kind of building sets up construction waste discharge and clears special facilities, the heavy caliber including uprightly passing through the every first floor plate of building clears pipe (2), be set to the second layer and every first floor plate of the above floor at and with pipe is cleared abut the open waste collection conduit (1) suitable for reading be connected to, be set to ground floor and positioned at the waste gathering pond (4) for clearing bottom of the tube;Each layer of waste collection conduit (1) with clear pipe (2) and be interconnected and fixed by pipe fixing bracket (3), pipe fixing bracket (3) is fixedly installed on the building masonry wall (6) cleared by pipe.The utility model, which can discharge at any time the wastes such as pump line waste water and each floor rubbish to clear to the rubbish concentration of building bottom, clears place, and it is time saving and energy saving, environmental pollution is small.

Description

A kind of building sets up construction waste discharge and clears special facilities
Technical field
The utility model relates to when tier building construction casting concrete, the wastes such as pump line waste water and each floor rubbish are arranged It puts and clears special facilities technical field.
Background technique
After high-rise and multi-layer concrete building pours, the waste water of pump line cleaning can not be discharged into the first floor fixedly There is waste water uncontrollable discharge in point, construction site, pollute molding concrete wall surface, ground, safety net etc., greatly influence to apply Work safety and construction civilization.Floor concrete blinding remove after, masonry finish building after paint a large amount of building waste of generation also without Method is organized to clear first floor fixed location, and construction site is caused the case where dumping rubbish down directly from floor occur, Not only fugitive dust is big, influences environmental sanitation, also causes great security risk.It is the rubbish after cleaning that construction site, which uses more, Rubbish pack is placed on floor, and elevator to be onstructed is just cleared when rising to dumping layer, and it is logical that personnel are influenced during dumping Capable and constructing operation, and clear at high cost.
Summary of the invention
The purpose of this utility model is to solve the above-mentioned problems of the prior art, and providing one kind can be by pump line waste water and each The wastes such as floor rubbish, which discharge to clear to the rubbish concentration of building bottom at any time, clears place, and time saving and energy saving, dirty to environment Contaminate small special facilities.
The purpose of this utility model is achieved through the following technical solutions:
A kind of building sets up construction waste discharge and clears special facilities, including uprightly passes through the every first floor plate of building Heavy caliber clear pipe, be set to the second layer and every first floor plate of the above floor at and with clear pipe against be connected to it is suitable for reading Open waste collection conduit is set to ground floor and is located at the waste gathering pond for clearing bottom of the tube;Each layer of waste Collecting pipe with clear pipe and be interconnected and fixed by pipe fixing bracket, pipe fixing bracket is fixedly installed in the building cleared by pipe On wall.
Pipe fixing bracket described in the utility model includes that the cross bar that is fixedly installed on building masonry wall of one end, both ends pass through It is bolted the U-shaped card circle arranged side by side in two on cross bar, the waste collection conduit and clears pipe and be respectively placed in a U In type retainer ring.The inlet of waste collection conduit is provided with sieve.The heavy caliber clears the caliber of pipe not less than 300mm. Heavy caliber clears pipe using plastic tube.
It, can be when building each layer of construction using the utility model, waste water and various building wastes that construction is generated It puts into the waste collection conduit of this layer of setting, is cleared in the straight garbage collection pond to ground floor of pipe by heavy caliber in time, Vehicle need to only be reached and collect waste by garbage collection pond, eliminated that waste is packed and relied in each floor and apply It is the problem of work elevator conveying, time saving and energy saving, at the same also avoid construction site waste water crossing current, waste bulk deposition, directly from Upstairs topple over environmental pollution caused by waste etc. and security risk.The utility model structure is simple, and assembling and disassembling is convenient, can and Each floor building castoff of Shi Qingyun thoroughly solves the problems, such as construction layer discharge of wastewater, and construction civilization level, drop is substantially improved Low construction management cost.
Detailed description of the invention
Fig. 1 is that the utility model installs and uses schematic diagram;
Fig. 2 is the mounting means plan view of the utility model.
Specific embodiment
Building as shown in Figure 1 and Figure 2 sets up construction waste discharge and clears special facilities, including uprightly passes through building The heavy caliber of every first floor plate clears pipe 2, be set to the second layer and every first floor plate 8 of the above floor at and it is tight with pipe is cleared By connection open waste collection conduit 1 suitable for reading, be set to ground floor and be located at and clear the waste gathering pond 4 of bottom of the tube; Each layer of waste collection conduit 1 with clear pipe 2 and be interconnected and fixed by pipe fixing bracket 3, pipe fixing bracket 3 is fixedly mounted In clearing on the building masonry wall 6 by pipe.As shown in Fig. 2, the pipe fixing bracket includes that one end is fixedly installed in building wall Two U-shaped card circle 3c arranged side by side that cross bar 3a, both ends on body 6 are connected on cross bar by bolt 3b, the waste It collecting pipe 1 and clears pipe 2 and is respectively placed in a U-shaped card circle.The inlet of waste collection conduit 1 is provided with sieve 5, prevents Excessive waste entrance clears pipe and results in blockage.The heavy caliber clears the caliber of pipe 2 not less than 300mm, in order to solid-state Building castoff can smoothly be fallen, and will not be blocked in the duct.Heavy caliber clears the plastic tube that pipe uses inner wall smooth, convenient for building The smooth whereabouts of solid-state castoff is built, and production cost can be reduced.The heavy caliber clears pipe 2 by multistage pipeline plug connection group At.
This special facilities is to increase with floor as the construction speed of building is successively assembled and add great Kou when installing Diameter clears pipe, and installation site may be provided at constructure ventilation well head, smoke vent position.In use, when each floor casting concrete, Heavy caliber is cleared into the top of pipe 2 as discharge of wastewater mouth 7, the waste water for cleaning pump line drains into waste by discharge of wastewater mouth and receives Collect pond 4, after other building castoffs of each floor such as sandstone, brick are screened after cleaning by the sieve 5 suitable for reading of waste collection conduit 1 Drain into waste gathering pond 4.Construction finish and each floor refuse collection after, the utility model is successively removed.
The utility model greatly facilitates each floor building waste and clears and construct discharge of wastewater, convenient for disassembly and assembly and can Circulation is used in turn.

Claims (5)

1. a kind of building sets up construction waste discharge and clears special facilities, which is characterized in that including uprightly passing through building The heavy caliber of every first floor plate clears pipe (2), be set to the second layer and every first floor plate of the above floor at and with clear pipe Against connection open waste collection conduit (1) suitable for reading, be set to ground floor and be located at and clear the waste gathering of bottom of the tube Pond (4);Each layer of waste collection conduit (1) with clear pipe (2) and be interconnected and fixed by pipe fixing bracket (3), pipeline is solid Determine frame (3) to be fixedly installed on the building masonry wall (6) cleared by pipe.
2. a kind of building according to claim 1 sets up construction waste discharge and clears special facilities, which is characterized in that The pipe fixing bracket (3) include one end be fixedly installed on building masonry wall (6) cross bar (3a), both ends are by bolt (3b) Two be connected on cross bar U-shaped card circle (3c) arranged side by side, the waste collection conduit (1) and clears pipe (2) and sets respectively In a U-shaped card circle.
3. a kind of building according to claim 1 sets up construction waste discharge and clears special facilities, which is characterized in that The inlet of waste collection conduit (1) is provided with sieve (5).
4. a kind of building according to claim 1 or 2 or 3 sets up construction waste discharge and clears special facilities, special Sign is that the heavy caliber clears the caliber of pipe (2) not less than 300mm.
5. a kind of building according to claim 1 or 2 or 3 sets up construction waste discharge and clears special facilities, special Sign is that it is plastic tube that the heavy caliber, which clears pipe (2),.
CN201820746227.4U 2018-05-18 2018-05-18 A kind of building sets up construction waste discharge and clears special facilities Active CN208202459U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820746227.4U CN208202459U (en) 2018-05-18 2018-05-18 A kind of building sets up construction waste discharge and clears special facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820746227.4U CN208202459U (en) 2018-05-18 2018-05-18 A kind of building sets up construction waste discharge and clears special facilities

Publications (1)

Publication Number Publication Date
CN208202459U true CN208202459U (en) 2018-12-07

Family

ID=64518370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820746227.4U Active CN208202459U (en) 2018-05-18 2018-05-18 A kind of building sets up construction waste discharge and clears special facilities

Country Status (1)

Country Link
CN (1) CN208202459U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042487A (en) * 2020-01-06 2020-04-21 李成玉 Vertical discharging device for high-rise building garbage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042487A (en) * 2020-01-06 2020-04-21 李成玉 Vertical discharging device for high-rise building garbage
CN111042487B (en) * 2020-01-06 2021-03-09 广州优易机械科技有限公司 Vertical discharging device for high-rise building garbage

Similar Documents

Publication Publication Date Title
CN105000783A (en) Pipe duct sludge reduction and innocent treatment technology and device
CN208152231U (en) A kind of large-scale integrated pump station with slag removing function
CN105625557B (en) Integrated sewage disposal pumping plant
CN208202459U (en) A kind of building sets up construction waste discharge and clears special facilities
CN2931394Y (en) Chute for transferring and storing garbage
CN110450759B (en) Installation method of automatic car washer
CN101987325B (en) Comprehensive sorting and pretreating integrated equipment of kitchen garbage
CN104069679A (en) All-in-one machine for sewage sludge treatment
CN208212711U (en) A kind of dedicated settling system of building waste
CN113529902B (en) Combined type rainwater and sewage inspection well and environment-friendly diversion method
CN205933434U (en) Novel oil -water separator
CN102351081B (en) Mutual recovery device and method of cement silos
CN205975907U (en) Drainage pipeline
CN105442686A (en) Integrated device for collecting and conveying sewage and rainwater
CN210683398U (en) Efficient municipal sewage treatment plant
CN210140891U (en) Rain and sewage collecting system for garbage site
CN104128250B (en) Garbage multi-stage water concentration device
CN206156888U (en) Rain sewage filter equipment of quick construction installation
CN213446499U (en) Integrated sewage pretreatment equipment
CN215253300U (en) City planning municipal drainage pipe
CN219992986U (en) Can have enough to meet need assembled floor rubbish passageway and wash pump waste fitting discharging concurrently
CN204957522U (en) Face board house floor sewage waste collection device greatly
CN212053157U (en) Prefabricated pump station of integration with refuse treatment function
CN212493444U (en) Sand washer
CN214219834U (en) Prefabricated pump station of automatically cleaning integration has

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant