CN208830666U - A kind of skyscraper vertical garbage transportation system - Google Patents
A kind of skyscraper vertical garbage transportation system Download PDFInfo
- Publication number
- CN208830666U CN208830666U CN201820405454.0U CN201820405454U CN208830666U CN 208830666 U CN208830666 U CN 208830666U CN 201820405454 U CN201820405454 U CN 201820405454U CN 208830666 U CN208830666 U CN 208830666U
- Authority
- CN
- China
- Prior art keywords
- rubbish
- garbage
- channel
- tube body
- garbage transporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuse Collection And Transfer (AREA)
Abstract
The utility model relates to building waste transportation arts, a kind of especially skyscraper vertical garbage transportation system, garbage transporting channel including more end to end vertical tube body compositions, and it is set to multiple buffer boards in garbage transporting channel, the rubbish pour spout that floor is correspondingly arranged on garbage transporting channel, garbage transporting vias inner walls in rubbish pour spout are equipped with the baffle for stopping fugitive dust, rubbish delivery outlet is equipped in garbage transporting the bottom of the channel, spray port is equipped on the adjacent tube body of rubbish delivery outlet, one second buffer board is provided tiltedly on the tube body of rubbish delivery outlet side, building waste transport at present is mostly to use construction elevator, it is transformed based on lift well, but the volume of building waste and it is in irregular shape etc. due to, it easily causes fugitive dust during transportation and ground or cleaning equipment is damaged, it is time-consuming Arduously, the utility model effectively buffers rubbish sinking speed, and prevents fugitive dust from endangering, and structure is simple, can be widely popularized.
Description
Technical field
The utility model relates to building waste transportation arts, especially a kind of skyscraper vertical garbage transportation system.
Background technique
Building waste refers to construction, unit in charge of construction or build to individual to all kinds of buildings, structures, pipe network etc.,
It is laid with or removes, generated dregs, spoir, rejected material, remaining mud and other wastes in reparative processes, with industrialization, city
The acceleration of change process, construction industry is also fast-developing simultaneously, and the building waste generated together is increasing, Chinese architecture rubbish
Quantity has accounted for 1/3 of municipal refuse total amount or more.
At present in architectural engineering, especially when tier building is constructed, the building waste of generation needs timely to be transported to ground
Then face is transported, not then can occupy construction site, make originally limited construction site become narrow, hinder normal construction into
Row.If building waste directly thrown to ground, not only there is serious security risk, but also in throwing process, can also produce
Raw a large amount of fugitive dust and noise, in particular with increasing for floor, adverse effect caused by the mode of this direct throwing is more
Add obviously, so the requirement of obvious improper current safe construction, civilized construction and environmental protection construction, so, in current multilayer
Rubbish in building in work progress generallys use following three kinds of modes: one is use construction elevator, that is, passes through installation
Elevator, by building waste by elevator gradually be transported to ground, be labor intensive first in this way, need worker first
By refuse bag or frame up, then again in movement to elevator, then ground be transported to by elevator, building waste be transported to ground it
Afterwards, it is also necessary to which rubbish is moved out elevator and is transported at stacking by worker;Secondly as being by elevator traffic, single freight volume is small,
And transportational process is also and discontinuous, so that the transporting velocity of rubbish is slower;Furthermore, it should be noted that building at present
Engineering in general floor construct to eight layers just start installation elevator, could usually be used in eleventh floor, construction elevator just
Before being often used, the cleaning of floor rubbish cannot be kept up in time, still influence civilized construction and fugitive dust prevention and treatment.Another way is benefit
Rubbish transfer passage is established with skyscraper lift well, that is, elevator doorway is transformed into rubbish pour spout, every floor can
Corresponding to be provided at least one and be thrown into mouth, in use, each floor rubbish is directly thrown into elevator shaft, rubbish is in elevator shaft
Interior free-falling to ground is in this way that elevator needs to install first, when elevator being stopped using to dump rubbish,
The peak period that positive value building waste is formed, so still without solving the problems, such as clearing for rubbish at all.And rubbish rehandling
It is time-consuming.It moreover is to affect elevator to be installed to the prospecting in elevator, transformation, Secondary Design time early period.The third
Mode is using garbage chute, that is, by the way that garbage chute is arranged, opened up on garbage chute it is multiple be thrown into mouth, keep every floor all corresponding
There is at least one to be thrown into mouth, in use, can directly directly be thrown into the building waste of each floor in garbage chute, building waste exists
Free-falling is to ground in garbage chute.In this way, it is that of avoiding the generation of fugitive dust first;Secondly as can be continuous
Construction can make rubbish constantly toward falling, greatly improve the speed of garbage transporting.But since building waste is in rubbish
Rubbish falls vertically in road, and when falling to the ground under rubbish, speed is larger, also, since the big hardness of building waste intensity itself is high,
Shape is also irregular, all can to garbage chute itself and the transporting equipment being disposed below, or even to the ground below garbage chute
Greater impact is caused, with increasing for floor, this impact is bigger, so, garbage chute is limited in tier building construction
Using height, CN204662883U discloses a kind of building waste channel, the construction elevator that solves that no setting is required, without changing
It makes elevator entrance and carries out garbage transporting, but rubbish buffering effect is poor, and not can effectively prevent fugitive dust, especially in refuse collection
When, it is easy to pollute the environment.
Summary of the invention
In view of the deficiencies of the prior art, a kind of skyscraper vertical garbage transportation system is provided, is realizing high-rise rubbish
While conveying, building waste can be effectively reduced and topple over impact to transportation system bottom, and effectively control fugitive dust, structure letter
It is single, it can be widely used to promote.
The technical scheme adopted by the utility model is that a kind of skyscraper vertical garbage transportation system, including built along high level
Build the garbage transporting channel of more that exterior wall is arranged from top to bottom end to end vertical tube bodies compositions, adjacent vertical tube body it
Between be equipped with flange for connecting the two, the short transverse in garbage transporting channel is equipped with multiple for slowing down rubbish landing
First buffer board of speed is successively arranged multiple rubbish pour spouts being correspondingly arranged with floor on garbage transporting channel, described
Garbage transporting vias inner walls in rubbish pour spout are equipped with the baffle for stopping fugitive dust, on first buffer board and baffle
Equipped with the channel attached compressed spring of garbage transporting, garbage transporting the bottom of the channel be equipped with for rubbish to be delivered to outside channel
Rubbish delivery outlet, on the adjacent tube body of rubbish delivery outlet correspondence be uniformly provided with multiple spray ports for reducing fugitive dust, institute
It states and is provided tiltedly with second buffering for carrying out secondary buffer for the rubbish to rapid descent on the tube body of rubbish delivery outlet side
Plate.
Above-mentioned skyscraper vertical garbage transportation system, the rubbish pour spout are equipped with for closing rubbish pour spout
Door body, hinge for connecting the two is equipped between the door body and rubbish pour spout, is equipped in door body for opening
The handle of door body is equipped with the bolt for preventing rubbish from overflowing for closing door body in handle two sides.
Above-mentioned skyscraper vertical garbage transportation system, first buffer board and the second buffer board are steel plate.
A kind of beneficial effect of skyscraper vertical garbage of the utility model transportation system is, using flange that tube body is vertical
The height being adapted with story height is connected into, not by story height lower limit, while without transformation skyscraper lift well
Rubbish transfer passage is established, time-consuming and laborious, flange is easily attached, and it is easy to disassemble, it can reuse, save material, in rubbish
First buffer board is set in channel, prevents building waste to garbage shaft itself and the transporting equipment being disposed below, even
Greater impact is caused to the ground below garbage chute, by being successively arranged multiple rubbish being correspondingly arranged with floor on transport channel
Rubbish pour spout facilitates toppling over for each floor rubbish, and baffle is arranged in the garbage shaft inner wall in rubbish pour spout, avoids and inclines
When tipping rubbish, fugitive dust is endangered caused by the person of worker, rubbish delivery outlet is equipped in rubbish transfer passage bottom, due to bottom
Fugitive dust is larger, then spray port is arranged on the tube body of bottom, can effectively reduce bottom fugitive dust, the tube body updip in rubbish delivery outlet side
One is tiltedly equipped with for buffering the second buffer board that rubbish is fallen, rubbish is again reduced first and lands defeated, avoid transporting rubbish
Defeated device damages, and secondly can increase spray port to the spray time of rubbish, fugitive dust be effectively reduced, third is sliding convenient for rubbish
It falls, can prevent rubbish from blocking delivery outlet, clear processing convenient for rubbish.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model:
Fig. 2 is the structural schematic diagram of door body:
Fig. 3 is the structural schematic diagram of spray port.
Specific embodiment
Below in conjunction with attached drawing, elaborate to the utility model.
As shown in Figure 1, 2, 3, a kind of skyscraper vertical garbage transportation system, including from top to bottom along external wall of high-rise building
The garbage transporting channel that the end to end vertical tube body 1 of more be arranged forms is equipped with for that adjacent will erect between vertical tube body
The flange 2 connected to tube body, flange are convenient for connection, and easily disassembled, convenient for reusing, have saved cost, tube body 1 can be used
Plastic conduit, durable and tubing is light, and convenient for construction, price is low, economical and beautiful, save the cost, along volley transport channel
Interior short transverse is equipped with multiple the first buffer boards 3 to land for buffering rubbish, and the first buffer board 3 is equipped with and connect with tube body
Compressed spring 4,4 softness of compressed spring is good, that is, the range deformed is relatively wide, and manufacture be easier, structure compares
Compact, cushion performance is preferable, can bear to be successively arranged what multiple and floor was correspondingly arranged on garbage transporting channel compared with big load
Rubbish pour spout 5, the rubbish convenient for each corridor are toppled over, and one is equipped on rubbish pour spout 5 and is used for 5 envelope of rubbish pour spout
The door body 6 closed, and the handle 7 for opening door body 6, be equipped in 7 two sides of handle prevents rubbish from overflowing for closing door body 6
Bolt 8 is equipped with the hinge 9 for connecting the two on tube body 1 and door body 6, prevents rubbish from excessively overflowing out of pour spout, give
Construction site is made troubles, and the baffle 10 for stopping fugitive dust, baffle 10 are equipped on the adjacent inboard wall of tube body of rubbish pour spout 5
Bottom is equipped with the compressed spring 4 connecting with tube body for being used to support baffle 10, avoids fugitive dust caused by dumping rubbish to worker
The person caused by endanger, be equipped with rubbish delivery outlet 11 for being delivered to rubbish outside channel in garbage transporting the bottom of the channel,
Garbage transporting equipment can be placed in rubbish equipped at outlet port, rubbish is directly fallen on transporting equipment, convenient for directly transporting, is not necessarily to two
Manpower is saved in secondary carrying, the spray port 12 for reducing fugitive dust is equipped on the adjacent tube body of rubbish delivery outlet 11, due to bottom
Fugitive dust is larger, and spray port 12 is arranged on the tube body of bottom, can be adjacent in volley delivery outlet 11 to reach good spraying effect
Tube body on it is corresponding be uniformly provided with multiple, can effectively reduce bottom fugitive dust, tilt and set on the tube body of 11 side of rubbish delivery outlet
There is second buffer board 13 that secondary buffer is carried out for the rubbish to rapid descent, the first buffer board is with the second buffer board
Steel plate, steel plate material is hard, and damage of the impact for effectivelying prevent large-scale or irregular rubbish to fall to buffer board passes through setting
Second buffer board 13 again reduces rubbish first and falls speed, avoids damaging garbage transporting device, secondly can increase
Fugitive dust is effectively reduced to the spray time of rubbish in spray port, and third can prevent rubbish from blocking delivery outlet convenient for rubbish landing,
Processing is cleared convenient for rubbish, is time saving and energy saving, nothing first in this way relative to installation elevator conveying rubbish
It needs worker that first refuse bag or dress are rectified, is then transferred in elevator again, then ground is transported to by elevator, transported in building waste
To ground, it is also necessary to which rubbish is moved out elevator and is transported at stacking by worker: secondly as being by elevator traffic, single
Freight volume is small, and transportational process is also and discontinuous, so that the transporting velocity of rubbish is slower, and, it should be noted that
Architectural engineering at present, which is generally constructed in floor, just starts installation elevator to eight layers, could usually use, apply in eleventh floor
Before work elevator normal use, the cleaning of floor rubbish cannot be kept up in time, still influence civilized construction and fugitive dust prevention and treatment, this is practical
It is novel plastic conduit to be connected into the height being adapted with story height using flange, not by floor according to story height
High lower limit, while rubbish transfer passage is established without transformation skyscraper lift well, time-consuming and laborious, the utility model knot
Structure is simple and practical, facilitates installation, easy to disassemble, can widely popularize practical.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, this
The those of ordinary skill of technical field, in the essential scope of the utility model, the variation made, remodeling, addition or replacement, all
It should belong to the protection scope of the utility model.
Claims (3)
1. a kind of skyscraper vertical garbage transportation system, which is characterized in that including being arranged from top to bottom along external wall of high-rise building
More end to end vertical tube body compositions garbage transporting channel, be equipped with for connecting the two between adjacent vertical tube body
The flange connect, the short transverse in garbage transporting channel are equipped with multiple the first buffer boards for being used to slow down rubbish sinking speed,
Multiple rubbish pour spouts being correspondingly arranged with floor, the rubbish in the rubbish pour spout are successively arranged on garbage transporting channel
Transport channel inner wall is equipped with the baffle for stopping fugitive dust, and first buffer board and baffle are equipped with and garbage transporting channel
The compressed spring of connection is equipped with the rubbish delivery outlet for being delivered to rubbish outside channel in garbage transporting the bottom of the channel, in rubbish
Correspondence is uniformly provided with multiple spray ports for reducing fugitive dust on the adjacent tube body of rubbish delivery outlet, rubbish delivery outlet side
Second buffer board that secondary buffer is carried out for the rubbish to rapid descent is provided tiltedly on tube body.
2. skyscraper vertical garbage according to claim 1 transportation system, characterized in that set on the rubbish pour spout
There is the door body for closing rubbish pour spout, the hinge for connecting the two be equipped between the door body and rubbish pour spout,
It is equipped with the handle for opening door body in door body, the bolt for preventing rubbish from overflowing for closing door body is equipped in handle two sides.
3. skyscraper vertical garbage according to claim 1 transportation system, characterized in that first buffer board and
Two buffer boards are steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820405454.0U CN208830666U (en) | 2018-03-13 | 2018-03-13 | A kind of skyscraper vertical garbage transportation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820405454.0U CN208830666U (en) | 2018-03-13 | 2018-03-13 | A kind of skyscraper vertical garbage transportation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208830666U true CN208830666U (en) | 2019-05-07 |
Family
ID=66292600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820405454.0U Expired - Fee Related CN208830666U (en) | 2018-03-13 | 2018-03-13 | A kind of skyscraper vertical garbage transportation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208830666U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080495A (en) * | 2019-05-28 | 2019-08-02 | 重庆工程职业技术学院 | Skyscraper building waste recyclable device |
CN110107056A (en) * | 2019-05-17 | 2019-08-09 | 张哲夫 | A kind of green building garbage reclamation channel |
CN111395700A (en) * | 2019-05-17 | 2020-07-10 | 张哲夫 | Dustproof equipment is retrieved to green building rubbish |
CN112227654A (en) * | 2020-10-02 | 2021-01-15 | 江苏省建筑工程集团有限公司 | Depend on building rubbish transportation system of building body |
CN113914579A (en) * | 2021-09-26 | 2022-01-11 | 青岛一建集团有限公司 | Building construction site is with turnover assembled rubbish clearance passageway |
CN115030446A (en) * | 2022-06-15 | 2022-09-09 | 中国一冶集团有限公司 | Construction waste transport pipeline |
-
2018
- 2018-03-13 CN CN201820405454.0U patent/CN208830666U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110107056A (en) * | 2019-05-17 | 2019-08-09 | 张哲夫 | A kind of green building garbage reclamation channel |
CN111395700A (en) * | 2019-05-17 | 2020-07-10 | 张哲夫 | Dustproof equipment is retrieved to green building rubbish |
CN112267644A (en) * | 2019-05-17 | 2021-01-26 | 张哲夫 | Green building rubbish recovery channel equipment |
CN111395700B (en) * | 2019-05-17 | 2021-05-07 | 深圳市中航装饰设计工程有限公司 | Dustproof equipment is retrieved to green building rubbish |
CN112267644B (en) * | 2019-05-17 | 2022-02-18 | 中岦建设工程(广东)有限公司 | Green building rubbish recovery channel equipment |
CN110080495A (en) * | 2019-05-28 | 2019-08-02 | 重庆工程职业技术学院 | Skyscraper building waste recyclable device |
CN110080495B (en) * | 2019-05-28 | 2020-10-27 | 重庆工程职业技术学院 | Building rubbish recovery device for high-rise building |
CN112227654A (en) * | 2020-10-02 | 2021-01-15 | 江苏省建筑工程集团有限公司 | Depend on building rubbish transportation system of building body |
CN113914579A (en) * | 2021-09-26 | 2022-01-11 | 青岛一建集团有限公司 | Building construction site is with turnover assembled rubbish clearance passageway |
CN115030446A (en) * | 2022-06-15 | 2022-09-09 | 中国一冶集团有限公司 | Construction waste transport pipeline |
CN115030446B (en) * | 2022-06-15 | 2023-05-16 | 中国一冶集团有限公司 | Building rubbish transportation pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208830666U (en) | A kind of skyscraper vertical garbage transportation system | |
CN111749430B (en) | Automatic conveying system for construction waste of high-rise building | |
CN107916765B (en) | A kind of construction rubbish conveyer | |
CN104234388B (en) | Refuse chute for high-rise building construction | |
CN110295723A (en) | A kind of buffer-type construction garbage shaft | |
CN115613862B (en) | Intelligent nomadic recycled concrete rapid production workshop and construction method | |
CN207934392U (en) | The quick conveying device of skyscraper rubbish | |
CN109797947A (en) | Building waste vertical transit system for super high-rise building | |
CN207934393U (en) | A kind of dust-proof transportation system of skyscraper rubbish | |
CN208533965U (en) | Building waste clears device in high-building construction floor | |
CN207776364U (en) | The conveyer of construction rubbish can be crushed | |
CN207568138U (en) | For the building waste vertical transit system of high-rise building | |
CN207917764U (en) | Lane device for skyscraper rubbish quick drain | |
CN206707203U (en) | Building refuse collection passage | |
CN203403420U (en) | Concrete vertical conveying pouring system | |
CN208347245U (en) | A kind of construction site floor refuse collection channel | |
CN210482895U (en) | Garbage pipeline conveying and grading device for multi-storey building construction | |
CN206091206U (en) | Building floor construction rubbish collecting channel | |
CN207032786U (en) | A kind of atomized dust settling energy dissipating garbage chute | |
CN113233032A (en) | Building rubbish conveying and temporary storage device between floors | |
CN214402591U (en) | Vertical garbage transport channel for high-rise buildings | |
CN206752961U (en) | Rubbish storage case | |
CN214942027U (en) | High-rise building rubbish transfer passage | |
CN109353722A (en) | A kind of Construction of High-rise multipurpose body feed tank and its application method | |
CN210164190U (en) | Building site floor rubbish clearance passageway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190507 Termination date: 20200313 |
|
CF01 | Termination of patent right due to non-payment of annual fee |