CN208830666U - A kind of skyscraper vertical garbage transportation system - Google Patents

A kind of skyscraper vertical garbage transportation system Download PDF

Info

Publication number
CN208830666U
CN208830666U CN201820405454.0U CN201820405454U CN208830666U CN 208830666 U CN208830666 U CN 208830666U CN 201820405454 U CN201820405454 U CN 201820405454U CN 208830666 U CN208830666 U CN 208830666U
Authority
CN
China
Prior art keywords
rubbish
garbage
channel
tube body
garbage transporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820405454.0U
Other languages
Chinese (zh)
Inventor
张甡
郑建国
黑增武
杨兆光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
Zhongqi Jiaojian Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqi Jiaojian Group Corp Ltd filed Critical Zhongqi Jiaojian Group Corp Ltd
Priority to CN201820405454.0U priority Critical patent/CN208830666U/en
Application granted granted Critical
Publication of CN208830666U publication Critical patent/CN208830666U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model relates to building waste transportation arts, a kind of especially skyscraper vertical garbage transportation system, garbage transporting channel including more end to end vertical tube body compositions, and it is set to multiple buffer boards in garbage transporting channel, the rubbish pour spout that floor is correspondingly arranged on garbage transporting channel, garbage transporting vias inner walls in rubbish pour spout are equipped with the baffle for stopping fugitive dust, rubbish delivery outlet is equipped in garbage transporting the bottom of the channel, spray port is equipped on the adjacent tube body of rubbish delivery outlet, one second buffer board is provided tiltedly on the tube body of rubbish delivery outlet side, building waste transport at present is mostly to use construction elevator, it is transformed based on lift well, but the volume of building waste and it is in irregular shape etc. due to, it easily causes fugitive dust during transportation and ground or cleaning equipment is damaged, it is time-consuming Arduously, the utility model effectively buffers rubbish sinking speed, and prevents fugitive dust from endangering, and structure is simple, can be widely popularized.

Description

A kind of skyscraper vertical garbage transportation system
Technical field
The utility model relates to building waste transportation arts, especially a kind of skyscraper vertical garbage transportation system.
Background technique
Building waste refers to construction, unit in charge of construction or build to individual to all kinds of buildings, structures, pipe network etc., It is laid with or removes, generated dregs, spoir, rejected material, remaining mud and other wastes in reparative processes, with industrialization, city The acceleration of change process, construction industry is also fast-developing simultaneously, and the building waste generated together is increasing, Chinese architecture rubbish Quantity has accounted for 1/3 of municipal refuse total amount or more.
At present in architectural engineering, especially when tier building is constructed, the building waste of generation needs timely to be transported to ground Then face is transported, not then can occupy construction site, make originally limited construction site become narrow, hinder normal construction into Row.If building waste directly thrown to ground, not only there is serious security risk, but also in throwing process, can also produce Raw a large amount of fugitive dust and noise, in particular with increasing for floor, adverse effect caused by the mode of this direct throwing is more Add obviously, so the requirement of obvious improper current safe construction, civilized construction and environmental protection construction, so, in current multilayer Rubbish in building in work progress generallys use following three kinds of modes: one is use construction elevator, that is, passes through installation Elevator, by building waste by elevator gradually be transported to ground, be labor intensive first in this way, need worker first By refuse bag or frame up, then again in movement to elevator, then ground be transported to by elevator, building waste be transported to ground it Afterwards, it is also necessary to which rubbish is moved out elevator and is transported at stacking by worker;Secondly as being by elevator traffic, single freight volume is small, And transportational process is also and discontinuous, so that the transporting velocity of rubbish is slower;Furthermore, it should be noted that building at present Engineering in general floor construct to eight layers just start installation elevator, could usually be used in eleventh floor, construction elevator just Before being often used, the cleaning of floor rubbish cannot be kept up in time, still influence civilized construction and fugitive dust prevention and treatment.Another way is benefit Rubbish transfer passage is established with skyscraper lift well, that is, elevator doorway is transformed into rubbish pour spout, every floor can Corresponding to be provided at least one and be thrown into mouth, in use, each floor rubbish is directly thrown into elevator shaft, rubbish is in elevator shaft Interior free-falling to ground is in this way that elevator needs to install first, when elevator being stopped using to dump rubbish, The peak period that positive value building waste is formed, so still without solving the problems, such as clearing for rubbish at all.And rubbish rehandling It is time-consuming.It moreover is to affect elevator to be installed to the prospecting in elevator, transformation, Secondary Design time early period.The third Mode is using garbage chute, that is, by the way that garbage chute is arranged, opened up on garbage chute it is multiple be thrown into mouth, keep every floor all corresponding There is at least one to be thrown into mouth, in use, can directly directly be thrown into the building waste of each floor in garbage chute, building waste exists Free-falling is to ground in garbage chute.In this way, it is that of avoiding the generation of fugitive dust first;Secondly as can be continuous Construction can make rubbish constantly toward falling, greatly improve the speed of garbage transporting.But since building waste is in rubbish Rubbish falls vertically in road, and when falling to the ground under rubbish, speed is larger, also, since the big hardness of building waste intensity itself is high, Shape is also irregular, all can to garbage chute itself and the transporting equipment being disposed below, or even to the ground below garbage chute Greater impact is caused, with increasing for floor, this impact is bigger, so, garbage chute is limited in tier building construction Using height, CN204662883U discloses a kind of building waste channel, the construction elevator that solves that no setting is required, without changing It makes elevator entrance and carries out garbage transporting, but rubbish buffering effect is poor, and not can effectively prevent fugitive dust, especially in refuse collection When, it is easy to pollute the environment.
Summary of the invention
In view of the deficiencies of the prior art, a kind of skyscraper vertical garbage transportation system is provided, is realizing high-rise rubbish While conveying, building waste can be effectively reduced and topple over impact to transportation system bottom, and effectively control fugitive dust, structure letter It is single, it can be widely used to promote.
The technical scheme adopted by the utility model is that a kind of skyscraper vertical garbage transportation system, including built along high level Build the garbage transporting channel of more that exterior wall is arranged from top to bottom end to end vertical tube bodies compositions, adjacent vertical tube body it Between be equipped with flange for connecting the two, the short transverse in garbage transporting channel is equipped with multiple for slowing down rubbish landing First buffer board of speed is successively arranged multiple rubbish pour spouts being correspondingly arranged with floor on garbage transporting channel, described Garbage transporting vias inner walls in rubbish pour spout are equipped with the baffle for stopping fugitive dust, on first buffer board and baffle Equipped with the channel attached compressed spring of garbage transporting, garbage transporting the bottom of the channel be equipped with for rubbish to be delivered to outside channel Rubbish delivery outlet, on the adjacent tube body of rubbish delivery outlet correspondence be uniformly provided with multiple spray ports for reducing fugitive dust, institute It states and is provided tiltedly with second buffering for carrying out secondary buffer for the rubbish to rapid descent on the tube body of rubbish delivery outlet side Plate.
Above-mentioned skyscraper vertical garbage transportation system, the rubbish pour spout are equipped with for closing rubbish pour spout Door body, hinge for connecting the two is equipped between the door body and rubbish pour spout, is equipped in door body for opening The handle of door body is equipped with the bolt for preventing rubbish from overflowing for closing door body in handle two sides.
Above-mentioned skyscraper vertical garbage transportation system, first buffer board and the second buffer board are steel plate.
A kind of beneficial effect of skyscraper vertical garbage of the utility model transportation system is, using flange that tube body is vertical The height being adapted with story height is connected into, not by story height lower limit, while without transformation skyscraper lift well Rubbish transfer passage is established, time-consuming and laborious, flange is easily attached, and it is easy to disassemble, it can reuse, save material, in rubbish First buffer board is set in channel, prevents building waste to garbage shaft itself and the transporting equipment being disposed below, even Greater impact is caused to the ground below garbage chute, by being successively arranged multiple rubbish being correspondingly arranged with floor on transport channel Rubbish pour spout facilitates toppling over for each floor rubbish, and baffle is arranged in the garbage shaft inner wall in rubbish pour spout, avoids and inclines When tipping rubbish, fugitive dust is endangered caused by the person of worker, rubbish delivery outlet is equipped in rubbish transfer passage bottom, due to bottom Fugitive dust is larger, then spray port is arranged on the tube body of bottom, can effectively reduce bottom fugitive dust, the tube body updip in rubbish delivery outlet side One is tiltedly equipped with for buffering the second buffer board that rubbish is fallen, rubbish is again reduced first and lands defeated, avoid transporting rubbish Defeated device damages, and secondly can increase spray port to the spray time of rubbish, fugitive dust be effectively reduced, third is sliding convenient for rubbish It falls, can prevent rubbish from blocking delivery outlet, clear processing convenient for rubbish.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model:
Fig. 2 is the structural schematic diagram of door body:
Fig. 3 is the structural schematic diagram of spray port.
Specific embodiment
Below in conjunction with attached drawing, elaborate to the utility model.
As shown in Figure 1, 2, 3, a kind of skyscraper vertical garbage transportation system, including from top to bottom along external wall of high-rise building The garbage transporting channel that the end to end vertical tube body 1 of more be arranged forms is equipped with for that adjacent will erect between vertical tube body The flange 2 connected to tube body, flange are convenient for connection, and easily disassembled, convenient for reusing, have saved cost, tube body 1 can be used Plastic conduit, durable and tubing is light, and convenient for construction, price is low, economical and beautiful, save the cost, along volley transport channel Interior short transverse is equipped with multiple the first buffer boards 3 to land for buffering rubbish, and the first buffer board 3 is equipped with and connect with tube body Compressed spring 4,4 softness of compressed spring is good, that is, the range deformed is relatively wide, and manufacture be easier, structure compares Compact, cushion performance is preferable, can bear to be successively arranged what multiple and floor was correspondingly arranged on garbage transporting channel compared with big load Rubbish pour spout 5, the rubbish convenient for each corridor are toppled over, and one is equipped on rubbish pour spout 5 and is used for 5 envelope of rubbish pour spout The door body 6 closed, and the handle 7 for opening door body 6, be equipped in 7 two sides of handle prevents rubbish from overflowing for closing door body 6 Bolt 8 is equipped with the hinge 9 for connecting the two on tube body 1 and door body 6, prevents rubbish from excessively overflowing out of pour spout, give Construction site is made troubles, and the baffle 10 for stopping fugitive dust, baffle 10 are equipped on the adjacent inboard wall of tube body of rubbish pour spout 5 Bottom is equipped with the compressed spring 4 connecting with tube body for being used to support baffle 10, avoids fugitive dust caused by dumping rubbish to worker The person caused by endanger, be equipped with rubbish delivery outlet 11 for being delivered to rubbish outside channel in garbage transporting the bottom of the channel, Garbage transporting equipment can be placed in rubbish equipped at outlet port, rubbish is directly fallen on transporting equipment, convenient for directly transporting, is not necessarily to two Manpower is saved in secondary carrying, the spray port 12 for reducing fugitive dust is equipped on the adjacent tube body of rubbish delivery outlet 11, due to bottom Fugitive dust is larger, and spray port 12 is arranged on the tube body of bottom, can be adjacent in volley delivery outlet 11 to reach good spraying effect Tube body on it is corresponding be uniformly provided with multiple, can effectively reduce bottom fugitive dust, tilt and set on the tube body of 11 side of rubbish delivery outlet There is second buffer board 13 that secondary buffer is carried out for the rubbish to rapid descent, the first buffer board is with the second buffer board Steel plate, steel plate material is hard, and damage of the impact for effectivelying prevent large-scale or irregular rubbish to fall to buffer board passes through setting Second buffer board 13 again reduces rubbish first and falls speed, avoids damaging garbage transporting device, secondly can increase Fugitive dust is effectively reduced to the spray time of rubbish in spray port, and third can prevent rubbish from blocking delivery outlet convenient for rubbish landing, Processing is cleared convenient for rubbish, is time saving and energy saving, nothing first in this way relative to installation elevator conveying rubbish It needs worker that first refuse bag or dress are rectified, is then transferred in elevator again, then ground is transported to by elevator, transported in building waste To ground, it is also necessary to which rubbish is moved out elevator and is transported at stacking by worker: secondly as being by elevator traffic, single Freight volume is small, and transportational process is also and discontinuous, so that the transporting velocity of rubbish is slower, and, it should be noted that Architectural engineering at present, which is generally constructed in floor, just starts installation elevator to eight layers, could usually use, apply in eleventh floor Before work elevator normal use, the cleaning of floor rubbish cannot be kept up in time, still influence civilized construction and fugitive dust prevention and treatment, this is practical It is novel plastic conduit to be connected into the height being adapted with story height using flange, not by floor according to story height High lower limit, while rubbish transfer passage is established without transformation skyscraper lift well, time-consuming and laborious, the utility model knot Structure is simple and practical, facilitates installation, easy to disassemble, can widely popularize practical.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, this The those of ordinary skill of technical field, in the essential scope of the utility model, the variation made, remodeling, addition or replacement, all It should belong to the protection scope of the utility model.

Claims (3)

1. a kind of skyscraper vertical garbage transportation system, which is characterized in that including being arranged from top to bottom along external wall of high-rise building More end to end vertical tube body compositions garbage transporting channel, be equipped with for connecting the two between adjacent vertical tube body The flange connect, the short transverse in garbage transporting channel are equipped with multiple the first buffer boards for being used to slow down rubbish sinking speed, Multiple rubbish pour spouts being correspondingly arranged with floor, the rubbish in the rubbish pour spout are successively arranged on garbage transporting channel Transport channel inner wall is equipped with the baffle for stopping fugitive dust, and first buffer board and baffle are equipped with and garbage transporting channel The compressed spring of connection is equipped with the rubbish delivery outlet for being delivered to rubbish outside channel in garbage transporting the bottom of the channel, in rubbish Correspondence is uniformly provided with multiple spray ports for reducing fugitive dust on the adjacent tube body of rubbish delivery outlet, rubbish delivery outlet side Second buffer board that secondary buffer is carried out for the rubbish to rapid descent is provided tiltedly on tube body.
2. skyscraper vertical garbage according to claim 1 transportation system, characterized in that set on the rubbish pour spout There is the door body for closing rubbish pour spout, the hinge for connecting the two be equipped between the door body and rubbish pour spout, It is equipped with the handle for opening door body in door body, the bolt for preventing rubbish from overflowing for closing door body is equipped in handle two sides.
3. skyscraper vertical garbage according to claim 1 transportation system, characterized in that first buffer board and Two buffer boards are steel plate.
CN201820405454.0U 2018-03-13 2018-03-13 A kind of skyscraper vertical garbage transportation system Expired - Fee Related CN208830666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820405454.0U CN208830666U (en) 2018-03-13 2018-03-13 A kind of skyscraper vertical garbage transportation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820405454.0U CN208830666U (en) 2018-03-13 2018-03-13 A kind of skyscraper vertical garbage transportation system

Publications (1)

Publication Number Publication Date
CN208830666U true CN208830666U (en) 2019-05-07

Family

ID=66292600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820405454.0U Expired - Fee Related CN208830666U (en) 2018-03-13 2018-03-13 A kind of skyscraper vertical garbage transportation system

Country Status (1)

Country Link
CN (1) CN208830666U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080495A (en) * 2019-05-28 2019-08-02 重庆工程职业技术学院 Skyscraper building waste recyclable device
CN110107056A (en) * 2019-05-17 2019-08-09 张哲夫 A kind of green building garbage reclamation channel
CN111395700A (en) * 2019-05-17 2020-07-10 张哲夫 Dustproof equipment is retrieved to green building rubbish
CN112227654A (en) * 2020-10-02 2021-01-15 江苏省建筑工程集团有限公司 Depend on building rubbish transportation system of building body
CN113914579A (en) * 2021-09-26 2022-01-11 青岛一建集团有限公司 Building construction site is with turnover assembled rubbish clearance passageway
CN115030446A (en) * 2022-06-15 2022-09-09 中国一冶集团有限公司 Construction waste transport pipeline

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110107056A (en) * 2019-05-17 2019-08-09 张哲夫 A kind of green building garbage reclamation channel
CN111395700A (en) * 2019-05-17 2020-07-10 张哲夫 Dustproof equipment is retrieved to green building rubbish
CN112267644A (en) * 2019-05-17 2021-01-26 张哲夫 Green building rubbish recovery channel equipment
CN111395700B (en) * 2019-05-17 2021-05-07 深圳市中航装饰设计工程有限公司 Dustproof equipment is retrieved to green building rubbish
CN112267644B (en) * 2019-05-17 2022-02-18 中岦建设工程(广东)有限公司 Green building rubbish recovery channel equipment
CN110080495A (en) * 2019-05-28 2019-08-02 重庆工程职业技术学院 Skyscraper building waste recyclable device
CN110080495B (en) * 2019-05-28 2020-10-27 重庆工程职业技术学院 Building rubbish recovery device for high-rise building
CN112227654A (en) * 2020-10-02 2021-01-15 江苏省建筑工程集团有限公司 Depend on building rubbish transportation system of building body
CN113914579A (en) * 2021-09-26 2022-01-11 青岛一建集团有限公司 Building construction site is with turnover assembled rubbish clearance passageway
CN115030446A (en) * 2022-06-15 2022-09-09 中国一冶集团有限公司 Construction waste transport pipeline
CN115030446B (en) * 2022-06-15 2023-05-16 中国一冶集团有限公司 Building rubbish transportation pipeline

Similar Documents

Publication Publication Date Title
CN208830666U (en) A kind of skyscraper vertical garbage transportation system
CN111749430B (en) Automatic conveying system for construction waste of high-rise building
CN107916765B (en) A kind of construction rubbish conveyer
CN104234388B (en) Refuse chute for high-rise building construction
CN110295723A (en) A kind of buffer-type construction garbage shaft
CN115613862B (en) Intelligent nomadic recycled concrete rapid production workshop and construction method
CN207934392U (en) The quick conveying device of skyscraper rubbish
CN109797947A (en) Building waste vertical transit system for super high-rise building
CN207934393U (en) A kind of dust-proof transportation system of skyscraper rubbish
CN208533965U (en) Building waste clears device in high-building construction floor
CN207776364U (en) The conveyer of construction rubbish can be crushed
CN207568138U (en) For the building waste vertical transit system of high-rise building
CN207917764U (en) Lane device for skyscraper rubbish quick drain
CN206707203U (en) Building refuse collection passage
CN203403420U (en) Concrete vertical conveying pouring system
CN208347245U (en) A kind of construction site floor refuse collection channel
CN210482895U (en) Garbage pipeline conveying and grading device for multi-storey building construction
CN206091206U (en) Building floor construction rubbish collecting channel
CN207032786U (en) A kind of atomized dust settling energy dissipating garbage chute
CN113233032A (en) Building rubbish conveying and temporary storage device between floors
CN214402591U (en) Vertical garbage transport channel for high-rise buildings
CN206752961U (en) Rubbish storage case
CN214942027U (en) High-rise building rubbish transfer passage
CN109353722A (en) A kind of Construction of High-rise multipurpose body feed tank and its application method
CN210164190U (en) Building site floor rubbish clearance passageway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190507

Termination date: 20200313

CF01 Termination of patent right due to non-payment of annual fee