CN115110715A - Building rubbish discharging equipment for floor - Google Patents

Building rubbish discharging equipment for floor Download PDF

Info

Publication number
CN115110715A
CN115110715A CN202210764058.8A CN202210764058A CN115110715A CN 115110715 A CN115110715 A CN 115110715A CN 202210764058 A CN202210764058 A CN 202210764058A CN 115110715 A CN115110715 A CN 115110715A
Authority
CN
China
Prior art keywords
discharge pipe
support
pipe
discharging
vertical type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210764058.8A
Other languages
Chinese (zh)
Inventor
李冰
张宏源
韩璐
毕鹏
汪亮
王峰
吕国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Ningxia Electric Power Co Ltd
Original Assignee
State Grid Ningxia Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Ningxia Electric Power Co Ltd filed Critical State Grid Ningxia Electric Power Co Ltd
Priority to CN202210764058.8A priority Critical patent/CN115110715A/en
Publication of CN115110715A publication Critical patent/CN115110715A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/10Arrangements in buildings for the disposal of refuse
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/82Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only
    • E04B1/84Sound-absorbing elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Refuse Collection And Transfer (AREA)

Abstract

The invention discloses a building garbage discharging device for floors, which comprises a dust removing component, a vertical discharging pipe, a plurality of bent discharging pipes and a collecting component, wherein the vertical discharging pipe is arranged at the topmost layer, the plurality of bent discharging pipes are sequentially connected end to end, the bending directions of two adjacent bent discharging pipes are opposite, the vertical discharging pipe and the plurality of bent discharging pipes are arranged at preset positions of the floors from top to bottom so as to discharge building garbage in each floor, the dust removing component is arranged at the top end of the vertical discharging pipe, the outer side of the vertical discharging pipe is wrapped by a first sound insulation layer, the outer side of each bent discharging pipe is wrapped by a second sound insulation layer, an inlet of the collecting component is positioned right below the bent discharging pipe at the lowest floor, as the discharging channels at each floor are integrated, the mounting efficiency is improved, the building garbage is buffered and dropped into the collecting component through the bent discharging pipes, the sound insulation layers are arranged at the outer sides of the discharging channels at each floor so that the discharged noise is smaller, and the dust removal component is used for inhibiting dust from flying.

Description

Building rubbish discharging equipment for floor
Technical Field
The invention relates to the technical field of garbage treatment, in particular to a building garbage discharging device for floors.
Background
In building engineering, the building rubbish in the floor is more, can't transport ground after cleaning, and the majority is directly emptyd from the floor, produces a large amount of dust and has the potential safety hazard, and the noise is huge, influences resident's life on every side.
Then, a utility model patent with the Chinese patent application number of CN201921234094.3 appears, which discloses a floor garbage transportation channel, which is formed by connecting a first section and a standard section below the first section in series, wherein a lifting device is arranged on the first section; the main bodies of the first section and the standard section are hexahedral three-dimensional structures which are formed by surrounding side wall steel plates into upper and lower hollow bodies; the top of the first section is provided with a bearing angle steel, and the bottom of the first section is provided with an annular smooth steel bar; annular plain steel bars are arranged at the top and the bottom of each standard knot along the outer contour of each standard knot; the upper part of the side wall steel plate of the first section is welded with the bearing angle steel, and the lower part of the side wall steel plate of the first section is welded with the annular smooth steel bar; and the upper part and the lower part of the side wall steel plate of the standard knot are both connected with the annular smooth steel bars in a welding manner. Although the building garbage can be discharged to the first floor from the higher floor, the installation difficulty is increased because the channel installed on each floor is fixed by the first section and the plurality of standard sections through welding from top to bottom, and meanwhile, certain requirements are also met on the welding technology of installation workers.
Disclosure of Invention
In view of the above, it is desirable to provide a building garbage discharging device for floors, which can reduce dust and is convenient to install.
A building garbage discharging device for floors comprises a dust removing assembly, a vertical discharging pipe, a plurality of bending discharging pipes and a collecting assembly, wherein the vertical discharging pipe is arranged at the topmost layer, the bending discharging pipes are sequentially connected end to end, the upper end of the bending discharging pipe at the topmost layer is connected with the lower end of the vertical discharging pipe, the bending directions of two adjacent bending discharging pipes are opposite, the vertical discharging pipe and the bending discharging pipes are arranged at preset positions of a building from top to bottom so as to discharge building garbage in each floor, the dust removing assembly is arranged at the top end of the vertical discharging pipe and can remove dust in the vertical discharging pipe, a first fixed support is arranged at the upper end of the vertical discharging pipe, a second fixed support is arranged at the lower end of the vertical discharging pipe, a first inlet is arranged at the position, close to the second fixed support, of the lower end of the vertical discharging pipe, and a first sound insulation layer wraps the outer side of the vertical discharging pipe, the upper end of every crooked delivery pipe sets up the third support, the lower extreme of every crooked delivery pipe sets up the fourth support, crooked delivery pipe's the outside parcel second puigging, the position that the lower extreme of crooked delivery pipe is close to the fourth support sets up the second and throws into the mouth, the third support and the second fixed bearing fixed connection of the crooked delivery pipe of topmost layer, the fourth support of the crooked delivery pipe of topmost layer and the third support fixed connection of the crooked delivery pipe of next-door neighbour downside, the inlet port of collecting the subassembly is located the crooked delivery pipe of bottommost layer under, the lower extreme of collecting the subassembly sets up the discharge port.
Preferably, the first cover is installed at the first input port, the first bolt is arranged on the first cover, the first sound insulation layer is installed on the outer side of the first cover, the vertical discharge pipe is made of a steel plate, and the vertical discharge pipe is cylindrical or square.
Preferably, a second cover is installed at the second inlet, a second bolt is installed on the second cover, a second soundproof layer is installed on the outer side of the second cover, and the curved drain pipe is made of a steel plate.
Preferably, the thickness of the steel plate for manufacturing the vertical discharge pipe is 4 mm.
Preferably, the dust removal assembly comprises a first spray header, a first support and a first water delivery pipe, the first support is installed on the vertical discharge pipe, the first spray header is installed on the first support, a water outlet of the first spray header is located at the upper port of the vertical discharge pipe, and the first water delivery pipe is installed on the first spray header to supply water to the first spray header.
Preferably, the top end of the vertical discharge pipe is provided with a first cover plate, and the first cover plate and one side wall of the vertical discharge pipe are connected through a shaft.
Preferably, the first soundproof layer is soundproof cotton 50mm thick, and the second soundproof layer is soundproof cotton 50mm thick.
Preferably, the collecting assembly comprises a collecting box and a supporting frame, the collecting box is mounted on the supporting frame, the bottom of the collecting box is arranged at a preset distance from the ground, the preset distance is 2m to 2.5m, the bottom of the collecting box is provided with a discharge port, a door is arranged at the discharge port, and the door and the collecting box are rotatably connected and can seal the discharge port.
Preferably, a spraying assembly is arranged at an inlet of the collecting box and comprises a second spraying head, a second support and a second water conveying pipe, the second support is arranged at the inlet of the collecting box, the first spraying head is arranged on the second support, a water outlet of the second spraying head is positioned at the upper port of the collecting box, and the second water conveying pipe is arranged on the second spraying head and supplies water to the second spraying head.
Preferably, the collecting box comprises a first collecting part and a second collecting part, the lower end of the first collecting part is connected with the upper end of the second collecting part, the cross sections at different heights along the first collecting part are all in the same shape, the cross sections at different heights along the first collecting part are equal in size, the cross sections from the upper end to the lower end of the second collecting part are in a gradually-reduced shape, and the discharge port is arranged at the lowest end of the second collecting part.
In the building garbage discharging device for floors, because the discharging channels of each floor are a whole, the discharging channels of adjacent floors are only needed to be butted and fixed with each other, the installation efficiency is improved, the building garbage is put into the discharging channels through the input ports of different floors, the building garbage falls into the collecting assembly along the discharging channels, and then the garbage is cleaned through the discharge ports of the collecting assembly, the garbage cleaning efficiency of different floors is improved, the descending speed of the building garbage can be effectively reduced through the installation between the bent discharging pipes and the adjacent bent discharging pipes, the impact on the bent discharging channels and the collecting assembly caused by the higher descending speed of the building garbage is reduced, and in the process of discharging the garbage from a high place, because the sound insulation layer is arranged on the outer side of each discharging channel, the noise generated in the discharging process is smaller, and the interference on people around can not be caused, meanwhile, the dust removing assembly can restrain dust in the discharge channel.
Drawings
FIG. 1 is a schematic view of the assembly structure of the present invention.
FIG. 2 is a schematic view of the dust extraction assembly and vertical drain assembly.
Fig. 3 is a schematic view of a curved drain structure.
Fig. 4 is a schematic view of the collection assembly.
Fig. 5 is a schematic structural view of the invention installed on one side or inside of a building body.
Fig. 6 is a perspective view of the fixing member.
In the figure: the building garbage discharging device for the floor 100, the dust removing assembly 10, the first spray header 11, the first bracket 12, the first water pipe 13, the vertical discharging pipe 20, the first fixing support 21, the second fixing support 22, the first input port 23, the first soundproof layer 24, the first cover 25, the first bolt 251, the first cover plate 26, the curved discharging pipe 30, the third support 31, the fourth support 32, the second soundproof layer 33, the second input port 34, the second cover 35, the second bolt 351, the collecting assembly 40, the discharge port 41, the door 411, the collecting box 42, the first collecting portion 421, the second collecting portion 422, the support bracket 43, the spray assembly 50, the second spray header 51, the second bracket 52, the second water pipe 53, the fixing bracket 60, the fixing member 61, the self-arc portion 611, the fixing portion 612, and the fixing frame 62.
Detailed Description
The technical solutions and effects of the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings of the present invention.
Referring to fig. 1 to 6, the construction waste discharging apparatus 100 for floors includes a dust removing assembly 10, a vertical type discharge pipe 20, a plurality of bent discharge pipes 30, and a collecting assembly 40, the vertical type discharge pipe 20 being installed at the topmost floor, the plurality of bent discharge pipes 30 being sequentially connected end to end, an upper end of the bent discharge pipe 30 at the topmost floor being connected to a lower end of the vertical type discharge pipe 20, the bending directions of adjacent two bent discharge pipes 30 being opposite, the vertical type discharge pipe 20 and the plurality of bent discharge pipes 30 being installed at predetermined positions of the building from the top down to discharge construction waste in each floor, the dust removing assembly 10 being installed at the top end of the vertical type discharge pipe 20, the dust removing assembly 10 being capable of removing dust from the vertical type discharge pipe 20, a first fixing support 21 being provided at the upper end of the vertical type discharge pipe 20, a second fixing support 22 being provided at the lower end of the vertical type discharge pipe 20, a first input port 23 being provided at the lower end of the vertical type discharge pipe 20 near the second fixing support 22, the outer side of the vertical type discharge pipe 20 is wrapped with a first soundproof layer 24, the upper end of each curved discharge pipe 30 is provided with a third support 31, the lower end of each curved discharge pipe 30 is provided with a fourth support 32, the outer side of the curved discharge pipe 30 is wrapped with a second soundproof layer 33, the lower end of the curved discharge pipe 30 is provided with a second inlet 34 near the fourth support 32, the third support 31 and the second fixed support 22 of the curved discharge pipe 30 at the topmost layer are fixedly connected, the fourth support 32 of the curved discharge pipe 30 at the topmost layer and the third support 31 of the curved discharge pipe 30 at the next lower side are fixedly connected, the inlet of the collecting assembly 40 is positioned right below the curved discharge pipe 30 at the bottommost layer, and the lower end of the collecting assembly 40 is provided with an outlet 41. The installation of the curved discharge pipe 30 and the adjacent curved discharge pipes 30 effectively reduces the descending speed of the construction waste, and reduces the impact on the lower curved discharge passage 30 and the collection unit 40 due to the construction waste descending speed. Wherein, the pipe diameters of the vertical discharge pipe 20 and the bent discharge pipe 30 are determined according to the size of the construction waste, or the construction waste can be crushed or disassembled into a size capable of passing through the pipes of the vertical discharge pipe 20 and the bent discharge pipe 30.
The above-mentioned vertical type discharging pipe 20 and the plurality of bent discharging pipes 30 are installed at a predetermined position of a building body, specifically, at one side of the building body, in order to make the installation more stable, the construction waste discharging apparatus 100 for floors further comprises a fixing frame 60, the fixing frame 60 comprises a fixing member 61 and a fixing frame 62, the fixing member 61 comprises an arc portion 611 and fixing portions 612 extending from both ends of the arc portion 611, the arc portion 611 is sleeved on the vertical type discharging pipe 20, the fixing portions 612 are attached to the wall surface of the building body, the fixing portions 612 distributed at both sides of the vertical type discharging pipe 20 are fixed to the wall surface of the building body by using an anchor, similarly, the arc portion 611 is sleeved on the bent discharging pipe 30, the fixing portions 612 are attached to the wall surface of the building body, and the fixing portions 612 distributed at both sides of the bent discharging pipe 30 are fixed to the wall surface of the building body by using the anchor. The fixing frame 62 is constructed by a plurality of steel pipes, each layer is constructed by four steel pipes to form a # -shaped assembly, the vertical discharge pipe 20 or the bent discharge pipe 30 is fixed on one side of a building body, and the vertical discharge pipe 20 or the bent discharge pipe 30 is prevented from being loosened with the connected floor due to the fact that construction waste collides with the vertical discharge pipe 20 or the bent discharge pipe 30. In order to discharge the construction waste more smoothly, the construction waste is crushed before being discharged, the crushed particle size is smaller than the widths of the first input port 23 and the second input port 34, and the crushed particle size is much smaller than the pipe diameter of the vertical discharge pipe 20 or the bent discharge pipe 30.
Further, a first cover 25 is installed at the first input port 23, a first bolt 251 is installed on the first cover 25, a first soundproof layer 24 is installed on the outer side of the first cover 25, the vertical discharge pipe 20 is made of a steel plate, and the vertical discharge pipe 20 is cylindrical or the vertical discharge pipe 20 is square-cylindrical.
Further, a second cover 35 is installed at the second inlet 34, a second latch 351 is installed on the second cover 35, a second soundproof layer 33 is installed outside the second cover 35, and the curved discharge pipe 30 is made of a steel plate.
Further, the thickness of the steel plate for manufacturing the vertical discharge pipe 20 is 4 mm.
Further, the dust removing assembly 10 comprises a first spray head 11, a first bracket 12 and a first water pipe 13, the first bracket 12 is installed on the vertical type discharge pipe 20, the first spray head 11 is installed on the first bracket 12, a water outlet of the first spray head 11 is located at an upper port of the vertical type discharge pipe 20, and the first water pipe 13 is installed on the first spray head 11 and supplies water to the first spray head 11.
Further, a first cover plate 26 is provided at the top end of the vertical discharge pipe 20, and the first cover plate 26 and a sidewall of the vertical discharge pipe 20 are connected by a shaft.
Further, the first soundproof layer 24 is soundproof cotton 50mm thick, and the second soundproof layer 33 is soundproof cotton 50mm thick.
Further, the collecting assembly 40 comprises a collecting box 42 and a supporting frame 43, the collecting box 42 is mounted on the supporting frame 43, the bottom of the collecting box 42 is a preset distance from the ground, the preset distance is 2m to 2.5m, the bottom of the collecting box 42 is provided with a discharge port 41, a door 411 is arranged at the discharge port 41, and the door 411 is rotatably connected with the collecting box 42 and can block the discharge port 41. The vehicle of transportation can be berthhed the carriage under collecting box 42, opens the back with door 411, and the construction waste who collects in collecting box 42 can drop to the carriage in, convenient transportation.
Further, a spraying assembly 50 is arranged at an inlet of the collecting box 42, the spraying assembly 50 comprises a second spraying head 51, a second support 52 and a second water conveying pipe 53, the second support 52 is installed at the inlet of the collecting box 42, the first spraying head 11 is installed on the second support 52, a water outlet of the second spraying head 51 is located at the upper port of the discharge channel 20, the second water conveying pipe 53 is installed on the second spraying head 51 to supply water to the second spraying head 51, and dust generated when the construction waste is discharged to the collecting box 42 can be settled in the process that the second spraying head 51 sprays water mist, so that air pollution is reduced.
Further, the collecting box 42 includes a first collecting portion 421 and a second collecting portion 422, the lower end of the first collecting portion 421 is connected to the upper end of the second collecting portion 422, the cross sections at different heights along the first collecting portion 421 are all the same shape, the cross sections at different heights along the first collecting portion 421 are equal in size, the cross sections from the upper end to the lower end of the second collecting portion 422 are gradually reduced, and the discharge port 41 is disposed at the lowest end of the second collecting portion 422.
Further, the upper port and the lower port of the first collecting portion 421 are both square, the second collecting portion 422 is square pyramid-shaped, and the upper port of the second collecting portion 422 and the lower port of the first collecting portion 421 have the same shape and are adaptive in size so as to be connected.
Further, the first collecting portion 421 has a cylindrical shape, the second collecting portion 422 has a conical shape, and an upper port of the second collecting portion 422 and a lower port of the first collecting portion 421 have the same shape and are adapted in size to be connected.

Claims (10)

1. The utility model provides a building rubbish discharging equipment for floor which characterized in that: the garbage collecting device comprises a dust removing assembly, a vertical type discharge pipe, a plurality of bending discharge pipes and a collecting assembly, wherein the vertical type discharge pipe is arranged at the topmost layer, the plurality of bending discharge pipes are sequentially connected end to end, the upper end of the bending discharge pipe at the topmost layer is connected with the lower end of the vertical type discharge pipe, the bending directions of two adjacent bending discharge pipes are opposite, the vertical type discharge pipe and the plurality of bending discharge pipes are arranged at preset positions of buildings from top to bottom so as to discharge building garbage in each floor, the dust removing assembly is arranged at the top end of the vertical type discharge pipe, the dust removing assembly can remove dust in the vertical type discharge pipe, a first fixed support is arranged at the upper end of the vertical type discharge pipe, a second fixed support is arranged at the lower end of the vertical type discharge pipe, a first input port is arranged at a position, close to the second fixed support, a first sound insulation layer is wrapped at the outer side of the vertical type discharge pipe, and a third support is arranged at the upper end of each bending discharge pipe, the lower extreme of every crooked discharge pipe sets up the fourth support, crooked discharge pipe's outside parcel second puigging, crooked discharge pipe's lower extreme sets up the second and throws into the mouth near the position of fourth support, the third support and the second fixed bolster fixed connection of the crooked discharge pipe of topmost layer, the fourth support of the crooked discharge pipe of topmost layer and the third support fixed connection of the crooked discharge pipe of next-door neighbour downside, the inlet port of collecting the subassembly is located the crooked discharge pipe of bottommost layer under, the lower extreme of collecting the subassembly sets up the discharge port.
2. The construction waste discharging device for floors according to claim 1, wherein: first input mouth department installation first lid, first cover and set up first bolt, the first puigging of outside installation of first lid, above-mentioned vertical formula delivery pipe is made with the steel sheet, and vertical formula delivery pipe is cylindricly, or vertical formula delivery pipe is the square tube-shape.
3. The construction waste discharge device for floors as set forth in claim 1, wherein: the second throw-in mouth department installs the second lid, and the second is covered and is set up the second bolt, and the outside installation second puigging of second lid, above-mentioned crooked discharge tube are made with the steel sheet.
4. The construction waste discharge device for floors as set forth in claim 2 or 3, wherein: the thickness of the steel plate for manufacturing the vertical discharge pipe is 4 mm.
5. The construction waste discharge device for floors as set forth in claim 1, wherein: the dust removal assembly comprises a first spray head, a first support and a first water delivery pipe, the first support is installed on the vertical type discharge pipe, the first spray head is installed on the first support, a water outlet of the first spray head is located at the upper port of the vertical type discharge pipe, and the first water delivery pipe is installed on the first spray head and supplies water to the first spray head.
6. The construction waste discharge device for floors as set forth in claim 1, wherein: the top end of the vertical type discharge pipe is provided with a first cover plate, and the first cover plate is connected with one side wall of the vertical type discharge pipe through a shaft.
7. The construction waste discharge device for floors as set forth in claim 1, wherein: first puigging is 50mm thick soundproof cotton, and the second puigging is 50mm thick soundproof cotton.
8. The construction waste discharge device for floors as set forth in claim 1, wherein: the collecting assembly comprises a collecting box and a supporting frame, the collecting box is installed on the supporting frame, the bottom of the collecting box is arranged at a preset distance from the ground, the preset distance is 2m to 2.5m, a discharging port is formed in the bottom of the collecting box, a door is arranged at the discharging port, and the door and the collecting box are rotatably connected and can be used for plugging the discharging port.
9. The construction waste discharging device for floors according to claim 8, wherein: the spraying assembly is arranged at an inlet of the collecting box and comprises a second spraying head, a second support and a second water conveying pipe, the second support is arranged at the inlet of the collecting box, the first spraying head is arranged on the second support, a water outlet of the second spraying head is located at the upper port of the collecting box, and the second water conveying pipe is arranged on the second spraying head and supplies water to the second spraying head.
10. The construction waste discharge device for floors as set forth in claim 9, wherein: the collecting box includes first collection portion and second collection portion, and the lower extreme of first collection portion is connected with the upper end of second collection portion, is the same shape along the not cross-section of co-altitude of first collection portion, and equals along the size of the not cross-section of co-altitude of first collection portion, for reducing the form gradually from second collection portion upper end to lower extreme, and the discharge port setting is at the second collection portion lowermost extreme.
CN202210764058.8A 2022-06-29 2022-06-29 Building rubbish discharging equipment for floor Pending CN115110715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210764058.8A CN115110715A (en) 2022-06-29 2022-06-29 Building rubbish discharging equipment for floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210764058.8A CN115110715A (en) 2022-06-29 2022-06-29 Building rubbish discharging equipment for floor

Publications (1)

Publication Number Publication Date
CN115110715A true CN115110715A (en) 2022-09-27

Family

ID=83330169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210764058.8A Pending CN115110715A (en) 2022-06-29 2022-06-29 Building rubbish discharging equipment for floor

Country Status (1)

Country Link
CN (1) CN115110715A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205476328U (en) * 2016-01-26 2016-08-17 河南省恒宇建筑工程有限公司 Device is cleared to building rubbish in high -rise building construction floor
CN206319543U (en) * 2016-10-18 2017-07-11 中国建筑第五工程局有限公司 System is transported under skyscraper vertical garbage
CN207934393U (en) * 2018-03-13 2018-10-02 中启胶建集团有限公司 A kind of dust-proof transportation system of skyscraper rubbish
CN207934392U (en) * 2018-03-13 2018-10-02 中启胶建集团有限公司 The quick conveying device of skyscraper rubbish
CN211572426U (en) * 2019-11-19 2020-09-25 贵州民族大学 A rubbish conveyer for building of many floors
CN214942027U (en) * 2020-09-21 2021-11-30 湖南六建项目标准化设施租赁服务有限公司 High-rise building rubbish transfer passage

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205476328U (en) * 2016-01-26 2016-08-17 河南省恒宇建筑工程有限公司 Device is cleared to building rubbish in high -rise building construction floor
CN206319543U (en) * 2016-10-18 2017-07-11 中国建筑第五工程局有限公司 System is transported under skyscraper vertical garbage
CN207934393U (en) * 2018-03-13 2018-10-02 中启胶建集团有限公司 A kind of dust-proof transportation system of skyscraper rubbish
CN207934392U (en) * 2018-03-13 2018-10-02 中启胶建集团有限公司 The quick conveying device of skyscraper rubbish
CN211572426U (en) * 2019-11-19 2020-09-25 贵州民族大学 A rubbish conveyer for building of many floors
CN214942027U (en) * 2020-09-21 2021-11-30 湖南六建项目标准化设施租赁服务有限公司 High-rise building rubbish transfer passage

Similar Documents

Publication Publication Date Title
CN115110715A (en) Building rubbish discharging equipment for floor
CN212271568U (en) Hanging basket capable of preventing falling object from high altitude
CN211839533U (en) Civil engineering room construction waste material processing apparatus
CN214942027U (en) High-rise building rubbish transfer passage
CN209194932U (en) A kind of building waste tapping equipment in construction
CN214402591U (en) Vertical garbage transport channel for high-rise buildings
CN214182007U (en) Environment-friendly floor construction waste conveyor
CN215539437U (en) Raise dust treatment equipment for building engineering construction
CN213683064U (en) Vertical transport passageway of building rubbish in elevator shaft
CN114504915A (en) Ultralow-emission efficient wet dust removal system and process
CN215716907U (en) A rubbish transport corridor for construction is demolishd in old building transformation
CN113931414A (en) Construction site garbage pipeline
CN215484403U (en) Building garbage channel arranged upwards along with floors in multi-storey building construction
CN218522137U (en) Interim perpendicular transport corridor of hidden building rubbish
CN217998968U (en) A pipeline transportation device for building site construction waste
CN211384343U (en) High-efficient dust and mist purification separator
CN220226070U (en) Timely cleaning pipeline device for building rubbish on floor plate in high-rise building construction
CN214345608U (en) Reactor for SCR denitration
CN218541338U (en) Vertical garbage cleaning channel for high-rise construction
CN214917428U (en) Water curtain dust removal device for fireproof door processing paint room
CN216109528U (en) High-rise building construction rubbish clearance device
CN217326276U (en) Construction waste cleaning channel
CN208563951U (en) A kind of building scaffold can be realized fast blanking
CN220395090U (en) Closed building rubbish conveyer
CN216988272U (en) Waste gas and waste paint collecting device for spraying process in steel structure manufacturing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination