CN113931414A - Construction site garbage pipeline - Google Patents

Construction site garbage pipeline Download PDF

Info

Publication number
CN113931414A
CN113931414A CN202111278215.6A CN202111278215A CN113931414A CN 113931414 A CN113931414 A CN 113931414A CN 202111278215 A CN202111278215 A CN 202111278215A CN 113931414 A CN113931414 A CN 113931414A
Authority
CN
China
Prior art keywords
pipeline
garbage
transportation
fixed frame
trunk line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202111278215.6A
Other languages
Chinese (zh)
Inventor
罗国恒
潘意
彭玲
杨沐霖
李海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202111278215.6A priority Critical patent/CN113931414A/en
Publication of CN113931414A publication Critical patent/CN113931414A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/10Arrangements in buildings for the disposal of refuse
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/10Arrangements in buildings for the disposal of refuse
    • E04F17/12Chutes

Abstract

The invention discloses a construction site garbage pipeline which comprises a fixed frame, wherein a special garbage can is arranged in the fixed frame, and an automatic spraying dust-settling mechanism and a construction garbage auxiliary transportation mechanism are arranged on the fixed frame. The construction site garbage pipeline can convey garbage at different high layers into the interior of a main transportation pipeline through feed inlets at different positions, and the garbage collides with the buffering partition plate, so that the buffering partition plate rotates along the outer part of the positioning pin shaft and compresses the buffering partition plate to the connecting spring, the falling speed of the garbage can be effectively buffered, and the collision force of the garbage is reduced; the falling speed of the garbage can be dispersed through the discharge pipeline, the garbage collides with the cover plate of the discharge pipeline, and the impact strength of the garbage can be effectively buffered by matching the return spring connecting column; the transportation main pipeline and the discharging pipeline can be movably connected, the rotating angle of the discharging pipeline can be changed, the discharging pipeline can be adjusted to a proper position, and the direction of the garbage discharged from the discharging pipeline can be conveniently changed.

Description

Construction site garbage pipeline
Technical Field
The invention relates to the technical field of construction site garbage pipelines, in particular to a construction site garbage pipeline.
Background
The vertical collecting and transporting system for the building floor garbage refers to a vertical conveying pipeline for conveying the building garbage in a multi-storey and high-rise building and transferring, and the vertical conveying pipeline is mostly arranged in the wall of hidden places such as stairways, corridors, kitchens, service balconies and the like of the building or in special pipeline rooms and can also be vertically arranged along the outer wall of the building. The garbage pipeline is composed of a garbage hopper, a garbage shaft, a garbage pool and spraying dust-settling equipment. The centralized garbage pool at the bottom of the garbage shaft is provided with an ash outlet for removing garbage, the ash outlet is opened to input the garbage into the special garbage can, and then the special garbage collection and transportation vehicle intelligently and mechanically collects the garbage in the garbage can for transportation and treatment.
Present building site waste pipe says and leads to rubbish to pile up easily to and block up the pipeline easily, be not convenient for provide the dust fall for building site waste pipe says and handle, the user demand who satisfies people that can not be fine, to above-mentioned condition, carries out technical innovation on present building site waste pipe says basis.
Disclosure of Invention
The invention aims to provide a construction site garbage pipeline, which aims to solve the problems that the existing construction site garbage pipeline is easy to cause garbage accumulation, block the pipeline and is not convenient for providing dust-settling treatment for the construction site garbage pipeline in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: building site rubbish pipeline, including fixed frame, be equipped with special dustbin in the fixed frame, be equipped with on the fixed frame and spray dust fall mechanism and construction waste auxiliary transportation mechanism voluntarily.
Preferably, automatic spray dust fall mechanism includes spray tube, nozzle, coupling hose, high pressure water pump and water storage tank, be equipped with a plurality of nozzle on the axial of spray tube, the end connection of spray tube has coupling hose, the last high pressure water pump that is equipped with of coupling hose, the one end that coupling hose kept away from the spray tube is connected with the water storage tank.
Preferably, the water storage tank can realize dust fall through the cooperation of connecting hose, high pressure water pump and spray tube through the nozzle.
Preferably, supplementary transport mechanism of building rubbish includes transportation trunk line, row's material pipeline, feed inlet, buffer baffle, locating pin axle, coupling spring, apron and return spring spliced pole, arc row's material pipeline has been cup jointed in the tip activity of transportation trunk line, the inner wall coating of transportation trunk line and row's material pipeline has the polypropylene material, transportation trunk line and row's material pipeline mainly comprise galvanized steel sheet.
Preferably, a plurality of feed inlet has been seted up to the inner wall of transportation trunk line, be equipped with the buffer baffle of a plurality of and feed inlet one-to-one on the axial of transportation trunk line, locating pin axle is worn to be equipped with by the tip of buffer baffle, be equipped with coupling spring on the buffer baffle.
Preferably, the buffer clapboard is movably connected to the main transportation pipeline through the matching of a positioning pin shaft and a connecting spring.
Preferably, the material discharging pipeline is internally provided with a cover plate, a return spring connecting column is arranged between the material discharging pipeline and the cover plate in a penetrating mode, and the cover plate is movably connected to the material discharging pipeline through the return spring connecting column.
Compared with the prior art, the invention has the following beneficial effects:
the automatic spraying dust-settling mechanism is arranged, and under the action of the high-pressure water pump, stored water in the water storage tank can be guided into the spray pipe through the connecting hose and is sprayed out through the nozzle, so that high-pressure spray acts on dust, water mist and the dust are combined for settling dust, and the dust can be effectively inhibited from flying;
the auxiliary transportation mechanism for the construction waste is arranged, the waste of different high layers can be conveyed into the transportation main pipeline through the feeding holes at different positions, and the waste collides with the buffering partition plate, so that the buffering partition plate rotates along the outer part of the positioning pin shaft, and the buffering partition plate is compressed by the connecting spring, so that the falling speed of the waste can be effectively buffered, and the collision force of the waste is reduced; the falling speed of the garbage can be dispersed through the discharge pipeline, the garbage collides with the cover plate of the discharge pipeline, and the impact strength of the garbage can be effectively buffered by matching the return spring connecting column; the transportation trunk line can change the turned angle of the discharging pipeline by movably connecting the transportation trunk line with the discharging pipeline, and can adjust the discharging pipeline to a proper position, so that the direction of the discharged garbage of the discharging pipeline can be changed conveniently, and the abrasion between the garbage and the transportation trunk line and the discharging pipeline can be reduced by matching the polypropylene material, thereby effectively improving the efficiency of the garbage discharge.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the external structure of the present invention;
FIG. 3 is an enlarged view of a portion A of FIG. 1 according to the present invention.
In the figure: 1. a fixed frame; 2. a special dustbin; 3. an automatic spraying dust-settling mechanism; 301. a nozzle; 302. a nozzle; 303. a connecting hose; 304. a high pressure water pump; 305. a water storage tank; 4. the construction waste auxiliary transportation mechanism; 401. a main transport conduit; 402. a discharge conduit; 403. a feed inlet; 404. a buffer spacer; 405. positioning a pin shaft; 406. a connecting spring; 407. a cover plate; 408. and a return spring connecting column.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
As shown in fig. 1 and fig. 2, the present invention provides a technical solution: building site rubbish pipeline, including fixed frame 1, be equipped with special dustbin 2 in the fixed frame 1, be equipped with automatic dust fall mechanism 3 and the supplementary transport mechanism 4 of building rubbish on the fixed frame 1, automatic dust fall mechanism 3 that sprays includes spray tube 301, nozzle 302, coupling hose 303, high pressure water pump 304 and water storage tank 305, be equipped with a plurality of nozzle 302 on the axial of spray tube 301, the end connection of spray tube 301 has coupling hose 303, be equipped with high pressure water pump 304 on the coupling hose 303, the one end that coupling hose 303 keeps away from spray tube 301 is connected with water storage tank 305, water storage tank 305 is through coupling hose 303, high pressure water pump 304 and spray tube 301 cooperation can realize the dust fall through nozzle 302, through the effect of high pressure water pump 304, can lead to the inside of spray tube 301 through coupling hose 303 with the water storage inside of water storage tank 305, and erupt through nozzle 302, make high pressure spraying act on dust fall, make water smoke and dust combine, thereby effectively inhibiting the flying of dust.
Example two
The scheme in the first embodiment is further described in the following with reference to specific working modes, which are described in detail in the following:
as shown in fig. 1 and fig. 3, as a preferred embodiment, on the basis of the above manner, further, the construction waste auxiliary transport mechanism 4 includes a main transport pipe 401, a discharge pipe 402, feed ports 403, a buffer partition 404, a positioning pin 405, a connection spring 406, a cover plate 407 and a return spring connection column 408, the inner wall of the main transport pipe 401 is provided with a plurality of feed ports 403, the main transport pipe 401 is axially provided with a plurality of buffer partitions 404 corresponding to the feed ports 403 one by one, the end of the buffer partition 404 is provided with the positioning pin 405 in a penetrating manner, the buffer partition 404 is provided with the connection spring 406, the buffer partition 404 is movably connected to the main transport pipe 401 through the cooperation of the positioning pin 405 and the connection spring 406, so that different types of waste can be fed into the main transport pipe 401 through the feed ports at different positions on the high level, and the waste collides with the buffer partition 404, the buffer clapboard 404 rotates along the outside of the positioning pin shaft 405, and the buffer clapboard 404 compresses the connecting spring 406, thereby effectively buffering the falling speed of the garbage and reducing the impact force of the garbage, the end part of the main transport pipeline 401 is movably sleeved with the arc-shaped discharge pipeline 402, the cover plate 407 is arranged in the discharge pipeline 402, the return spring connecting column 408 is penetrated between the discharge pipeline 402 and the cover plate 407, the cover plate 407 is movably connected on the discharge pipeline 402 through the return spring connecting column 408, the falling speed of the garbage can be dispersed through the discharge pipeline 402, and the garbage collides with the cover plate 407 of the discharge pipeline 402, the impact strength of the garbage can be effectively buffered by matching the return spring connecting column 408, the inner walls of the main transport pipeline 401 and the discharge pipeline 402 are coated with polypropylene materials, the main transport pipeline 401 and the discharge pipeline 402 mainly comprise galvanized steel plates, and the main transport pipeline 401 and the discharge pipeline 402 can be movably connected, can change the turned angle of blowdown pipeline 402 to and can adjust to suitable position with the blowdown pipeline 402, be convenient for change the direction of blowdown pipeline 402 discharge rubbish, and the cooperation polypropylene material can alleviate the wearing and tearing between rubbish and the main transportation pipeline 401 and the blowdown pipeline 402, thereby can effectual improvement rubbish exhaust high efficiency.
This building site rubbish pipeline's theory of operation: firstly, the garbage at different high levels can be fed into the interior of the main transporting pipeline 401 through the feeding holes 403 at different positions, and the garbage collides with the buffering partition plate 404, so that the buffering partition plate 404 rotates along the outside of the positioning pin 405, and the buffering partition plate 404 compresses the connecting spring 406, thereby effectively buffering the falling speed of the garbage, reducing the collision force of the garbage, dispersing the falling speed of the garbage through the discharging pipeline 402, colliding with the cover plate 407 of the discharging pipeline 402, effectively buffering the impact strength of the garbage by matching with the return spring connecting column 408, then the main transporting pipeline 401 is movably connected with the discharging pipeline 402, changing the rotating angle of the discharging pipeline 402, adjusting the discharging pipeline 402 to a proper position, facilitating the change of the direction of the garbage discharged from the discharging pipeline 402, then, under the action of the high-pressure water pump 304, the water stored in the water storage tank 305 can be led into the interior of the spraying pipe 301 through the connecting hose 303, and is sprayed out through the nozzle 302, so that high-pressure spray acts on dust, water mist and the dust are combined for dust fall, and the flying of the dust can be effectively inhibited.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. Building site rubbish pipeline, including fixed frame (1), its characterized in that: be equipped with special dustbin (2) in fixed frame (1), be equipped with on fixed frame (1) and spray dust fall mechanism (3) and construction waste auxiliary transportation mechanism (4) automatically.
2. The worksite refuse pipeline of claim 1, wherein: automatic spray dust fall mechanism (3) and include spray tube (301), nozzle (302), coupling hose (303), high pressure water pump (304) and water storage tank (305), be equipped with a plurality of nozzle (302) on the axial of spray tube (301), the end connection of spray tube (301) has coupling hose (303), be equipped with high pressure water pump (304) on coupling hose (303), the one end that coupling hose (303) kept away from spray tube (301) is connected with water storage tank (305).
3. The worksite refuse pipeline of claim 2, wherein: the water storage tank (305) can realize dust fall through the nozzle (302) through the matching of the connecting hose (303), the high-pressure water pump (304) and the spray pipe (301).
4. The worksite refuse pipeline of claim 1, wherein: construction waste subsidiary transport mechanism (4) are including transportation trunk line (401), row material pipeline (402), feed inlet (403), buffer baffle (404), locating pin axle (405), coupling spring (406), apron (407) and return spring spliced pole (408), arc row material pipeline (402) has been cup jointed in the tip activity of transportation trunk line (401), the inner wall coating of transportation trunk line (401) and row material pipeline (402) has the polypropylene material, transportation trunk line (401) and row material pipeline (402) mainly comprise galvanized steel sheet.
5. The worksite refuse pipeline of claim 4, wherein: a plurality of feed inlet (403) have been seted up to the inner wall of transportation trunk line (401), be equipped with buffer baffle (404) of a plurality of and feed inlet (403) one-to-one on the axial of transportation trunk line (401), locating pin axle (405) are worn to be equipped with by the tip of buffer baffle (404), be equipped with coupling spring (406) on buffer baffle (404).
6. The worksite refuse pipeline of claim 4, wherein: the buffer clapboard (404) is movably connected to the main transportation pipeline (401) through the matching of a positioning pin shaft (405) and a connecting spring (406).
7. The worksite refuse pipeline of claim 4, wherein: a cover plate (407) is arranged in the discharging pipeline (402), a return spring connecting column (408) penetrates between the discharging pipeline (402) and the cover plate (407), and the cover plate (407) is movably connected to the discharging pipeline (402) through the return spring connecting column (408).
CN202111278215.6A 2021-10-30 2021-10-30 Construction site garbage pipeline Withdrawn CN113931414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111278215.6A CN113931414A (en) 2021-10-30 2021-10-30 Construction site garbage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111278215.6A CN113931414A (en) 2021-10-30 2021-10-30 Construction site garbage pipeline

Publications (1)

Publication Number Publication Date
CN113931414A true CN113931414A (en) 2022-01-14

Family

ID=79285160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111278215.6A Withdrawn CN113931414A (en) 2021-10-30 2021-10-30 Construction site garbage pipeline

Country Status (1)

Country Link
CN (1) CN113931414A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114408410A (en) * 2022-02-25 2022-04-29 李晓宇 Building rubbish clearing device in high-rise building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114408410A (en) * 2022-02-25 2022-04-29 李晓宇 Building rubbish clearing device in high-rise building construction

Similar Documents

Publication Publication Date Title
CN113931414A (en) Construction site garbage pipeline
CN111053501A (en) Cleaning robot
CN201785043U (en) Grain conveying device
CN106823623B (en) A kind of Biohazard Waste Disposal atomization dust-collecting equipment
CN109319360B (en) Building garbage disposal system
CN211817681U (en) A building rubbish discharging equipment for in construction
CN201851147U (en) Dust removal device for mining surface of low coal seam
CN106013306A (en) Garbage excavation all-in-one machine
CN210613822U (en) Dust collector for construction
CN206233926U (en) Coal machine sprayer unit
CN211079856U (en) Raised dust collecting device of pavement grooving machine
CN205413466U (en) Take miniature automation and concentrate spray gun cleaning machine of foreseeing vacuum drainage technique
CN209985660U (en) Painting spray booth
CN109468919A (en) A kind of road roller with aproll depositing dust function
CN110629977B (en) Vertical transport channel for construction waste and use method thereof
CN211569498U (en) Dust falling device of coal conveying belt machine
CN201275521Y (en) Spray type machine for paining outer wall of steel tube with oil
CN213161383U (en) Activated carbon injection device
CN215196034U (en) Dust fall mechanism applied to garbage channel
CN106120624A (en) A kind of electric ground sweeper with airborne dust processing means
CN207189467U (en) A kind of aluminum alloy pattern plate Special shot blast machine
CN218538556U (en) Dustproof rubbish transport pipe way for high-rise building
CN205078297U (en) Underground mine negative pressure stack geomantic omen entrained bed dust exhausting fan
CN112502393A (en) Construction site rubbish conveying mechanism for building construction
CN212607278U (en) Building site environment-friendly refuse handling installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20220114

WW01 Invention patent application withdrawn after publication