CN211817681U - A building rubbish discharging equipment for in construction - Google Patents

A building rubbish discharging equipment for in construction Download PDF

Info

Publication number
CN211817681U
CN211817681U CN201922088194.6U CN201922088194U CN211817681U CN 211817681 U CN211817681 U CN 211817681U CN 201922088194 U CN201922088194 U CN 201922088194U CN 211817681 U CN211817681 U CN 211817681U
Authority
CN
China
Prior art keywords
pipe
construction
branch pipe
conveying pipeline
discharge device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922088194.6U
Other languages
Chinese (zh)
Inventor
郑赵岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhonghao Construction Co Ltd
Original Assignee
Zhonghao Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhonghao Construction Co Ltd filed Critical Zhonghao Construction Co Ltd
Priority to CN201922088194.6U priority Critical patent/CN211817681U/en
Application granted granted Critical
Publication of CN211817681U publication Critical patent/CN211817681U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a construction waste discharging device used in building construction, which comprises a material conveying pipeline, wherein the material conveying pipeline is formed by combining a first branch pipe and a second branch pipe which are vertically arranged, the upper ends of the first branch pipe and the second branch pipe are both connected with a feeding mechanism, the lower end of the second branch pipe is connected with a guiding bent pipe, the right end of the guiding bent pipe is connected with a material collecting mechanism, and the outer side walls of the first branch pipe and the second branch pipe are both connected with a U-shaped hoop; the utility model has the advantages of reasonable design, can collect the building rubbish of different floors through the feeder hopper, send into the unified processing of mechanism that gathers materials along conveying pipeline, convenient high-efficient, improved rubbish cleaning efficiency, the joint pipe passes through the spiral cover and connects conveying pipeline, and loading and unloading are convenient, are convenient for maintain the change to the subassembly.

Description

A building rubbish discharging equipment for in construction
Technical Field
The utility model relates to a refuse discharge device technical field especially relates to a building rubbish discharging equipment for in construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
In vast rural areas, the second floor is the extensive selection of building by oneself, in the construction process of building, can produce a certain amount of building rubbish, need rely on hanging flower basket or other elevating system to go on when the building rubbish that is located the eminence is transported, the conveying efficiency is low, lead to building rubbish to clear up the operation progress slow, what is more, directly fall from upstairs, lead to rubbish to scatter, cause the potential safety hazard, produce a large amount of raise dusts when empting, the polluted environment, for this reason, we have proposed a building rubbish discharging equipment who is arranged in the construction.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building rubbish discharging equipment for in construction has improved cleaning efficiency, has reduced the raise dust pollution. In order to realize the technical purpose, the technical effect is achieved, and the utility model discloses a realize through following technical scheme.
The utility model provides a building rubbish discharging equipment for in construction, includes the conveying pipeline, the conveying pipeline is formed by the combination of the first minute pipe and the second minute pipe of vertical setting, the upper end that first minute pipe and second were in charge of all is connected with feed mechanism, the lower extreme that the second was in charge of is connected with the direction return bend, the right-hand member of direction return bend is connected with the mechanism that gathers materials, the lateral wall that first minute pipe and second were in charge of all is connected with the U-shaped staple bolt.
Preferably, a among the building rubbish discharging equipment for in the construction, feed mechanism includes the joint pipe, the port department of joint pipe is connected with the fender ring, the outside movable sleeve of joint pipe is equipped with the spiral cover that two sets of symmetries set up, joint outside of tubes wall intercommunication has the feeder hopper, joint inner tube cavity articulates there is the buffer board, the buffer board is located feeder hopper bottom open-ended top, the articulated department of buffer board is equipped with the torsional spring.
Preferably, among a building rubbish discharging equipment for among the construction, the mechanism that gathers materials includes the waste bin, the inner chamber of waste bin is connected with the filter plate, the inner chamber top of waste bin is connected with the raceway, the lower extreme equipartition of raceway has the mouth that sprays, the right side wall of waste bin articulates there is the bin gate, the bottom intercommunication of waste bin has the sewage pipe.
Preferably, in the construction waste discharge device for building construction, the pipeline diameter of the material conveying pipeline is more than 300 mm.
Preferably, in the construction waste discharge device for building construction, the outer side wall of the material conveying pipeline is provided with an external thread matched with the screw cap.
Preferably, in the construction waste discharge device for building construction, a sealing ring is arranged between the screw cap and the baffle ring.
Preferably, in the construction waste discharge device for building construction, the upper end of the water delivery pipe is externally connected with a water inlet pipe.
The utility model has the advantages that:
1. the utility model has the advantages of reasonable design, can collect the construction waste of different floors through the feeder hopper, send into the unified processing of aggregate mechanism along the conveying pipeline, convenient high-efficient, improved rubbish cleaning efficiency;
2. the conveying pipeline in the device is connected with a building wall through the U-shaped hoop, the joint pipe is connected with the conveying pipeline through the screw cap, the assembly and disassembly are convenient, the maintenance and the replacement of the components are convenient, and the sealing performance of the joint is improved by arranging the sealing ring between the screw cap and the baffle ring;
3. the buffer plate is hinged inside the joint pipe in the device and is reset through the torsion spring, and the buffer plate can reduce the impact force when high-rise garbage falls, so that the guide bent pipe is protected, and the service life of the device is prolonged;
4. this device sprays the processing through spraying the mouth to building rubbish, can avoid producing the raise dust, and sewage sees through the filter plate whereabouts, reaches the solid-liquid separation effect.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the feeding mechanism of the present invention;
fig. 3 is the internal structure diagram of the material collecting mechanism of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the present embodiment is a building waste discharging device for building construction, including a material conveying pipeline 1, where the material conveying pipeline 1 is formed by combining a first branch pipe 101 and a second branch pipe 102 that are vertically arranged, the upper ends of the first branch pipe 101 and the second branch pipe 102 are both connected with feeding mechanisms 2, two groups of feeding mechanisms 2 respectively correspond to two building floors, the lower end of the second branch pipe 102 is connected with a guiding bent pipe 3, the right end of the guiding bent pipe 3 is connected with a material collecting mechanism 4, the outer side walls of the first branch pipe 101 and the second branch pipe 102 are both connected with a U-shaped hoop 103, the U-shaped hoop 103 is fixed by screws, the first branch pipe 101 and the second branch pipe 102 are fixed on a building wall, and the first branch pipe 101 is located right above the second branch pipe 102.
The feeding mechanism 2 comprises a joint pipe 201, a port of the joint pipe 201 is connected with a baffle ring 202, two groups of symmetrically-arranged spiral covers 203 are movably sleeved outside the joint pipe 201, the outer side wall of the joint pipe 201 is communicated with a feed hopper 204, the inner cavity of the joint pipe 201 is hinged with a buffer plate 205, the buffer plate 205 is located above an opening in the bottom of the feed hopper 204, and a torsional spring is arranged at the hinged position of the buffer plate 205.
The collecting mechanism 4 comprises a waste box 401, a filter plate 402 is connected to the inner cavity of the waste box 401, a water conveying pipe 403 is connected to the top of the inner cavity of the waste box 401, spraying ports 404 are evenly distributed at the lower end of the water conveying pipe 403, a bin door 405 is hinged to the right side wall of the waste box 401, and a sewage pipe 406 is communicated with the bottom of the waste box 401.
The diameter of the delivery pipeline 1 is larger than 300mm, so that the construction waste is conveniently discharged.
The outer side wall of the material conveying pipeline 1 is provided with an external thread matched with the screw cap 203, so that the material conveying pipeline 1 and the end part of the joint pipe 201 can be conveniently fixed.
A sealing ring is arranged between the screw cap 203 and the baffle ring 202, so that the sealing performance of the joint is improved.
The upper end of the water delivery pipe 403 is externally connected with a water inlet pipe, so that the construction waste is conveniently sprayed, and the raised dust is reduced.
The utility model discloses a concrete implementation way does:
when the device is used, the feeding mechanisms 2 are arranged at two ends of the first branch pipe 101, the connector pipe 201 is attached to the end part of the conveying pipeline 1 through the outer thread of the conveying pipeline 1 in a threaded manner by the screw cap 203, the sealing ring is arranged between the baffle ring 202 and the screw cap 203 to improve the sealing property of the joint, the second branch pipe 102 is connected below the first branch pipe 101, the two groups of feed hoppers 204 are respectively close to corresponding floors, the assembly and disassembly are convenient, the components are convenient to maintain and replace, the conveying pipeline 1 is fixed on the outer side of a building through the U-shaped hoop 103 and the screws, construction waste generated during construction is put in through the feed hoppers 204, the waste falls along the conveying pipeline 1 and is introduced into the collecting mechanism 4 through the guide bent pipe 3, the impact force generated when high-rise waste falls can be reduced through the arrangement of the buffer plate 205, the guide bent pipe 3 is protected, the water conveying pipe 403 is externally connected with a water inlet pipe, can avoid producing the raise dust, can collect the processing to building rubbish after opening door 405, sewage sees through filter plate 402 whereabouts, discharges through sewage pipe 406.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (7)

1. The utility model provides a building rubbish discharging equipment for in construction, includes conveying pipeline (1), its characterized in that: conveying pipeline (1) is divided by the first branch pipe (101) and the second of vertical setting and manages (102) combination and form, the upper end that first branch pipe (101) and second were divided pipe (102) all is connected with feed mechanism (2), the lower extreme that the second was divided pipe (102) is connected with direction return bend (3), the right-hand member of direction return bend (3) is connected with mechanism (4) that gathers materials, the lateral wall that first branch pipe (101) and second were divided pipe (102) all is connected with U-shaped staple bolt (103).
2. A construction waste discharge device for use in construction according to claim 1, wherein: feed mechanism (2) are including joint pipe (201), the port department of joint pipe (201) is connected with keeps off ring (202), joint pipe (201) outside activity cover is equipped with spiral cover (203) that two sets of symmetries set up, joint pipe (201) lateral wall intercommunication has feeder hopper (204), joint pipe (201) inner chamber articulates there is buffer plate (205), buffer plate (205) are located feeder hopper (204) bottom open-ended top, the articulated department of buffer plate (205) is equipped with the torsional spring.
3. A construction waste discharge device for use in construction according to claim 1, wherein: mechanism (4) of gathering materials includes waste bin (401), the inner chamber of waste bin (401) is connected with filter plate (402), the inner chamber top of waste bin (401) is connected with raceway (403), the lower extreme equipartition of raceway (403) has spraying mouth (404), the right side wall of waste bin (401) articulates there is bin gate (405), the bottom intercommunication of waste bin (401) has sewage pipe (406).
4. A construction waste discharge device for use in construction according to claim 1, wherein: the diameter of the material conveying pipeline (1) is larger than 300 mm.
5. A construction waste discharge device for use in construction according to claim 2, wherein: the outer side wall of the material conveying pipeline (1) is provided with an external thread matched with the screw cap (203).
6. A construction waste discharge device for use in construction according to claim 2, wherein: and a sealing ring is arranged between the screw cap (203) and the baffle ring (202).
7. A construction waste discharge device for use in construction according to claim 3, wherein: the upper end of the water delivery pipe (403) is externally connected with a water inlet pipe.
CN201922088194.6U 2019-11-28 2019-11-28 A building rubbish discharging equipment for in construction Expired - Fee Related CN211817681U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922088194.6U CN211817681U (en) 2019-11-28 2019-11-28 A building rubbish discharging equipment for in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922088194.6U CN211817681U (en) 2019-11-28 2019-11-28 A building rubbish discharging equipment for in construction

Publications (1)

Publication Number Publication Date
CN211817681U true CN211817681U (en) 2020-10-30

Family

ID=73030334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922088194.6U Expired - Fee Related CN211817681U (en) 2019-11-28 2019-11-28 A building rubbish discharging equipment for in construction

Country Status (1)

Country Link
CN (1) CN211817681U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112875109A (en) * 2021-01-20 2021-06-01 北京新兴保信建设工程有限公司 Building rubbish clearance system
CN113775148A (en) * 2021-09-24 2021-12-10 中国建筑第二工程局有限公司 High-efficient conveying system of high-rise building rubbish

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112875109A (en) * 2021-01-20 2021-06-01 北京新兴保信建设工程有限公司 Building rubbish clearance system
CN112875109B (en) * 2021-01-20 2021-12-28 北京新兴保信建设工程有限公司 Building rubbish clearance system
CN113775148A (en) * 2021-09-24 2021-12-10 中国建筑第二工程局有限公司 High-efficient conveying system of high-rise building rubbish

Similar Documents

Publication Publication Date Title
CN211817681U (en) A building rubbish discharging equipment for in construction
CN109482627B (en) Construction waste treatment line and treatment method
CN208599919U (en) A kind of industrial machinery processing waste material crushing recyclable device
CN214995620U (en) Indoor garbage cleaning and transporting system for small high-rise construction site
CN200998629Y (en) Preprocessing device of the dust wiper
CN211839533U (en) Civil engineering room construction waste material processing apparatus
CN214182007U (en) Environment-friendly floor construction waste conveyor
CN208591946U (en) A kind of impact breaker system of dust control and noise absorption safety
CN218048100U (en) Green construction waste recovery device
CN214942027U (en) High-rise building rubbish transfer passage
CN113931414A (en) Construction site garbage pipeline
CN211706231U (en) Assembled filter drum dust remover
CN211159933U (en) Building waste retrieves sorting device
CN210453197U (en) Environment-friendly self-leveling mortar production equipment
CN207388269U (en) A kind of vacuum line anti-block apparatus of double screw extruder
CN202802998U (en) Multifunctional pulse bag type dust collector
CN205380781U (en) Storehouse is stored to neotype powder of concrete mixing plant
CN220125795U (en) Spraying device in construction waste passageway
CN105584751A (en) Garbage can convenient to use on floors
CN205771476U (en) A kind of have the bucket elevator orienting station dedusting structure more
CN209455721U (en) A kind of chain elevator
CN215401926U (en) Ton package feeding station
CN201061776Y (en) Water impinging type ceramic multi-pipe cyclonic dust collector
CN207951695U (en) A kind of Highefficientpulverizer with dedusting function
CN103657280A (en) Multi-functional pulse bag type dust collector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030

Termination date: 20211128

CF01 Termination of patent right due to non-payment of annual fee