Prior art keywords
standard
discharging
mounting
frame
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120035229.4U
Other languages
Chinese (zh)
Inventor
姚鹏飞
铁亚敏
张攀
马亚军
蔡向阳
杨海潮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
First Construction Co Ltd of China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
First Construction Co Ltd of China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, First Construction Co Ltd of China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202120035229.4U priority Critical patent/CN214995620U/en
Application granted granted Critical
Publication of CN214995620U publication Critical patent/CN214995620U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

An indoor garbage cleaning system for a small high-rise construction site comprises a cleaning channel and a garbage cleaning pool, wherein the tail end of the cleaning channel extends into the garbage cleaning pool; the clearing and transporting channel comprises standard sections and mounting sections, the standard sections are sequentially arranged from top to bottom, and the mounting sections are arranged among the standard sections at intervals; the cross section of the standard section is rectangular, the standard section comprises a standard left frame and a standard right frame, the standard left frame and the standard right frame are connected through a bolt, the end part of the standard left frame extends into the standard right frame, and a rubber sealing ring is arranged on the inner wall of the standard right frame close to the end part; the adjacent standard joints are in threaded connection, and the standard joints are in threaded connection with the mounting joints. The utility model has convenient installation, can adjust the standard section and the installation section according to different specifications, improves the application range of the device, and simultaneously can effectively dissipate the energy of the garbage in the garbage channel in the discharging section, thereby avoiding the excessive energy dissipation section in the garbage channel and ensuring the smooth falling of the construction garbage; in addition, the system can effectively warn surrounding personnel, and construction safety is guaranteed.

Description

Indoor garbage cleaning and transporting system for small high-rise construction site
Technical Field
The utility model belongs to the technical field of the construction site is cleared with rubbish, especially, relate to a little high-rise construction site is cleared with indoor rubbish system.
Background
The building waste channel is a channel erected outside or inside a building and capable of vertically conveying building waste to the bottom of the building easily and quickly.
The material of the device is generally plastic, and a small part of the device is made of iron. From the whole development process of the construction waste pipeline, the construction waste pipeline is gradually replaced by plastic after going through the iron era. The initial country using the construction waste channel is the United states, in the middle of eighties, the waste channel is in the golden period of rapid development in the United states, the capital construction and the construction industry are rapidly developed, the labor cost and the environmental protection pressure are suddenly increased, some projects begin to use the iron construction waste vertical conveying channel, and in the using process, iron is gradually found to have inherent advantages in the aspect of impact resistance, but is not as good as plastic materials in the aspects of noise, corrosion resistance, buffering, repeated utilization rate, cost, easiness in processing, installation, maintenance and the like. The plastic material can completely offset the defects of easy abrasion and impact resistance of the plastic material through various skillfully designed buffering and reinforcing, thereby achieving the best combination point of cost performance. Nowadays, developed countries in europe and america are completely mature in the aspect of building garbage passage use, and tend to use the building garbage passage as a standard product of construction project construction sites.
The basic configuration of the building garbage channel mainly comprises the following parts: standard section, throw material festival, buffer part, chain subassembly and bearing support.
When the garbage cleaning device is used, the construction garbage is conveyed into the garbage channel through the feeding section, and the construction garbage moves into the garbage cleaning pool in the garbage channel and is finally cleaned in a centralized mode.
The disadvantages of this technique are: the existing garbage channel is generally formed by a pipeline with a circular cross section, in order to ensure stability, a bearing support is required to be used when the garbage channel is installed, the bearing support is complex to install, manpower and financial resources are consumed, the number of reliable connection points of the garbage channel is small when the garbage channel is not suitable for the bearing support, and the garbage channel is easy to deform or even collapse.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a simple structure, excellent in use effect's little high-rise job site is with indoor rubbish clearance system.
In order to solve the technical problem, the utility model provides a following technical scheme: an indoor garbage cleaning system for a small high-rise construction site comprises a cleaning channel and a garbage cleaning pool, wherein the tail end of the cleaning channel extends into the garbage cleaning pool; the clearing and transporting channel comprises standard sections and mounting sections, wherein the standard sections are sequentially arranged from top to bottom, and the mounting sections are arranged among the standard sections at intervals; the cross section of the standard section is rectangular, the standard section comprises a standard left frame and a standard right frame, the standard left frame and the standard right frame are connected through a bolt, the end part of the standard left frame extends into the standard right frame, and the outer wall of the standard right frame close to the end part is provided with a rubber sealing ring; the adjacent standard joints are in threaded connection, and the standard joints are in threaded connection with the mounting joints.
The standard left frame and the standard right frame are in threaded connection through a long screw; two connecting steel plate groups are vertically arranged on the outer wall of the standard joint and respectively close to the top end and the bottom end of the standard joint; every connecting steel plate group includes the connecting steel plate of two level settings, and two connecting steel plates set up respectively on the lateral wall that standard left side frame and standard right frame kept away from, and the connecting steel plate spiro union of adjacent standard festival.
The cross section of the mounting section is rectangular, the mounting section comprises a mounting left frame and a mounting right frame, the mounting left frame and the mounting right frame are connected through a bolt, the end part of the mounting left frame is arranged in the mounting right frame in a sliding mode, and a rubber sealing ring is arranged on the outer wall of the mounting right frame close to the end part; clamping grooves are formed in the outer walls, far away from each other, of the left mounting frame and the right mounting frame, and the clamping grooves are distributed in sequence along the height direction of the mounting section; set up the cardboard in the draw-in groove, cardboard inner wall and draw-in groove laminating pass through bolted connection between draw-in groove and the cardboard, and the cardboard passes through expansion bolts with the floor and is connected.
Be equipped with the feeding casing on two standard festivals that are the same distance apart, the direction downward sloping setting of the interior bottom surface orientation standard festival of feeding casing, feeding casing front end is equipped with feeding baffle, and feeding baffle is articulated with the feeding casing.
The discharging section comprises a discharging left frame and a discharging right frame, and the bottom surfaces of the discharging left frame and the discharging right frame are sealed; the discharging left frame and the discharging right frame are connected through bolts, the end part of the discharging left frame extends into the discharging right frame, and a rubber sealing ring is arranged on the outer wall of the discharging right frame close to the end part; the discharging section is in threaded connection with the adjacent standard section; a discharging shell is arranged in the discharging section, the discharging shell comprises a discharging plate and two side plates which are perpendicular to the discharging plate, and the two side plates are respectively positioned on two sides of the discharging plate; the end part of the discharging plate is hinged with the discharging left frame, a buffer spring group positioned on the inner bottom surface of the discharging left frame is arranged below the discharging plate, and the buffer spring group comprises at least 3 buffer springs; a discharge hole is arranged on the right discharge frame in a matching way with the discharge shell.
An electromagnet is arranged on the front end face of the feeding shell, and an iron sheet is arranged on the discharging plate in a matching manner with the electromagnet; the electromagnet is arranged around the front end face of the feeding shell in the circumferential direction, and an electromagnet driving circuit is connected to the electromagnet and drives the electromagnet to work.
The feeding baffle is provided with a key, the signal input end of the key is connected with a processor, and the signal output end of the processor is connected with an electromagnet driving circuit.
The garbage cleaning and transporting system is characterized by further comprising an alarm arranged at the garbage cleaning and transporting pool, wherein an alarm driving circuit is connected to the processor, and the alarm driving circuit drives the alarm to work.
A dust-raising prevention spray pipe is arranged above the garbage cleaning pool, the dust-raising prevention spray pipe is arranged along the circumferential direction of the garbage cleaning pool, and spray heads arranged towards the garbage cleaning pool are uniformly distributed on the dust-raising prevention spray pipe; the dust-proof spray pipe is connected with a water inlet pipe, the water inlet pipe is connected with a water tank through a water pump, the processor is connected with a water pump driving circuit, and the water pump driving circuit drives the water pump to work.
The shower nozzle includes that mount pad and slip set up the sleeve pipe in the mount pad, is equipped with reset spring in the mount pad, and reset spring end connection sleeve pipe, sleeve pipe one end and dustproof spray tube intercommunication, the other one end of sleeve pipe is sealed, is equipped with the apopore on the sleeve pipe lateral wall.
Through the technical scheme, the beneficial effects of the utility model are that: the system can realize the clearance of indoor rubbish to the flue is for relying on, has guaranteed the stability of clearance passageway, the standard festival has improved the application scope of device with installation festival adjustable size, has guaranteed the reliable connection of clearance passageway and flue. The alarm that sets up can report to the police before rubbish whereabouts, prevents personnel's maloperation, causes the incident. The garbage in the garbage channel can be effectively energy-dissipated in the discharging section, so that excessive energy dissipation sections are prevented from being arranged in the garbage channel, and the building garbage can smoothly fall; in addition, the system can effectively warn surrounding personnel, and construction safety is guaranteed.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a feed section;
FIG. 3 is a schematic diagram of a standard knot structure;
FIG. 4 is a schematic view of a mounting section;
FIG. 5 is a schematic view of a discharging section;
FIG. 6 is a schematic structural view of the discharge casing;
FIG. 7 is a schematic view of the structure of the garbage disposal pool;
FIG. 8 is a schematic view of the garbage disposal pool with the dense mesh net removed;
FIG. 9 is a perspective view of the showerhead;
FIG. 10 is a schematic view of a showerhead structure;
fig. 11 is a schematic circuit diagram of the present invention.
Detailed Description
An indoor garbage cleaning system for a small high-rise construction site is shown in figures 1-8 and comprises a cleaning channel and a garbage cleaning pool 4, wherein the tail end of the cleaning channel extends into the garbage cleaning pool 4, building garbage enters the cleaning channel, moves from a high position to the garbage cleaning pool 4 in the cleaning channel, and is finally conveyed in the garbage cleaning pool 4 in a centralized mode.
The clearing and transporting channel comprises standard sections 2 and mounting sections 1, wherein the standard sections 2 are sequentially arranged from top to bottom, and the mounting sections 1 are arranged between the standard sections 2 at intervals. When the method is implemented, 1 mounting joint 1 is arranged at each floor, and the installation of the clearing and transporting channel and the floor is realized through the mounting joints 1. The adjacent standard joint 2 is in threaded connection, and the standard joint 2 and the mounting joint 1 are also in threaded connection.
The main body is often internally provided with a flue in advance, the garbage cleaning channel is arranged by taking the flue as a support, the flue is often a reserved rectangular opening and is matched with the flue, so that the reliable installation of the cleaning channel is realized, and the cross section of the standard section 2 is rectangular. Typically, the flue is a standard pre-cut having several standard dimensions.
For adapting to different standard sizes, the standard knot 2 comprises a standard left frame 10 and a standard right frame 11, an adjusting plate is fixedly arranged on the standard left frame 10 and the standard right frame 11, a long screw 8 is arranged between the adjusting plates of the standard left frame 10 and the standard right frame 11, the connection of the standard left frame 10 and the standard right frame 11 is realized through the long screw 8, and meanwhile, the distance between the standard left frame and the standard right frame 11 can be adjusted through the long screw 8.
The end part of the standard left frame 10 extends into the standard right frame 11, and a rubber sealing ring is arranged on the inner wall of the standard right frame 11 close to the end part. Through the length that the frame 10 stretched into the frame 11 on the right side of the standard of regulation standard, rethread long screw 8 realizes the fixed after the adjustment, realizes the adjustment of 2 width of standard festival, and then makes two lateral walls of standard festival 2 can laminate with the flue, improve stability.
In order to realize the bolt connection of two adjacent standard knots 2, two groups of connecting steel plates 9 are vertically arranged on the outer wall of each standard knot 2, and the two groups of connecting steel plates 9 are respectively close to the top end and the bottom end of each standard knot 2; every 9 groups of steel plates include two horizontally arranged steel plates 9, two steel plates 9 are respectively arranged on the side wall far away from the standard left frame 10 and the standard right frame 11, and the steel plates 9 of the adjacent standard sections 2 are in threaded connection.
When in use, only two of the 4 side walls of the standard knot 2 are attached to the inner wall of the flue.
To installation section 1, the cross section of installation section 1 is the rectangle, and installation section 1 is including installation left frame 13 and installation right frame 14, and installation left frame 13 passes through bolted connection with installation right frame 14, and installation left frame 13 tip slides and sets up in installation right frame 14, and installation right frame 14 is equipped with rubber seal on the inner wall that is close to the tip.
The outer walls of the left mounting frame 13 and the right mounting frame 14, which are far away from each other, are provided with clamping grooves 16, and the clamping grooves 16 are distributed in sequence along the height direction of the mounting section 1.
Set up cardboard 15 in the draw-in groove 16, cardboard 15 inner wall and draw-in groove 16 laminating pass through bolted connection between draw-in groove 16 and the cardboard 15, and cardboard 15 passes through expansion bolts with the floor and is connected. When implementing, select suitable draw-in groove 16 as required to make the lower surface of cardboard 15 can with the upper surface laminating of floor, the reliable connection of cardboard 15 and floor is realized to rethread expansion bolts.
For realizing the feeding, be equipped with feeding casing 6 on two standard festival 2 that are the same distance apart, the interior bottom surface of feeding casing 6 sets up towards the direction downward sloping of standard festival 2, and 6 front ends of feeding casing are equipped with feeding baffle 7, and feeding baffle 7 is articulated with feeding casing 6. The front end face of the feeding shell 6 is provided with an electromagnet, the electromagnet is arranged around the circumference of the front end face of the feeding shell 6, and an iron plate is selected at the position, opposite to the feeding shell 6, of the feeding baffle 7, so that the electromagnet and the feeding baffle 7 are reliably connected after being electrified. The electromagnet is connected with a direct current power supply.
In order to realize discharging, the discharging section 3 is connected to the standard section 2 at the bottom end, the discharging section 3 comprises a discharging left frame 17 and a discharging right frame 18, the discharging left frame 17 and the discharging right frame 18 are also connected through a long screw 8, the end part of the discharging left frame 17 extends into the discharging right frame 18, and a rubber sealing ring is arranged on the inner wall of the discharging right frame 18 close to the end part; the discharging joint 3 is in threaded connection with the adjacent standard joint 2. The inner bottom surfaces of the left discharging frame 17 and the right discharging frame 18 are both in a closed state.
A discharging shell 19 is arranged in the discharging section 3, the discharging shell 19 comprises a discharging plate 20 and two side plates 21 which are perpendicular to the discharging plate 20, and the two side plates 21 are respectively positioned on two sides of the discharging plate 20.
Go out 20 tip of flitch and ejection of compact left side frame 17 and articulate, go out flitch 20 below and establish the buffer spring group that is located ejection of compact left side frame 17 inner bottom surface, buffer spring group includes 3 at least buffer spring 22.
The discharging right frame 18 is provided with a discharging port 5 by matching with a discharging shell 19. Along with the compression of the buffer spring 22, the inclination angle of the discharging shell 19 is driven to be increased, so that the discharging hole 5 on the discharging right frame 18 is exposed, and the construction waste is discharged through the discharging hole 5.
Building rubbish enters the discharging section 3 through the rubbish clearing channel and falls into the discharging shell 19, and when the elasticity of the buffer spring 22 is overcome, the discharging shell 19 inclines downwards to form a slope surface, so that the building rubbish falls down from the discharging shell 19 and enters the rubbish clearing pool 4.
According to construction habits and construction standards, because the construction wastes cannot be thrown at the same time through all the feed inlets, the situation that the construction wastes continuously fall down is avoided when the building garbage throwing device is used; the construction waste falls into the waste channel under the action of gravity, and when the construction waste falls into the discharging shell 19, the elasticity of the buffer spring 22 is overcome, so that the discharging shell 19 is inclined, and then falls into the waste cleaning pool 4.
Buffering the building rubbish through setting up ejection of compact casing 19 on the one hand, having realized the effect of energy dissipation, realized on the other hand that building rubbish drops into rubbish clearance pond 4 together in, avoided the emergence of the phenomenon that a small amount of rubbish constantly falls into rubbish clearance pond 4.
In the embodiment, the garbage discharging device is suitable for small high-rise buildings, the discharging shell 19 is arranged in the small high-rise buildings, the buffer spring group can buffer construction garbage, and the problems of garbage blockage, garbage impact channel and the like caused by the fact that a bent buffer channel is arranged in the garbage channel are avoided.
A dense mesh net 23 is arranged above the garbage cleaning pool, garbage in the garbage cleaning pool can advance to a dust-raising prevention spray pipe 25 which is provided with an alarm LS1 and is positioned below the alarm LS1 through the dense mesh net 23, the dust-raising prevention spray pipe 25 is arranged along the circumferential direction of the garbage cleaning pool, and spray heads 26 which are arranged towards the garbage cleaning pool are uniformly distributed on the dust-raising prevention spray pipe 25; the dust-proof spray pipe 25 is connected with a water inlet pipe, and the water inlet pipe is connected with a water tank through a water pump 24.
As shown in fig. 9 to 10, the nozzle 26 includes a mounting seat 27 and a sleeve 28 slidably disposed in the mounting seat 27, a return spring 30 is disposed in the mounting seat 27, an end of the return spring 30 is connected to the sleeve 28, one end of the sleeve 28 is communicated with the dust-proof nozzle 25, the other end of the sleeve 28 is closed, and a water outlet 29 is disposed on a side wall of the sleeve 28.
During operation, the water pump 24 pumps the water in the water tank into the water inlet pipe, enters the dustproof spray pipe 25 through the water inlet pipe, enters the spray head 26 from the dustproof spray pipe 25, is sprayed out of the spray head 26, and is sprayed to the garbage cleaning pool 4. The process of water in the spray head 26 is: in water entered into the sleeve pipe 28 of shower nozzle 26 through dust-proof spray pipe 25, sleeve pipe 28 received hydraulic impact and overcome reset spring 30's elasticity, removed to the direction of keeping away from mount pad 27 to make apopore 29 expose from mount pad 27, water comes out from apopore 29, has avoided the jam of dust to apopore 29, has improved shower nozzle 26's life.
As shown in fig. 11, for the convenience of use, the device further comprises a key S1, a processor, a water pump driving circuit, an electromagnet driving circuit and an alarm driving circuit.
The button S1 is connected with the signal input end of the processor, and the signal output end of the processor is respectively connected with the water pump driving circuit, the electromagnet driving circuit and the alarm driving circuit.
The button S1 is pressed, the processor receives a button S1 signal and outputs a signal to the water pump driving circuit, the electromagnet driving circuit and the alarm driving circuit, so that the electromagnet is powered off, the water pump 24 is powered on, the alarm LS1 is powered on, the electromagnet is powered off, the magnetism disappears, the feeding baffle 7 can be opened, and the construction waste is poured into the waste cleaning pool 4; the water pump 24 is powered to pump water from the water tank into the spray head 26 and then to spray the water from the water outlet 29; alarm LS1 sends out the alarm sound with electricity, warns surrounding personnel, prevents personnel from entering into the rubbish clearing pool 4 nearby by mistake in the process of rubbish falling.
The processor comprises a singlechip U1 (model is STC8F2K64S2_ LQFP 32) and a minimum system of a singlechip U1, the minimum system of the singlechip U1 ensures the normal operation of the singlechip U1, and the processor is not described herein for the mature prior art.
The button S1 sets up on feeding baffle 7, and button S1 connects the signal input part of singlechip U1, and the first end ground connection of button S1, the signal input part of singlechip U1 is connected to the second end of button S1, and the second end of button S1 passes through button S1 resistance R1 and connects DC power supply simultaneously.
The signal output end of the singlechip U1 is respectively connected with an electromagnet driving circuit, a water pump driving circuit and an alarm driving circuit; the electromagnetic valve driving circuit, the water pump driving circuit and the alarm driving circuit respectively drive the electromagnet, the water pump 24 and the alarm LS1 to work.
The structures of the water pump driving circuit, the electromagnet driving circuit and the alarm driving circuit are the same, and the water pump driving circuit is taken as an example for explanation.
The water pump driving circuit comprises a triode Q1, a relay, a light emitting diode and a protective diode D1; the signal output end of the singlechip U1 is connected with the base electrode of the triode Q1, the collector electrode of the triode Q1 is connected with a direct-current power supply, and the emitter electrode of the triode Q1 is grounded through a coil K1 of the relay; the emitter of the triode Q1 is also connected with the cathode of a protection diode D1, and the anode of the protection diode D1 is grounded; the normally open contacts of the relay are connected in series in the power circuit of the water pump 24.
The corresponding electromagnet driving circuit and the water pump driving circuit are characterized in that: the normally closed contact of the relay is connected in series in the power circuit of the electromagnet. When the single chip microcomputer U1 receives a key S1 signal, the single chip microcomputer U1 outputs a signal, so that a normally closed contact of the relay is disconnected, and the electromagnet is powered off.
The alarm drive circuit is different from the water pump drive circuit in that: the normally open contact of the relay is connected in series in the power supply circuit of the alarm LS 1. When the single chip microcomputer U1 receives a key S1 signal, the single chip microcomputer U1 outputs a signal, so that a normally open contact of the relay is closed, and the alarm LS1 is powered on to give an alarm.
The working process is as follows: according to the construction site conditions, the sizes of the standard section 2 and the installation section 1 are adjusted, so that the standard section 2 and the installation section 1 can be in contact with the inner wall of the flue, and the stability in the use process is ensured; clamping the clamping plate 15 in a clamping groove 16 suitable for the mounting joint 1, so that the clamping plate 15 can be attached to the upper surface of the floor slab, and connecting the clamping plate 15 with the floor slab through an expansion bolt 8 to realize the mounting of the mounting joint 1; when the construction waste needs to be discharged, the button S1 is pressed, the feeding baffle 7 is separated from the feeding shell 6, the feeding baffle 7 is opened, and the waste is thrown into the waste channel through the feeding shell 6; building rubbish whereabouts in the refuse passage, when falling on ejection of compact casing 19, buffer spring 22 on the ejection of compact casing 19 can cushion building rubbish, greatly reduces potential energy wherein, has avoided setting up the problem of too much energy dissipation festival in the refuse passage again, has effectively avoided the jam of refuse passage.
Finally, the construction waste comes out from the discharging section 3 and falls into the waste cleaning pool 4.
In the process, after the key S1 is pressed, the single chip microcomputer U1 receives the information of the key S1 and respectively outputs signals to the water pump driving circuit and the alarm driving circuit, so that the water pump 24 works, water pushes the sleeve 28, and the aim of dust fall is fulfilled from the water outlet; alarm LS1 works to give an alarm to surrounding personnel, and prevents danger from occurring when personnel mistakenly enter garbage cleaning pool 4.
The utility model has convenient installation, can adjust the standard section 2 and the installation section 1 according to different specifications, improves the application range of the device, and simultaneously can effectively dissipate energy of garbage in the garbage channel in the discharging section 3, thereby avoiding excessive energy dissipation sections in the garbage channel and ensuring the smooth falling of construction garbage; in addition, the system can effectively warn surrounding personnel, and construction safety is guaranteed.

Claims (10)

1. The utility model provides a little high-rise job site is with indoor rubbish clearance system which characterized in that: the garbage cleaning and transporting device comprises a cleaning and transporting channel and a garbage cleaning and transporting pool, wherein the tail end of the cleaning and transporting channel extends into the garbage cleaning and transporting pool; the clearing and transporting channel comprises standard sections and mounting sections, wherein the standard sections are sequentially arranged from top to bottom, and the mounting sections are arranged among the standard sections at intervals; the cross section of the standard section is rectangular, the standard section comprises a standard left frame and a standard right frame, the standard left frame and the standard right frame are connected through a bolt, the end part of the standard left frame extends into the standard right frame, and the outer wall of the standard right frame close to the end part is provided with a rubber sealing ring; the adjacent standard joints are in threaded connection, and the standard joints are in threaded connection with the mounting joints.
2. The indoor garbage cleaning system for small high-rise construction site according to claim 1, wherein: the standard left frame and the standard right frame are in threaded connection through a long screw; two connecting steel plate groups are vertically arranged on the outer wall of the standard joint and respectively close to the top end and the bottom end of the standard joint; every connecting steel plate group includes the connecting steel plate of two level settings, and two connecting steel plates set up respectively on the lateral wall that standard left side frame and standard right frame kept away from, and the connecting steel plate spiro union of adjacent standard festival.
3. The indoor garbage cleaning system for small high-rise construction site according to claim 2, wherein: the cross section of the mounting section is rectangular, the mounting section comprises a mounting left frame and a mounting right frame, the mounting left frame and the mounting right frame are connected through a bolt, the end part of the mounting left frame is arranged in the mounting right frame in a sliding mode, and a rubber sealing ring is arranged on the outer wall of the mounting right frame close to the end part; clamping grooves are formed in the outer walls, far away from each other, of the left mounting frame and the right mounting frame, and the clamping grooves are distributed in sequence along the height direction of the mounting section; set up the cardboard in the draw-in groove, cardboard inner wall and draw-in groove laminating pass through bolted connection between draw-in groove and the cardboard, and the cardboard passes through expansion bolts with the floor and is connected.
4. The indoor garbage cleaning system for small high-rise construction site according to claim 3, wherein: be equipped with the feeding casing on two standard festivals that are the same distance apart, the direction downward sloping setting of the interior bottom surface orientation standard festival of feeding casing, feeding casing front end is equipped with feeding baffle, and feeding baffle is articulated with the feeding casing.
5. The indoor garbage cleaning system for small high-rise construction site according to claim 4, wherein: the discharging section comprises a discharging left frame and a discharging right frame, and the bottom surfaces of the discharging left frame and the discharging right frame are sealed; the discharging left frame and the discharging right frame are connected through bolts, the end part of the discharging left frame extends into the discharging right frame, and a rubber sealing ring is arranged on the outer wall of the discharging right frame close to the end part; the discharging section is in threaded connection with the adjacent standard section; a discharging shell is arranged in the discharging section, the discharging shell comprises a discharging plate and two side plates which are perpendicular to the discharging plate, and the two side plates are respectively positioned on two sides of the discharging plate; the end part of the discharging plate is hinged with the discharging left frame, a buffer spring group positioned on the inner bottom surface of the discharging left frame is arranged below the discharging plate, and the buffer spring group comprises at least 3 buffer springs; a discharge hole is arranged on the right discharge frame in a matching way with the discharge shell.
6. The indoor garbage cleaning system for small high-rise construction site according to claim 5, wherein: an electromagnet is arranged on the front end face of the feeding shell, and an iron sheet is arranged on the discharging plate in a matching manner with the electromagnet; the electromagnet is arranged around the front end face of the feeding shell in the circumferential direction, and an electromagnet driving circuit is connected to the electromagnet and drives the electromagnet to work.
7. The indoor garbage cleaning system for small high-rise construction site according to claim 6, wherein: the feeding baffle is provided with a key, the signal input end of the key is connected with a processor, and the signal output end of the processor is connected with an electromagnet driving circuit.
8. The indoor garbage collection system for small high-rise construction sites according to claim 6 or 7, wherein: the garbage cleaning and transporting system is characterized by further comprising an alarm arranged at the garbage cleaning and transporting pool, wherein an alarm driving circuit is connected to the processor, and the alarm driving circuit drives the alarm to work.
9. The indoor garbage cleaning system for small high-rise construction site according to claim 8, wherein: a dust-raising prevention spray pipe is arranged above the garbage cleaning pool, the dust-raising prevention spray pipe is arranged along the circumferential direction of the garbage cleaning pool, and spray heads arranged towards the garbage cleaning pool are uniformly distributed on the dust-raising prevention spray pipe; the dust-proof spray pipe is connected with a water inlet pipe, the water inlet pipe is connected with a water tank through a water pump, the processor is connected with a water pump driving circuit, and the water pump driving circuit drives the water pump to work.
10. The indoor garbage cleaning system for small high-rise construction site according to claim 9, wherein: the shower nozzle includes that mount pad and slip set up the sleeve pipe in the mount pad, is equipped with reset spring in the mount pad, and reset spring end connection sleeve pipe, sleeve pipe one end and dustproof spray tube intercommunication, the other one end of sleeve pipe is sealed, is equipped with the apopore on the sleeve pipe lateral wall.
CN202120035229.4U 2021-01-07 2021-01-07 Indoor garbage cleaning and transporting system for small high-rise construction site Active CN214995620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120035229.4U CN214995620U (en) 2021-01-07 2021-01-07 Indoor garbage cleaning and transporting system for small high-rise construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120035229.4U CN214995620U (en) 2021-01-07 2021-01-07 Indoor garbage cleaning and transporting system for small high-rise construction site

Publications (1)

Publication Number Publication Date
CN214995620U true CN214995620U (en) 2021-12-03

Family

ID=79143164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120035229.4U Active CN214995620U (en) 2021-01-07 2021-01-07 Indoor garbage cleaning and transporting system for small high-rise construction site

Country Status (1)

Country Link
CN (1) CN214995620U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114313684A (en) * 2022-01-18 2022-04-12 中建一局集团华南建设有限公司 High-rise building garbage rapid treatment system and construction method thereof
CN115324305A (en) * 2022-08-26 2022-11-11 中国建筑第八工程局有限公司 Novel garbage pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114313684A (en) * 2022-01-18 2022-04-12 中建一局集团华南建设有限公司 High-rise building garbage rapid treatment system and construction method thereof
CN115324305A (en) * 2022-08-26 2022-11-11 中国建筑第八工程局有限公司 Novel garbage pipeline

Similar Documents

Publication Publication Date Title
CN214995620U (en) Indoor garbage cleaning and transporting system for small high-rise construction site
CN210187390U (en) A breaker for building rubbish letter sorting
CN214143886U (en) Dust fall protector of quartering hammer
CN110714431A (en) Efficient blowing and sucking type sweeping machine and operation method thereof
CN210239342U (en) Noise control dust device for construction
CN211817681U (en) A building rubbish discharging equipment for in construction
CN211887018U (en) Metal collection device among building rubbish
CN218395209U (en) Photovoltaic panel surface ash removal device
CN219281175U (en) Vertical conveying device for high-rise building garbage
CN114852729A (en) Construction waste treatment device based on building engineering
CN213328604U (en) Prevent secondary dusting feeding machine and milling machine
CN215876698U (en) Intelligent dustproof system for thin-wall steel plate net
CN220125795U (en) Spraying device in construction waste passageway
CN214189599U (en) A water-saving washing unit for green building construction
CN211495786U (en) Heavy plate type feeding machine with material cleaning system
CN210557602U (en) Building rubbish conveyer belt dust keeper
CN217321810U (en) Hopper integral square movable garbage compression equipment
CN219356498U (en) Construction waste crushing mechanism
CN215291182U (en) Perpendicular conveyer of building rubbish
CN215676550U (en) Novel industrial cooling tower
CN219750669U (en) Cement bin with cleaning function
CN211395443U (en) Warning device for construction site and construction vehicle
CN211636735U (en) Environment-friendly impact crusher
CN212468310U (en) Building engineering garbage collection device
CN219073610U (en) Pneumatic system garbage separation device

Legal Events

Date Code Title Description
GR01 Patent grant