CN207917764U - Lane device for skyscraper rubbish quick drain - Google Patents

Lane device for skyscraper rubbish quick drain Download PDF

Info

Publication number
CN207917764U
CN207917764U CN201820405453.6U CN201820405453U CN207917764U CN 207917764 U CN207917764 U CN 207917764U CN 201820405453 U CN201820405453 U CN 201820405453U CN 207917764 U CN207917764 U CN 207917764U
Authority
CN
China
Prior art keywords
rubbish
garbage transporting
channel
tube body
pour spout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820405453.6U
Other languages
Chinese (zh)
Inventor
张甡
张雪伟
马庆元
孙兆岐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
Zhongqi Jiaojian Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqi Jiaojian Group Corp Ltd filed Critical Zhongqi Jiaojian Group Corp Ltd
Priority to CN201820405453.6U priority Critical patent/CN207917764U/en
Application granted granted Critical
Publication of CN207917764U publication Critical patent/CN207917764U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to building waste transportation arts,In particular for the lane device of skyscraper rubbish quick drain,Including the first garbage transporting channel,Buffer board in the first garbage transporting channel,The first rubbish pour spout is equipped on the first garbage transporting channel,And the first baffle for stopping airborne dust,First garbage transporting the bottom of the channel is connected with the second garbage transporting channel,The second rubbish pour spout is equipped on the second garbage transporting channel,And second baffle,Second garbage transporting the bottom of the channel is equipped with rubbish delivery outlet,The adjacent tube body of rubbish delivery outlet is equipped with spray port,Building waste transport at present is mostly with construction elevator,It is transformed based on lift well,It is time-consuming and laborious,And the volume of building waste and it is in irregular shape etc. due to,Airborne dust and the damage to ground or cleaning equipment are easily caused in transportational process,The utility model effectively buffers rubbish sinking speed,Prevent airborne dust from endangering,And it is simple in structure,It can be widely popularized.

Description

Lane device for skyscraper rubbish quick drain
Technical field
The utility model is related to building waste transportation arts, are filled in particular for the channel of skyscraper rubbish quick drain It sets.
Background technology
At present in architectural engineering, especially when tier building is constructed, the building waste of generation needs timely to be transported to ground Then face is transported, not then can occupy construction site, make originally limited construction site become narrow, hinder normal construction into Row.If building waste directly thrown to ground, not only there is serious security risk, but also in throwing process, can also produce Raw a large amount of airborne dust and noise, in particular with increasing for floor, adverse effect caused by the mode of this direct throwing is more Add obviously, so the requirement of apparent improper current safe construction, civilized construction and environmental protection construction, so, in current multilayer Three kinds of modes below rubbish generally use in building in work progress:One is using construction elevator, that is, passes through installation Elevator, by building waste by elevator gradually be transported to ground, be labor intensive first in this way, need worker first By refuse bag or frame up, then again in movement to elevator, then ground be transported to by elevator, building waste be transported to ground it Afterwards, it is also necessary to which rubbish is moved out elevator and is transported at stacking by worker;Secondly as being by elevator traffic, single freight volume is small, And transportational process is also and discontinuous, so that the transporting velocity of rubbish is slower;Furthermore, it should be noted that building at present Engineering in general floor construct to eight layers just start installation elevator, could usually be used in eleventh floor, construction elevator just Before being often used, the cleaning of floor rubbish cannot be kept up in time, still influence civilized construction and airborne dust prevention.Another way is profit Rubbish transfer passage is established with skyscraper lift well, that is, elevator doorway is transformed into rubbish pour spout, it can per floor It is corresponding be provided with it is at least one be thrown into mouth, in use, each floor rubbish is directly thrown into elevator shaft, rubbish is in elevator shaft Interior free-falling is to ground, is that elevator needs to install first in this way, when elevator being stopped using to dump rubbish, The peak period that positive value building waste is formed, so still without solving the problems, such as clearing for rubbish at all.And rubbish rehandling It is time-consuming.Moreover it is to affect elevator to be installed to the prospecting in elevator, transformation, Secondary Design time early period.The third Ten thousand formulas be use garbage chute, that is, by be arranged garbage chute, opened up on garbage chute it is multiple be thrown into mouth, keep every floor all corresponding Have it is at least one be thrown into mouth, in use, can directly directly be thrown into the building waste of each floor in garbage chute, building waste exists Free-falling is to ground in garbage chute.In this way, it is that of avoiding the generation of airborne dust first;Secondly as can be continuous Construction can make rubbish constantly toward falling, greatly improve the speed of garbage transporting.But since building waste is in rubbish Rubbish falls vertically in road, and when being fallen to the ground under rubbish, speed is larger, also, since the big hardness of building waste intensity itself is high, Shape is also irregular, all can to garbage chute itself and the transporting equipment being disposed below, or even to the ground below garbage chute Greater impact is caused, with increasing for floor, this impact is bigger, so, garbage chute is limited in tier building construction Using height, and then cause in current construction, garbage chute is substantially use in low-rise building engineering, and Since building waste volume is larger, a large amount of airborne dusts are be easy to cause, especially in refuse collection, are easy to pollute the environment.
Invention content
In view of the deficiencies of the prior art, the lane device for skyscraper rubbish quick drain is provided, it is high realizing While layer rubbish conveying, building waste can be effectively reduced and topple over the impact caused by transport system bottom, and effectively controlled Airborne dust, it is simple in structure, it can wide popularization and application.
The technical scheme adopted by the utility model is that the lane device for skyscraper rubbish quick drain, including edge First garbage transporting channel of the more end to end first vertical tube body compositions that external wall of high-rise building is arranged from top to bottom, edge Short transverse in first garbage transporting channel is equipped with multiple buffer boards for slowing down rubbish sinking speed, is transported in the first rubbish Multiple the first rubbish pour spouts corresponding with floor, the inboard wall of tube body in the first rubbish pour spout are equipped on defeated channel successively It is equipped with the first baffle for stopping airborne dust, is connected with for quick at least the one of each first vertical tube body junction The rubbish of landing into the second garbage transporting channel of row buffering, second garbage transporting channel include along external wall of high-rise building from More second vertical tube bodies of upper and lower setting and multiple connect formation for the described second vertical tube body to turn round repeatedly The bending tube body in two garbage transporting channels is equipped with multiple the second rubbish corresponding with floor successively on the second garbage transporting channel Pour spout, the second garbage transporting vias inner walls in the second rubbish pour spout are equipped with and the second garbage transporting channel rotates Connection is used to prevent rubbish whereabouts in the garbage transporting channel of top from the second baffle of airborne dust occur, in the second garbage transporting channel Bottom is equipped with the rubbish delivery outlet for being delivered to rubbish outside channel, and the adjacent tube body of the rubbish delivery outlet is equipped with and is used for Reduce the spray port of airborne dust.
The above-mentioned lane device for skyscraper rubbish quick drain, the bending tube body includes one end and upper part The connection of vertical tube body the first metal bends and the lateral tube body that is connect with the first metal bends other end of one end, The transverse direction tube body other end connects the second vertical tube body of lower part by the second metal bends, and the rubbish pour spout is set to On lateral tube body.
The above-mentioned lane device for skyscraper rubbish quick drain, the buffer board are equipped with on first baffle With the channel attached compressed spring of the first garbage transporting.
The above-mentioned lane device for skyscraper rubbish quick drain, the rubbish pour spout are equipped with for closing The door body of rubbish pour spout is equipped with the hinge for connecting the two, is set in door body between the door body and rubbish pour spout It is useful for opening the handle of door body, the bolt for preventing rubbish from overflowing for closing door body is equipped in handle both sides.
The above-mentioned lane device for skyscraper rubbish quick drain, along the height side of rubbish delivery outlet adjacent tubes To being correspondingly provided with multiple spray ports.
The advantageous effect of the lane device of the utility model skyscraper rubbish quick drain is, by erecting more first It is arranged from top to bottom along external wall of high-rise building to tube body head and the tail connection and forms the first garbage transporting channel, it is logical in the first garbage transporting Buffer board is set in road, it is simple in structure, it is easy to make, reduces the impact force of rubbish landing, on the first garbage shaft successively It is adjacent in rubbish pour spout convenient for toppling over for each corresponding floor rubbish equipped with the first rubbish pour spout corresponding with floor First baffle is set on inboard wall of tube body, when preventing from dumping rubbish, airborne dust, which raises up, pollutes environment, causes damages to health of human body, First garbage transporting the bottom of the channel is connected with to be connected the second garbage transporting to be formed by the second vertical tube body and leads to by being bent tube body Road buffers by the first garbage transporting channel into the second garbage transporting channel, further reduced impact force again, while Second rubbish pour spout is set on the second garbage transporting channel, and convenient for toppling over for low layer floor rubbish, the second garbage transporting is logical Second baffle is set in road, stops airborne dust, is equipped in second garbage transporting the bottom of the channel for rubbish to be delivered to outside channel Rubbish delivery outlet, when by the first, second garbage transporting channel rubbish reach bottom rubbish delivery outlet when, due to airborne dust compared with It is more, by the way that spray port is arranged, rubbish is sprayed, airborne dust can be effectively reduced, processing, the utility model are cleared convenient for rubbish It is simple in structure, ensure that rubbish effectively prevent airborne dust while quickly convey, ensure that cleaning and the worker of the environment in building site Physical and mental health is not necessarily to installation elevator, and it is not necessary that elevator is transformed, installing and dismounting is relatively easy to, convenient for reusing, and not It is limited by story height, is particularly suitable for the garbage disposal of higher floor, it can wide popularization and application.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of door body;
Fig. 3 is the structural schematic diagram for being bent tube body;
Fig. 4 is the structural schematic diagram of spray port.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific embodiment, it elaborates to the utility model.
As shown in Figure 1,2,3, 4, the lane device of skyscraper rubbish quick drain, including along external wall of high-rise building from upper And the first garbage transporting channel 1 of more end to end first vertical tube body 3 compositions of lower setting, the first vertical tube body 3 can Using plastic conduit, durable and tubing is light, and convenient for construction, price is low, economical and beautiful, cost-effective, along the first rubbish Short transverse in channel 1 is equipped with multiple buffer boards 4 for buffering rubbish landing, and building waste is mostly irregular, avoids When toppling over building waste into straight barrel type garbage chute, the impact caused by bottom, buffer board 4 is equipped with and first garbage transporting The compressed spring 5 that channel 1 connects, compressed spring is simple in structure, and softness is good, that is, the range deformed is relatively wide, and manufactures It is easier;Structure is compact, and cushion performance is preferable, can bear compared with big load, steel plate, steel plate material can be used in buffer board 4 It is harder, it is durable, prevent the impact that rubbish is fallen from being damaged caused by buffer board, on the first garbage transporting channel 1 successively Equipped with multiple the first rubbish pour spouts 6 corresponding with floor, the first rubbish pour spout 6 is equipped with one for toppling over the first rubbish 6 closed door body 7 of mouth, and the handle 8 for opening door body 7, be equipped in 8 both sides of handle prevents rubbish for closing door body 7 The bolt 9 of spilling is equipped with the hinge 10 for connecting the two on vertical tube body 3 and door body 7, topples over rubbish convenient for each floor It while rubbish, prevents rubbish excessive, is overflowed from pour spout, construction environment is influenced, in the adjacent tube body of the first rubbish pour spout 6 Wall is equipped with first baffle 11 for stopping airborne dust, and 11 bottom of first baffle is equipped with the compressed spring 5 being connect with tube body, the The second garbage transporting channel 2 is also associated on one garbage transporting channel 1, the second garbage transporting channel 2 includes outside skyscraper More second vertical tube bodies 12 that wall is arranged from top to bottom and multiple connect shape for the second vertical tube body 12 to turn round repeatedly At the bending tube body 13 in the second garbage transporting channel 2, the bending tube body 13 includes the vertical tube body connection of one end and upper part The first metal bends 14 and the lateral tube body 15 that is connect with 14 other end of the first metal bends of one end, the transverse direction 15 other end of tube body connects the second vertical tube body of lower part, the first metal bends and the second metal bending by the second metal bends 16 45 ° of metal bends can be used in head, and convenient for connection, and metal material can effectively prevent transfer passage to be hit by heavy construction rubbish It wears, the first vertical tube body, by flanged joint, flange is easily attached, easy to disassemble, can for the second vertical tube body and bending tube body It reuses, has saved material, topple over successively equipped with multiple the second rubbish corresponding with floor on the second garbage transporting channel 2 Mouth 17, the second rubbish pour spout 17 are equipped with one and are used for by 17 closed door body 7 of the second rubbish pour spout, and for opening door The handle 8 of body 7 is equipped with the bolt 9 for preventing rubbish from overflowing for closing door body 7 in 8 both sides of handle, for ease of inclining for bottom rubbish , the second rubbish pour spout can be set on lateral tube body 15, is equipped on the second rubbish pour spout 17 and door body 7 for inciting somebody to action The hinge 10 of the two connection, while dumping rubbish convenient for each floor, prevents rubbish excessive, overflows from the second rubbish pour spout Go out, influence construction environment, the second garbage transporting vias inner walls in the second rubbish pour spout 14 are equipped with and the second garbage transporting Channel rotation connection is used to prevent rubbish whereabouts in the garbage transporting channel of top from the second baffle 18 of airborne dust, the second rubbish occur The shaft for assisting second baffle 18 to rotate being connect with second baffle 18 is equipped in transport channel 2, the second garbage transporting is logical Road is equipped with the hole for limit rotary shaft, simple in structure, easy to manufacture, prevents worker when dumping rubbish, body of the airborne dust to worker Body endangers, and the rubbish delivery outlet 19 for being delivered to rubbish outside channel is equipped in 2 bottom of the second garbage transporting channel, can be by rubbish Rubbish transporting equipment is positioned over rubbish equipped at outlet port, and rubbish is directly fallen on transporting equipment, convenient for directly transporting, is removed without secondary Fortune, save manpower, the adjacent tube body of rubbish delivery outlet 19 be equipped with for reducing airborne dust spray port 20, due to bottom airborne dust compared with Greatly, spray port 20 is set on the tube body of bottom, and to reach good spraying effect, spray port can be along the short transverse of inboard wall of tube body It is uniformly arranged multiple, effectively reduces bottom airborne dust, processing is cleared convenient for rubbish, relative to installation elevator conveying rubbish, In this way, it is time saving and energy saving first, first by refuse bag or frames up without worker, then again in movement to elevator, Ground is transported to by elevator again, after building waste is transported to ground, it is also necessary to which rubbish is moved out elevator and is transported at stacking by worker; Secondly as being by elevator traffic, single freight volume is small, and transportational process is also and discontinuous, so that rubbish Transporting velocity is slower;Furthermore, it should be noted that architectural engineering at present is generally constructed in floor just starts installation to eight layers Elevator could usually be used in eleventh floor, and before construction elevator normal use, the cleaning of floor rubbish cannot be kept up in time, according to Civilized construction and airborne dust prevention are so influenced, the utility model can be moulded hard using flange and metal bends according to story height Expects pipe connects into the height being adapted with story height, not by story height lower limit, while without transformation skyscraper elevator Vertical shaft establishes rubbish transfer passage, and time-consuming and laborious, the utility model is simple and practical in structure, facilitates installation, easy to disassemble, can be energetically It promotes the use of.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, this The those of ordinary skill of technical field, in the essential scope of the utility model, the variations, modifications, additions or substitutions made, all The scope of protection of the utility model should be belonged to.

Claims (5)

1. the lane device for skyscraper rubbish quick drain, which is characterized in that including along external wall of high-rise building from upper and First garbage transporting channel of more end to end first vertical tube body compositions of lower setting, along the first garbage transporting channel Short transverse be equipped with multiple for slowing down the buffer boards of rubbish sinking speed, be equipped with successively on the first garbage transporting channel more A the first rubbish pour spout corresponding with floor, the inboard wall of tube body in the first rubbish pour spout are equipped with for stopping airborne dust First baffle, be connected at least the one of each first vertical tube body junction for the rubbish to rapid descent into row buffering The second garbage transporting channel, second garbage transporting channel includes more be arranged from top to bottom along external wall of high-rise building Two vertical tube bodies and multiple connections that are used to repeatedly turn round the described second vertical tube body form the curved of the second garbage transporting channel Curved tube body is equipped with multiple the second rubbish pour spouts corresponding with floor, second rubbish successively on the second garbage transporting channel The second garbage transporting vias inner walls in rubbish pour spout are equipped with to be used to prevent with what the second garbage transporting channel was rotatablely connected Rubbish, which falls, in square garbage transporting channel there is the second baffle of airborne dust, is equipped with for by rubbish in second garbage transporting the bottom of the channel Rubbish is delivered to the rubbish delivery outlet outside channel, and the adjacent tube body of the rubbish delivery outlet is equipped with the spray for reducing airborne dust Mouthful.
2. the lane device according to claim 1 for skyscraper rubbish quick drain, which is characterized in that described curved Curved tube body includes the first metal bends and one end and first metal bends of the vertical tube body connection of one end and upper part The lateral tube body of other end connection, the transverse direction tube body other end connect the second vertical duct of lower part by the second metal bends Body, the rubbish pour spout are set on lateral tube body.
3. the lane device according to claim 1 for skyscraper rubbish quick drain, which is characterized in that described slow It is equipped with and the channel attached compressed spring of the first garbage transporting on punching and first baffle.
4. the lane device according to claim 1 for skyscraper rubbish quick drain, which is characterized in that the rubbish Rubbish pour spout is equipped with door body for closing rubbish pour spout, is equipped between the door body and rubbish pour spout for by the two The hinge of connection is equipped with the handle for opening door body in door body, and be equipped in handle both sides prevents rubbish for closing door body The bolt of spilling.
5. the lane device according to claim 1 for skyscraper rubbish quick drain, which is characterized in that along rubbish The short transverse of delivery outlet adjacent tubes is correspondingly provided with multiple spray ports.
CN201820405453.6U 2018-03-13 2018-03-13 Lane device for skyscraper rubbish quick drain Expired - Fee Related CN207917764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820405453.6U CN207917764U (en) 2018-03-13 2018-03-13 Lane device for skyscraper rubbish quick drain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820405453.6U CN207917764U (en) 2018-03-13 2018-03-13 Lane device for skyscraper rubbish quick drain

Publications (1)

Publication Number Publication Date
CN207917764U true CN207917764U (en) 2018-09-28

Family

ID=63596661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820405453.6U Expired - Fee Related CN207917764U (en) 2018-03-13 2018-03-13 Lane device for skyscraper rubbish quick drain

Country Status (1)

Country Link
CN (1) CN207917764U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942735A (en) * 2021-02-03 2021-06-11 浙江省建筑设计研究院 Vertical garbage transporting device for high-rise building construction site and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942735A (en) * 2021-02-03 2021-06-11 浙江省建筑设计研究院 Vertical garbage transporting device for high-rise building construction site and construction method thereof
CN112942735B (en) * 2021-02-03 2022-04-15 浙江省建筑设计研究院 Vertical garbage transporting device for high-rise building construction site and construction method thereof

Similar Documents

Publication Publication Date Title
CN208830666U (en) A kind of skyscraper vertical garbage transportation system
CN111749430B (en) Automatic conveying system for construction waste of high-rise building
CN104234388B (en) Garbage chute for high-building construction
CN207934392U (en) The quick conveying device of skyscraper rubbish
CN207917764U (en) Lane device for skyscraper rubbish quick drain
CN107916765A (en) A kind of construction rubbish conveyer
CN207934393U (en) A kind of dust-proof transportation system of skyscraper rubbish
CN109797947A (en) Building waste vertical transit system for super high-rise building
CN208533965U (en) Building waste clears device in high-building construction floor
CN203403420U (en) Concrete vertical conveying pouring system
CN107938996A (en) Building waste clears device in a kind of high-building construction floor
CN207568138U (en) For the building waste vertical transit system of high-rise building
CN206752961U (en) Rubbish storage case
CN214942027U (en) High-rise building rubbish transfer passage
CN208039739U (en) Skyscraper refuse conveying pipe road system
CN207329582U (en) Building waste conveying device
CN206408905U (en) A kind of skyscraper garbage transporting device
CN211114625U (en) Vertical transport system of building rubbish assembled
CN206646767U (en) The skyscraper garbage transporting integrated system of automatic monitoring depositing dust
CN206112366U (en) Curved buffer that wear -resistants who is used for non -pressure transport among civil engineering
CN113233032A (en) Building rubbish conveying and temporary storage device between floors
CN204098438U (en) A kind of refuse chute for high-building construction
CN212053623U (en) Self-closing door system for high-rise building garbage channel
CN207245099U (en) The interim rubbish blanking system of Core Walls Structure
CN108643519B (en) A kind of buffer-type fold-line-shaped threeway refuse inlet device for construction site construction waste cleaning

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20190313

CF01 Termination of patent right due to non-payment of annual fee