CN207436183U CN201721290601.6U CN201721290601U CN207436183U CN 207436183 U CN207436183 U CN 207436183U CN 201721290601 U CN201721290601 U CN 201721290601U CN 207436183 U CN207436183 U CN 207436183U
Authority
CN
China
Prior art keywords
water
drainage system
water conservancy
well
facility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721290601.6U
Other languages
Chinese (zh)
Inventor
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Drainage Systems Co Ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201721290601.6U priority Critical patent/CN207436183U/en
Application granted granted Critical
Publication of CN207436183U publication Critical patent/CN207436183U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It is managed the utility model discloses one kind with dirt is cut, it regulates and stores the drainage system of facility and online treatment facility, the drainage system has the effect of intelligent drainage function, pass through the reasonable reasonable discharge for controlling realization water body of aperture and associated component that control system switchs the water conservancy in the drainage system, while ensure that flood passage is safe, to the greatest extent shut off dirty water or initial rainwater to sewage treatment plant, if sewage treatment plant is unable to timely processing, it is introduced by water passage in facility of regulating and storing and is temporarily stored, when the processing capacity of sewage treatment plant is recovered, sewage treatment plant is drained into again, and in use without manual operation, pass through control unit, it can realize the automatic adjustment of water conservancy switch.The drainage system can remove the solid particulate matters such as the silt being mingled in water body, the appearance for the problems such as downstream pipe is avoided to block.The use of the drainage system can be adapted for any bar pipe network in sewerage pipeline network from the restriction of occasion.

Description

A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility
Technical field
The invention belongs to technical field of drainage, and in particular to one kind is with section dirty pipe, regulate and store facility and an online treatment facility Drainage system.
Background technology
Currently, the drainage system of city and groups of building mainly includes separate system, combined system and mixed flow system, main purpose It is collection, conveying and the processing for realizing water body.For example, the system that all waste water are treated using a kind of mode claims combined system.It is only There are one drainage systems, claim converging system, and drainage pipeline claims combined pipeline.Waste water of different nature is treated in different ways System claim separate system, it is general, and there are two drainage systems.One is properly termed as storm-water system, for collecting rainwater and pollution journey Degree is very low, the industrial wastewater of water body is directly discharged without processing, and pipeline claims storm sewer.Another is properly termed as sewage System, collects the industrial wastewater that could be discharged after sanitary sewage and needs processing, and pipeline claims sewage conduct.Mixed flow system is a kind of System between separate system and combined system is mainly since pipeline misconnection, hybrid junction etc. cause in the region of separate system There is waste water of different nature in section of tubing, i.e. storm sewer or sewage conduct has actually become combined pipeline.City Waste water in sewage conduct and combined pipeline is often referred to as municipal sewage.
Densely populated with the appearance of modern house sanitary equipment and skyscraper, excrement is conveyed with current, is greatly increased The intensity of municipal sewage;Along with industry prosperity, industrial wastewater substantial increase, the rivers and lakes of near cities occur as soon as and cannot hold The pollution condition born.Then sewage treatment plant is added, and each water outlet is connected with pipeline, the waste water in each arterial drainage is converged Collection sewage treatment plant is handled, and forms shutoff type converging system.The connection water outlet and waste water that shuts off is to the pipe of sewage treatment plant Road claims shut off pipeline or wastewater interception pipe.
Wastewater flow rate abruptly increase during rainfall if all waste water are all retained, shuts off pipeline and sewage treatment plant is necessarily required to It is very extensive, too increase engineering cost.So the inspection shaft of arterial drainage and intercepting sewer intersection is generally replaced with into shunting Well.The construction of shunting well can have a different designs, but current design and not perfect, and for different sewage quantity and rain Water does not make improvement yet.Because there was only sewage in pipe during dry season, shunting well can stop sewage, flow to sewage pipe;Rainy season When part rainwater and sewage are stopped and flow into sewage pipe, remaining stormwater overflow continues towards downstream by weir in well.For rain The flow direction of water and sewage, it is most in current control method to be controlled using water level or rainfall, but existing water level control Method or rainfall control methods, the flow-dividing control to rainwater and sewage is not fine, so as to lose meaning existing for shunting well.
Moreover, in rainfall, either initial rainwater or middle and later periods rainwater are often mixed into rainwash There are the solid particulate matters such as substantial amounts of silt, so these particulate matters are relatively fine, but be only to play in existing shunting well The effect of shunting, for particulate matters such as the silts that is mingled in water body, there is no effective minimizing technology, if the particulate matters such as silt It clears up away not in time, will necessarily deposit in shunting well or pipeline, in the course of time by blocking pipeline, be likely to result in when serious The paralysis of drainage system.
The content of the invention
In order to solve the deficiencies in the prior art, the present invention provides one kind with a section dirty pipe, regulate and store facility and online processing The drainage system of facility, the drainage system shut off and shunt for rainwater and/or sewage, can effectively remove in water body and press from both sides The solid particulate matters such as miscellaneous silt, the appearance for the problems such as downstream pipe is avoided to block.
The present invention provides a kind of drainage system, the drainage system includes shunting well, and the shunting well includes shunting well Well body and the first barricade and the second barricade for being arranged at the shunting well well body bottom;First barricade and the second barricade will divide Stream well well body is divided into the first well body, the second well body and the 3rd well body, wherein, it is the first well between the first barricade and well body side wall Body, is the second well body between the first barricade and the second barricade, is the 3rd well body between the second barricade and well body side wall;
The shunting well further includes four openings, is water inlet, the first water outlet, the second water outlet and the 3rd water outlet respectively Mouthful;The water inlet is arranged in the first well body, and first water outlet is arranged at the first well body, the second well body or the 3rd well body In, second water outlet is arranged in the second well body or the 3rd well body, and the 3rd water outlet is arranged in the 3rd well body;
The shunting well further includes strainer, and the strainer is arranged horizontally at close to water inlet opening or water inlet Open bottom;
The drainage system further includes water passage, regulate and store facility and section dirty pipe;The arrival end of the water passage is with dividing The first water outlet in stream well is connected;The water passage is connected with facility of regulating and storing;The port of export of the water passage is with cutting dirt Pipe is connected;
The drainage system further includes online treatment facility, and the online treatment facility is connected with the second water outlet.
According to the utility model, first water outlet is arranged in the second well body, and second water outlet is arranged at In three well bodies.
According to the utility model, first barricade and the second barricade are arranged in parallel in the shunting well well body bottom.
According to the utility model, multiple barricades can also be set, the multiple barricade is located at into water in first well body Between mouth and first barricade;Multiple barricades can also be set in second well body, and the multiple barricade is located at described the Between one barricade and the second barricade;Multiple barricades can also be set in the 3rd well body, and the multiple barricade is located at described the Between two barricades and the second water outlet.
According to the utility model, it will be understood by those skilled in the art that the height of first barricade and the second barricade does not have There is specific restriction, may be the same or different;Preferably, the height of first barricade and/or the second barricade is not high In the bottom level of water inlet;It is further preferred that the height of first barricade and the second barricade is identical and is not higher than water inlet Bottom level.
According to the utility model, the strainer is connected with the side wall where water inlet.
According to the utility model, the strainer side wall adjacent with the side wall where water inlet is connected.
According to the utility model, the strainer is connected with the side wall where water inlet and extends to above the second barricade.
According to the utility model, the strainer side wall adjacent with the side wall where water inlet is connected and extends to second gear Above wall.
According to the utility model, it will be understood by those skilled in the art that the strainer that the strainer is known in the art.
According to the utility model, the strainer is arranged on water inlet, for filtering into the shunting well well body Grain object, water body flow into shunting well well body after being separated by filtration;In the first barricade and the second barricade that shunting well well body bottom is set The silt in water body can further be filtered.When water body after strainer filtering passes through the first barricade, the remainder particulate in water body Object deposits to the first well body bottom, and a small amount of particle object is contained on top or the water body overflow without particulate matter is entered by the first barricade In second well body, the water body directly after strainer filtering is further included in the second well body, since water body may still contain in the second well body There is a small amount of particulate matter, deposition can equally occur for these a small amount of particulate matters, deposit to the second well body bottom, top is contained A small amount of particle object or water body without particulate matter again overflow by the second barricade into the 3rd well body, so as to fulfill in water body The abundant deposition separation of silt.
According to the utility model, the drainage system further includes the first water conservancy switch, the second water conservancy switch, the 3rd water conservancy and opens It closes and the 4th water conservancy switchs;Wherein, in the port of export close to the water passage the first water conservancy is set to switch, passed through for controlling The water amount of the port of export of water passage;Close to first water outlet the second water conservancy is being set to switch, passed through for controlling The water amount of first water outlet;Close to second water outlet the 3rd water conservancy is being set to switch, for controlling to go out by second The water amount at the mouth of a river;Close to the 3rd water outlet the 4th water conservancy is being set to switch, for controlling through the 3rd water outlet Water amount.
According to the utility model, the drainage system further includes control system, and the control system includes the first monitoring and fills It puts, the second monitoring device and the control unit being connected with its signal;Described control unit is switched with the first water conservancy, the second water conservancy is opened It closes, the 3rd water conservancy switch is connected with the 4th water conservancy switching signal;First monitoring device and the second monitoring device are used to monitor The signal of monitoring is simultaneously conveyed to control unit by signal, and control unit controls the first water conservancy switch, second according to received signal The aperture of water conservancy switch, the 3rd water conservancy switch and the 4th water conservancy switch.
According to the utility model, the water passage is selected from the buffering gallery with waterpower switch, with waterpower switch Cross water lines and can overflow at least one of pipeline.
According to the utility model, the water passage is arranged on regulate and store installation atop or inside;Or the water passage It sets with facility of regulating and storing and is connected by waterpower switch parallel.
When water passage is buffering gallery with waterpower switch or the mistakes water lines with waterpower switch, described water Passage can be arranged on regulate and store installation atop or inside;Or the water passage is set parallel with facility of regulating and storing.When the mistake When water body in aquaporin has little time discharge, water body is acted on by pressure, is washed waterpower switch open, is temporarily deposited into facility of regulating and storing Storage.
When water passage for can overflow pipeline when, the water passage can be arranged on regulate and store installation atop or inside. When the water body in the water passage has little time discharge, water body overflow is entered by pipeline, the water body of overflow in facility of regulating and storing Temporarily storage.
Just rain pipe can also be set according to the utility model, between the water passage and the first water outlet.
According to the utility model, the online treatment facility is connected by pipeline or gallery with the second water outlet, such as logical Online processing tube is crossed with the second water outlet to be connected.
According to the utility model, the drainage system further includes outlet pipe;3rd water outlet is by outlet pipe with leading to Pipeline toward natural water is connected.
According to the utility model, first water outlet is arranged in the first well body, and first water outlet leads to crossing water The arrival end in road is connected;The water body of the first water outlet is discharged, it, can be with containing a small amount of silt in the water body through strainer filtering Reach row to sewage treatment plant and/or the discharge standard for facility of regulating and storing, so as to efficiently solve Sedimentation Problems.
According to the utility model, first water outlet is arranged in the second well body, and first water outlet leads to crossing water The arrival end in road is connected;Discharge the water body of the first water outlet or through strainer filtering and primary overflow deposition or through strainer mistake It filters, only can reach and arrange to sewage treatment plant and/or the discharge standard for facility of regulating and storing containing a small amount of silt in the water body, So as to efficiently solve Sedimentation Problems.
According to the utility model, first water outlet is arranged in the 3rd well body, and first water outlet leads to crossing water The arrival end in road is connected;Discharge the water body of the first water outlet or through strainer filtering and the deposition of overflow at least twice or through filter Net filtration and at least once overflow deposit, and almost no longer contain silt in the water body, the row of being fully achieved to sewage treatment plant with/ Or the discharge standard for facility of regulating and storing, so as to efficiently solve Sedimentation Problems.
According to the utility model, second water outlet is arranged in the second well body, second water outlet and online place Reason facility is connected;Discharge the water body of the second water outlet or through strainer filtering and primary overflow deposition or through strainer filtering, Only reach discharge standard of the row to online treatment facility containing a small amount of silt in the water body, asked so as to efficiently solve silt Topic.
According to the utility model, second water outlet is arranged in the 3rd well body, second water outlet and online place Reason facility is connected;Discharge the water body of the second water outlet or through strainer filtering and the deposition of overflow at least twice or through strainer mistake Filter and at least once overflow deposit, and almost no longer contain silt in the water body, and the row of being fully achieved is to the row of online treatment facility Standard is put, so as to efficiently solve Sedimentation Problems.
According to the utility model, the 3rd water outlet is arranged in the 3rd well body, and the 3rd water outlet passes through water outlet It manages and is connected with the pipeline towards natural water;Discharge the water body of the 3rd water outlet or through strainer filtering and overflow at least twice Deposition or through strainer filtering and overflow deposition at least once, almost no longer contains silt in the water body, can the row of arrival to The discharge standard of natural water, efficiently solves Sedimentation Problems.
According to the utility model, the drainage system further includes integrated treatment facility, the port of export of the facility of regulating and storing It is connected with the arrival end of integrated treatment facility.
According to the utility model, the drainage system further includes the 8th water conservancy switch;In going out close to the facility of regulating and storing At the arrival end of mouthful end or integrated treatment facility the 8th water conservancy is set to switch, for controlling through the port of export of facility of regulating and storing or The water amount of the arrival end of integrated treatment facility.
According to the utility model, the 8th water conservancy switch is connected with control unit signal, and control unit is according to reception Signal controls the aperture of the 8th water conservancy switch.
According to the utility model, the device that first monitoring device includes monitoring water body liquid level (such as can be liquid level Sensor, liquid level gauge, liquid-level switch etc.), monitor water quality device (such as can be Water quality detector, online COD monitoring Instrument, online TSS monitors, online BOD monitors, online TN monitors, online TP monitors, online NH3It is-N monitors, online Ammonia nitrogen monitor, electrode, conductivity meter etc.), the device for monitoring water body total amount (such as can be opened with the electronic of function of measuring Close machine etc.), monitor at least one of the device (such as rainfall gauge) of rainfall, device (such as timer) of monitoring time.
According to the utility model, first monitoring device may be provided in shunting well well body or shunt according to type demand Outside well well body.For example, the device of monitoring water body liquid level and the device of monitoring water quality are arranged in shunting well well body, rain is monitored The device of amount is arranged on outside shunting well well body, and the device of monitoring water body total amount is arranged on the water conservancy switch in shunting well well body, The device of monitoring time is arranged in shunting well well body or outside shunting well well body.
According to the utility model, the device that second monitoring device includes monitoring water body liquid level (such as can be liquid level Sensor, liquid level gauge, liquid-level switch etc.), the device for monitoring water body total amount (such as can be the electronic keying with function of measuring At least one of machine etc.).
According to the utility model, second monitoring device may be provided to regulate and store in facility or regulate and store according to type demand and set It applies outer.For example, the device of monitoring water body liquid level is arranged on and regulates and stores in facility;The device of the monitoring water body total amount is arranged on the 8th On water conservancy switch.
According to the utility model, it will be understood by those skilled in the art that the water inlet, the first water outlet, the second water outlet The shape and openings of sizes of mouth and the 3rd water outlet do not limit specifically, can be with the shape of coupled pipeline or gallery Or the shape of the water conservancy switch set with it matches.Such as the water inlet, the first water outlet, the second water outlet and The shape of three water outlets is circle.
According to the utility model, it will be understood by those skilled in the art that arrangement of the water inlet in the first well body is suitable Sequence and arrangement mode do not limit, and the region area and geopotentia that can be set according to well body reasonably set the water inlet Position in the first well body.Such as the water inlet is arranged on side wall or the bottom of the first well body.
According to the utility model, it will be understood by those skilled in the art that first water outlet is in the first well body, the second well Putting in order in body or the 3rd well body does not limit with arrangement mode, can be according to the first well body, the second well body or the 3rd well The region area and geopotentia that body is set reasonably set first water outlet in the first well body, the second well body or the 3rd well The position of body.Such as first water outlet is arranged on the side wall of the first well body, the second well body or the 3rd well body.
According to the utility model, it will be understood by those skilled in the art that second water outlet is in the second well body or the 3rd Putting in order in well body does not limit with arrangement mode, can according to the region area that the second well body or the 3rd well body are set and Geopotentia reasonably sets second water outlet in the position of the second well body or the 3rd well body.Such as second water outlet It is arranged on the side wall of the second well body or the 3rd well body.
According to the utility model, it will be understood by those skilled in the art that row of the 3rd water outlet in the 3rd well body Row order and arrangement mode do not limit, and the region area and geopotentia that can be set according to the 3rd well body reasonably set institute The 3rd water outlet is stated in the position of the 3rd well body.Such as the 3rd water outlet is arranged on the side wall of the 3rd well body.
According to the utility model, it will be understood by those skilled in the art that the quantity of the online treatment facility in systems It is not limited specifically with arrangement, can be multiple online treatment facilities of serial or parallel connection;Its specific arrangement mode can root It is reasonably arranged according to the region area of the system is used.The online treatment facility can be known in the art online Treatment facility, such as including biofilter, online processing pond, flocculation basin, inclined-plate clarifying basin, setting pot or artificial swamp etc..
According to the utility model, it will be understood by those skilled in the art that the quantity of the facility in drainage system of regulating and storing It is not limited specifically with arrangement, can be according to the region area of the system be used reasonably to be arranged, such as can go here and there Connection or multiple facilities of regulating and storing in parallel.The facility of regulating and storing can be facility of regulating and storing known in the art, for example, including storage pond, It regulates and stores box culvert, deep tunnel or shallow tunnel etc..
According to the utility model, it will be understood by those skilled in the art that the number of the integrated treatment facility in systems Amount and arrangement do not limit specifically, can be multiple integrated treatment facilities of serial or parallel connection;Its specific arrangement mode can With according to the region area of the system is used reasonably to be arranged.The integrated treatment facility can be known in the art Integrated treatment facility, such as including integrated sewage disposal station etc..
According to the utility model, the first water conservancy switch, the second water conservancy switch, the 3rd water conservancy switch and the 4th water conservancy are opened Close separately selected from valve (ball valve, gate valve, knife gate valve, butterfly valve, lift rubber slab shut off check-valves etc.), gate (on Open type gate, bottom-open type gate etc.), weir gate (upper open type weir gate, bottom-open type weir gate, rotary weir gate etc.), (shut off flap valve flap valve Deng) in one kind.
According to the utility model, first water conservancy switch can realize maximum current-limiting function, that is, ensure by described the The flow of one water conservancy switch does not exceed the flow value of setting.
According to the utility model, second water conservancy switch can realize maximum current-limiting function, that is, ensure by described the The flow of two water conservancies switch does not exceed the flow value of setting.
According to the utility model, the 3rd water conservancy switch can realize maximum current-limiting function, that is, ensure by described the The flow of three water conservancies switch does not exceed the flow value of setting.
According to the utility model, the 8th water conservancy switch is selected from valve (ball valve, gate valve, knife gate valve, butterfly valve, lift Rubber slab shuts off check-valves etc.), gate (upper open type gate, bottom-open type gate etc.), weir gate (upper open type weir gate, bottom-open type weir gate, Rotary weir gate etc.), one kind in flap valve (flap valve that shuts off etc.).
According to the utility model, the 8th water conservancy switch can realize maximum current-limiting function, that is, ensure by described the The flow of eight water conservancies switch does not exceed the flow value of setting.
Beneficial effects of the present invention:
1) the second water outlet of drainage system of the invention is provided with online treatment facility;The online treatment facility can Effectively to solve the process problem for the middle and later periods rainwater having in shunting well well body, accomplish initial rainwater and middle and later periods thoroughly Rainwater shunting is handled.
2) the first water outlet setting water passage of drainage system of the invention, regulate and store facility and section dirty pipe, on the one hand in fact Existing sanitary sewage or initial rainwater are diverted to sewage treatment plant, on the other hand, cannot can in time shut off to sewage treatment plant Initial rainwater send to facility storage of regulating and storing, realize effectively shutting off for sanitary sewage and initial rainwater.
3) shunting well of the drainage system of the utility model includes strainer and barricade, the water body into shunting well well body The solid particulate matters such as the silt being mingled in water body can be removed after strainer filtering and barricade deposition, avoid downstream pipe The appearance of the problems such as blocking.
4) drainage system of the invention has many advantages, such as that floor space is small, powerful, using a small amount of land area just Can realize rainwater and sewage efficiently separates processing.The use of the drainage system can be adapted for from the restriction of occasion Any bar pipe network in sewerage pipeline network.
5) drainage system of the invention can also include control system, in use without manual operation, pass through control Unit processed can realize the automatic adjustment of water conservancy switch, have the characteristics that flexible and changeable, reduce substantial amounts of manpower and materials.Tool For body, drainage system of the invention has the effect of intelligent drainage function, and the water conservancy in the drainage system is opened by control system The reasonable discharge of water body, while ensure that flood passage is safe, maximum journey are realized in the reasonable control of the aperture and associated component of pass Degree shuts off to sewage treatment plant to dirty water or initial rainwater, if sewage treatment plant is unable to timely processing, by crossing water Passage is introduced into facility of regulating and storing and is temporarily stored, and when the processing capacity of sewage treatment plant is recovered, then drains into sewage disposal Factory.
6) drainage system of the invention can also set integrated treatment facility in the port of export for facility of regulating and storing, and pass through one Body treatment facility handles the water body being stored in facility of regulating and storing, the processing pressure of sewage treatment plant when slowing down flood season Power reduces due to sewage treatment plant's processing capacity deficiency and the frequency of waterlogging number generation occurs.
7) drainage system of the invention efficiently solve cut in the prior art dirty pipe can not carry out current limliting, clean water or after Phase rainwater, which can also enter, cuts the phenomenon that dirty pipe is delivered to sewage treatment plant.By reasonably control dirty water, initial rainwater and in after The discharge approach of phase rainwater, to greatest extent shuts off dirty water to facility of regulating and storing, draining into natural water compared with clean water.
8) drainage system of the invention is in rainfall, since rainfall intensity is larger, cannot shut off in time to sewage disposal The initial rainwater of factory is sent to facility storage of regulating and storing, while integrated treatment facility can also be to the water body in facility of regulating and storing with constant Flow handled, treated, and clean water body is directly discharged in the pipeline being connected with natural water;Later stage is cleaner Rainwater is directly discharged to natural water again, it is possible to reduce the number and spillway discharge of overflow occurs in rainfall, so as to reduce rain The pollution load of overflow of water.
Description of the drawings
Fig. 1 is the structure diagram of the drainage system described in a preferred embodiment of the invention;
Wherein, 1- water inlets;The first water outlets of 2-;The second water outlets of 3-;The 3rd water outlets of 4-;The first barricades of 5-;6- Two barricades;The first well bodies of 7-;The second well bodies of 8-;The 3rd well bodies of 9-;10- strainers;11- regulates and stores facility;The second water conservancies of 12- switch; The 3rd water conservancies of 13- switch;The 4th water conservancies of 14- switch;The first rain pipes of 22-;The online processing tubes of 23-;24- outlet pipes;21- is handled online Facility;25- water passages;26- cuts dirty pipe.
Specific embodiment
With reference to specific embodiment, the present invention is further explained.It is to be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.Furthermore, it is to be understood that after recorded content of the invention has been read, this field skill Art personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within limited range of the present invention.
In the description of the present invention, it is necessary to explanation, term " first ", " second ", " the 3rd ", " the 4th " and " the 8th " Description purpose is only used for, and not for instruction or implies relative importance.
Embodiment 1
As shown in Figure 1, the present invention provides a kind of drainage system, the drainage system includes shunting well, the shunting well Including shunting well well body and the first barricade 5 and the second barricade 6 that are arranged at the shunting well well body bottom;First barricade 5 Shunting well well body is divided into the first well body 7, the second well body 8 and the 3rd well body 9 with the second barricade 6;
The shunting well further includes four openings, is water inlet 1, the first water outlet 2, the second water outlet 3 and the 3rd respectively Water outlet 4;The water inlet 1 is arranged in the first well body 7, and first water outlet 2 is arranged at the first well body 7, the second well body 8 Or the 3rd in well body 9, second water outlet 3 is arranged in the second well body 8 or the 3rd well body 9, and the 3rd water outlet 4 is set In the 3rd well body 9, wherein, it is the first well body 7, the first barricade 5 and the second barricade 6 between the first barricade 5 and well body side wall Between be the second well body 8, be the 3rd well body 9 between the second barricade 6 and well body side wall;
The shunting well further includes strainer 10, the strainer 10 be arranged horizontally at close to 1 opening of water inlet or 1 open bottom of water inlet;
The drainage system further includes water passage 25, regulate and store facility 11 and section dirty pipe 26;The water passage 25 enters Mouth end is connected with the first water outlet 2 in shunting well;The water passage 25 is connected with facility 11 of regulating and storing;The water passage 25 The port of export be connected with cutting a dirty pipe 26;
The drainage system further includes online treatment facility, and the online treatment facility is connected with the second water outlet 3.
In a preferred embodiment of the utility model, first water outlet 2 is arranged in the second well body 8, institute The second water outlet 3 is stated to be arranged in the 3rd well body 9.
In a preferred embodiment of the utility model, 5 and second barricade 6 of the first barricade is arranged in parallel in institute State shunting well well body bottom.
In a preferred embodiment of the utility model, multiple barricades, institute can also be set in first well body 7 Multiple barricades are stated to be located between water inlet 1 and first barricade 5;Multiple barricades, institute can also be set in second well body 8 Multiple barricades are stated between 5 and second barricade 6 of the first barricade;Multiple barricades can also be set in 3rd well body 9, The multiple barricade is between 6 and second water outlet 3 of the second barricade.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that first barricade 5 It does not limit specifically, may be the same or different with the height of the second barricade 6;Preferably, first barricade 5 and/ Or second barricade 6 height be not higher than water inlet 1 bottom level;It is further preferred that 5 and second barricade 6 of the first barricade Bottom level that is highly identical and being not higher than water inlet 1.
In a preferred embodiment of the utility model, the strainer 10 is connected with the side wall where water inlet 1.
In a preferred embodiment of the utility model, the strainer 10 is adjacent with the side wall where water inlet 1 Side wall is connected.
In a preferred embodiment of the utility model, the strainer 10 is connected simultaneously with the side wall where water inlet 1 Extend to 6 top of the second barricade.
In a preferred embodiment of the utility model, the strainer 10 is adjacent with the side wall where water inlet 1 Side wall is connected and extends to above the second barricade 6.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the strainer 10 is Strainer 10 known in the art.
In a preferred embodiment of the utility model, the strainer 10 is arranged at water inlet 1, for filter into Enter the particulate matter in the shunting well well body, water body flows into shunting well well body after being separated by filtration;It is set in shunting well well body bottom The first barricade 5 and the second barricade 6 can further filter silt in water body.Water body after the filtering of strainer 10 passes through first During barricade 5, the remainder particulate object in water body deposits to 7 bottom of the first well body, and top contains a small amount of particle object or without particulate matter Water body overflow by the first barricade 5 into the second well body 8, being further included in the second well body 8 directly after the filtering of strainer 10 Water body, since water body may still contain a small amount of particulate matter in the second well body 8, these a small amount of particulate matters can equally deposit Effect, deposits to 8 bottom of the second well body, top contain a small amount of particle object or water body without particulate matter again overflow by second Barricade 6 enters in the 3rd well body 9, so as to fulfill the abundant deposition separation of silt in water body.
In a preferred embodiment of the utility model, the drainage system further includes the first water conservancy switch, second Water conservancy switchs the 12, the 3rd water conservancy switch 13 and the 4th water conservancy switch 14;Wherein, set in the port of export close to the water passage 25 The first water conservancy switch is put, for controlling the water amount of the port of export by water passage 25;At first water outlet 2 The second water conservancy is set to switch 12, for controlling the water amount by the first water outlet 2;It is set at second water outlet 3 The 3rd water conservancy switch 13 is put, for controlling the water amount by the second water outlet 3;It is being set at the 3rd water outlet 4 4th water conservancy switch 14, for controlling the water amount by the 3rd water outlet 4.
In a preferred embodiment of the utility model, the drainage system further includes control system, the control System includes the first monitoring device, the second monitoring device and the control unit being connected with its signal;Described control unit and first Water conservancy switch, the second water conservancy switch the 12, the 3rd water conservancy switch 13 and are connected with the 4th water conservancy 14 signals of switch;The first monitoring dress It puts with the second monitoring device for monitoring signals and the signal of monitoring is conveyed to control unit, control unit is according to the letter of reception Number control the first water conservancy switch, the second water conservancy switch the 12, the 3rd water conservancy switch 13 and the 4th water conservancy switch 14 aperture.
In a preferred embodiment of the utility model, the water passage 25 is selected from the buffering with waterpower switch Gallery, the mistake water lines with waterpower switch and can overflow at least one of pipeline.
In a preferred embodiment of the utility model, the water passage 25 be arranged on regulate and store the top of facility 11 or It is internal;Or the water passage 25 with facility 11 of regulating and storing sets and is connected by waterpower switch parallel.
When water passage 25 be with waterpower switch buffering gallery or with waterpower switch mistake water lines when, the mistake Aquaporin 25 can be arranged on facility 11 top or internal of regulating and storing;Or the water passage 25 is set parallel with facility 11 of regulating and storing It puts.When the water body in the water passage 25 has little time discharge, water body is acted on by pressure, waterpower switch is washed open, into tune It stores and is temporarily stored in facility 11.
When water passage 25 for can overflow pipeline when, the water passage 25 can be arranged on regulate and store the top of facility 11 or It is internal.When the water body in the water passage 25 has little time discharge, by pipeline, the water body of overflow, which enters, regulates and stores for water body overflow It is temporarily stored in facility 11.
In a preferred embodiment of the utility model, may be used also between 25 and first water outlet 2 of water passage To set just rain pipe 22.
In a preferred embodiment of the utility model, the online treatment facility 21 by online processing tube 23 with Second water outlet 3 is connected.
In a preferred embodiment of the utility model, the drainage system further includes outlet pipe 24;Described 3rd Water outlet 4 is connected by outlet pipe 24 with the pipeline towards natural water.
In a preferred embodiment of the utility model, the drainage system further includes outlet pipe 24;Described 3rd Water outlet 4 is connected by outlet pipe 24 with the pipeline towards natural water.
In a preferred embodiment of the utility model, first water outlet 2 is arranged in the first well body 7, institute The first water outlet 2 is stated with the arrival end of water passage to be connected;The water body of the first water outlet 2 is discharged, is filtered through strainer 10, the water Containing a small amount of silt in body, row can be reached to sewage treatment plant and/or the discharge standard for facility 11 of regulating and storing, so as to effectively solve It has determined Sedimentation Problems.
In a preferred embodiment of the utility model, first water outlet 2 is arranged in the second well body 8, institute The first water outlet 2 is stated with the arrival end of water passage to be connected;Discharge the first water outlet 2 water body or through strainer 10 filtering and Primary overflow is deposited or filtered through strainer 10, only can reach row to sewage disposal containing a small amount of silt in the water body Factory and/or the discharge standard for facility 11 of regulating and storing, so as to efficiently solve Sedimentation Problems.
In a preferred embodiment of the utility model, first water outlet 2 is arranged in the 3rd well body 9, institute The first water outlet 2 is stated with the arrival end of water passage to be connected;Discharge the first water outlet 2 water body or through strainer 10 filtering and Overflow at least twice is deposited or filtered through strainer 10 and deposited with overflow at least once, almost no longer contains mud in the water body Sand, the row of being fully achieved is to sewage treatment plant and/or the discharge standard for facility 11 of regulating and storing, so as to efficiently solve Sedimentation Problems.
In a preferred embodiment of the utility model, second water outlet 3 is arranged in the second well body 8, institute The second water outlet 3 is stated with online treatment facility to be connected;Discharge the water body of the second water outlet 3 or through the filtering of strainer 10 and once Overflow is deposited or filtered through strainer 10, only reaches discharge of the row to online treatment facility containing a small amount of silt in the water body Standard, so as to efficiently solve Sedimentation Problems.
In a preferred embodiment of the utility model, second water outlet 3 is arranged in the 3rd well body 9, institute The second water outlet 3 is stated with online treatment facility to be connected;Discharge the water body of the second water outlet 3 or through the filtering of strainer 10 and at least Overflow twice is deposited or filtered through strainer 10 and deposited with overflow at least once, almost no longer contains silt in the water body, complete It is complete to reach discharge standard of the row to online treatment facility, so as to efficiently solve Sedimentation Problems.
In a preferred embodiment of the utility model, the 3rd water outlet 4 is arranged in the 3rd well body 9, institute The 3rd water outlet 4 is stated by outlet pipe 24 with the pipeline towards natural water to be connected;Discharge the 3rd water outlet 4 water body or It is filtered through the filtering of strainer 10 and the deposition of overflow at least twice or through strainer 10 and overflow deposits at least once, in the water body Almost no longer contain silt, can the row of arrival to the discharge standard of natural water, efficiently solve Sedimentation Problems.
In a preferred embodiment of the utility model, first monitoring device includes the dress of monitoring water body liquid level (such as can be liquid level sensor, liquid level gauge, liquid-level switch etc.) be put, the device for monitoring water quality (such as can be water quality Detector, online COD monitors, online TSS monitors, online BOD monitors, online TN monitors, online TP monitors, Line NH3- N monitors, online ammonia nitrogen monitor, electrode, conductivity meter etc.), the device for monitoring water body total amount (such as can be band Have electronic headstock gear of function of measuring etc.), monitor the device (such as rainfall gauge) of rainfall, device (such as timer of monitoring time At least one of Deng).
In a preferred embodiment of the utility model, first monitoring device may be provided at according to type demand In shunting well well body or outside shunting well well body.For example, the device of monitoring water body liquid level and the device of monitoring water quality are arranged on In shunting well well body, the device for monitoring rainfall is arranged on outside shunting well well body, and the device of monitoring water body total amount is arranged on shunting well On water conservancy switch in well body, the device of monitoring time is arranged in shunting well well body or outside shunting well well body.
In a preferred embodiment of the utility model, second monitoring device includes the dress of monitoring water body liquid level It puts (such as can be liquid level sensor, liquid level gauge, liquid-level switch etc.), the device for monitoring water body total amount (such as can carry At least one of electronic headstock gear of function of measuring etc.).
In a preferred embodiment of the utility model, second monitoring device may be provided at according to type demand It regulates and stores in facility or regulates and stores outside facility.For example, the device of monitoring water body liquid level is arranged on and regulates and stores in facility 11;The monitoring water body The device of total amount is arranged on the 8th water conservancy switch.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the water inlet 1, The shape and openings of sizes of first water outlet 2, the second water outlet 3 and the 3rd water outlet 4 do not limit specifically, can with its Connected pipeline or the shape of gallery or the shape of the water conservancy switch set with it match.Such as the water inlet 1, The shape of one water outlet 2, the second water outlet 3 and the 3rd water outlet 4 is circle.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the water inlet 1 exists Putting in order in the first well body 7 does not limit with arrangement mode, can be according to the region area and geopotentia that well body is set Position of the water inlet 1 in the first well body 7 is reasonably set.Such as the water inlet 1 is arranged on the side wall of the first well body 7 Or bottom.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that first water outlet Mouthful 2 putting in order in the first well body 7, the second well body 8 or the 3rd well body 9 do not limit with arrangement mode, can be according to the The region area and geopotentia that one well body 7, the second well body 8 or the 3rd well body 9 are set reasonably set first water outlet 2 In the position of the first well body 7, the second well body 8 or the 3rd well body 9.Such as first water outlet 2 is arranged on the first well body 7, The side wall of two well bodies 8 or the 3rd well body 9.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that second water outlet 3 putting in order in the second well body 8 or the 3rd well body 9 of mouth do not limit with arrangement mode, can be according to the second well body 8 or the The region area and geopotentia that three well bodies 9 are set reasonably set second water outlet 3 in the second well body 8 or the 3rd well body 9 position.Such as second water outlet 3 is arranged on the side wall of the second well body 8 or the 3rd well body 9.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the 3rd water outlet 4 putting in order in the 3rd well body 9 of mouth do not limit with arrangement mode, the region area that can be set according to the 3rd well body 9 3rd water outlet 4 is reasonably set with geopotentia in the position of the 3rd well body 9.Such as the 3rd water outlet 4 is set In the side wall of the 3rd well body 9.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the online processing The quantity of facility in systems and arrangement do not limit specifically, can be multiple online treatment facilities of serial or parallel connection;Its Specific arrangement mode can be according to using the region area of the system reasonably to be arranged.The online treatment facility can be Online treatment facility known in the art, such as including biofilter, online processing pond, flocculation basin, inclined-plate clarifying basin, sand setting Pond or artificial swamp etc..
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the facility of regulating and storing Quantity in drainage system and arrangement do not limit specifically, can be carried out according to the region area for using the system rational Arrangement, such as can be the multiple facilities of regulating and storing of serial or parallel connection.The facility of regulating and storing can be that known in the art regulating and storing is set It applies, such as including storage pond, box culvert of regulating and storing, deep tunnel or shallow tunnel etc..
In a preferred embodiment of the utility model, the first water conservancy switch, the second water conservancy switch, the 3rd water Separately selected from valve, (ball valve, gate valve, knife gate valve, butterfly valve, lift rubber slab shut off for profit switch and the 4th water conservancy switch Check-valves etc.), gate (upper open type gate, bottom-open type gate etc.), weir gate (upper open type weir gate, bottom-open type weir gate, rotary weir gate Deng), one kind in flap valve (flap valve that shuts off etc.).
In a preferred embodiment of the utility model, the first water conservancy switch can realize maximum current limliting work( Can, that is, ensure not exceeding the flow value of setting by the flow that first water conservancy switchs.
In a preferred embodiment of the utility model, the second water conservancy switch can realize maximum current limliting work( Can, that is, ensure not exceeding the flow value of setting by the flow that second water conservancy switchs.
In a preferred embodiment of the utility model, the 3rd water conservancy switch can realize maximum current limliting work( Can, that is, ensure not exceeding the flow value of setting by the flow that the 3rd water conservancy switchs.
Embodiment 2
A kind of drainage system, the drainage system include the drainage system described in embodiment 1, further include integrated treatment and set It applies, the port of export of the facility 11 of regulating and storing is connected with the arrival end of integrated treatment facility.
In a preferred embodiment of the utility model, the drainage system further includes the 8th water conservancy switch;By At nearly the regulate and store port of export of facility 11 or the arrival end of integrated treatment facility the 8th water conservancy is set to switch, it is logical for controlling Cross the water amount of the port of export for facility 11 of regulating and storing or the arrival end of integrated treatment facility.
In a preferred embodiment of the utility model, the 8th water conservancy switch is connected with control unit signal, Control unit controls the aperture of the 8th water conservancy switch according to received signal.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that at the integration The quantity of reason facility in systems does not limit specifically with arrangement, can be that multiple integrated treatments of serial or parallel connection are set It applies;Its specific arrangement mode can be according to using the region area of the system reasonably to be arranged.The integrated treatment is set It can be integrated treatment facility known in the art to apply, such as including integrated sewage disposal station etc..
In a preferred embodiment of the utility model, the 8th water conservancy switch selected from valve (ball valve, gate valve, Knife gate valve, butterfly valve, lift rubber slab shut off check-valves etc.), gate (upper open type gate, bottom-open type gate etc.), weir gate (above open Formula weir gate, bottom-open type weir gate, rotary weir gate etc.), one kind in flap valve (flap valve that shuts off etc.).
In a preferred embodiment of the utility model, the 8th water conservancy switch can realize maximum current limliting work( Can, that is, ensure not exceeding the flow value of setting by the flow that the 8th water conservancy switchs.
Embodiment 3
The present embodiment is to provide a kind of water discharge control method of water level-water quality method control, and the water discharge control method is base In the drainage system described in embodiment 1, the drainage system includes control system, the first monitoring device in the control system Including monitoring the device of water body liquid level and the device of monitoring water quality and being arranged in shunting well well body, the control system In the second monitoring device include the device and being arranged on of monitoring water body liquid level and regulate and store in facility, in the control list of the control system Warning line H2, the pollutant concentration standard value C1 of shunting well and the highest reserve-water-level H3 for facility 11 of regulating and storing are set in member;Institute The method of stating includes the following steps:
1c) water body is monitored by the device for monitoring water body liquid level in shunting well well body in real time from water inlet 1 into shunting well The liquid level H of water body monitors water quality C in shunting well in real time by the device for monitoring water quality;By monitoring water body The device of liquid level monitors water body liquid level H ' in facility of regulating and storing in real time;
2c) as C >=C1 and H < H2, if H ' < H3, the first water conservancy switch is at opening, the second water conservancy switch In opening, the 3rd water conservancy switch is closed, and the 4th water conservancy switch is in current floe condition;Water body flows through facility of regulating and storing And then flow through a section dirty pipe and arrange to sewage treatment plant, the row of having not enough time to is stored temporarily in facility of regulating and storing to the water body of sewage treatment plant In;If H ' >=H3, the first water conservancy switch ensures in opening by first in opening, the second water conservancy switch The water flow that water conservancy is switched with the second water conservancy switchs is identical, and the 3rd water conservancy switch is closed, at the 4th water conservancy switch In current floe condition;Water body, which enters to regulate and store facility and then flow through a section dirty pipe, to be arranged to sewage treatment plant, without being carried out in facility of regulating and storing Storage;
3c) as C >=C1 and H >=H2, if H ' < H3, the first water conservancy switch is at opening, the second water conservancy switch In opening, the 3rd water conservancy switch is in opening, and the 4th water conservancy switch is in opening;Part water body, which flows through, regulates and stores It facility and then flows through and cuts a dirty pipe and arrange to sewage treatment plant, the row of having not enough time to is stored temporarily in regulate and store and set to the water body of sewage treatment plant Shi Zhong, part water body are emitted into natural water or the pipe being connected with natural water into after being handled in line treatment facility Road, part water body flow through outlet pipe and enter the pipeline being connected with natural water;If H ' >=H3, the first water conservancy switch is in opening state State, the second water conservancy switch ensure the water flow phase switched by the first water conservancy switch and the second water conservancy in opening Together, the 3rd water conservancy switch is in opening, and the 4th water conservancy switch is in opening;Part water body into regulate and store facility and then It flows through a section dirty pipe to arrange to sewage treatment plant, without being stored in facility of regulating and storing, part water body enters in online treatment facility Natural water or the pipeline being connected with natural water are emitted into after being handled, part water body flows through outlet pipe entrance and Natural Water The pipeline that body is connected;
4c) as C < C1 and H < H2, the first water conservancy switch is in opening, and the second water conservancy switch is in closing shape State, the 3rd water conservancy switch is in opening, and the 4th water conservancy switch is in current floe condition;Water body enter online treatment facility in into Natural water or the pipeline being connected with natural water are emitted into after row processing;
5c) as C < C1 and H >=H2, the first water conservancy switch is in opening, and the second water conservancy switch is in closing shape State, the 3rd water conservancy switch is in opening, and the 4th water conservancy switch is in opening;Part water body enters online treatment facility It is middle handled after the pipeline that is emitted into natural water or is connected with natural water, part water body flows through outlet pipe and enters and nature The pipeline that water body is connected.
Embodiment 4
When the drainage system includes integrated treatment facility, that is, when corresponding to the drainage system of embodiment 2, using implementation The water discharge control method of example 3, and further comprise following steps:
The second monitoring device in the control system includes monitoring the device of water body total amount and being arranged on the 8th water conservancy opening It shuts, the water body total amount Q8 in the facility of regulating and storing is set in the control unit of the control system;
Water body total amount Q8 ' in facility of regulating and storing is monitored by the device for monitoring water body total amount in real time;
As Q8 ' >=Q8, the 8th water conservancy switch ensures that water body flows through the 8th water with constant flow in opening Profit switch;
As Q8 ' < Q8, the 8th water conservancy switch is closed.
In above-described embodiment 3-4, according to shunting well to physical features minimum point in receivable aqua region when ponding risk occurs Height sets the warning line H2 of shunting well in the control unit of the control system.Existed according to the carrying capacity of the facility of regulating and storing The highest reserve-water-level H3 of the facility of regulating and storing is set in the control unit of the control system.
In above-described embodiment 3-4, the device of the monitoring water body liquid level is liquid level sensor, liquid level gauge, liquid-level switch etc..
In above-described embodiment 3-4, according to the environmental carrying capacity for the natural water being discharged into and the water quality into shunting well Pollutant concentration standard value C1 is set in the control unit of the control system.
In above-described embodiment 3-4, the device of the monitoring water quality is Water quality detector, online COD monitors, online Ammonia nitrogen monitor, online TSS monitors, online BOD monitors, online NH3- N monitors, online TP monitors, online TN prisons Instrument, electrode, conductivity meter etc. are surveyed, is arranged in shunting well;Its monitor be pollutant in water body in well concentration, the dirt Contaminating object includes TSS, COD, BOD, NH3One or more of-N, TN or TP.The Water quality detector can use electrode Method, UV optical methods, optical scattering method etc. realize the detection to water quality.
In above-described embodiment 3-4, the environmental carrying capacity of the natural water that the shunting well is discharged into can be natural water such as Rivers,lakes and seas;When the environmental carrying capacity of the natural water is larger (such as ocean), pollutant concentration standard value C1 can be properly increased; When the environmental carrying capacity of the natural water is smaller (such as lake), pollutant concentration standard value C1 can be reduced suitably.When it is described into Enter shunting well water quality it is preferable when, such as middle and later periods rainwater, pollutant concentration standard value C1 can be reduced suitably;When described Into shunting well water quality it is poor when, such as sanitary sewage and/or initial rainwater, pollutant concentration standard value C1 can be fitted Work as raising.The purpose is to pollution of the reduction as few as possible to natural water.
In above-described embodiment 3-4, existed according to the processing capacity of the carrying capacity of the facility of regulating and storing and integrated treatment facility The water body total amount Q8 in the facility of regulating and storing is set in the control unit of the control system.
In above-described embodiment 3-4, the device of the monitoring water body total amount is selected from the electronic headstock gear with function of measuring.
In above-described embodiment 3-4, the second water conservancy switch, the 3rd water conservancy switch and the 8th water conservancy switch can be realized most Big current-limiting function, the flow value for referring to switch by the water conservancy in opening are less than or equal to the maximum stream flow of setting Value, this can adjust the aperture of the water conservancy switch to realize by the control unit in control system.
In above-described embodiment 3-4, the 4th water conservancy switch refers to that water body can be by the water conservancy in opening Switch flows to natural water.
In above-described embodiment 3-4, the 4th water conservancy switch refers to adjust opening for the 4th water conservancy switch in current floe condition Degree, ensures that water body shuts off in the upstream end of water conservancy switch, it is impossible to flow to natural water by water conservancy switch.
In above-described embodiment 3-4, the water conservancy switch is closed referring to the water body switched by the water conservancy Flow value is zero.
More than, embodiments of the present invention are illustrated.But the present invention is not limited to the above embodiments.It is all Within the spirit and principles in the present invention, any modification, equivalent substitution, improvement and etc. done should be included in the guarantor of the present invention Within the scope of shield.

Claims (40)

1. a kind of drainage system, which is characterized in that the drainage system includes shunting well, and the shunting well includes shunting well well body With the first barricade and the second barricade for being arranged at the shunting well well body bottom;First barricade and the second barricade are by shunting well Well body is divided into the first well body, the second well body and the 3rd well body, wherein, it is the first well body between the first barricade and well body side wall, It is the second well body between first barricade and the second barricade, is the 3rd well body between the second barricade and well body side wall;
The shunting well further includes four openings, is water inlet, the first water outlet, the second water outlet and the 3rd water outlet respectively; The water inlet is arranged in the first well body, and first water outlet is arranged in the first well body, the second well body or the 3rd well body, Second water outlet is arranged in the second well body or the 3rd well body, and the 3rd water outlet is arranged in the 3rd well body;
The shunting well further includes strainer, and the strainer is arranged horizontally at close to water inlet opening or water inlet opening Bottom;
The drainage system further includes water passage, regulate and store facility and section dirty pipe;The arrival end and shunting well of the water passage In the first water outlet be connected;The water passage is connected with facility of regulating and storing;The port of export of the water passage is with cutting dirty pipe phase Even;
The drainage system further includes online treatment facility, and the online treatment facility is connected with the second water outlet.
2. drainage system according to claim 1, which is characterized in that first water outlet is arranged in the second well body, Second water outlet is arranged in the 3rd well body.
3. drainage system according to claim 1, which is characterized in that first barricade and the second barricade are arranged in parallel in The shunting well well body bottom.
4. drainage system according to claim 1, which is characterized in that multiple barricades, institute are also set up in first well body Multiple barricades are stated to be located between water inlet and first barricade.
5. drainage system according to claim 1, which is characterized in that multiple barricades, institute are also set up in second well body Multiple barricades are stated between first barricade and the second barricade.
6. drainage system according to claim 1, which is characterized in that also set up multiple barricades in the 3rd well body, institute Multiple barricades are stated between second barricade and the second water outlet.
7. drainage system according to claim 1, which is characterized in that the height of first barricade and/or the second barricade Not higher than the bottom level of water inlet.
8. drainage system according to claim 7, which is characterized in that the height of first barricade and the second barricade is identical And it is not higher than the bottom level of water inlet.
9. drainage system according to claim 1, which is characterized in that the strainer is connected with the side wall where water inlet.
10. drainage system according to claim 9, which is characterized in that the strainer is adjacent with the side wall where water inlet Side wall be connected.
11. drainage system according to claim 9, which is characterized in that the strainer is connected with the side wall where water inlet And it extends to above the second barricade.
12. drainage system according to claim 10, which is characterized in that the strainer is adjacent with the side wall where water inlet Side wall be connected and extend to above the second barricade.
13. according to the drainage system any one of claim 1-12, which is characterized in that the drainage system further includes One water conservancy switch, the second water conservancy switch, the 3rd water conservancy switch and the 4th water conservancy switch;Wherein, close to the water passage The port of export sets the first water conservancy to switch, for controlling the water amount of the port of export by water passage;Go out close to described first At the mouth of a river the second water conservancy is set to switch, for controlling the water amount by the first water outlet;Close to second water outlet The 3rd water conservancy is set to switch, for controlling the water amount by the second water outlet;The is being set close to the 3rd water outlet Four water conservancies switch, for controlling the water amount by the 3rd water outlet.
14. drainage system according to claim 13, which is characterized in that the drainage system further includes control system, institute Stating control system includes the first monitoring device, the second monitoring device and the control unit being connected with its signal;Described control unit It is connected with the first water conservancy switch, the second water conservancy switch, the 3rd water conservancy switch and the 4th water conservancy switching signal;The first monitoring dress It puts with the second monitoring device for monitoring signals and the signal of monitoring is conveyed to control unit, control unit is according to the letter of reception Number control the first water conservancy switch, the second water conservancy switch, the 3rd water conservancy switch and the 4th water conservancy switch aperture.
15. according to the drainage system any one of claim 1-12, which is characterized in that the water passage is selected from and carries The buffering gallery of waterpower switch, the mistake water lines with waterpower switch and can overflow at least one of pipeline.
16. according to the drainage system any one of claim 1-12, which is characterized in that the water passage is arranged on tune Store installation atop or inside;Or the water passage with facility of regulating and storing sets and is connected by waterpower switch parallel.
17. according to the drainage system any one of claim 1-12, which is characterized in that the water passage goes out with first Just rain pipe is also set up between the mouth of a river.
18. according to the drainage system any one of claim 1-12, which is characterized in that the online treatment facility passes through Pipeline or gallery are connected with the second water outlet.
19. drainage system according to claim 18, which is characterized in that the online treatment facility passes through online processing tube It is connected with the second water outlet.
20. according to the drainage system any one of claim 1-12, which is characterized in that the drainage system further includes out Water pipe;3rd water outlet is connected by outlet pipe with the pipeline towards natural water.
21. according to the drainage system any one of claim 1-12, which is characterized in that the drainage system further includes one Body treatment facility, the port of export of the facility of regulating and storing are connected with the arrival end of integrated treatment facility.
22. drainage system according to claim 21, which is characterized in that the drainage system further includes the 8th water conservancy and opens It closes;At the regulate and store port of export of facility or the arrival end of integrated treatment facility the 8th water conservancy is being set to switch, be used for The water amount of the arrival end for the port of export or integrated treatment facility that control passes through facility of regulating and storing.
23. drainage system according to claim 22, which is characterized in that the 8th water conservancy switch and control unit signal Connection, control unit control the aperture of the 8th water conservancy switch according to received signal.
24. drainage system according to claim 14, which is characterized in that first monitoring device includes monitoring water body liquid The device of position monitors the device of water quality, monitors the device of water body total amount, monitors the device of rainfall, the device of monitoring time At least one of.
25. drainage system according to claim 24, which is characterized in that the device of the monitoring water body liquid level is that liquid level passes Sensor, liquid level gauge or liquid-level switch, the device of the monitoring water quality is Water quality detector, online COD monitors, online TSS monitors, online BOD monitors, online TN monitors, online TP monitors, online NH3- N monitors, online ammonia nitrogen prison Survey instrument, electrode or conductivity meter, the device of the monitoring water body total amount is the electronic headstock gear with function of measuring, the monitoring The device of rainfall is rainfall gauge, and the device of the monitoring time is timer.
26. the drainage system according to claim 24 or 25, which is characterized in that the device and prison of the monitoring water body liquid level The device for surveying water quality is arranged in shunting well well body, and the device of the monitoring rainfall is arranged on outside shunting well well body, described The device of monitoring water body total amount is arranged on the water conservancy switch in shunting well well body, and the device of the monitoring time is arranged on shunting In well well body or outside shunting well well body.
27. drainage system according to claim 14, which is characterized in that second monitoring device includes monitoring water body liquid The device of position or the device for monitoring water body total amount.
28. drainage system according to claim 27, which is characterized in that the device of the monitoring water body liquid level is that liquid level passes Sensor, liquid level gauge or liquid-level switch, the device of the monitoring water body total amount is the electronic headstock gear with function of measuring.
29. the drainage system according to claim 27 or 28, which is characterized in that the device of the monitoring water body liquid level is set In facility of regulating and storing;The device of the monitoring water body total amount is arranged on the 8th water conservancy switch.
30. according to the drainage system any one of claim 1-12, which is characterized in that the facility of regulating and storing be series connection or Multiple facilities of regulating and storing in parallel;The facility of regulating and storing includes storage pond, box culvert of regulating and storing, deep tunnel or shallow tunnel.
31. according to the drainage system any one of claim 1-12, which is characterized in that the online treatment facility is string Connection or multiple online treatment facilities of parallel connection;The online treatment facility include biofilter, online processing pond, flocculation basin, tiltedly Plate sedimentation basin, setting pot or artificial swamp.
32. drainage system according to claim 21, which is characterized in that the integrated treatment facility is serial or parallel connection Multiple integrated treatment facilities;The integrated treatment facility includes integrated sewage disposal station.
33. drainage system according to claim 13, which is characterized in that first water conservancy switchs, the second water conservancy switchs, 3rd water conservancy switchs and the 4th water conservancy switchs separately one kind in valve, gate, weir gate or flap valve.
34. drainage system according to claim 33, which is characterized in that the valve be selected from ball valve, gate valve, knife gate valve, Butterfly valve or lift rubber slab shut off check-valves;The gate is selected from upper open type gate or bottom-open type gate;The weir gate is selected from Upper open type weir gate, bottom-open type weir gate or rotary weir gate;The flap valve is selected from the flap valve that shuts off.
35. drainage system according to claim 13, which is characterized in that the first water conservancy switch can realize maximum limit Function is flowed, that is, ensures not exceeding the flow value of setting by the flow that first water conservancy switchs.
36. drainage system according to claim 13, which is characterized in that the second water conservancy switch can realize maximum limit Function is flowed, that is, ensures not exceeding the flow value of setting by the flow that second water conservancy switchs.
37. drainage system according to claim 13, which is characterized in that the 3rd water conservancy switch can realize maximum limit Function is flowed, that is, ensures not exceeding the flow value of setting by the flow that the 3rd water conservancy switchs.
38. drainage system according to claim 22, which is characterized in that the 8th water conservancy switch selected from valve, gate, One kind in weir gate or flap valve.
39. the drainage system according to claim 38, which is characterized in that the valve be selected from ball valve, gate valve, knife gate valve, Butterfly valve or lift rubber slab shut off check-valves;The gate is selected from upper open type gate or bottom-open type gate;The weir gate is selected from Upper open type weir gate, bottom-open type weir gate or rotary weir gate;The flap valve is selected from the flap valve that shuts off.
40. drainage system according to claim 22, which is characterized in that the 8th water conservancy switch can realize maximum limit Function is flowed, that is, ensures not exceeding the flow value of setting by the flow that the 8th water conservancy switchs.
CN201721290601.6U 2017-09-30 2017-09-30 A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility Active CN207436183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721290601.6U CN207436183U (en) 2017-09-30 2017-09-30 A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721290601.6U CN207436183U (en) 2017-09-30 2017-09-30 A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility

Publications (1)

Publication Number Publication Date
CN207436183U true CN207436183U (en) 2018-06-01

Family

ID=62296066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721290601.6U Active CN207436183U (en) 2017-09-30 2017-09-30 A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility

Country Status (1)

Country Link
CN (1) CN207436183U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235598A (en) * 2018-09-18 2019-01-18 北京城市排水集团有限责任公司 One kind being based on contamination characteristics index online detection and control device and its application method
CN113788527A (en) * 2021-08-27 2021-12-14 同济大学 Load distribution sewage treatment system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235598A (en) * 2018-09-18 2019-01-18 北京城市排水集团有限责任公司 One kind being based on contamination characteristics index online detection and control device and its application method
CN113788527A (en) * 2021-08-27 2021-12-14 同济大学 Load distribution sewage treatment system

Similar Documents

Publication Publication Date Title
CN107761900A (en) It is a kind of to carry the double shunting wells of flap gate including the drainage system of the shunting well and water discharge control method
CN107605006A (en) A kind of drainage system and water discharge control method
CN207436200U (en) A kind of shunting well with downflow weir and the drainage system including the shunting well
CN207959445U (en) A kind of drainage system with regulate and store facility and online processing facility
CN107587580A (en) A kind of band surge bottom-open type weir gate and pump row drainage system and water discharge control method
CN107653958B (en) A kind of drainage system and water discharge control method with facility of regulating and storing
CN207760983U (en) A kind of drainage system with facility of regulating and storing
CN107842088A (en) A kind of drainage system and water discharge control method with regulate and store facility and online treatment facility
CN107605005A (en) A kind of drainage system and water discharge control method arranged with waterpower non-return weir gate and pump
CN207436183U (en) A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility
CN107558593A (en) It is a kind of to enter four drainage systems and water discharge control method for going out formula shunting well including one
CN207761004U (en) A kind of shunting well with downflow weir and the drainage system including the shunting well
CN207761003U (en) A kind of drainage system with regulate and store facility and integrated treatment facility
CN207760984U (en) A kind of drainage system managed with section dirt with online processing facility
CN207436179U (en) A kind of shunting well with double flap gates and the drainage system including the shunting well
CN207760985U (en) A kind of band surges the drainage system of bottom-open type weir gate and pump row
CN207436182U (en) A kind of drainage system
CN107587579A (en) A kind of a drainage system and water discharge control method with section dirt pipe and rainwater treatment facility
CN107806154A (en) A kind of drainage system and water discharge control method with online treatment facility
CN107620367A (en) A kind of drainage system and water discharge control method with section dirty pipe and facility of regulating and storing
CN107558594A (en) A kind of one, which enters four, goes out formula shunting well including the drainage system and water discharge control method of the shunting well
CN207436176U (en) A kind of drainage system with online treatment facility
CN207633483U (en) A kind of drainage system with facility of regulating and storing
CN207436223U (en) A kind of drainage system for going out formula shunting well including one into four