CN206408969U - 一种用于调节盖梁纵横坡度的支撑装置 - Google Patents
一种用于调节盖梁纵横坡度的支撑装置 Download PDFInfo
- Publication number
- CN206408969U CN206408969U CN201621493684.4U CN201621493684U CN206408969U CN 206408969 U CN206408969 U CN 206408969U CN 201621493684 U CN201621493684 U CN 201621493684U CN 206408969 U CN206408969 U CN 206408969U
- Authority
- CN
- China
- Prior art keywords
- bent cap
- horizontal
- bed die
- shaped
- support meanss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种用于调节盖梁纵横坡度的支撑装置,其中,盖梁由盖梁底模和盖梁钢筋骨架及模板构成,所述盖梁底模的底部沿盖梁纵向设有多个墩柱,所有墩柱的预设高度处均分别固定有抱箍,在每个抱箍的顶部支撑平台上位于盖梁横向的两端部分别设有螺旋千斤顶,在横向上同一端的螺旋千斤顶分别放置一根工字钢横梁,两个工字钢横梁之间用多组拉杆螺母连接件连接固定,在两个工字钢横梁上、沿盖梁纵向布置有多个高度一致的方木,所述盖梁底模放置于所述的方木上。通过调节螺旋千斤顶达到快速调节盖梁纵横坡度及标高的效果,操作方便、成本低、功效高。
Description
技术领域
本实用新型涉及一种支撑装置,具体为用于快速调节盖梁纵横坡高程组合支撑装置。
背景技术
近年来,盖梁的施工传统的施工工艺有搭设满堂架、钢棒支撑法,其中搭设满堂架的施工方法不仅浪费材料,而且耗工费时,钢棒支撑法是在墩柱中预留孔,需事先测好预留孔的标高位置,盖梁施工完成后再把预留孔用细石混凝土封堵,施工较烦琐,且影响混凝土外观质量,采用以上方法施工,如果盖梁底模或者钢筋骨架安装完成以后,整体纵横坡度及标高精度达不到设计要求,需要重新吊装或返工处理,引起施工成本增加,而且影响工期。
实用新型内容
针对上述盖梁的施工传统的施工工艺,本实用新型提供一种组合支撑装置,可以达到快速调节盖梁纵横坡度及标高效果,且消除了因整体纵横坡度及标高精度达不到设计要求,需要重新吊装或返工情况的发生,操作方便、成本低、功效高。
为了解决上述技术问题,本实用新型一种用于调节盖梁纵横坡度的支撑装置,其中,盖梁由盖梁底模和盖梁钢筋骨架及模板构成,所述盖梁底模的底部沿盖梁纵向设有多个墩柱,所有墩柱的预设高度处均分别固定有抱箍,在每个抱箍的顶部支撑平台上位于盖梁横向的两端部分别设有螺旋千斤顶,在横向上同一端的螺旋千斤顶分别放置一根工字钢横梁,两个工字钢横梁之间用多组拉杆螺母连接件连接固定,在两个工字钢横梁上、沿盖梁纵向布置有多个高度一致的方木,所述盖梁底模放置于所述的方木上。
两个工字钢横梁之间的多组拉杆螺母连接件包括沿盖梁横向穿过两个工字钢横梁的拉杆,所述拉杆的两端设有外螺纹并用螺母将两根工字钢横梁固定。
所有方木按照等间距布置。
墩柱的个数为两个。
与现有技术相比,本实用新型的有益效果是:由于本实用新型组合支撑装置,在抱箍与工字钢横梁支点上设置螺旋千斤顶,通过调节千斤顶达到快速调节盖梁纵横坡度及标高的效果,本实用新型可以减少工作量及成本,提高功效,其操作方便,安全省力,经济适用。
附图说明
图1是盖梁的平面图;
图2是本实用新型用于调节盖梁纵横坡度的支撑装置的立面示意图;
图3是图2所示支撑装置的平面示意图。
图中:1-抱箍,2-螺旋千斤顶,3-工字钢横梁,4-拉杆,5-螺母,6-方木,7-墩柱,8-盖梁底模,9-盖梁钢筋骨架及模板,10-盖梁。
具体实施方式
下面结合具体实施方式对本实用新型作进一步详细地描述。
如图2和图3所示,本实用新型一种用于调节盖梁纵横坡度的支撑装置,如图1和图2所示,盖梁10由盖梁底模8和盖梁钢筋骨架及模板9构成,如图2所示,所述盖梁底模8的底部沿盖梁10纵向设有多个墩柱7,通常墩柱7的个数为两个。所有墩柱7的预设高度处均分别固定有抱箍1,如图2和图3所示,在每个抱箍1的顶部支撑平台上位于盖梁10横向的两端部分别设有螺旋千斤顶2,在横向上同一端的螺旋千斤顶2分别放置一根工字钢横梁3,两个工字钢横梁3之间用多组拉杆螺母连接件连接固定,即两个工字钢横梁3之间的多组拉杆螺母连接件包括沿盖梁横向穿过两个工字钢横梁3的拉杆4,所述拉杆4的两端设有外螺纹并用螺母5将两根工字钢横梁4固定。在两个工字钢横梁3上、沿盖梁10纵向布置有多个高度一致的方木6,所有方木6按照等间距布置,所述盖梁底模8放置于所述的方木6上,从而形成稳定的组合支撑。
本实用新型是在抱箍1与工字钢横梁3之间安装有多台螺旋千斤顶2,每个螺旋千斤顶2即为一个支点,通过调节各支点上的螺旋千斤顶2达到快速调节盖梁10横纵坡度高程的效果。
首先,按照螺旋千斤顶2所处支点位置对进行编号,施工过程,根据测量班复测每个支点位置顶部高程误差,确定每个支点需要升降的数值,分别调节对应支点位置的螺旋千斤顶2伸缩的高度,从而控制支撑工字钢横梁3托举方木6及盖梁底模8的相对坡度,从而快速调节盖梁10总体的纵横坡度及标高。
本实用装置可以适应于各种悬空组合支撑装置,通过结构物自重及支点间距需要,采用相匹配的工字钢横梁及螺旋千斤顶型号和支点平台,适用于微调结构物托底支撑点达到快速调整已安装结构物的纵横坡度和高程其他形式结构物施工。
Claims (4)
1.一种用于调节盖梁纵横坡度的支撑装置,其中,盖梁(10)由盖梁底模(8)和盖梁钢筋骨架及模板(9)构成,所述盖梁底模(8)的底部沿盖梁(10)纵向设有多个墩柱(7),其特征在于,所有墩柱(7)的预设高度处均分别固定有抱箍(1),在每个抱箍(1)的顶部支撑平台上位于盖梁(10)横向的两端部分别设有螺旋千斤顶(2),在横向上同一端的螺旋千斤顶(2)分别放置一根工字钢横梁(3),两个工字钢横梁(3)之间用多组拉杆螺母连接件连接固定,在两个工字钢横梁(3)上、沿盖梁(10)纵向布置有多个高度一致的方木(6),所述盖梁底模(8)放置于所述的方木(6)上。
2.根据权利要求1所述用于调节盖梁纵横坡度的支撑装置,其特征在于,两个工字钢横梁(3)之间的多组拉杆螺母连接件包括沿盖梁横向穿过两个工字钢横梁(3)的拉杆(4),所述拉杆(4)的两端设有外螺纹并用螺母(5)将两根工字钢横梁(3)固定。
3.根据权利要求1所述用于调节盖梁纵横坡度的支撑装置,其特征在于,所有方木(6)按照等间距布置。
4.根据权利要求1所述用于调节盖梁纵横坡度的支撑装置,其特征在于,墩柱(7)的个数为两个。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621493684.4U CN206408969U (zh) | 2016-12-31 | 2016-12-31 | 一种用于调节盖梁纵横坡度的支撑装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621493684.4U CN206408969U (zh) | 2016-12-31 | 2016-12-31 | 一种用于调节盖梁纵横坡度的支撑装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206408969U true CN206408969U (zh) | 2017-08-15 |
Family
ID=59551854
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621493684.4U Active CN206408969U (zh) | 2016-12-31 | 2016-12-31 | 一种用于调节盖梁纵横坡度的支撑装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206408969U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080116A (zh) * | 2019-05-30 | 2019-08-02 | 甘肃路桥建设集团有限公司 | 一种大跨度预应力盖梁临时支撑装置及其施工方法 |
CN111005323A (zh) * | 2020-01-02 | 2020-04-14 | 中铁十九局集团第六工程有限公司 | 一种公路桥梁工程的变坡盖梁端模的支撑方法及装置 |
CN114635350A (zh) * | 2022-03-23 | 2022-06-17 | 保利长大工程有限公司 | 可调节坡度的盖梁模板支撑结构 |
-
2016
- 2016-12-31 CN CN201621493684.4U patent/CN206408969U/zh active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080116A (zh) * | 2019-05-30 | 2019-08-02 | 甘肃路桥建设集团有限公司 | 一种大跨度预应力盖梁临时支撑装置及其施工方法 |
CN110080116B (zh) * | 2019-05-30 | 2024-08-16 | 甘肃路桥建设集团有限公司 | 一种大跨度预应力盖梁临时支撑装置及其施工方法 |
CN111005323A (zh) * | 2020-01-02 | 2020-04-14 | 中铁十九局集团第六工程有限公司 | 一种公路桥梁工程的变坡盖梁端模的支撑方法及装置 |
CN114635350A (zh) * | 2022-03-23 | 2022-06-17 | 保利长大工程有限公司 | 可调节坡度的盖梁模板支撑结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202509404U (zh) | 一种高墩单柱盖梁模板施工支撑系统 | |
CN105220769B (zh) | 大面积螺栓球网架整体顶升施工方法 | |
CN206408969U (zh) | 一种用于调节盖梁纵横坡度的支撑装置 | |
CN204298825U (zh) | 基坑浇筑溜管支撑调节装置 | |
CN204510005U (zh) | 一种盖梁施工操作平台 | |
CN104032969A (zh) | 一种隔震支座预埋板精确定位及过程调控装置 | |
CN105317052B (zh) | 一种塔吊基础螺栓固定方法 | |
CN105040968A (zh) | 一种倾斜的高大空腹薄壁钢筋混凝土墙模板支护装置及方法 | |
CN107916623A (zh) | 一种盖梁标高调节装置及调节方法 | |
CN205955239U (zh) | 格构柱施工用校正架 | |
CN203531027U (zh) | 采用专用千斤顶作为支撑定位的风机基础环精准校平系统 | |
CN103114572A (zh) | 一种地下连续墙导墙移动模架 | |
CN206800800U (zh) | 水平钢筋间隔件 | |
CN203961257U (zh) | 智能托撑 | |
CN205804189U (zh) | 一种高速铁路桥梁支座安装设备 | |
CN211524138U (zh) | 一种用于地脚螺栓的定位模具 | |
CN102653943B (zh) | 地下预埋钢柱调直限位装置 | |
CN209722744U (zh) | 一种用于钢箱梁拼装的支撑结构体系 | |
CN206986745U (zh) | 一种现浇简支梁支架卸落装置 | |
CN103174299A (zh) | 叠层橡胶支座及平板滑移支座的安装施工方法 | |
CN207194911U (zh) | 管廊施工用模板台车延长系统 | |
CN204019070U (zh) | 井架组装用组合钢架 | |
CN106592623B (zh) | 底坑结构安装方法 | |
CN203160787U (zh) | 一种超大直径筒仓库壁无内支撑滑模装置 | |
CN206016305U (zh) | 粘滞阻尼墙一体化支撑体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |