CN204983606U - Track scaffold of folding up leads - Google Patents

Track scaffold of folding up leads Download PDF

Info

Publication number
CN204983606U
CN204983606U CN201520767961.5U CN201520767961U CN204983606U CN 204983606 U CN204983606 U CN 204983606U CN 201520767961 U CN201520767961 U CN 201520767961U CN 204983606 U CN204983606 U CN 204983606U
Authority
CN
China
Prior art keywords
track
bar
cross bar
cross
lifting casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520767961.5U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING WANSHENG DISTRICT PUHUI CITY CONSTRUCTION CONSULTING SERVICES Co Ltd
Original Assignee
CHONGQING WANSHENG DISTRICT PUHUI CITY CONSTRUCTION CONSULTING SERVICES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING WANSHENG DISTRICT PUHUI CITY CONSTRUCTION CONSULTING SERVICES Co Ltd filed Critical CHONGQING WANSHENG DISTRICT PUHUI CITY CONSTRUCTION CONSULTING SERVICES Co Ltd
Priority to CN201520767961.5U priority Critical patent/CN204983606U/en
Application granted granted Critical
Publication of CN204983606U publication Critical patent/CN204983606U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a track scaffold of folding up leads, including the stand, there is the track horizontal pole at the inboard equal fixed distribution of the post that whenever stands in a line, at parallel arrangement be provided with vertical horizontal pole between the track horizontal pole, be provided with the track on the track horizontal pole, it is just right to the tip at one of them be provided with elevating gear between the track horizontal pole, elevating gear includes lifting box body parallel arrangement has horizontal track pole on lifting box body's the base, be provided with the track on the horizontal track pole, this horizontal track pole and the track horizontal pole is just to setting up stop gear is installed to lifting box body both sides wall, in the guide way of this stop gear card on the stand. The railcar is placed to structure more than adopting in lifting box body, when needs when a certain floor height is under construction, reach this floor height with the railcar, transversely transport constructor or arrival of cargo assigned position to improve work efficiency greatly, greatly reduced the risk that takes place the incident simultaneously.

Description

Guiding folding track scaffold
Technical field
The utility model belongs to building implement technical field, is specifically related to a kind of guiding folding track scaffold.
Background technology
Scaffold is at the construction field (site) for operative and high-rise working and the various supports set up, and is the generic term of building field, is mainly used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height on building sites.Scaffold makes material bamboo and wood, steel pipe or synthetic materials etc. usually, current floor building is all higher, the upper and lower scaffold construction of workman can be required great effort very much, therefore, constructor wants to arrive higher operating location can only by the mode of climbing scaffold, part building site is provided with elevator, but can only by constructor or goods handling to appointment floor height, railcar can not be carried, driving to after making it arrive appointment floor height is provided with on the scaffold of track, and then on scaffold transverse shifting, transport constructor or goods arrive the assignment position of this floor height, thus there is efficiency of construction low, the high deficiency of degree of danger, solve this problem and become the task of top priority.
Utility model content
For solving above technical problem, the utility model provide a kind of can by the guiding folding track scaffold of vehicle track running on scaffold.
Its technical scheme is as follows:
A kind of guiding folding track scaffold, its main points are: comprise the column (5) that two rows are vertically arranged, track cross bar (6) is had in the equal stationary distribution in inner side of often arranging column (5), longitudinal cross bar (7) is provided with between the described track cross bar (6) be arranged in parallel, this longitudinal cross bar (7) is positioned at the below of described track cross bar (6), and described track cross bar (6) is provided with track;
Lifting gear is provided with wherein between the described track cross bar (6) that pair of end portions is just right, described lifting gear comprises lifting casing (1), the base (1a) of described lifting casing (1) is arranged with cross track bar (2) in parallel, described cross track bar (2) is provided with track, this cross track bar (2) and described track cross bar (6) are just to setting, and the track of described cross track bar (2) is concordant with the track of track cross bar (6);
Cave inward in intersection, described lifting casing (1) adjacent two side and form accommodation space (11), in described accommodation space (11), position-limit mechanism is installed, it is parallel with Crane Rail (2) when this position-limit mechanism is protruding, described position-limit mechanism comprises cylinder (8), connecting rod (9) and pulley (10), one end and the described lifting casing (1) of described connecting rod (9) are side walls hinged, the other end of this connecting rod (9) is provided with described pulley (10), cylinder body and the described lifting casing (1) of described cylinder (8) are side walls hinged, the piston rod outer end of this cylinder (8) and described connecting rod (9) middle part hinged,
On the sidewall of lifting casing (1) side, have gathering sill at described column (5), described pulley (10) is positioned at described gathering sill.
Adopt above structure, railcar is placed in lifting gear, when needs are constructed at a certain floor height, railcar is sent to this floor height, now, due to lifting casing (1) built-in cross track bar (2), scaffold is provided with the track cross bar that can dock, thus make railcar to drive to scaffold in lifting casing (1), laterally transport constructor or goods arrival assigned address, thus substantially increase operating efficiency, greatly reduce the risk that security incident occurs simultaneously; Meanwhile, the existence of position-limit mechanism can prevent lifting gear run-off the straight etc., so security of operation is steady.
As preferably: described track cross bar (6) and cross track bar (2) are channel-section steel, and the notch of channel-section steel is described track.Adopt above structure, track can be selected at lower cost.
As preferably: described lifting casing (1) has all installed lifting gear door (4) perpendicular to the both sides sidewall of cross track bar (2).Adopt above structure, ensure the safety in lifting process, the design that both sides sidewall is equipped with door too increases practicality.
As preferably: described lifting casing (1) top is installed with suspension ring (3).Simple and reliable for structure above, practicality is high.
Beneficial effect: the guiding folding track scaffold adopting above technical scheme, structure is simply novel, improves efficiency of construction, avoids security risk, is easy to realize, simple to operate.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural representation of lifting gear and position-limit mechanism in Fig. 1.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, Figure 2 and Figure 3, a kind of guiding folding track scaffold, comprise the column 5 that two rows are vertically arranged, in the inner side of often arranging column 5, equal stationary distribution has track cross bar 6, longitudinal cross bar 7 is provided with between the described track cross bar 6 be arranged in parallel, this longitudinal cross bar 7 is positioned at the below of described track cross bar 6, and described track cross bar 6 is provided with track, lifting gear is provided with wherein between the described track cross bar 6 that pair of end portions is just right, described lifting gear comprises lifting casing 1, described lifting casing 1 has all installed lifting gear door 4 perpendicular to the both sides sidewall of cross track bar 2, described lifting casing 1 top is installed with suspension ring 3, the base 1a of described lifting casing 1 is arranged with cross track bar 2 in parallel, described cross track bar 2 is provided with track, this cross track bar 2 and described track cross bar 6 are just to setting, cave inward in intersection, described lifting casing 1 adjacent two side and form accommodation space 11, in described accommodation space 11, position-limit mechanism is installed, it is parallel with Crane Rail 2 when this position-limit mechanism is protruding, described position-limit mechanism comprises cylinder 8, connecting rod 9 and pulley 10, one end and the described lifting casing 1 of described connecting rod 9 are side walls hinged, the other end of this connecting rod 9 is provided with described pulley 10, cylinder body and the described lifting casing 1 of described cylinder 8 are side walls hinged, hinged in the middle part of the piston rod outer end of this cylinder 8 and described connecting rod 9, on the sidewall of lifting casing 1 side, have gathering sill at described column 5, described pulley 10 is positioned at described gathering sill, described track cross bar 6 is channel-section steel, and the notch of channel-section steel is described track.
When guiding folding track scaffold uses, railcar is placed in lifting casing 1, when needs carry out constructing or conveying goods to a certain floor height at a certain floor height, guiding folding track scaffold rises or declines and arrives this floor height, and opened by door 4 after coming to a complete stop, cross track bar 2 docks with the track cross bar 6 on scaffold, railcar rolls lifting casing 1 away from, reach the track cross bar 6 of scaffold, transverse shifting on scaffold, by constructor or goods handling to assigned address.

Claims (4)

1. a guiding folding track scaffold, it is characterized in that: comprise the column (5) that two rows are vertically arranged, track cross bar (6) is had in the equal stationary distribution in inner side of often arranging column (5), longitudinal cross bar (7) is provided with between the described track cross bar (6) be arranged in parallel, this longitudinal cross bar (7) is positioned at the below of described track cross bar (6), and described track cross bar (6) is provided with track;
Lifting gear is provided with wherein between the described track cross bar (6) that pair of end portions is just right, described lifting gear comprises lifting casing (1), the base (1a) of described lifting casing (1) is arranged with cross track bar (2) in parallel, described cross track bar (2) is provided with track, this cross track bar (2) and described track cross bar (6) are just to setting, and the track of described cross track bar (2) is concordant with the track of track cross bar (6);
Cave inward in intersection, described lifting casing (1) adjacent two side and form accommodation space (11), in described accommodation space (11), position-limit mechanism is installed, it is parallel with Crane Rail (2) when this position-limit mechanism is protruding, described position-limit mechanism comprises cylinder (8), connecting rod (9) and pulley (10), one end and the described lifting casing (1) of described connecting rod (9) are side walls hinged, the other end of this connecting rod (9) is provided with described pulley (10), cylinder body and the described lifting casing (1) of described cylinder (8) are side walls hinged, the piston rod outer end of this cylinder (8) and described connecting rod (9) middle part hinged,
On the sidewall of lifting casing (1) side, have gathering sill at described column (5), described pulley (10) is positioned at described gathering sill.
2. guiding folding track scaffold according to claim 1, is characterized in that: described track cross bar (6) and cross track bar (2) are channel-section steel, and the notch of channel-section steel is described track.
3. guiding folding track scaffold according to claim 1, is characterized in that: described lifting casing (1) has all installed lifting gear door (4) perpendicular to the both sides sidewall of cross track bar (2).
4. the guiding folding track scaffold according to claim 1 or 3, is characterized in that: described lifting casing (1) top is installed with suspension ring (3).
CN201520767961.5U 2015-10-06 2015-10-06 Track scaffold of folding up leads Expired - Fee Related CN204983606U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520767961.5U CN204983606U (en) 2015-10-06 2015-10-06 Track scaffold of folding up leads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520767961.5U CN204983606U (en) 2015-10-06 2015-10-06 Track scaffold of folding up leads

Publications (1)

Publication Number Publication Date
CN204983606U true CN204983606U (en) 2016-01-20

Family

ID=55117988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520767961.5U Expired - Fee Related CN204983606U (en) 2015-10-06 2015-10-06 Track scaffold of folding up leads

Country Status (1)

Country Link
CN (1) CN204983606U (en)

Similar Documents

Publication Publication Date Title
CN203781754U (en) Movable weight hoister
CN205259564U (en) Can guidance tape track lift scaffold
CN204983606U (en) Track scaffold of folding up leads
CN204983604U (en) Direction is folded up and is taken track lift scaffold
CN205382695U (en) Prop up piece concatenation formula track scaffold
CN205259568U (en) Can guide rail scaffold
CN204983602U (en) Dock track scaffold of folding up leads
CN204983598U (en) Take orbital raise scaffold
CN204983600U (en) Concatenation formula track scaffold of folding up leads
CN204983601U (en) Direction is folded up and is propped up a piece dock track scaffold
CN204983605U (en) Direction is folded up and is propped up orbital scaffold in piece dock area
CN205259567U (en) A piece dock track scaffold can lead
CN204983603U (en) Orbital scaffold in dock area of folding up leads
CN204983599U (en) Direction is folded up and is propped up a piece concatenation formula track scaffold
CN205259562U (en) A piece concatenation formula track scaffold can lead
CN205259566U (en) Dock track scaffold
CN205259569U (en) Concatenation formula that can lead track scaffold
CN205259565U (en) Orbital scaffold in dock that can lead area
CN205382697U (en) Track scaffold
CN205259563U (en) An orbital scaffold in piece dock area can lead
CN206521228U (en) A kind of jacking haulage gear
CN205382696U (en) Concatenation formula track scaffold
CN106703390A (en) Scaffolding mechanism capable of guiding rails
CN205444864U (en) Prop up piece dock track scaffold
CN205444866U (en) Dock track scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20161006

CF01 Termination of patent right due to non-payment of annual fee