CN204983604U - Direction is folded up and is taken track lift scaffold - Google Patents
Direction is folded up and is taken track lift scaffold Download PDFInfo
- Publication number
- CN204983604U CN204983604U CN201520767959.8U CN201520767959U CN204983604U CN 204983604 U CN204983604 U CN 204983604U CN 201520767959 U CN201520767959 U CN 201520767959U CN 204983604 U CN204983604 U CN 204983604U
- Authority
- CN
- China
- Prior art keywords
- track
- lifting
- cross bar
- horizontal pole
- casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a direction is folded up and is taken track lift scaffold, including the stand of two rows of vertical settings, there is the track horizontal pole at the inboard equal fixed distribution of the post that whenever stands in a line, at parallel arrangement be provided with vertical horizontal pole between the track horizontal pole, be provided with the track on the track horizontal pole, it is just right to the tip at one of them be provided with elevating gear between the track horizontal pole, elevating gear includes lifting box body recessed driving rail is seted up to lifting box body's base coparallel, this driving rail with the track of track horizontal pole is just to setting up stop gear is installed to lifting box body both sides wall, in the guide way of this stop gear card on the stand. The railcar is placed to structure more than adopting in lifting box body, when needs when a certain floor height is under construction, reach this floor height with the railcar, transversely transport constructor or arrival of cargo assigned position to improve work efficiency greatly, greatly reduced the risk that takes place the incident simultaneously.
Description
Technical field
The utility model belongs to building implement technical field, is specifically related to a kind of guiding folding belt track lifting false work.
Background technology
Scaffold is at the construction field (site) for operative and high-rise working and the various supports set up, and is the generic term of building field, is mainly used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height on building sites.Scaffold makes material bamboo and wood, steel pipe or synthetic materials etc. usually, current floor building is all higher, the upper and lower scaffold construction of workman can be required great effort very much, therefore, constructor wants to arrive higher operating location can only by the mode of climbing scaffold, part building site is provided with elevator, but can only by constructor or goods handling to appointment floor height, railcar can not be carried, driving to after making it arrive appointment floor height is provided with on the scaffold of track, and then on scaffold transverse shifting, transport constructor or goods arrive the assignment position of this floor height, thus there is efficiency of construction low, the high deficiency of degree of danger, solve this problem and become the task of top priority.
Utility model content
For solving above technical problem, the utility model provide a kind of can by the guiding folding belt track lifting false work of vehicle track running on scaffold.
Its technical scheme is as follows:
A kind of guiding folding belt track lifting false work, its main points are: comprise the column (5) that two rows are vertically arranged, track cross bar (6) is had in the equal stationary distribution in inner side of often arranging column (5), longitudinal cross bar (7) is provided with between the described track cross bar (6) be arranged in parallel, this longitudinal cross bar (7) is positioned at the below of described track cross bar (6), and described track cross bar (6) is provided with track;
Lifting gear is provided with wherein between the described track cross bar (6) that pair of end portions is just right, described lifting gear comprises lifting casing (1), parallelly offer recessed Crane Rail (2) the base (1a) of described lifting casing (1) is upper, the track of this Crane Rail (2) and described track cross bar (6) is just to setting;
Cave inward in intersection, described lifting casing (1) adjacent two side and form accommodation space (11), in described accommodation space (11), position-limit mechanism is installed, it is parallel with Crane Rail (2) when this position-limit mechanism is protruding, described position-limit mechanism comprises cylinder (8), connecting rod (9) and pulley (10), one end and the described lifting casing (1) of described connecting rod (9) are side walls hinged, the other end of this connecting rod (9) is provided with described pulley (10), cylinder body and the described lifting casing (1) of described cylinder (8) are side walls hinged, the piston rod outer end of this cylinder (8) and described connecting rod (9) middle part hinged,
On the sidewall of lifting casing (1) side, have gathering sill at described column (5), described pulley (10) is positioned at described gathering sill.
Adopt above structure, railcar is placed in lifting gear, when needs are constructed at a certain floor height, railcar is sent to this floor height, now, due to lifting casing (1) built-in Crane Rail (2), scaffold is provided with the track cross bar that can dock, thus make railcar to drive to scaffold in lifting casing (1), laterally transport constructor or goods arrival assigned address, thus substantially increase operating efficiency, greatly reduce the risk that security incident occurs simultaneously; Meanwhile, when the existence of position-limit mechanism can prevent lifting gear run-off the straight and not use can folding in accommodation space, so security of operation steadily, avoid interfering.
As preferably: described track cross bar (6) is channel-section steel, and the notch of channel-section steel is described track.Adopt above structure, track can be selected at lower cost.
As preferably: described lifting casing (1) has all installed lifting gear door (4) perpendicular to the both sides sidewall of Crane Rail (2).Adopt above structure, ensure the safety in lifting process, the design that both sides sidewall is equipped with door too increases practicality.
As preferably: described lifting casing (1) top is installed with suspension ring (3).Simple and reliable for structure above, practicality is high.
Beneficial effect: the guiding folding belt track lifting false work adopting above technical scheme, structure is simply novel, improves efficiency of construction, avoids security risk, is easy to realize, simple to operate.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural representation of lifting gear and position-limit mechanism in Fig. 1.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail.
As illustrated in fig. 1 and 2, a kind of guiding folding belt track lifting false work, comprise the column 5 that two rows are vertically arranged, in the inner side of often arranging column 5, equal stationary distribution has track cross bar 6, longitudinal cross bar 7 is provided with between the described track cross bar 6 be arranged in parallel, this longitudinal cross bar 7 is positioned at the below of described track cross bar 6, and described track cross bar 6 is provided with track, lifting gear is provided with wherein between the described track cross bar 6 that pair of end portions is just right, described lifting gear comprises lifting casing 1, described lifting casing 1 has all installed lifting gear door 4 perpendicular to the both sides sidewall of Crane Rail 2, described lifting casing 1 top is installed with suspension ring 3, parallelly on the base 1a of described lifting casing 1 offer recessed Crane Rail 2, the track of this Crane Rail 2 and described track cross bar 6 is just to setting, cave inward in intersection, described lifting casing 1 adjacent two side and form accommodation space 11, in described accommodation space 11, position-limit mechanism is installed, it is parallel with Crane Rail 2 when this position-limit mechanism is protruding, described position-limit mechanism comprises cylinder 8, connecting rod 9 and pulley 10, one end and the described lifting casing 1 of described connecting rod 9 are side walls hinged, the other end of this connecting rod 9 is provided with described pulley 10, cylinder body and the described lifting casing 1 of described cylinder 8 are side walls hinged, hinged in the middle part of the piston rod outer end of this cylinder 8 and described connecting rod 9, on the sidewall of lifting casing 1 side, have gathering sill at described column 5, described pulley 10 is positioned at described gathering sill, described track cross bar 6 is channel-section steel, and the notch of channel-section steel is described track.
When guiding folding belt track lifting false work uses, railcar is placed in lifting casing 1, when needs carry out constructing or conveying goods to a certain floor height at a certain floor height, guiding folding belt track lifting false work rises or declines and arrives this floor height, after coming to a complete stop, door 4 is opened, the orbital docking of Crane Rail 2 and the track cross bar 6 on scaffold, railcar rolls lifting casing 1 away from, reach the track cross bar 6 of scaffold, transverse shifting on scaffold, by constructor or goods handling to assigned address.
Claims (5)
1. a guiding folding belt track lifting false work, it is characterized in that: comprise the column (5) that two rows are vertically arranged, track cross bar (6) is had in the equal stationary distribution in inner side of often arranging column (5), longitudinal cross bar (7) is provided with between the described track cross bar (6) be arranged in parallel, this longitudinal cross bar (7) is positioned at the below of described track cross bar (6), and described track cross bar (6) is provided with track;
Lifting gear is provided with wherein between the described track cross bar (6) that pair of end portions is just right, described lifting gear comprises lifting casing (1), parallelly offer recessed Crane Rail (2) the base (1a) of described lifting casing (1) is upper, the track of this Crane Rail (2) and described track cross bar (6) is just to setting;
Cave inward in intersection, described lifting casing (1) adjacent two side and form accommodation space (11), in described accommodation space (11), position-limit mechanism is installed, it is parallel with Crane Rail (2) when this position-limit mechanism is protruding, described position-limit mechanism comprises cylinder (8), connecting rod (9) and pulley (10), one end and the described lifting casing (1) of described connecting rod (9) are side walls hinged, the other end of this connecting rod (9) is provided with described pulley (10), cylinder body and the described lifting casing (1) of described cylinder (8) are side walls hinged, the piston rod outer end of this cylinder (8) and described connecting rod (9) middle part hinged,
On the sidewall of lifting casing (1) side, have gathering sill at described column (5), described pulley (10) is positioned at described gathering sill.
2. guiding folding belt track lifting false work according to claim 1, is characterized in that: described cylinder (8) is positioned at the top of described connecting rod (9).
3. guiding folding belt track lifting false work according to claim 1, is characterized in that: described track cross bar (6) is channel-section steel, and the notch of channel-section steel is described track.
4. guiding folding belt track lifting false work according to claim 1, is characterized in that: described lifting casing (1) has all installed lifting gear door (4) perpendicular to the both sides sidewall of Crane Rail (2).
5. guiding folding belt track lifting false work according to claim 4, is characterized in that: described lifting casing (1) top is installed with suspension ring (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520767959.8U CN204983604U (en) | 2015-10-06 | 2015-10-06 | Direction is folded up and is taken track lift scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520767959.8U CN204983604U (en) | 2015-10-06 | 2015-10-06 | Direction is folded up and is taken track lift scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204983604U true CN204983604U (en) | 2016-01-20 |
Family
ID=55117986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520767959.8U Expired - Fee Related CN204983604U (en) | 2015-10-06 | 2015-10-06 | Direction is folded up and is taken track lift scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204983604U (en) |
-
2015
- 2015-10-06 CN CN201520767959.8U patent/CN204983604U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205259564U (en) | Can guidance tape track lift scaffold | |
CN204983604U (en) | Direction is folded up and is taken track lift scaffold | |
CN204983606U (en) | Track scaffold of folding up leads | |
CN204983602U (en) | Dock track scaffold of folding up leads | |
CN205382695U (en) | Prop up piece concatenation formula track scaffold | |
CN204983605U (en) | Direction is folded up and is propped up orbital scaffold in piece dock area | |
CN204983603U (en) | Orbital scaffold in dock area of folding up leads | |
CN204983600U (en) | Concatenation formula track scaffold of folding up leads | |
CN204983598U (en) | Take orbital raise scaffold | |
CN204983601U (en) | Direction is folded up and is propped up a piece dock track scaffold | |
CN205259568U (en) | Can guide rail scaffold | |
CN204983599U (en) | Direction is folded up and is propped up a piece concatenation formula track scaffold | |
CN205259567U (en) | A piece dock track scaffold can lead | |
CN205259566U (en) | Dock track scaffold | |
CN205259562U (en) | A piece concatenation formula track scaffold can lead | |
CN205259565U (en) | Orbital scaffold in dock that can lead area | |
CN205259569U (en) | Concatenation formula that can lead track scaffold | |
CN205259563U (en) | An orbital scaffold in piece dock area can lead | |
CN205382697U (en) | Track scaffold | |
CN205382696U (en) | Concatenation formula track scaffold | |
CN206521228U (en) | A kind of jacking haulage gear | |
CN106703390A (en) | Scaffolding mechanism capable of guiding rails | |
CN205382698U (en) | Orbital scaffold in dock area | |
CN205444866U (en) | Dock track scaffold | |
CN205444865U (en) | Prop up orbital scaffold in piece dock area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 Termination date: 20181006 |
|
CF01 | Termination of patent right due to non-payment of annual fee |