CN204443226U - Rock slope timber greening structure alive - Google Patents

Rock slope timber greening structure alive Download PDF

Info

Publication number
CN204443226U
CN204443226U CN201520068022.1U CN201520068022U CN204443226U CN 204443226 U CN204443226 U CN 204443226U CN 201520068022 U CN201520068022 U CN 201520068022U CN 204443226 U CN204443226 U CN 204443226U
Authority
CN
China
Prior art keywords
timber
alive
rock slope
greening
planting bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520068022.1U
Other languages
Chinese (zh)
Inventor
谢廷雷
田晨曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520068022.1U priority Critical patent/CN204443226U/en
Application granted granted Critical
Publication of CN204443226U publication Critical patent/CN204443226U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a kind of rock slope timber solid earth greening alive structure, comprise cutting hole, timber, planting bag alive.Stable rock slope digs cutting hole, inner filling Nutrition Soil; There is otch the side of timber alive, can insert in cutting hole, and fix with fence rope; Planting bag overlays above fence successively, and the sack staple that is connected connects into entirety; In the hole that planting bag and rock slope are formed, fill Nutrition Soil, soil layer surface coverage plastic film.The timber alive that the utility model utilizes cuttage plant of one's native land to be made into, when after active branch germinating growth, itself has landscape effect, instead of original stone, cement prefab, construct permanent software side slope, greening vegetation speed is fast, and structure is simple, speed of application is fast, significantly can reduce engineering cost.

Description

Rock slope timber greening structure alive
Technical field
The utility model belongs to greening side slope field, particularly relates to a kind of rock slope timber solid earth greening alive structure.
Background technology
In the construction processes such as highway, railway, mine, water conservancy; much precipitous rock wall or soft side slope etc. are left in frequent meeting after engineering; the regeneration of exposed section vegetation and recovery is made to be subject to extreme influence; even cause serious water and soil loss, finally cause the highway after building up, railway, mine, water conservancy slope collapse.
Greening side slope is a kind of emerging ecological revetment mode effectively protecting bare slope, and it combines with traditional project post-evaluation, effectively can realize domatic ecological vegetation and recover.Rock side-slope generally belongs to high gradient slope, without the condition of plant growth, needs soil moved in improve the original during greening.Rock is completely exposed, moisture and nutrient condition poor, plant be difficult to growth.
The greening method that rocky slope outside Current Domestic is conventional has the method such as alien earth sparging method, tape planting (basin, bag) method, three-dimensional grid method, concrete frame lattice beam method, thick layer base material spraying greening vegetation, plant cover concrete greening, fish scale pit excavation technology, planting groove technique, vine greening.But these method great majority all face cost intensive, the fixing difficulty of base material, the problems such as vegetation vitality is not strong, and vegetation moisture, nutrient supply are not enough, meanwhile, a large amount of exposed rocks and concrete vision, the non-constant of landscape effect.
Summary of the invention
In order to overcome deficiency of the prior art, the utility model proposes a kind of rock slope timber solid earth greening alive structure, the timber alive of cuttage plant constitution of one's native land itself is utilized to have landscape function, can also soil and slope protection, simultaneously along with the growth of wooden branch of living, the entirety realizing rock slope together with surrounding plants covers greening, solves the problem that rock slope greening is difficult.
The technical solution adopted in the utility model is: on stable rock slope, dig cutting hole, inner filling Nutrition Soil; There is otch the side of timber alive, can insert in cutting hole, and fix with fence rope; Planting bag overlays above fence successively, and the sack staple that is connected connects into entirety; In the hole that planting bag and rock slope are formed, fill Nutrition Soil, soil layer surface coverage plastic film.
Described cutting hole, on stable rock slope with horizontal spacing 2 ~ 3m, vertical clearance 1.5 ~ 2.5m be blossom type distribution, upward, aperture 10 ~ 20cm, hole depth is not less than 30cm in aperture.
Described timber alive, formed by the activated cuttage plants shoots of one's native land of tool and the reinforcing bar mixing manufacture being no less than 15%, by active branch otch towards side, connect with rope and weave into faggot, active branch quantity proportion is no less than 40%, between adjacent timber alive, make fence with plants shoots and the reinforcing bar being no less than 20%, with rope, work timber is fixedly connected with fence.
Further, described reinforcing bar should choose diameter 1 ~ 2cm, is mainly used to the bearing capacity increasing timber alive and fence.
Further, described active branch should choose the indigenous plant branch of diameter 2 ~ 3cm as locust tree, weeping willow, the bark of eucommia, Chinese white poplar, removing leaf, being cut into length with scissors is 60cm ~ 100cm, by the branch alignment sheared, 20 ~ 40 are bundled into a branch of, in order to prevent wicker dry before cuttage, should be immersed in water or being contained in keeping inside plastic sack.
Described planting bag, the geotextiles be made up of macromolecular material is made, and central filler has the mixture of soil, climbing plants seed, water-loss reducer, fertilizer, overlays successively above fence, and the sack staple that is connected connects into entirety.
Further, described Nutrition Soil, is mixed by the multiple material such as fine earth, modifying agent, binding agent, composite fertilizer, water-loss reducer, vegetable fiber, repeatedly granule agent, increases soil fertility, for plant growth creates good soil environment.
The beneficial effects of the utility model are: utilize the timber alive that cuttage plant of one's native land is made into, and when after active branch germinating growth, itself has landscape effect, together with surrounding plants, form graceful view, naturally coordinate; Space reclaimed soil between planting bag and rock slope, planting bag coordinates with backfill soil, add soil thickness, nutrient needed for enough vegetation and moisture can be provided, and unnecessary rainwater can be stored in inside planting bag, discharges when plant needs, strengthen retaining water retention capacity, improve plant survival rate, expand afforestation coverage rate; Instead of original stone, cement prefab, structure is simple, speed of application is fast, significantly can reduce engineering cost, constructs permanent software side slope, and greening vegetation speed is fast, forms natural side slope attractive in appearance.
Accompanying drawing explanation
Fig. 1 is the utility model cross-sectional view;
Fig. 2 is the utility model afforestation effect schematic diagram;
In figure: 1-rock slope; 2-cutting hole; 3-branch alive; 4-reinforcing bar; 5-rope; 6-planting bag; 7-staple; 8-branch sprouting alive; 9-climbing plants; 10-shrub.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in further detail.
Embodiment one: see Fig. 1-Fig. 2, a kind of rock slope timber solid earth greening alive structure, comprises cutting hole (2), timber (3) alive, planting bag (6).First, clear up domatic float stone, danger stone, weeds foreign material etc., unwrapping wire is got a little, on stable rock slope, dig cutting hole (2) with drill bit with horizontal spacing 2 ~ 3m, vertical clearance 1.5 ~ 2.5m, aperture upward, distributes in blossom type, aperture 10 ~ 20cm, hole depth is not less than 30cm; After having punchinged, water in hand-hole with water, treat that ponding disappears, complete infiltration, then in cutting hole (2), insert the Nutrition Soil that 10cm is thick; To make the timber alive (3) bundled, the side that otch is downward, and insert in cutting hole, between adjacent timber alive, make fence with plant branch (3) alive with the reinforcing bar (4) being no less than 20%, fence fixes with timber rope (5) of living; The planting bag (6) of mixture of soil, climbing plants seed, water-loss reducer, fertilizer will be housed, overlay successively above fence, the sack staple (7) that is connected connects into entirety, then, in the hole formed at planting bag and rock slope, fill Nutrition Soil, plant shrub (10) above, herbaceous plant seeds can be sowed in top layer, last covered with plastic film, reduces the evaporating loss of soil moisture, improves plant survival rate.

Claims (6)

1. a rock slope timber solid earth greening alive structure, comprises cutting hole, timber, planting bag alive, it is characterized in that: on stable rock slope, dig cutting hole, inner filling Nutrition Soil; There is otch the side of timber alive, can insert in cutting hole, and fix with fence rope; Planting bag overlays above fence successively, and the sack staple that is connected connects into entirety; In the hole that planting bag and rock slope are formed, fill Nutrition Soil, soil layer surface coverage plastic film.
2. a kind of rock slope according to claim 1 timber solid earth greening alive structure, it is characterized in that: described cutting hole, on stable rock slope with horizontal spacing 2 ~ 3m, vertical clearance 1.5 ~ 2.5m be blossom type distribution, aperture is upward, aperture 10 ~ 20cm, hole depth is not less than 30cm.
3. a kind of rock slope according to claim 1 timber solid earth greening alive structure, it is characterized in that: described timber alive, formed by the activated cuttage plants shoots of one's native land of tool and the reinforcing bar mixing manufacture being no less than 15%, connect with rope and weave into faggot, active branch quantity proportion is no less than 40%, between adjacent timber alive, make fence with plants shoots and the reinforcing bar being no less than 20%, be fixedly connected with rope.
4. a kind of rock slope according to claim 1 timber solid earth greening alive structure, it is characterized in that: described planting bag, the geotextiles be made up of macromolecular material is made, central filler has the mixture of soil, climbing plants seed, water-loss reducer, fertilizer, overlay successively above fence, the sack staple that is connected connects into entirety.
5. a kind of rock slope according to claim 3 timber solid earth greening alive structure, is characterized in that: described reinforcing bar should choose diameter 1 ~ 2cm.
6. a kind of rock slope according to claim 3 timber solid earth greening alive structure, it is characterized in that: described active branch should choose the indigenous plant branch of diameter 2 ~ 3cm as locust tree, weeping willow, the bark of eucommia, Chinese white poplar, removing leaf, being cut into length with scissors is 60cm ~ 100cm, by the branch alignment sheared, 20 ~ 40 are bundled into a branch of.
CN201520068022.1U 2015-02-01 2015-02-01 Rock slope timber greening structure alive Expired - Fee Related CN204443226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520068022.1U CN204443226U (en) 2015-02-01 2015-02-01 Rock slope timber greening structure alive

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520068022.1U CN204443226U (en) 2015-02-01 2015-02-01 Rock slope timber greening structure alive

Publications (1)

Publication Number Publication Date
CN204443226U true CN204443226U (en) 2015-07-08

Family

ID=53650201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520068022.1U Expired - Fee Related CN204443226U (en) 2015-02-01 2015-02-01 Rock slope timber greening structure alive

Country Status (1)

Country Link
CN (1) CN204443226U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105200998A (en) * 2015-09-07 2015-12-30 北京林业大学 Planting structure and ecological slope protection structure
CN106471913A (en) * 2016-09-30 2017-03-08 上官秀丰 A kind of greening means of defence of precipice
CN107142897A (en) * 2017-06-27 2017-09-08 王建军 Fish-scale pit biology bank protecting method
CN108086335A (en) * 2017-12-22 2018-05-29 中南林业科技大学 Ecological slope protection structure and its construction method
CN108617370A (en) * 2017-03-22 2018-10-09 广西进联德环保工程有限公司 A kind of method for stereo afforesting
CN109837916A (en) * 2019-03-13 2019-06-04 湖北工业大学 The wooden sash side slope ecological renovation method of assemble type
CN109923969A (en) * 2019-05-06 2019-06-25 重庆大学 A kind of river-like reservoir falling zone method for recovering vegetation
CN111719569A (en) * 2020-06-18 2020-09-29 深圳供电规划设计院有限公司 Ecological slope protection structure and method
CN112502169A (en) * 2020-11-30 2021-03-16 中国建筑材料工业地质勘查中心湖南总队 Rock massif ecological remediation structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105200998A (en) * 2015-09-07 2015-12-30 北京林业大学 Planting structure and ecological slope protection structure
CN106471913A (en) * 2016-09-30 2017-03-08 上官秀丰 A kind of greening means of defence of precipice
CN108617370A (en) * 2017-03-22 2018-10-09 广西进联德环保工程有限公司 A kind of method for stereo afforesting
CN107142897A (en) * 2017-06-27 2017-09-08 王建军 Fish-scale pit biology bank protecting method
CN107142897B (en) * 2017-06-27 2023-10-27 王建军 Biological slope protection method for fish scale pits
CN108086335A (en) * 2017-12-22 2018-05-29 中南林业科技大学 Ecological slope protection structure and its construction method
CN109837916A (en) * 2019-03-13 2019-06-04 湖北工业大学 The wooden sash side slope ecological renovation method of assemble type
CN109837916B (en) * 2019-03-13 2021-01-12 湖北工业大学 Ecological restoration method for side slope of split wooden sash
CN109923969A (en) * 2019-05-06 2019-06-25 重庆大学 A kind of river-like reservoir falling zone method for recovering vegetation
CN111719569A (en) * 2020-06-18 2020-09-29 深圳供电规划设计院有限公司 Ecological slope protection structure and method
CN112502169A (en) * 2020-11-30 2021-03-16 中国建筑材料工业地质勘查中心湖南总队 Rock massif ecological remediation structure
CN112502169B (en) * 2020-11-30 2022-05-17 中国建筑材料工业地质勘查中心湖南总队 Rock massif ecological remediation structure

Similar Documents

Publication Publication Date Title
CN204443226U (en) Rock slope timber greening structure alive
CN101112157B (en) Method for greening high precipitous rock slope
CN101258814B (en) Planting hole and method for using planting hole to green rock slope and breakage mountain body
CN105918056B (en) One kind, which is checked winds and fixed drifting sand, is retained greening method
CN104642054B (en) A kind of big specification Chinese scholar tree transplanting construction method in the north
CN101509257B (en) Method for growing balsamroot grass to fix soil to protect slope
CN102124930A (en) Method for planting big maidenhair trees in coastal areas
CN107100176B (en) A kind of expressway slope greening system
CN108174736A (en) A kind of rejuvenation method of Gu tea tree
CN111011093A (en) High rainfall rapid and steep rocky slope greening method
CN107646606A (en) Salt-soda soil arbor method for transplanting
CN105706821A (en) Reservoir bank hydro-fluctuation belt terraced tree planting method
CN104429801A (en) Method for afforestation on difficult lands in Han River seacoast
CN107439320A (en) A kind of greening method of concordant limestone breakage mountain body
CN113529753B (en) Construction method for quickly treating hillock by grouting quick-setting high polymer
CN204443227U (en) Utilize rock fracture plant growth structure
CN108385699A (en) A kind of discrete embedded association ecological bank protecting method
CN207619967U (en) Restoration of the ecosystem side slope surface construction on a kind of mine
CN107232003B (en) Construction method for planting water-resistant arbor in water
CN103548639B (en) Landscape tree cultivation method applicable to saline-alkali soil
CN209435883U (en) A kind of salt-soda soil cultivation of plants structure
CN102677651A (en) Method for ecological restoration of mountain
CN201874001U (en) Highway soil quality side slope live timber pile soil reinforcement structure
JP3602500B2 (en) Seedling production method
CN104762946A (en) Filler and method for ecologically repairing damaged mountain

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20160201