CN201903043U - 大板梁叠梁 - Google Patents

大板梁叠梁 Download PDF

Info

Publication number
CN201903043U
CN201903043U CN2010206470845U CN201020647084U CN201903043U CN 201903043 U CN201903043 U CN 201903043U CN 2010206470845 U CN2010206470845 U CN 2010206470845U CN 201020647084 U CN201020647084 U CN 201020647084U CN 201903043 U CN201903043 U CN 201903043U
Authority
CN
China
Prior art keywords
plate
hanger
shaped
upper beam
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206470845U
Other languages
English (en)
Inventor
魏海斌
杨全强
郝慧君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Shanxi Electric Power Construction Co Ltd
Original Assignee
Shanxi No4 Electric Power Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi No4 Electric Power Construction Co filed Critical Shanxi No4 Electric Power Construction Co
Priority to CN2010206470845U priority Critical patent/CN201903043U/zh
Application granted granted Critical
Publication of CN201903043U publication Critical patent/CN201903043U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种大板梁叠梁,解决了现有技术在大板梁的安装过程中采用钢丝绳捆绑吊装,吊装中容易造成大板梁偏斜,不好就位的技术问题。包括上梁(1)和下梁(2),高强度螺栓(3)将上梁(1)和下梁(2)固定连接在一起,在下梁(2)的立板的两侧面固定焊接有两块肋板(5),工字形上梁(1)的上表面固定设置有上梁吊耳(4),在所述的工字形下梁(2)的立板的两侧面固定焊接的两块肋板(5)上均设置有下吊耳,该下吊耳由下吊耳板(6)、下吊耳连接板(11)和肋板(5)组成。本实用新型安全可靠、操作方便,加快施工进度,能够重复利用降低工程成本,保证了施工质量。

Description

大板梁叠梁
技术领域
本发明涉及一种火力发电厂锅炉钢结构施工中对大板梁叠梁的吊装,特别涉及一种没有吊装吊耳的大板梁叠梁。
背景技术
随着电力行业的快速发展,电厂机组容量也越来越大,电站锅炉的钢结构跨度大、杆件重,结构复杂且高度一般都达到了80米高度,高空作业多,施工难度大。大板梁是锅炉钢结构中尺寸最大、重量最重的部件,600兆瓦机组重达120吨,一般分为单车吊装和双车抬吊方法,它的安装方法往往左右锅炉主吊机械的选择。大机组大板梁一般分上下叠梁,先装下梁,再装上梁,上下梁之间采用高强螺栓连接后,再焊接。在大板梁的安装过程中,是采用钢丝绳捆绑吊装,投资大、工序多、操作困难、危险大,另外吊装中容易造成大板梁偏斜,不好就位。
发明内容
本发明提供的大板梁叠梁解决了现有技术在大板梁的安装过程中采用钢丝绳捆绑吊装,投资大、工序多、操作困难、危险大,另外吊装中容易造成大板梁偏斜,不好就位的技术问题。
本发明是通过以下技术方案解决以上技术问题的:
一种大板梁叠梁,包括工字形上梁和工字形下梁,工字形上梁设置在工字形下梁上面,高强度螺栓将工字形上梁和工字形下梁固定连接在一起,在工字形下梁的立板的两侧面固定焊接有两块肋板,在所述的工字形上梁的上表面固定设置有上梁吊耳,在所述的工字形下梁的立板的两侧面固定焊接的两块肋板上均设置有下吊耳,该下吊耳由下吊耳板、下吊耳连接板和肋板组成,连接螺栓将两块下吊耳连接板的上端和在这两块下吊耳连接板的上端中夹持的下吊耳板螺接在一起,另一接螺栓将两块下吊耳连接板的下端和在这两块下吊耳连接板的下端中夹持的肋板螺接在一起。
在所述的上梁吊耳的上吊耳板的两侧均固定设置有梯形加强板,在上梁吊耳板的吊孔两侧均固定设置有圆环形加强板。
本发明安全可靠、操作方便,加快施工进度,能够重复利用降低工程成本,保证了施工质量。
附图说明
图1是本发明的结构示意图
图2是本发明的上吊耳的结构示意图
图3是本发明的上吊耳的侧视方向的结构示意图
图4是图1的下吊耳部分的A向视图
具体实施方式
本发明的具体实施方式如下:
一种大板梁叠梁,包括工字形上梁1和工字形下梁2,工字形上梁1设置在工字形下梁2上面,高强度螺栓3将工字形上梁1和工字形下梁2固定连接在一起,在工字形下梁2的立板的两侧面固定焊接有两块肋板5,在所述的工字形上梁1的上表面固定设置有上梁吊耳4,在所述的工字形下梁2的立板的两侧面固定焊接的两块肋板5上均设置有下吊耳,该下吊耳由下吊耳板6、下吊耳连接板11和肋板5组成,连接螺栓7将两块下吊耳连接板11的上端和在这两块下吊耳连接板11的上端中夹持的下吊耳板6螺接在一起,另一接螺栓将两块下吊耳连接板11的下端和在这两块下吊耳连接板11的下端中夹持的肋板5螺接在一起。
在所述的上梁吊耳4的上吊耳板9的两侧均固定设置有梯形加强板8,在上梁吊耳板9的吊孔两侧均固定设置有圆环形加强板10。
大板梁叠梁的装配方法如下:
第一步:吊点位置确定。根据吊装方案,确定负荷吊车分配情况,再根据吊车工况在大板梁上选择吊点的位置。
第二步:吊耳数量确定。根据大板梁重量及负荷分配情况选择吊耳数量。
第三步:选择吊耳型式。由于大板梁的结构特点及安装方式,选择下梁采用螺栓连接吊装吊耳,上梁采用在上平面焊接吊耳方法。
第四步:吊耳的计算及校核。根据每个吊耳受力大小来计算、校核吊耳的安全性能。根据计算选择吊耳大小、尺寸。
第五步:画出吊耳制作图。
第六步:吊耳制作。吊耳的孔眼宜采用钻孔。气割孔眼应磨光,以免损坏索具。吊耳所用的钢材应具有良好的可焊性。焊接应采用碱性焊条,焊脚尺寸应符合规定要求。
第七步:吊耳安装。吊耳的安装位置应与分段的重心对称,以保持吊耳负荷的均衡和分段吊运的平稳,吊耳的安装方向应与其受力方向一致,以免产生扭矩。
采用此方法的特点主要体现在以下方面:
1、解决了大板梁吊装中采用钢丝绳捆绑吊装,投资大、工序多、操作困难、危险大,另外吊装中容易造成大板梁偏斜,不好就位,且上梁不能采用钢丝绳捆绑吊装问题。
2、结构受力安装明确,计算简便,加工制作简单,易于安装、拆除。
3、操作简单,降低了高空作业难度,提高了工作安全系数。
4、吊装中大板梁平稳、不偏斜,易于就位,提高了工作效率。
5、避免了使用长钢丝绳捆绑吊装,节省了人力物力,降低了工程成本。
6、此方法可使用于大型钢结构的吊装,操作简单,安全系数高。

Claims (2)

1.一种大板梁叠梁,包括工字形上梁(1)和工字形下梁(2),工字形上梁(1)设置在工字形下梁(2)上面,高强度螺栓(3)将工字形上梁(1)和工字形下梁(2)固定连接在一起,在工字形下梁(2)的立板的两侧面固定焊接有两块肋板(5),其特征在于,在所述的工字形上梁(1)的上表面固定设置有上梁吊耳(4),在所述的工字形下梁(2)的立板的两侧面固定焊接的两块肋板(5)上均设置有下吊耳,该下吊耳由下吊耳板(6)、下吊耳连接板(11)和肋板(5)组成,连接螺栓(7)将两块下吊耳连接板(11)的上端和在这两块下吊耳连接板(11)的上端中夹持的下吊耳板(6)螺接在一起,另一连接螺栓将两块下吊耳连接板(11)的下端和在这两块下吊耳连接板(11)的下端中夹持的肋板(5)螺接在一起。
2.根据权利要求1所述的一种大板梁叠梁,其特征在于,在所述的上梁吊耳(4)的上吊耳板(9)的两侧均固定设置有梯形加强板(8),在上梁吊耳板(9)的吊孔两侧均固定设置有圆环形加强板(10)。
CN2010206470845U 2010-12-08 2010-12-08 大板梁叠梁 Expired - Lifetime CN201903043U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206470845U CN201903043U (zh) 2010-12-08 2010-12-08 大板梁叠梁

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206470845U CN201903043U (zh) 2010-12-08 2010-12-08 大板梁叠梁

Publications (1)

Publication Number Publication Date
CN201903043U true CN201903043U (zh) 2011-07-20

Family

ID=44273636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206470845U Expired - Lifetime CN201903043U (zh) 2010-12-08 2010-12-08 大板梁叠梁

Country Status (1)

Country Link
CN (1) CN201903043U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425269A (zh) * 2011-12-14 2012-04-25 上海交通大学 可悬吊重物的大板梁及其构筑方法
CN102943546A (zh) * 2012-11-26 2013-02-27 上海交通大学 一种用于锅炉钢架上的大板梁
CN110332513A (zh) * 2019-05-22 2019-10-15 山东电力建设第三工程有限公司 一种1000mw超超临界塔式锅炉大板梁吊装工法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425269A (zh) * 2011-12-14 2012-04-25 上海交通大学 可悬吊重物的大板梁及其构筑方法
CN102943546A (zh) * 2012-11-26 2013-02-27 上海交通大学 一种用于锅炉钢架上的大板梁
CN110332513A (zh) * 2019-05-22 2019-10-15 山东电力建设第三工程有限公司 一种1000mw超超临界塔式锅炉大板梁吊装工法

Similar Documents

Publication Publication Date Title
CN201882763U (zh) 一种双机抬吊专用扁担梁
CN101537973B (zh) 利用液压顶推提升连续吊装轧机牌坊方法
CN101624164B (zh) 用于机组发电机定子的吊装工法及其专用机构
CN201903043U (zh) 大板梁叠梁
CN201619953U (zh) 用于机组发电机定子吊装的专用吊装机构
CN202643084U (zh) 拆除、安装钢梁的小型吊具
CN204324677U (zh) 一种可拆卸板式吊耳
CN205527291U (zh) 一种用于吊装两块叠合板的框型架
CN205500579U (zh) 船闸用移动模架
CN101927955B (zh) 桥式、门式起重机主梁制造或改造的方法
CN201809032U (zh) 带可组合式吊架的自调整拉索装置
CN203159027U (zh) 一种预制装配式铁塔基础吊具
CN102587678A (zh) 钢结构节点滑移装置
CN216338968U (zh) 铁路双线箱梁静载弯曲试验梁
CN102518317A (zh) 在线提升大跨度厂房屋架梁高度方法
CN103086257A (zh) 吊装装置及其使用方法
CN210505201U (zh) 一种钢筋批量吊装的设备
CN201678344U (zh) 一种电梯上曳引机的布置结构
CN216549204U (zh) 适用于多种预制构件的通用吊具
CN201362860Y (zh) 建筑砼桩检测装置
CN201024038Y (zh) 二台行车同时起吊的吊梁
CN105113426A (zh) 一种扣索联结器及钢桁拱桥扣索联结的方法
CN220950800U (zh) 一种变电站吊运装置
CN204959605U (zh) 扣索联结器
CN212863954U (zh) 可广泛使用于烧结机台车栏板的便捷式吊装小车

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANXI NO 4 ELECTRIC POWER CONSTRUCTION COMPANY CH

Free format text: FORMER NAME: NO.4 POWER CONSTRUCTION COMPANY OF SHANXI ELECTRIC POWER CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 030012 Shanxi city of Taiyuan province Pingyang road two lane 24

Patentee after: Shanxi No.4 Electric Power Construction Company of China Energy Engineering Group

Address before: 030012 Shanxi city of Taiyuan province Pingyang road two lane 24

Patentee before: Shanxi No.4 Electric Power Construction Company

C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP SHANXI ELECTRIC POW

Free format text: FORMER NAME: SHANXI NO 4 ELECTRIC POWER CONSTRUCTION COMPANY CHINA ENERGY ENGINEERING GROUP

CP01 Change in the name or title of a patent holder

Address after: 030012 Shanxi city of Taiyuan province Pingyang road two lane 24

Patentee after: SHANXI ELECTRIC POWER CONSTRUCTION CO., LTD.(CEEC)

Address before: 030012 Shanxi city of Taiyuan province Pingyang road two lane 24

Patentee before: Shanxi No.4 Electric Power Construction Company of China Energy Engineering Group

CX01 Expiry of patent term

Granted publication date: 20110720

CX01 Expiry of patent term