CN1972764A - 连铸与轧制之间非连续金属板片制造过程及系统 - Google Patents
连铸与轧制之间非连续金属板片制造过程及系统 Download PDFInfo
- Publication number
- CN1972764A CN1972764A CNA2005800204972A CN200580020497A CN1972764A CN 1972764 A CN1972764 A CN 1972764A CN A2005800204972 A CNA2005800204972 A CN A2005800204972A CN 200580020497 A CN200580020497 A CN 200580020497A CN 1972764 A CN1972764 A CN 1972764A
- Authority
- CN
- China
- Prior art keywords
- thickness
- rolling
- blank
- continuous casting
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/463—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/04—Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
- B22D11/0408—Moulds for casting thin slabs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/1213—Accessories for subsequent treating or working cast stock in situ for heating or insulating strands
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/124—Accessories for subsequent treating or working cast stock in situ for cooling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/14—Plants for continuous casting
Abstract
一种金属板片制造过程及系统,金属片的厚度为0.14-20mm,金属板的厚度为10-100mm,毛坯(1)的厚度为30至300mm,采用弓形连铸形式。毛坯(1)在铸造后在感应炉(12)内加热,然后无连续地直接输送给轧制台(11),没有任何中间产品。轧制后的产品经冷却后形成板材(20),利用切割及抽丝装置(14),或者卷绕到辊子上,从而形成连续片状盘圆(15),可由冷却系统(13)下游处的切割装置(14’)来切割。可在轧制台之间设置表面冷却装置(13’)。根据厚度减小与终端产品质量的关系,来逐步增加从连铸至轧制结束为止的输送速度,并调节相对下游方向的级联。
Description
技术领域
本发明涉及一种从金属连铸至最终轧制台为止的非连续金属板片制造过程及系统,尤其涉及一种无任何中间产品的钢产品的制造过程及系统。
背景技术
在钢产业中,考虑到原材料成本及电耗的增大、全球市场竞争的加大以及防污标准的限制,需要采用一定的方法来制造高质量的热轧盘圆及板材,从而降低投资成本及产品成本,进而使板材厚度更为减小。提高竞争力,还可降低终端产品的电耗,从而使环境污染降至最低。
近年来在这一方面已经有了长足的进步,如本专利申请人名下的专利EP0415987,0925132,0946316,1011896以及国际公布WO2004/0262497所示。
然而,尽管产品质量达到了最佳(尤其是钢板),但其结果在污染和能耗方面却不尽人意,而且会增加终端产品的体积。
以上述的EP0415787所谓“铸轧”为例,其在弓形铸造机上只配有一台轧制机,从而使中间产品在加热后还需要第二次轧制。
在近年来公开的WO2004/026497中,上述“铸轧技术”采用连续铸造,且进行第一次轧制,不超过四台装置,从而获得中间产品,其在切割后进行加热,然后再进行塑性拉伸,并进行第二次轧制。根据该出版物WO2004/026497,在第一次粗加工后,还可以拉成板材,但不采用高质量板材所需的冷却系统。在实际中,板材拉制在没有下游处理的情况下只具有缓冲作用,从而避免连铸及后续生产线的中止,但与板材生产的程序性无关。
“铸轧”这一概念还见于EP0823294专利,其配有三个不同的制造步骤:第一步是产生奥氏体毛坯,从而形成中间品;第二步是进一步加热该中间品至温度<738℃,且按Fe/C图来进行金相组织转换;第三步是完成轧制,从而形成铁素体。该专利的主旨在于,采用铸轧概念,从而以三个不同的步骤来获得厚度较薄的板材,铁素体不采用最后一步,从而在所谓的“批量流动”(换言之,连铸出口处单位时间内的钢流量)之下,可通过一个制造步骤来获得超薄的奥氏体产品。
专利EP0889762中公开了一种采用铸轧概念的方法,从而不连续地一步制造薄板,还公开了一种毛坯连铸方法,其为大流量(毛坯厚度乘以出口速度,单位为m/min>0.487m2/min),且连铸出口处为高温(约为1240℃),在温度均匀后进行轧制。
与EP0823294相同,EP0889762专利也在第一次粗加工与最后的精加工之间配用冷却步骤或加热步骤。试验证明,该专利不适用于工业场合。进行高温连铸(约1400℃)从而在轧制过程中尽量利用热能这一想法固然令人生趣,然而在实际中是行不通的,因为如果在如此高温下连铸,连铸出口处的表面温度将高达1150℃,从而会造成弯液区不规则,进而造成毛坯缺陷甚至断裂。
发明内容
本发明旨在克服上述不足,采用一种新型的第二次冷却系统,从而可适于高流量流动,并进行感应加热,从而使毛坯温度至少提高100℃。
本发明的目的在于,提供一种制造过程,从而可在极小的设备上,通过连铸与轧制之间没有中间产品的一个连续步骤,来获得热轧板,甚至超薄热轧板,其最大厚度为20mm至0.14mm,还可获得高质量板材,其厚度为10与100mm之间,从而可最大限度地利用熔化金属的全部能量。
本发明的过程的主要特征如权利要求1所述,包括一个连铸步骤及一个在线轧制步骤,直接连接而没有中间粗加工,在连铸与轧制之间进行感应加热。
本发明的另一目的在于,提供一种用于招待上述过程的系统或设备,其中,在轧制台工作中,在模具及连续铸的下游材料不连续,在感应炉之后,连铸与第一轧制台之间的距离最小。该设备的主要特征如权利要求4所述。
附图说明
参照下列设备实施方式及附图,可进一步理解本发明的其它目的,其中:
图1表示本发明设备示例,用于制造卷成盘圆的钢板,最小厚度为1mm,板材的最大厚度为100mm;
图2表示连铸模具,其尺寸符合本发明的要求;和
图3表示从模具至最后轧制台为止的厚度减小量。
具体实施方式
应注意的是,本说明用于碳钢或不锈钢钢板制造及/或薄和超薄板材,但本发明也适用于铝、铜或钛的板材生产。
从钢水包向浇口盘倒入钢水(熔化钢),然后再进入连铸模,出口处毛坯的厚度为相对模具入口的厚度而缩小,其处于30与300mm之间,其长度为600与4000mm之间。在液态下厚度持续减小,同时在同一铸造步骤中进行第二次冷却,在轧制台上直接与连铸相联,直到结束为止,从而最大限制利用液态钢的起始能量,直到达到所希望的厚度为止,其厚度对片材而言为0.14-20mm,而对板材则为10-100mm。
本发明中的上述材料流量或“流量”的值较大,从而保证轧制所需的温度及速度,使终端产品具有所需的厚度及表面与内面质量,且模具内减小厚度。参见图3,厚度从模具本体开始减小,其中,毛坯的中心处首先减小,形成冠边,从而形成空心模具,液芯厚度减小,直到达到最后的轧制台为止。在铸造中的减小步骤中,材料的输送速度是一定的。
参见图2,流量与输送速度及毛坯的剖面SB成比例,根据本发明,最佳比率取决于模具内液钢表面(或熔化钢)的面积SM,即对应于弯液区的水平剖面,减去浸入式喷口的表面面积ST,以及毛坯在连续铸造出口处的垂直剖面SB。
该比率SM/SB必须为≥1.1,从而保证液态钢(或熔化钢)的流量受到限制,并使模具内及弯液波的涡动降低至最小。
液态钢的流量如果较大,则需要加大毛坯的第二次冷却电能。传统技术的对策一般是增加冷却水流量。但冷却水流量如果过大,则难以排出水,易于停留在喷口前端,从而妨碍了优质终端产品所必需的冷却均匀性。如果水压处于15与40巴之间,而且喷口与毛坯之间的距离为<150mm,则可以以以较小的“流量”来获得有效的毛坯冷却,并可获得优质终端产品所必需的温度(横向及纵向)均匀性。通过上述参数,来自喷口的水最好穿过蒸汽膜,从而在毛坯与冷却水之间形成隔绝(莱顿弗罗斯特现象效果)。
第二次冷却如上所述,具有冷却毛坯表面的特殊效果,同时使毛坯的中间部分保持最大温度。
其目的在于,使毛坯在连铸出口处的表面平均温度达到<1150℃,从而避免所谓的“凸起”,即,在铸造辊之间产生毛坯膨胀,从而产生不规则的弯液区,并影响产品质量,并使铸机出口处毛坯中部的平均温度尽量高,且在任意场合下均为>1300℃,从而在轧制时,以最小的分离力来获得最大的减缩。
这对于降低投资(机台较小)及同一产品厚度所需的低电耗是有利的。根据本发明,与传统技术不同,无需过大的电耗便可降低最终厚度,且kW值与铸机出口处的毛坯厚度成比例(SpB)。比如,对1600mm的毛坯而言,前五个机台的所需电耗为:
1号台:kW<SpB×20
2号台:kW<SpB×40
3号台:kW<SpB×70
4号台:kW<SpB×85
5号台:kW<SpB×100
图3表示上述内容与厚度减缩的关系,以及与前五个轧制台的电耗增加的关系,如各机台的对应尺寸所示。
通过采用上述铸机,其高度可低于立式铸机,固体毛坯内的铁素体对同一剖面及连铸出口速度而言是较低的,从而可避免膨胀或将其降至最低。
图1表示本发明的布局图示例,从连铸出口处的毛坯1开始至模具10为止。毛坯1的厚度为30至300mm之间,宽度为600至4000mm之间,其通过感应炉12输送给轧机11,从而加热该机台的上游及除鳞机16。连铸机出口与第一轧机11之间的距离不大于50m,从而限制毛坯的温度损失,这样,可以减小机台的尺寸,以减小空间。在流量保持一定的情况下,从连铸至最终轧制为止的整个过程的速度得到增加,且对应于终端产品所需的厚度减小量。在线轧制机11包括一个或多个机台,用于达到所需的最终厚度;比如,图1所示的机台具有七个(V1-V7)。辊子的直径最好为300至800mm之间。在这一范围内,可结合终端产品厚度来获得足够的减缩,并可获得各辊的良好冷却效果,从而避免产生所谓的“火纹”。
本发明的设备尤其是轧机11包括连铸机10,配有一个用于控制下游速度的系统,装置14用于在终端冷却系统13之后,切割卷筒上的盘圆。在后者的上游配备一台切割装置14’,用于交互作用,从而在板片厚度较大(达到100mm)的场合下抽出板材20,并处于在少于图示的轧制台之后的上游位置。
还提供一种冷却系统,用于在抽出装置14’之前冷却板片。
除了板片冷却系统13之外,在其上游还配有至少一个冷却系统,用于冷却毛坯1的表面,图中以二个相邻轧台之间的相反箭头(如13)来表示,从而形成所谓的中间冷却机13’,用于限制第二次氧化。
如上所述,从连铸至终端轧台为止的整个过程的输送速度逐步增加,并对应于所需的厚度减缩量,尤其是终端产品所需的厚度及质量。为此,沿从连铸开始的下游方向提供速度调节系统,从而提供一种不同于传统轧机所采用的在上游方向级联的调节方式。
如果将这种在上游方向级联的调节方式用于本发明,或者用于其它专利的设备(尤其是EP0889762),且连铸直接与轧制相连而无连续,则不可避免地会造成铸造速度波动,对毛坯质量即表面均匀性及材料内部性能产生不利影响。
因此,通过克服一般的技术难题,采用一种沿下游方向级联的调节概念,其中,铸造速度预选确定,并对下游机台的速度参数进行速度校正,还考虑本发明相对其它技术的轧机操作差异。传统技术中,片材进入已关闭的各机台内,根据规定的厚度,在各轧辊之间设置夹持器,同时沿着上游方向进行调节,从而校正已夹持了材料的机台速度。相反,在本发明中,毛坯进入辊子开启状态下的各机台内,在毛坯头通过后关闭,直至达到对应于所需减缩量的夹持器为止。
图1表示感应炉12、除鳞机16及轧台入口及出口处各种过程参数示例(厚度,减缩率%,温度及速度)。其中的IN及OUT对应于感应炉的IH,而DES则对应于除鳞机,V1-V7对应于图1的各机台。对后者而言,只示出了四个出口参数,但轧机的第一个机台V1除外,其还示出了入口值。根据本发明,毛坯的厚度为70mm,初始速度为6.5m/min,总长度为70m的设备可获得约1mm的厚度。对末端机台出口处的片材温度而言,应能确保轧制出奥氏体金相组织。
最后,本发明的过程及设备还可用于制造连续板片材,不仅是碳钢或不锈钢,而且还可制造铝、铜或钛。
Claims (9)
1、一种钢片制造过程,其厚度为0.14mm至20mm,金属板的厚度为10与100mm之间,毛坯厚度为30与300mm之间,宽度为600与400mm之间,通过连铸而获得,出口处单位时间内有大流量的材料流通,其中,连续铸造(10)为弓形模具,且在一个制造步骤中直接连接轧制步骤(11)而不连续,其特征在于,减小厚度,从在模具内从开始起逐步增加,并在铸造及轧制中连续,在第二个冷却步骤中,在连铸出口获得一种毛坯,其剖面上具有转换温度梯度,毛坯的平均表面温度为<1150℃,芯部的平均温度为>1350℃,在铸造与轧制之间进行感应加热(12),对板材(20)进行切割及拉伸(14’),在一定的冷却下,使轧制片形成盘圆(15),还提供一种速度调节系统,相对从连续铸造开始的下游方向级联,其中,轧制端的上述输送速度对应于终端产品的厚度减少量而逐步增加,铸造与轧制之间的距离在过程中最后一个考虑。
2、根据权利要求1所述的过程,其特征在于,在上述轧制步骤之中/或之后,还提供至少一种冷却步骤(13,13)。
3、根据权利要求1所述的过程,其特征在于,上述大值流量,毛坯厚度为>30mm,速度为>4m/min。
4、一种钢片制造过程,其厚度为0.14mm至20mm,金属板的厚度为10与100mm之间,连铸包括模具及弓形铸机,液芯从毛坯(1)开始减小,其厚度为3O与300mm之间,宽度为600与4000mm之间,其特征在于,上述模具表面SM之间在弯液区之比为≥1.1,减去浸入式喷口的面积ST,以及毛坯(1)在连铸出口处的剖面Sb,从而提供第二冷却系统,用于在连铸出口获得一种毛坯,其剖面上具有转换温度梯度,毛坯的平均表面温度为<1150℃,芯部的平均温度为>1350℃,成品研磨机(11)直接连接连铸系统,最大距离为50m,在连铸出口与研磨机(11)之间以及后者的出口处提供感应加热器(12),或者在冷却系统(13)之后提供切割装置(14)或卷绕在终端辊(15)上的盘圆,或者提供切割装置(14’),用于拉动板材(10),其还由上述冷却系统(13)来冷却。
5、根据权利要求4所述的设备,其特征在于,上述在线轧制机(11)至少有一个机台,最大为二十个机台,前五个机台所需的功率取决于铸造出口处的毛坯厚度(SpB),并乘以某个数值,该数值从第一机台的20增加到最后一个机台的100,并结合宽度1600mm来调节,宽度越大,则越增加乘数,其处于实际宽度与1600mm之间。
6、根据权利要求4-5任一项所述的设备,其特征在于,还包括一个基于加压水的表面冷却系统(13’),在至少二个邻近轧台之间,设有朝向毛坯(1)的对置喷口。
7、根据权利要求4所述的设备,其特征在于,第二次冷却铸造中的水压处于10与40巴之间,冷却喷口相对毛坯(1)的距离为≤150mm。
8、根据权利要求4所述的设备,其特征在于,包括用于轧制台(11)的辊子,其直径为300至800mm之间。
9、根据权利要求4所述的设备,其特征在于,上述装置(14’)用于切割并抽出片材(20),其处于上述冷却装置(13’)下游处各机台之间,并处于上述冷却系统(13)的上游,在其下游设有一个剪切机(14),用于在盘圆(15)卷绕结束后切割片材。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/IB2005/000915 WO2006106376A1 (en) | 2005-04-07 | 2005-04-07 | Process and system for manufacturing metal strips and sheets without solution of continuity between continuous casting and rolling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1972764A true CN1972764A (zh) | 2007-05-30 |
CN1972764B CN1972764B (zh) | 2011-12-07 |
Family
ID=34966713
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2005800204972A Active CN1972764B (zh) | 2005-04-07 | 2005-04-07 | 连续铸造与轧制间非连续金属带材及板材制造工艺与设备 |
Country Status (19)
Country | Link |
---|---|
US (2) | US7832460B2 (zh) |
EP (1) | EP1868748B1 (zh) |
JP (1) | JP5371421B2 (zh) |
KR (1) | KR20110033873A (zh) |
CN (1) | CN1972764B (zh) |
AR (1) | AR053045A1 (zh) |
AT (1) | ATE411120T1 (zh) |
AU (1) | AU2005330323B2 (zh) |
BR (1) | BRPI0513754B1 (zh) |
CA (1) | CA2569841C (zh) |
DE (1) | DE602005010487D1 (zh) |
DK (1) | DK1868748T3 (zh) |
EG (1) | EG24541A (zh) |
ES (1) | ES2314642T3 (zh) |
HR (1) | HRP20080586T3 (zh) |
MX (1) | MX2007012433A (zh) |
PL (1) | PL1868748T3 (zh) |
PT (1) | PT1868748E (zh) |
WO (1) | WO2006106376A1 (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103068502A (zh) * | 2010-08-13 | 2013-04-24 | 西门子公司 | 借助于铸坯直接轧制联合装置制造轧件的方法,用于铸坯直接轧制联合装置的控制装置和/或调节装置和铸坯直接轧制联合装置 |
CN101868313B (zh) * | 2007-11-22 | 2013-12-04 | 西门子Vai金属科技有限责任公司 | 用于连续地奥氏体轧制在连续的浇注过程中制造的带钢坯的方法以及用于实施所述方法的组合的浇注和轧制设备 |
CN104025705A (zh) * | 2011-12-28 | 2014-09-03 | Posco公司 | 加热设备及加热方法 |
CN114126782A (zh) * | 2019-07-11 | 2022-03-01 | 杰富意钢铁株式会社 | 连续铸造铸片的二次冷却方法及二次冷却装置 |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120018113A1 (en) * | 2004-12-03 | 2012-01-26 | Joachim Schwellenbach | CSP-continuous casting plant with an additional rolling line |
WO2007072515A1 (en) * | 2005-12-22 | 2007-06-28 | Giovanni Arvedi | Process and related plant for producing steel strips with solution of continuity |
DE102007058709A1 (de) * | 2007-08-04 | 2009-02-05 | Sms Demag Ag | Verfahren zum Herstellen eines Bandes aus Stahl |
DE102008003222A1 (de) * | 2007-09-13 | 2009-03-19 | Sms Demag Ag | Kompakte flexible CSP-Anlage für Endlos-, Semi-Endlos- und Batchbetrieb |
KR101331324B1 (ko) | 2008-10-30 | 2013-11-20 | 지멘스 악티엔게젤샤프트 | 다중 스탠드 압연 트레인을 통과하는 압연 재료의 배출 두께 조정 방법, 개회로 제어 장치 및/또는 폐회로 제어 장치 및 압연 설비 |
DE102009018683A1 (de) | 2009-04-23 | 2010-10-28 | Sms Siemag Ag | Verfahren und Vorrichtung zum Stranggießen einer Bramme |
IT1400002B1 (it) | 2010-05-10 | 2013-05-09 | Danieli Off Mecc | Procedimento ed impianto per la produzione di prodotti laminati piani |
CO6310134A1 (es) | 2010-08-31 | 2011-08-22 | Pacific Rubiales Energy Corp | Sistema sincronizado de produccion de crudo por combustion in situ |
EP2441538A1 (de) * | 2010-10-12 | 2012-04-18 | Siemens VAI Metals Technologies GmbH | Stranggießvorrichtung mit dynamischer Strangdickenreduzierung |
EP2441539A1 (de) | 2010-10-12 | 2012-04-18 | Siemens VAI Metals Technologies GmbH | Energie- und ausbringungsoptimiertes Verfahren und Anlage zur Erzeugung von Stahlwarmband |
EP2441540A1 (de) | 2010-10-12 | 2012-04-18 | Siemens VAI Metals Technologies GmbH | Verfahren und Anlage zur energieeffizienten Erzeugung von Stahlwarmband |
KR101510568B1 (ko) | 2013-12-23 | 2015-04-08 | 주식회사 포스코 | 연연속 압연장치 및 연연속 압연방법 |
RU2679664C2 (ru) | 2014-06-11 | 2019-02-12 | Арведи Стил Энджиниринг С.П.А. | Стакан для литья тонких слябов для распределения расплавленного металла с высоким расходом |
US9725780B2 (en) | 2014-06-13 | 2017-08-08 | M3 Steel Tech | Modular micro mill and method of manufacturing a steel long product |
EP2998046B1 (en) | 2014-09-12 | 2017-11-15 | Arvedi Steel Engineering S.p.A. | Integrated plant with very low environmental impact for producing hot-rolled and cold-rolled steel strip |
DE102014221068A1 (de) | 2014-10-16 | 2016-04-21 | Sms Group Gmbh | Anlage und Verfahren zur Herstellung von Grobblechen |
DE102015216512A1 (de) | 2015-08-28 | 2017-03-02 | Sms Group Gmbh | Anlage nach dem CSP-Konzept sowie Verfahren zum Betreiben einer solchen Anlage |
EP3532213B1 (en) | 2016-10-27 | 2021-09-01 | Novelis, Inc. | Apparatus and method for making thick gauge aluminum alloy articles |
BR112019007379B1 (pt) | 2016-10-27 | 2022-11-08 | Novelis Inc | Método para produzir um produto de liga de alumínio, e, produto de liga de alumínio |
CA3041580A1 (en) | 2016-10-27 | 2018-05-03 | Novelis Inc. | High strength 7xxx series aluminum alloys and methods of making the same |
IT201700039423A1 (it) * | 2017-04-10 | 2018-10-10 | Arvedi Steel Eng S P A | Impianto e procedimento per la produzione in molteplici modalita' di nastri e lamiere d’acciaio |
EP3456451A1 (de) | 2017-09-13 | 2019-03-20 | Primetals Technologies Austria GmbH | Vorrichtung und verfahren zum querteilen eines warmbands |
EP3966355A1 (en) | 2019-05-07 | 2022-03-16 | United States Steel Corporation | Methods of producing continuously cast hot rolled high strength steel sheet products |
DE102019219308A1 (de) | 2019-12-11 | 2021-06-17 | Sms Group Gmbh | Vorrichtung und Verfahren zum Querteilen eines Metallbandes in einer Walzstraße |
DE102019219309A1 (de) | 2019-12-11 | 2021-06-17 | Sms Group Gmbh | Vorrichtung und Verfahren zum Querteilen eines Metallbandes in einer Walzstraße |
IT202000016120A1 (it) | 2020-07-03 | 2022-01-03 | Arvedi Steel Eng S P A | Impianto e procedimento per la produzione in continuo di nastri d’acciaio ultrasottili laminati a caldo |
EP3974072B1 (de) * | 2020-09-24 | 2023-07-19 | Primetals Technologies Austria GmbH | Giess-walz-verbundanlage und verfahren zum betrieb der giess-walz-verbundanlage |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5997705A (ja) * | 1982-11-26 | 1984-06-05 | Hitachi Ltd | 連続式圧延法 |
JPS61264135A (ja) * | 1985-05-16 | 1986-11-22 | Nippon Kokan Kk <Nkk> | 絞り用Alキルド冷延鋼板の製造方法 |
DE3640525C2 (de) * | 1986-11-27 | 1996-02-15 | Schloemann Siemag Ag | Kokille zum Stranggießen von Stahlband |
JPS63238963A (ja) * | 1987-03-27 | 1988-10-05 | Hitachi Ltd | 金属板製造方法及びその装置 |
ATE75978T1 (de) * | 1987-04-13 | 1992-05-15 | Thyssen Stahl Ag | Anlage zum herstellen eines stahlbandes mit einer dicke von 2 bis 25 mm. |
DE3712537A1 (de) | 1987-04-13 | 1988-11-10 | Thyssen Stahl Ag | Verfahren zum herstellen eines stahlbandes |
IT1224318B (it) | 1988-05-26 | 1990-10-04 | Mannesmann Ag | Processo ed impianto per la produzione continua di nastro di acciaio |
JPH07110364B2 (ja) * | 1988-06-01 | 1995-11-29 | 三菱重工業株式会社 | 連続鋳造薄スラブの圧延方法 |
DE3823861A1 (de) | 1988-07-14 | 1990-01-18 | Thyssen Stahl Ag | Verfahren und anlage zum herstellen eines stahlbandes mit einer dicke von weniger als 10 mm |
JPH05500003A (ja) | 1989-09-01 | 1993-01-14 | マーズ インコーポレイテッド | 酸で安定化されたパスタ |
JP2932587B2 (ja) * | 1990-03-28 | 1999-08-09 | 石川島播磨重工業株式会社 | 熱間薄板製造設備 |
ES2112440T3 (es) * | 1993-05-17 | 1998-04-01 | Danieli Off Mecc | Linea para producir banda y/o plancha. |
JP3161917B2 (ja) * | 1994-09-30 | 2001-04-25 | 株式会社日立製作所 | 薄スラブ連続鋳造機及び薄スラブ連続鋳造方法 |
JPH08309406A (ja) * | 1995-05-15 | 1996-11-26 | Hitachi Ltd | 連鋳直結熱間圧延システム |
DE19613718C1 (de) * | 1996-03-28 | 1997-10-23 | Mannesmann Ag | Verfahren und Anlage zur Herstellung von warmgewalztem Stahlband |
IT1284035B1 (it) | 1996-06-19 | 1998-05-08 | Giovanni Arvedi | Tuffante per la colata continua di bramme sottili |
DE19632448A1 (de) | 1996-08-05 | 1998-02-12 | Mannesmann Ag | Verfahren und Anlage zur Herstellung von Band aus niedriggekohlten und ultraniedriggekohlten Stählen |
IT1287156B1 (it) | 1996-11-12 | 1998-08-04 | Giovanni Arvedi | Insieme perfezionato di apparecchiature per la colata continua a velocita' elevata di bramme d'acciaio sottili di buona qualita' |
CN1166464C (zh) * | 1996-12-19 | 2004-09-15 | 科鲁斯斯塔尔有限公司 | 生产薄钢板或带钢的方法及装置 |
GB2322320A (en) * | 1997-02-21 | 1998-08-26 | Kvaerner Metals Cont Casting | Continuous casting with rolling stages separated by a temperature controlling stage |
IT1293817B1 (it) | 1997-08-04 | 1999-03-10 | Giovanni Arvedi | Lingottiera per la colata continua di bramme d'acciaio a contatto migliorato |
JP2000126803A (ja) * | 1998-10-27 | 2000-05-09 | Ishikawajima Harima Heavy Ind Co Ltd | 熱間圧延方法及び設備 |
ITMI20021996A1 (it) | 2002-09-19 | 2004-03-20 | Giovanni Arvedi | Procedimento e linea di produzione per la fabbricazione di nastro a caldo ultrasottile sulla base della tecnologia della bramma sottile |
-
2005
- 2005-04-07 DE DE602005010487T patent/DE602005010487D1/de active Active
- 2005-04-07 WO PCT/IB2005/000915 patent/WO2006106376A1/en active Application Filing
- 2005-04-07 US US11/720,172 patent/US7832460B2/en active Active
- 2005-04-07 AU AU2005330323A patent/AU2005330323B2/en active Active
- 2005-04-07 EP EP05732302A patent/EP1868748B1/en active Active
- 2005-04-07 AT AT05732302T patent/ATE411120T1/de active
- 2005-04-07 JP JP2008504861A patent/JP5371421B2/ja active Active
- 2005-04-07 ES ES05732302T patent/ES2314642T3/es active Active
- 2005-04-07 BR BRPI0513754A patent/BRPI0513754B1/pt active IP Right Grant
- 2005-04-07 PT PT05732302T patent/PT1868748E/pt unknown
- 2005-04-07 MX MX2007012433A patent/MX2007012433A/es active IP Right Grant
- 2005-04-07 CN CN2005800204972A patent/CN1972764B/zh active Active
- 2005-04-07 CA CA2569841A patent/CA2569841C/en active Active
- 2005-04-07 PL PL05732302T patent/PL1868748T3/pl unknown
- 2005-04-07 DK DK05732302T patent/DK1868748T3/da active
- 2005-04-07 KR KR1020117006238A patent/KR20110033873A/ko active Search and Examination
-
2006
- 2006-04-06 AR ARP060101355A patent/AR053045A1/es active IP Right Grant
-
2007
- 2007-02-14 EG EGNA2007000180 patent/EG24541A/xx active
-
2008
- 2008-12-13 HR HR20080586T patent/HRP20080586T3/xx unknown
-
2010
- 2010-11-02 US US12/938,021 patent/US20110042034A1/en not_active Abandoned
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101868313B (zh) * | 2007-11-22 | 2013-12-04 | 西门子Vai金属科技有限责任公司 | 用于连续地奥氏体轧制在连续的浇注过程中制造的带钢坯的方法以及用于实施所述方法的组合的浇注和轧制设备 |
CN103068502A (zh) * | 2010-08-13 | 2013-04-24 | 西门子公司 | 借助于铸坯直接轧制联合装置制造轧件的方法,用于铸坯直接轧制联合装置的控制装置和/或调节装置和铸坯直接轧制联合装置 |
CN104025705A (zh) * | 2011-12-28 | 2014-09-03 | Posco公司 | 加热设备及加热方法 |
CN104025705B (zh) * | 2011-12-28 | 2016-02-24 | Posco公司 | 加热设备及加热方法 |
CN114126782A (zh) * | 2019-07-11 | 2022-03-01 | 杰富意钢铁株式会社 | 连续铸造铸片的二次冷却方法及二次冷却装置 |
CN114126782B (zh) * | 2019-07-11 | 2023-07-04 | 杰富意钢铁株式会社 | 连续铸造铸片的二次冷却方法及二次冷却装置 |
Also Published As
Publication number | Publication date |
---|---|
AR053045A1 (es) | 2007-04-18 |
CN1972764B (zh) | 2011-12-07 |
PL1868748T3 (pl) | 2009-01-30 |
US7832460B2 (en) | 2010-11-16 |
AU2005330323A1 (en) | 2006-10-12 |
BRPI0513754A (pt) | 2008-05-13 |
EG24541A (en) | 2009-09-09 |
DE602005010487D1 (de) | 2008-11-27 |
KR20110033873A (ko) | 2011-03-31 |
HRP20080586T3 (en) | 2009-01-31 |
PT1868748E (pt) | 2008-12-12 |
WO2006106376A1 (en) | 2006-10-12 |
ES2314642T3 (es) | 2009-03-16 |
JP2008534289A (ja) | 2008-08-28 |
BRPI0513754B1 (pt) | 2018-10-23 |
JP5371421B2 (ja) | 2013-12-18 |
DK1868748T3 (da) | 2009-01-19 |
MX2007012433A (es) | 2007-11-09 |
WO2006106376A8 (en) | 2007-12-27 |
AU2005330323B2 (en) | 2010-07-22 |
US20110042034A1 (en) | 2011-02-24 |
ATE411120T1 (de) | 2008-10-15 |
EP1868748B1 (en) | 2008-10-15 |
EP1868748A1 (en) | 2007-12-26 |
US20080035301A1 (en) | 2008-02-14 |
CA2569841C (en) | 2012-05-29 |
CA2569841A1 (en) | 2006-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1972764A (zh) | 连铸与轧制之间非连续金属板片制造过程及系统 | |
EP1870172B1 (en) | A continuous casting and rolling method for medium plate | |
CN1103647C (zh) | 制造热轧钢带的方法和设备 | |
KR101809108B1 (ko) | 열간 강 스트립의 에너지 효율적인 제조를 위한 방법 및 플랜트 | |
US7954539B2 (en) | Process and a plant for the production of metal strip | |
CN106180192B (zh) | 一种线棒材连铸坯高速直送直轧系统及方法 | |
KR101809112B1 (ko) | 에너지- 및 수율-최적화된, 열간 강 스트립 제조 방법 및 플랜트 | |
RU2747341C2 (ru) | Комбинированная литейно-прокатная установка и способ бесконечного изготовления горячекатаной чистовой полосы | |
KR20140029493A (ko) | 열간 압연 이전에 강 스톡을 제조하는 방법 및 장치 | |
US5765626A (en) | Continous casting process and continous casting/rolling process for steel | |
CN106269871B (zh) | 一种在CSP产线采用升速轧制工艺生产厚度≤2.0mm低强度带钢的方法 | |
WO2020030040A1 (en) | Production of twin-roll cast and hot rolled steel strip | |
CN109093084A (zh) | 一种连铸薄板坯的生产方法 | |
CN110087801B (zh) | 用于在铸轧复合设备中连续制造卷绕的热轧带钢的方法 | |
CN1978080A (zh) | 一种带钢生产工艺-esp | |
WO1996001710A1 (en) | Method of casting and rolling steel using twin-roll caster | |
CN101351285B (zh) | 用于连铸的方法和装置 | |
CN211360593U (zh) | 多边形铸坯的连铸系统 | |
RU2376106C2 (ru) | Способ и система для изготовления металлических полос и листов без нарушения непрерывности между непрерывным литьем и прокаткой | |
CN100396391C (zh) | 薄带钢铸轧生产工艺 | |
CN107921497B (zh) | 轧制方法和设备 | |
CN113272084A (zh) | 生产金属带材的方法及实施所述方法的生产设备 | |
CN114951277A (zh) | 一种方坯近终型连铸连轧系统及工艺 | |
CN110773712A (zh) | 多边形铸坯的连铸系统和连铸工艺 | |
KR20070117992A (ko) | 연속 주조 및 압연 사이에 연속성 해결수단이 없는 금속스트립 및 시트 제조 방법 및 시스템 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |