CN1966385A - 快速更换大型行车钢丝绳的方法 - Google Patents

快速更换大型行车钢丝绳的方法 Download PDF

Info

Publication number
CN1966385A
CN1966385A CN 200510110494 CN200510110494A CN1966385A CN 1966385 A CN1966385 A CN 1966385A CN 200510110494 CN200510110494 CN 200510110494 CN 200510110494 A CN200510110494 A CN 200510110494A CN 1966385 A CN1966385 A CN 1966385A
Authority
CN
China
Prior art keywords
steel rope
rope
steel
old
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510110494
Other languages
English (en)
Other versions
CN100509607C (zh
Inventor
张希贤
施忠平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAOGANG METALLURGICAL CONSTRUCTION CORP SHANGHAI
Original Assignee
BAOGANG METALLURGICAL CONSTRUCTION CORP SHANGHAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAOGANG METALLURGICAL CONSTRUCTION CORP SHANGHAI filed Critical BAOGANG METALLURGICAL CONSTRUCTION CORP SHANGHAI
Priority to CNB200510110494XA priority Critical patent/CN100509607C/zh
Publication of CN1966385A publication Critical patent/CN1966385A/zh
Application granted granted Critical
Publication of CN100509607C publication Critical patent/CN100509607C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明属于大型行车的钢丝绳更换方法技术领域。本发明所述的快速更换大型行车钢丝绳的方法,其步骤如下:先拆除旧的钢丝绳,然后将新旧钢丝绳进行焊接,最后将旧钢丝绳放下,新钢丝绳卷上去完成新钢丝绳的安装。本发明利用新旧钢丝绳临时对接的方法,取消了常规钢丝绳更换法中采用引绳的步骤,旧钢丝绳直接在下放的过程中,就可以将新的钢丝绳带上去,极大地降低了劳动的强度,能快速、高效的完成钢丝绳更换的工作。

Description

快速更换大型行车钢丝绳的方法
技术领域
本发明属于大型行车的钢丝绳更换方法技术领域。
背景技术
大型行车的钢丝绳更换,在通常的施工工艺中,都是先将旧的钢丝绳放下,利用小的钢丝绳穿引,然后再将小钢丝绳与新的钢丝绳绑轧,最后将新的钢丝绳顺着小钢丝绳逐步牵引上去,完成钢丝绳的更换。
但此种方法需要大量的时间,以某钢厂440t行车的主卷钢丝绳更换为例,如果使用此方法,一般需要12个人利用8-12小时的时间完成。对于检修作业来说,时间太长,达不到严格的时间控制的要求,严重影响作业进度的要求,且人工效率不高,为解决此问题,我们研究开发了一套新的钢丝绳更换工艺,以满足检修施工的需要。
发明内容
本发明的目的是克服现有技术的缺陷,提供一种快速更换大型行车钢丝绳的方法。
本发明所述的快速更换大型行车钢丝绳的方法,其步骤如下:先拆除旧的钢丝绳,然后将新旧钢丝绳进行焊接,最后将旧钢丝绳放下,新钢丝绳卷上去完成新钢丝绳的安装。
拆除旧钢丝绳所用的具体方法是:用副钩挂一对钢丝绳,并利用4只卸扣吊住主钩龙门架,拆除主卷限位,主卷下降200~300mm后拆龙门架动滑轮上钢丝绳固定端牛腿的4只销轴,再用4根长麻绳牵引,主卷下降将端头4根钢丝绳拉到地面,割断牛腿上的钢丝绳。
新旧钢丝绳的焊接所用的具体步骤是:将新旧钢丝绳的接头做焊前处理,然后进行焊接,直至将接头坡口填满,焊接完以后,立即敲打钢丝绳接头部位与钢丝绳外径保持一致。
最后新钢丝绳安装的具体过程是:将主卷下降到卷筒上只有2~4圈时停车,把卷筒下钢丝绳专用卡和葫芦吊住,然后拆除卷筒上钢丝绳压板,把绳头下放,再用麻绳把绳头牵住,地面人员拉住麻绳,主卷扬上升,将旧绳放下,同时新钢丝绳卷上去。
本发明的有益效果:
本发明利用新旧钢丝绳临时对接的方法,取消了常规钢丝绳更换法中采用引绳的步骤,旧钢丝绳直接在下放的过程中,就可以将新的钢丝绳带上去,极大地降低了劳动的强度,能快速、高效的完成钢丝绳更换的工作。本发明将原本需要12个人工作8-12小的3个工序的工作量,合并为一个工序进行,同时作业工时减至8个人4-6小时就可以完成,降低了作业的成本,提高工了作效率,同时又能满足在检修作业中的时间节点要求,成为一个新型、高效的施工工艺,在大型需要吊装的工业中值得广泛推广。
附图说明
图1为新旧钢丝绳焊口处理示意图。
图2为钢丝绳更换示意图。
具体实施方式
利用本发明的方法对大型钢厂的450t行车的钢丝绳进行更换,结合图1和图2说明具体的操作方法:
一、旧钢丝绳的拆除
1、用80t副钩2,挂一对¢50mm*8000钢丝绳,并利用4只16t的卸扣,吊住主钩龙门架7,拆除主卷限位1;
2、主卷8下降200~300mm,后拆龙门架动滑轮上钢丝绳固定端牛腿的4只销轴,再用4根¢14mm*15000的长麻绳牵引,主卷下降将端头4根钢丝绳拉到地面,割断牛腿上的钢丝绳。
二、新旧钢丝绳焊接
1、焊前处理
钢丝绳在连接时,首先应把钢丝绳的头部段切除,因为这一段可能在安装过程中,受挤压或敲打,造成钢丝绳头部松动或变形,会对钢丝绳的焊接造成质量不高的影响,
其次应在焊接的300mm范围内应用氧-乙炔焰进行加热烫烧,对钢丝绳内油脂进行清理,这样能保证钢丝绳在焊接过程时去除油脂污物,并能适当地降低钢丝绳钢丝的淬硬度,保证钢丝绳焊接接头在更换过程中不被折断。同时焊接前,必须将焊接的钢丝绳用丙酮浸泡、清洗15分钟,用于清理焊接接头部的油污及氧化物质等杂质,有效地保证钢丝绳的焊接接头。
2、焊口处理
如图1所示,在新旧钢丝绳的端头300mm处用轧箍件2轧紧,松开钢丝绳(共6股),再将新钢丝绳件1与旧钢丝绳件3的单股钢丝揉合在一起,用细铁丝绑牢固,即可焊接。
3、焊接
钢丝绳接头的焊接材料采用焊接性好,强度与钢丝绳相当的J50焊丝,然后用气焊枪开始在钢丝绳接头部位进行熔融,待熔池形成后添加焊丝,同时,慢慢转动钢丝绳,直至将接头坡口填满。
4、焊后处理
焊接完以后,立即用手锤敲打钢丝绳接头部位能与钢丝绳外径保持一致,以防在更换过程中造成卡位,能适当地增加焊接接头的金属致密性,增加钢丝绳的抗拉强度。
在整个操作的过程结束后,此时焊口处切不可采用水冷或压缩空气急冷,以免造成钢丝绳更换过程中的脆断,必须让钢丝绳自然冷却,方可进行更换作业。
三、新钢丝绳安装
1、将主卷下降到卷筒上只有3圈时停车;
2、把卷筒下钢丝绳专用卡和1t葫芦吊住,然后拆除卷筒上钢丝绳压板,把绳头6下放,再用麻绳把绳头牵住,地面人员拉住麻绳;
3、主卷扬上升,将旧绳放下,新钢丝绳卷5缓慢释放,将新钢丝绳卷上去。
4、新钢丝绳4就位后,将焊接过的300mm左右的端头割除,用压板固定。

Claims (5)

1、一种快速更换大型行车钢丝绳的方法,其步骤如下:先拆除旧的钢丝绳,然后将新旧钢丝绳进行焊接,最后进行新钢丝绳的安装,即将旧钢丝绳放下,新钢丝绳卷上去。
2、如权利要求1所述的快速更换大型行车钢丝绳的方法,其特征在于,拆除旧钢丝绳的具体方法是:用副钩挂一对钢丝绳,并利用4只卸扣吊住主钩龙门架,拆除主卷限位,主卷下降200~300mm后拆龙门架动滑轮上钢丝绳固定端牛腿的4只销轴,再用4根长麻绳牵引,主卷下降将端头4根钢丝绳拉到地面,割断牛腿上的钢丝绳。
3、如权利要求1所述的快速更换大型行车钢丝绳的方法,其特征在于,新旧钢丝绳的焊接所用的具体步骤是:将新旧钢丝绳的接头做焊前处理、焊口处理,然后进行焊接,直至将接头坡口填满,焊接完以后,立即敲打钢丝绳接头部位与钢丝绳外径保持一致。
4、如权利要求3所述的快速更换大型行车钢丝绳的方法,其特征在于,焊前处理是指:钢丝绳在连接时,首先把钢丝绳的头部段切除,其次在焊接的300mm范围内进行加热烫烧,对钢丝绳内油脂进行清理。
5、如权利要求1所述的快速更换大型行车钢丝绳的方法,其特征在于,新钢丝绳安装的具体过程是:将主卷下降到卷筒上只有2~4圈时停车,把卷筒下钢丝绳专用卡和葫芦吊住,然后拆除卷筒上钢丝绳压板,把绳头下放,再用麻绳把绳头牵住,地面人员拉住麻绳,主卷扬上升,将旧绳放下,同时新钢丝绳卷上去。
CNB200510110494XA 2005-11-17 2005-11-17 快速更换大型行车钢丝绳的方法 Active CN100509607C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200510110494XA CN100509607C (zh) 2005-11-17 2005-11-17 快速更换大型行车钢丝绳的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200510110494XA CN100509607C (zh) 2005-11-17 2005-11-17 快速更换大型行车钢丝绳的方法

Publications (2)

Publication Number Publication Date
CN1966385A true CN1966385A (zh) 2007-05-23
CN100509607C CN100509607C (zh) 2009-07-08

Family

ID=38075406

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200510110494XA Active CN100509607C (zh) 2005-11-17 2005-11-17 快速更换大型行车钢丝绳的方法

Country Status (1)

Country Link
CN (1) CN100509607C (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798045A (zh) * 2010-04-12 2010-08-11 山东煤安矿山提升设备安装有限公司 尾绳快速更换工艺
CN101898691A (zh) * 2010-07-15 2010-12-01 中国神华能源股份有限公司 装船机的俯仰钢丝绳的更换方法
CN101700858B (zh) * 2008-12-29 2011-05-18 攀枝花钢城集团瑞钢工业有限公司 卷绕钢丝绳更换方法
CN102294585A (zh) * 2011-08-23 2011-12-28 上海宏钢电站设备铸锻有限公司 行车钢缆快速更换的方法
CN101712443B (zh) * 2009-12-22 2012-07-04 舞阳钢铁有限责任公司 起重机钢丝绳快速更换方法
CN103274323A (zh) * 2013-06-13 2013-09-04 济钢集团有限公司 一种起重机动滑轮组及钢丝绳快速更换法
CN103569865A (zh) * 2012-08-02 2014-02-12 西林钢铁集团有限公司 铸造起重机龙门吊多根钢丝绳同步快速更换法
CN103588092A (zh) * 2013-11-28 2014-02-19 莱芜钢铁集团有限公司 一种更换钢丝绳的辅助装置及方法
CN103754712A (zh) * 2013-12-30 2014-04-30 攀钢集团工程技术有限公司 一种更换缠绕于双向卷扬机卷筒上钢绳的装置及方法
CN104828696A (zh) * 2015-03-27 2015-08-12 山东钢铁股份有限公司 一种用于桥式起重机中动滑轮组和钢丝绳更换的方法
CN105697655A (zh) * 2016-03-15 2016-06-22 重庆钢铁(集团)有限责任公司 一种行车钢丝绳更换方法
CN110886117A (zh) * 2019-11-06 2020-03-17 晋城蓝焰煤业股份有限公司 一种钢丝绳的插接方法
CN111453530A (zh) * 2020-03-27 2020-07-28 青岛港国际股份有限公司 一种起升钢丝绳更换装置及其控制方法
CN111960184A (zh) * 2020-08-18 2020-11-20 马鞍山钢铁股份有限公司 一种冶金吊单根钢丝绳更换结构及其更换方法
CN112441517A (zh) * 2019-08-30 2021-03-05 上海梅山钢铁股份有限公司 一种用于桥式抓斗卸船机主钢丝绳更换装置

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101700858B (zh) * 2008-12-29 2011-05-18 攀枝花钢城集团瑞钢工业有限公司 卷绕钢丝绳更换方法
CN101712443B (zh) * 2009-12-22 2012-07-04 舞阳钢铁有限责任公司 起重机钢丝绳快速更换方法
CN101798045B (zh) * 2010-04-12 2011-10-05 山东煤安矿山提升设备安装有限公司 尾绳快速更换工艺
CN101798045A (zh) * 2010-04-12 2010-08-11 山东煤安矿山提升设备安装有限公司 尾绳快速更换工艺
CN101898691A (zh) * 2010-07-15 2010-12-01 中国神华能源股份有限公司 装船机的俯仰钢丝绳的更换方法
CN101898691B (zh) * 2010-07-15 2013-09-11 中国神华能源股份有限公司 装船机的俯仰钢丝绳的更换方法
CN102294585A (zh) * 2011-08-23 2011-12-28 上海宏钢电站设备铸锻有限公司 行车钢缆快速更换的方法
CN103569865A (zh) * 2012-08-02 2014-02-12 西林钢铁集团有限公司 铸造起重机龙门吊多根钢丝绳同步快速更换法
CN103274323A (zh) * 2013-06-13 2013-09-04 济钢集团有限公司 一种起重机动滑轮组及钢丝绳快速更换法
CN103274323B (zh) * 2013-06-13 2016-05-11 济钢集团有限公司 一种起重机动滑轮组及钢丝绳快速更换法
CN103588092B (zh) * 2013-11-28 2015-12-09 莱芜钢铁集团有限公司 一种采用辅助装置更换钢丝绳的方法
CN103588092A (zh) * 2013-11-28 2014-02-19 莱芜钢铁集团有限公司 一种更换钢丝绳的辅助装置及方法
CN103754712A (zh) * 2013-12-30 2014-04-30 攀钢集团工程技术有限公司 一种更换缠绕于双向卷扬机卷筒上钢绳的装置及方法
CN103754712B (zh) * 2013-12-30 2015-12-30 攀钢集团工程技术有限公司 一种更换缠绕于双向卷扬机卷筒上钢绳的装置及方法
CN104828696A (zh) * 2015-03-27 2015-08-12 山东钢铁股份有限公司 一种用于桥式起重机中动滑轮组和钢丝绳更换的方法
CN105697655A (zh) * 2016-03-15 2016-06-22 重庆钢铁(集团)有限责任公司 一种行车钢丝绳更换方法
CN112441517A (zh) * 2019-08-30 2021-03-05 上海梅山钢铁股份有限公司 一种用于桥式抓斗卸船机主钢丝绳更换装置
CN110886117A (zh) * 2019-11-06 2020-03-17 晋城蓝焰煤业股份有限公司 一种钢丝绳的插接方法
CN111453530A (zh) * 2020-03-27 2020-07-28 青岛港国际股份有限公司 一种起升钢丝绳更换装置及其控制方法
CN111960184A (zh) * 2020-08-18 2020-11-20 马鞍山钢铁股份有限公司 一种冶金吊单根钢丝绳更换结构及其更换方法
CN111960184B (zh) * 2020-08-18 2022-04-05 马鞍山钢铁股份有限公司 一种冶金吊单根钢丝绳更换结构及其更换方法

Also Published As

Publication number Publication date
CN100509607C (zh) 2009-07-08

Similar Documents

Publication Publication Date Title
CN100509607C (zh) 快速更换大型行车钢丝绳的方法
CN106115500B (zh) 一种超高层建筑专用自拆式屋面吊及自拆方法
CN103274323A (zh) 一种起重机动滑轮组及钢丝绳快速更换法
CN102009917A (zh) 一种大型桥式起重机钢丝绳和龙门钩同时更换的方法
CN102030270B (zh) 一种桥式吊车更换钢丝绳的辅助工具及方法
CN105905806A (zh) 冶金天车钢丝绳更换装置及制作方法及使用方法
CN106698223A (zh) 行车主钩钢绳更换方法
CN106044574A (zh) 同步更换铸造起重机龙门梁及钢丝绳的方法
CN112723196A (zh) 一种门座起重机大拉杆下铰点轴承的更换方法
CN210313155U (zh) 一种起重机用防活动的运输装置
CN211949516U (zh) 一种建筑施工用便于移动的手脚架
CN207061699U (zh) 一种大型塔机塔节引进升降系统
CN103569865A (zh) 铸造起重机龙门吊多根钢丝绳同步快速更换法
CN210326731U (zh) 一种架空线路跨越放线辅助装置
CN205802798U (zh) 冶金天车钢丝绳更换装置
CN110203825B (zh) 高炉斜桥拆除方法
CN204569127U (zh) 钢立柱吊装卡具
CN104929668B (zh) 锚索拆卸接头和锚索拆卸方法
CN210528252U (zh) 一种新型起重机挂钩结构
CN214456183U (zh) 一种框架的翻面工具
CN100467674C (zh) 导杆移动升降台车
CN218840966U (zh) 一种空中料框输送系统
CN212982218U (zh) 一种钢结构吊装棱角保护工具
CN219045105U (zh) 一种用于提高桥梁桩基圆钢快速调直的简易装置
CN212668999U (zh) 一种用于快速更换台车的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant