CN103588092A CN201310631132.XA CN201310631132A CN103588092A CN 103588092 A CN103588092 A CN 103588092A CN 201310631132 A CN201310631132 A CN 201310631132A CN 103588092 A CN103588092 A CN 103588092A
Authority
CN
China
Prior art keywords
steel rope
plate
auxiliary device
old
pressing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310631132.XA
Other languages
English (en)
Other versions
CN103588092B (zh
Inventor
陈延霞
王光成
刘哲
许晓健
付军
王泽军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Iron and Steel Group Co Ltd
Original Assignee
Laiwu Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laiwu Iron and Steel Group Co Ltd filed Critical Laiwu Iron and Steel Group Co Ltd
Priority to CN201310631132.XA priority Critical patent/CN103588092B/zh
Publication of CN103588092A publication Critical patent/CN103588092A/zh
Application granted granted Critical
Publication of CN103588092B publication Critical patent/CN103588092B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种更换钢丝绳的辅助装置及方法,所述装置包括与行车钢丝绳平衡梁底座固定连接的底板,所述底板上安装有立板,所述立板上端连接有下横板,所述下横板上固设有上横板,所述上横板的横向两端部均设有位于所述上横板下方的吊环,所述吊环下方分别连接有辅助滑轮。采用上述装置通过准备、割断、连接、安装、固定、割断和调整步骤,将钢丝绳更换。本发明可通过一根钢丝绳完成两根钢丝绳的更换,所需时间短,节省力气,减少了工作量,提高了作业效率,大大降低了作业强度,钢丝绳更换速度快。

Description

一种更换钢丝绳的辅助装置及方法
技术领域
本发明属于设备安装领域,具体地,本发明涉及一种更换钢丝绳的辅助装置和方法。
背景技术
有平衡梁8的行车钢丝绳为两根独立钢丝绳。现有技术中行车钢丝绳使用状态如图1所示,钢丝绳缠绕通常为第一根钢丝绳绳头由第一压板9固定在卷筒13上,一部分钢丝绳缠绕在卷筒13上,然后依次穿过与第一压板9固定同侧设置的动滑轮组11的第一个动滑轮、同侧的定滑轮组12的一个定滑轮和动滑轮组11的第二个动滑轮,然后将这根钢丝绳另一个绳头固定在平衡梁8上。第二根钢丝绳缠绕法与第一根对称设置,第二根钢丝绳绳头由第二压板10固定在卷筒13上,一部分钢丝绳缠绕在卷筒13上,然后依次穿过与所述第二压板10固定同侧设置的动滑轮组11的第一个动滑轮、同侧的定滑轮组12的一个定滑轮和动滑轮组11的第二个动滑轮,然后将这根钢丝绳另一个绳头固定在平衡梁8上。目前,钢丝绳的更换方法主要特征包括,准备:两盘钢丝绳和两个放绳器,如果仅有一盘钢丝绳的情况下,需要人工放出并截断出一根钢丝绳,割断:将卷筒13上缠绕的旧钢丝绳全部放下,两根旧钢丝绳同时牵引两根新钢丝绳。这种更换方法需要准备两根等长的钢丝绳,需要两次牵引新钢丝绳头至平衡梁8,并且在牵引新钢丝绳过程中,需要两人各负责一个放绳器的运行快慢。增加了工作量,因此作业效率不高,需要较多的维修工。
发明内容
本发明的目的在于,提供一种更换钢丝绳的辅助装置,该装置可通过一根钢丝绳完成两根钢丝绳的更换,所需时间短,节省力气,减少了工作量,提高了作业效率,大大降低了作业强度,钢丝绳更换速度快。
为达到上述目的,本发明采用的如下的技术方案:
一种更换钢丝绳的辅助装置,所述辅助装置包括与行车钢丝绳平衡梁底座固定连接的底板,所述底板上安装有立板,所述立板上端连接有下横板,所述下横板上固设有上横板,所述上横板的横向两端部均设有位于所述上横板下方的吊环,所述吊环连接有辅助滑轮。
作为优选的技术方案,所述上横板的宽度大于所述下横板的宽度。
作为对上述技术方案的改进,所述下横板与所述立板和/或所述底板与所述立板的连接部位设有加强支撑板。
作为优选的技术方案,所述下横板与上横板通过螺栓固定。
本发明的另一个目的在于,提供一种基于上述辅助装置的钢丝绳更换方法,所述方法包括以下步骤:
准备:将钢丝绳卷绕系统的动滑轮组下放至作业区,拆除卷筒上的限位开关;
割断:将卷筒上缠绕的旧钢丝绳全部放下,直至仅余第一压板和第二压板压住的两根旧钢丝绳的端头留在卷筒上,在第一压板所在侧的最外侧旧钢丝绳上取一点并割断,拆除割断侧卷筒上的第一压板,取走旧钢丝绳切割点到第一压板之间的旧钢丝绳;
连接:在旧钢丝绳切割点处将留在动滑轮上的旧钢丝绳的绳头与新钢丝绳的绳头连接;
安装:拆除平衡梁,将辅助装置的底板通过螺栓与平衡梁底座固定安装,将平衡梁两根的旧钢丝绳的两端分别穿过两辅助滑轮,然后将两根的旧钢丝绳焊接成一根旧钢丝绳;
固定:松开第二压板,起升旧钢丝绳直至新钢丝绳在卷筒上缠绕到第二压板处时,分割新钢丝绳和旧钢丝绳,第二压板紧固新钢丝绳的端头,将新钢丝绳另一端提升至卷筒处,用第一压板紧固新钢丝绳的另一端头;
割断:从两个辅助滑轮之间割断辅助装置上的新钢丝绳,一分为二,使之成为两根钢丝绳,将割断后新形成的两个绳头安装在平衡梁上,拆除辅助装置,安装平衡梁;
调整:新钢丝绳排绳,重新安装卷筒上的限位开关。
由于采用了上述技术方案,本发明的有益效果是通过一根钢丝绳完成两根钢丝绳的更换,所需时间短,节省力气,减少了工作量,提高了作业效率,大大降低了作业强度,钢丝绳更换速度快。
附图说明
以下附图仅旨在于对本发明做示意性说明和解释,并不限定本发明的范围。其中:
图1是现有技术中行车钢丝绳使用状态的结构示意图;
图2是本发明更换钢丝绳的辅助装置的结构示意图;
图3是本发明更换钢丝绳的辅助装置使用状态的结构示意图;
附图标记:1、底板;2、立板;3、下横板;4、上横板;5、吊环;6、辅助滑轮;7、加强支撑板;8、平衡梁;9、第一压板;10、第二压板;11、动滑轮组;12、定滑轮组;13、卷筒。
具体实施方式
下面结合附图和实施例,进一步阐述本发明。在下面的详细描述中,只通过说明的方式描述了本发明的某些示范性实施例。毋庸置疑,本领域的普通技术人员可以认识到,在不偏离本发明的精神和范围的情况下,可以用各种不同的方式对所描述的实施例进行修正。因此,附图和描述在本质上是说明性的,而不是用于限制权利要求的保护范围。
如图2所示,一种更换钢丝绳的辅助装置,所述辅助装置包括与行车钢丝绳平衡梁8底座固定连接的底板1,所述底板1上安装有立板2,所述立板2上端连接有下横板3,所述下横板3上通过螺栓固定上横板4,所述上横板4的横向两端部均设有位于所述上横板4下方的吊环5,所述吊环5下方分别连接有辅助滑轮6。
所述上横板4的宽度大于所述下横板3的宽度。
所述下横板3与所述立板2和/或所述底板1与所述立板2的连接部位设有加强支撑板7。
所述底板1用于与所述平衡梁8底座固定连接,所述立板2用于支撑,所述辅助滑轮6用于穿过钢丝绳,辅助更换钢丝绳,上述结构便于更换钢丝绳,节省力气,而且增加承压强度
如图3所示,基于上述辅助装置的钢丝绳更换方法,所述方法包括以下步骤:
准备:将钢丝绳卷绕系统的动滑轮11组下放至作业区,拆除卷筒13上的限位开关,所述限位开关图中未示出;
割断:将卷筒13上缠绕的旧钢丝绳全部放下,直至仅余第一压板9和第二压板10压住的两根旧钢丝绳的端头留在卷筒13上,在第一压板9所在侧的最外侧旧钢丝绳上取一点并割断,拆除割断侧卷筒13上的第一压板9,取走旧钢丝绳切割点到第一压板9之间的旧钢丝绳;
连接:在旧钢丝绳切割点处将留在动滑轮11上的旧钢丝绳的绳头与新钢丝绳的绳头连接;
安装:拆除平衡梁8,将辅助装置的底板1通过螺栓与平衡梁8底座固定安装,将平衡梁8两根的旧钢丝绳的两端分别穿过两辅助滑轮6,然后将两根的旧钢丝绳焊接成一根旧钢丝绳;
固定:松开第二压板10,起升旧钢丝绳牵引新钢丝绳沿旧钢丝绳绕线法穿过动滑轮11和定滑轮组12,直至新钢丝绳在卷筒13上缠绕到第二压板10处时,分割新钢丝绳和旧钢丝绳,第二压板10紧固新钢丝绳的端头,将新钢丝绳另一端提升至卷筒13处,用第一压板9紧固新钢丝绳的另一端头;
割断:从两个辅助滑轮之间割断两辅助滑轮6之间的新钢丝绳,一分为二,使之成为两根钢丝绳,将割断后新形成的两个绳头安装在平衡梁8上,拆除辅助装置,安装平衡梁8;
调整:新钢丝绳排绳,重新安装卷筒13上的限位开关。
本实施例的有益效果是通过一根钢丝绳完成两根钢丝绳的更换,所需时间短,节省力气,减少了工作量,提高了作业效率,大大降低了作业强度,钢丝绳更换速度快。
以上显示和描述了本发明的基本原理、主要特征及本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (6)

1.一种更换钢丝绳的辅助装置,其特征在于,所述辅助装置包括与行车钢丝绳平衡梁底座固定连接的底板(1),所述底板(1)上安装有立板(2),所述立板(2)上端连接有下横板(3),所述下横板(3)上固设有上横板(4),所述上横板(4)的横向两端部均设有位于所述上横板(4)下方的吊环(5),所述吊环(5)连接有辅助滑轮(6)。
2.如权利要求1所述的一种更换钢丝绳的辅助装置,其特征在于,所述上横板(4)的宽度大于所述下横板(3)的宽度。
3.如权利要求1或2所述的一种更换钢丝绳的辅助装置,其特征在于,所述立板(2)与下横板(3)和底板(1)的连接部位设有加强支撑板(7)。
4.如权利要求1或2所述的一种更换钢丝绳的辅助装置,其特征在于,所述立板(2)与下横板(3)或底板(1)的连接部位设有加强支撑板(7)。
5.如权利要求1所述的一种更换钢丝绳的辅助装置,其特征在于,所述下横板(3)与上横板(4)通过螺栓固定。
6.一种基于权利要求1所述更换钢丝绳的辅助装置的钢丝绳更换方法,其特征在于,所述方法包括以下步骤:
准备:将钢丝绳卷绕系统的动滑轮组下放至作业区,拆除卷筒上的限位开关;
割断:将卷筒上缠绕的旧钢丝绳全部放下,直至仅余第一压板和第二压板压住的两根旧钢丝绳的端头留在卷筒上,在第一压板所在侧的最外侧旧钢丝绳上取一点并割断,拆除割断侧卷筒上的第一压板,取走旧钢丝绳切割点到第一压板之间的旧钢丝绳;
连接:在旧钢丝绳切割点处将留在动滑轮上的旧钢丝绳的绳头与新钢丝绳的绳头连接;
安装:拆除平衡梁,将辅助装置的底板通过螺栓与平衡梁底座固定安装,将平衡梁上两根旧钢丝绳的两端分别穿过两辅助滑轮,然后将两根的旧钢丝绳焊接成一根旧钢丝绳;
固定:松开第二压板,起升旧钢丝绳直至新钢丝绳在卷筒上缠绕到第二压板处时,分割新钢丝绳和旧钢丝绳,第二压板紧固新钢丝绳的端头,将新钢丝绳另一端提升至卷筒处,用第一压板紧固新钢丝绳的另一端头;
割断:从两个辅助滑轮之间割断辅助装置上的新钢丝绳,一分为二,使之成为两根钢丝绳,将割断后新形成的两个绳头安装在平衡梁上,拆除辅助装置,安装平衡梁;
调整:新钢丝绳排绳,重新安装卷筒上的限位开关。
CN201310631132.XA 2013-11-28 2013-11-28 一种采用辅助装置更换钢丝绳的方法 Active CN103588092B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310631132.XA CN103588092B (zh) 2013-11-28 2013-11-28 一种采用辅助装置更换钢丝绳的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310631132.XA CN103588092B (zh) 2013-11-28 2013-11-28 一种采用辅助装置更换钢丝绳的方法

Publications (2)

Publication Number Publication Date
CN103588092A true CN103588092A (zh) 2014-02-19
CN103588092B CN103588092B (zh) 2015-12-09

Family

ID=50078464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310631132.XA Active CN103588092B (zh) 2013-11-28 2013-11-28 一种采用辅助装置更换钢丝绳的方法

Country Status (1)

Country Link
CN (1) CN103588092B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104071716A (zh) * 2014-07-18 2014-10-01 天津五洲国际集装箱码头有限公司 岸桥托架小车的环绕钢丝绳的换绳机构及更换方法
CN104944282A (zh) * 2015-05-07 2015-09-30 山东钢铁股份有限公司 一种用于起重机中钢丝绳更换的方法
CN111824992A (zh) * 2020-06-16 2020-10-27 山东钢铁股份有限公司 一种起重机钢丝绳的更换方法
CN112209276A (zh) * 2020-10-26 2021-01-12 山东钢铁股份有限公司 一种更换钢丝绳的装置及方法
CN112357777A (zh) * 2020-11-10 2021-02-12 鞍钢股份有限公司 一种龙门吊钩梁钢绳的快速更换方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2472574Y (zh) * 2001-04-20 2002-01-23 林振军 一种移动式茶瓶架
JP2004244162A (ja) * 2003-02-13 2004-09-02 Toshiba Elevator Co Ltd エレベータの巻上機交換用治具
CN1966385A (zh) * 2005-11-17 2007-05-23 上海宝钢冶金建设公司 快速更换大型行车钢丝绳的方法
CN101215811A (zh) * 2007-12-28 2008-07-09 中铁宝桥股份有限公司 高速铁路道岔可动心轨辙叉组装工作平台
CN201095587Y (zh) * 2007-09-29 2008-08-06 宝山钢铁股份有限公司 钢丝绳夹头更换架
CN101591939A (zh) * 2009-07-03 2009-12-02 周顺伍 轻质隔声减震墙体施工安装方法
CN101712443A (zh) * 2009-12-22 2010-05-26 舞阳钢铁有限责任公司 起重机钢丝绳快速更换方法
CN102030270A (zh) * 2009-09-24 2011-04-27 鞍山钢铁集团公司 一种桥式吊车更换钢丝绳的辅助工具及方法
CN203200434U (zh) * 2012-12-28 2013-09-18 泉州标达机械有限公司 一种提花机工字脚
CN203201015U (zh) * 2013-03-11 2013-09-18 陈丽锦 一种组合式工字钢构件

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2472574Y (zh) * 2001-04-20 2002-01-23 林振军 一种移动式茶瓶架
JP2004244162A (ja) * 2003-02-13 2004-09-02 Toshiba Elevator Co Ltd エレベータの巻上機交換用治具
CN1966385A (zh) * 2005-11-17 2007-05-23 上海宝钢冶金建设公司 快速更换大型行车钢丝绳的方法
CN201095587Y (zh) * 2007-09-29 2008-08-06 宝山钢铁股份有限公司 钢丝绳夹头更换架
CN101215811A (zh) * 2007-12-28 2008-07-09 中铁宝桥股份有限公司 高速铁路道岔可动心轨辙叉组装工作平台
CN101591939A (zh) * 2009-07-03 2009-12-02 周顺伍 轻质隔声减震墙体施工安装方法
CN102030270A (zh) * 2009-09-24 2011-04-27 鞍山钢铁集团公司 一种桥式吊车更换钢丝绳的辅助工具及方法
CN101712443A (zh) * 2009-12-22 2010-05-26 舞阳钢铁有限责任公司 起重机钢丝绳快速更换方法
CN203200434U (zh) * 2012-12-28 2013-09-18 泉州标达机械有限公司 一种提花机工字脚
CN203201015U (zh) * 2013-03-11 2013-09-18 陈丽锦 一种组合式工字钢构件

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104071716A (zh) * 2014-07-18 2014-10-01 天津五洲国际集装箱码头有限公司 岸桥托架小车的环绕钢丝绳的换绳机构及更换方法
CN104944282A (zh) * 2015-05-07 2015-09-30 山东钢铁股份有限公司 一种用于起重机中钢丝绳更换的方法
CN104944282B (zh) * 2015-05-07 2017-04-05 山东钢铁股份有限公司 一种用于起重机中钢丝绳更换的方法
CN111824992A (zh) * 2020-06-16 2020-10-27 山东钢铁股份有限公司 一种起重机钢丝绳的更换方法
CN112209276A (zh) * 2020-10-26 2021-01-12 山东钢铁股份有限公司 一种更换钢丝绳的装置及方法
CN112357777A (zh) * 2020-11-10 2021-02-12 鞍钢股份有限公司 一种龙门吊钩梁钢绳的快速更换方法

Also Published As

Publication number Publication date
CN103588092B (zh) 2015-12-09

Similar Documents

Publication Publication Date Title
CN103588092B (zh) 一种采用辅助装置更换钢丝绳的方法
CN104131519B (zh) 一种桥梁拆除设备施工方法
CN109973130B (zh) 一种主缆索股实现超长隧道锚窄空间一次牵引到位的施工系统及方法
CN202509407U (zh) 一种双导梁架桥机
CN102009917A (zh) 一种大型桥式起重机钢丝绳和龙门钩同时更换的方法
CN101607681B (zh) 臂行式悬臂起重机上的起升牵引机构
CN201284191Y (zh) 塔式起重机托绳小车
CN214456305U (zh) 一种用于天车拖缆的牵引装置
CN202717561U (zh) 一种吊篮用提升机
CN201817208U (zh) 一种简易吊装机
CN102153017B (zh) 一种矿井用桥式起重机小车
CN201882846U (zh) 连续墙抓斗滑轮机构
CN102229408A (zh) 一种矿井用桥式起重机
CN104724615A (zh) 大型动臂式塔机大直径变幅钢丝绳的穿绕方法
CN204676434U (zh) 一种铁路t梁救援小车
CN209758860U (zh) 一种小轨距起升卷扬载重小车
CN211255088U (zh) 主滑轮分体安装的天车装置
CN210855028U (zh) 一种广播电视工程用便携式灯光设备吊运装置
CN202022668U (zh) 矿井用桥式起重机
CN210326731U (zh) 一种架空线路跨越放线辅助装置
CN203612860U (zh) 大型门式起重机钢丝绳绕绳装置
CN103407903A (zh) 一种大型塔式起重机安拆标准节自动牵引系统及其牵引方法
CN201240796Y (zh) 臂行式悬臂起重机上的起升牵引机构
CN205634719U (zh) 一种起重机及其滑轮装置
CN105858391A (zh) 一种夹绳装置以及利用夹绳装置更换电梯组件的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Chen Yanxia

Inventor after: Wang Guangcheng

Inventor before: Chen Yanxia

Inventor before: Wang Guangcheng

Inventor before: Liu Zhe

Inventor before: Xu Xiaojian

Inventor before: Fu Jun

Inventor before: Wang Zejun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHEN YANXIA WANG GUANGCHENG LIU ZHE XU XIAOJIAN FU JUN WANG ZEJUN TO: CHEN YANXIA WANG GUANGCHENG

C14 Grant of patent or utility model
GR01 Patent grant