CN102009917A - 一种大型桥式起重机钢丝绳和龙门钩同时更换的方法 - Google Patents

一种大型桥式起重机钢丝绳和龙门钩同时更换的方法 Download PDF

Info

Publication number
CN102009917A
CN102009917A CN201010527229.2A CN201010527229A CN102009917A CN 102009917 A CN102009917 A CN 102009917A CN 201010527229 A CN201010527229 A CN 201010527229A CN 102009917 A CN102009917 A CN 102009917A
Authority
CN
China
Prior art keywords
new
old
rope
steel wire
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010527229.2A
Other languages
English (en)
Other versions
CN102009917B (zh
Inventor
张伟红
郑长斌
张德峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201010527229.2A priority Critical patent/CN102009917B/zh
Publication of CN102009917A publication Critical patent/CN102009917A/zh
Application granted granted Critical
Publication of CN102009917B publication Critical patent/CN102009917B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

一种大型桥式起重机钢丝绳和龙门钩同时更换的方法,属于建筑施工技术领域。利用旧绳带新绳按顺序缠绕法更换钢丝绳和龙门钩,利用旧钢丝绳作为牵引,连接新钢丝绳并顺序缠绕穿过新龙门钩,达到钢丝绳和龙门钩同时更换的目的。避免了频繁的高空作业,比传统方法更安全,更经济,更省时。

Description

一种大型桥式起重机钢丝绳和龙门钩同时更换的方法 
技术领域
本发明属于建筑施工技术领域,特别是提供了一种大型桥式起重机钢丝绳和龙门钩同时更换的方法,适用于大型桥式起重机同时更换钢丝绳和龙门钩的施工项目。 
背景技术
目前,大型桥式起重机钢丝绳和龙门钩同时更换一般采用先拆除旧钢丝绳和旧龙门钩,再用细钢绳顺序缠绕新龙门钩和定滑轮组,然后利用细钢丝绳带新钢丝绳才能完成更换。该方法环节较多,程序繁琐、耗时长;而且需额外准备牵引用细钢绳和卷扬,成本较大。 
发明内容
本发明的目的在于提供一种大型桥式起重机钢丝绳和龙门钩同时更换的方法,克服了现有方法环节较多,程序繁琐、耗时长;而且需额外准备牵引用细钢绳和卷扬,成本较大的不足。 
本发明利用旧绳带新绳按顺序缠绕法更换钢丝绳和龙门钩的施工方法,提供了一种大型桥式起重机钢丝绳和龙门钩同时更换的新思路,改善了作业条件并节省了时间。工艺步骤为: 
1、停产前在龙门钩的四个角适当的位置设置好新钢丝绳卷和支架,在四根新钢丝绳的一头各用气焊工具焊接一个螺母,螺母为M20螺母; 
2、将新旧两个龙门钩平行放置,间距必须保证施工人员有0.5~1米操作空间; 
3、分别切断固定在横梁上的四个旧钢丝绳的固定端,然后在四个旧钢丝绳头上分别焊接一个螺母; 
4、将新钢丝绳焊接螺母的一头穿过新龙门钩的第一组动滑轮,再将新旧两根绳头通过焊接好的螺母用卡扣将其连接为一体,起升主卷筒,使旧钢丝绳带动新钢丝绳穿过起重机的第一组定滑轮; 
5、当新旧接头运行到第二组动滑轮入口处后打开卸扣4,使新旧钢丝绳头分开,将新钢丝绳绳头穿过新龙门钩的第二组动滑轮,旧钢丝绳抽出旧龙门钩的第二组动滑轮组,再次利用卸扣4将新旧两个钢丝绳头连接为一体,重复四次步骤4的工作,直到新钢丝绳依次按顺序和旋向穿满起重机的动定滑轮组,此时旧龙门钩已经完全脱离旧钢丝绳,当新旧钢丝绳接头运行到主滚筒上方后打开新旧钢丝绳头; 
6、将新铜丝绳头固定在主滚筒上方的车架上,返转主滚筒将旧钢丝绳全部放到地面。安装新钢丝绳的活动端和固定端,完成更换。 
本发明有益效果是方法简单易行,不再使用细钢丝绳和卷扬,降低施工成本;新钢丝绳头螺母的焊接和钢丝绳的摆放在停产前完成,节省了时间;主要工作在地面完成,可靠方便,效率高,高空作业安全隐患小;四根钢丝绳同步穿梭更换,可节省3/4的穿绳时间。 
附图说明:
下面结合附图对本发明的具体实施方式作进一步说明。 
图1为本发明具体实施方式的平面布置图。其中,新钢丝绳1、钢丝绳卷筒5、新龙门钩6、旧龙门钩7。 
图2为本发明实施方式的立面图。其中,新钢丝绳1、旧钢丝绳2、钢丝绳卷筒5、新龙门钩6、旧龙门钩7。 
图3为钢丝绳螺母焊接图。其中,新钢丝绳1、旧钢丝绳2、螺母3。 
图4为新旧钢丝绳连接图。其中,新钢丝绳1、旧钢丝绳2、螺母3、卸扣4。 
具体实施方式
下面结合具体实施和图中所示例来说明本发明的实施方式: 
1、新旧龙门钩及新钢丝绳的布置 
将四卷钢丝绳按照与起重机对应的旋向分别放置在停车位的四个角。新的龙门钩放置在指定的检修位置的马凳上,龙门钩长度方向的中心线与起重机主卷筒中心线平行放置。再将旧龙门钩下落到马凳上,旧龙门钩放置的方向必须和新龙门钩平行且前后左右对齐,以便于在不移动大车的条件下钢丝绳能够顺利的穿过新龙门钩和钢丝绳滚筒(见图1)。 
2、在新旧钢丝绳的绳头焊接M20 
为了防止电流击毁钢丝绳和滑轮轴承,钢丝绳的焊接必须用气焊工具,焊接时必须先烤掉绳头的油污,钢丝与螺母必须全熔透满焊接,焊肉高度不小于6mm,保证焊接质量。割断固定在吊环上的四个旧钢丝绳末端,将绳头缓慢放到地面后开始焊接螺母(见图3)。 
3、新旧钢丝绳连接 
将新钢丝绳焊接螺母的一头穿过新龙门钩的第一组动滑轮,新旧两根钢丝绳头通过焊接好的M20的螺母用卡扣将其连接为一体,起升主卷筒使旧绳带动新绳穿过起重机的第一组定滑轮(见图2和图4) 
4、旧钢丝绳带新钢丝绳安装新钢丝绳和龙门钩 
新旧钢丝绳头连接在一体后低速启动主卷筒,使旧钢丝绳带动新钢丝绳穿过起重机的第一组定滑轮,当新旧钢丝绳接头运行到第二组动滑轮入口处后解开新旧钢丝绳接头,将新钢丝绳绳头穿过新龙门钩的第二组动滑轮,旧钢丝绳抽出旧龙门钩的第二组动滑龙组,再次利用吊环将新旧两个绳头连接在一体,重复五次以上工作,直到新钢丝绳依次按顺序和旋向穿满起重机的动定滑轮组,此时旧龙门钩已经完全脱离旧钢丝绳。反转卷筒拆除缠绕在卷筒上的旧钢丝绳,固定新钢丝绳的活动端和固定端,完成更换。提升过程中,4组绳都要分别设专人看护,每根新绳都应由2名工人负责捋顺,1人送绳,1人看护,防止拧花、卡绳现象出现。发生卡阻现象时应立即用对讲机联系司机停车,防止损坏钢丝绳。在滑轮组上穿钢丝绳时一定要配专业起重指导检查,防止穿错。 
5、缠绕在卷筒上的旧钢丝绳的拆除 
转动卷筒,利用人工牵引将钢丝绳盘好到地面四个角适当的位置,盘绳的方向应有利于抽绳,以免在回装送绳时发生卡阻现象。钢丝绳下放到卷筒最后一圈后,用电葫芦吊住钢丝绳与卷筒连接的绳头,打开卷筒压板螺栓,抽出旧钢丝绳的绳头,用电葫芦缓慢放到地面,依次放下剩下的钢丝绳头。 

Claims (2)

1.一种大型桥式起重机钢丝绳和龙门钩同时更换的方法,其特征在于,工艺步骤为:
(1)停产前在龙门钩的四个角适当的位置设置好新钢丝绳卷和支架,在四根新钢丝绳的一头各用气焊工具焊接一个螺母;
(2)将新旧两个龙门钩平行放置,间距保证施工人员有0.5~1米操作空间;
(3)分别切断固定在横梁上的四个旧钢丝绳的固定端,然后在四个旧钢丝绳头上分别焊接一个螺母;
(4)将新钢丝绳焊接螺母的一头穿过新龙门钩的第一组动滑轮,再将新旧两根绳头通过焊按好的螺母用卡扣将其连接为一体,起升主卷筒,使旧钢丝绳带动新钢丝绳穿过起重机的第一组定滑轮;
(5)当新旧接头运行到第二组动滑轮入口处后打开卸扣4,使新旧钢丝绳头分开,将新钢丝绳绳头穿过新龙门钩的第二组动滑轮,旧钢丝绳抽出旧龙门钩的第二组动滑轮组,再次利用卸扣4将新旧两个钢丝绳头连接为一体,重复四次步骤4的工作,直到新钢丝绳依次按顺序和旋向穿满起重机的动定滑轮组,此时旧龙门钩已经完全脱离旧钢丝绳,当新旧钢丝绳接头运行到主滚筒上方后打开新旧钢丝绳头;
(6)将新钢丝绳头固定在主滚筒上方的车架上,返转主滚筒将旧钢丝绳全部放到地面。安装新钢丝绳的活动端和固定端,完成更换。
2.根据权利要求1所述的方法,其特征在于,所述的螺母为M20螺母。
CN201010527229.2A 2010-10-26 2010-10-26 一种大型桥式起重机钢丝绳和龙门钩同时更换的方法 Expired - Fee Related CN102009917B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010527229.2A CN102009917B (zh) 2010-10-26 2010-10-26 一种大型桥式起重机钢丝绳和龙门钩同时更换的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010527229.2A CN102009917B (zh) 2010-10-26 2010-10-26 一种大型桥式起重机钢丝绳和龙门钩同时更换的方法

Publications (2)

Publication Number Publication Date
CN102009917A true CN102009917A (zh) 2011-04-13
CN102009917B CN102009917B (zh) 2012-05-02

Family

ID=43840281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010527229.2A Expired - Fee Related CN102009917B (zh) 2010-10-26 2010-10-26 一种大型桥式起重机钢丝绳和龙门钩同时更换的方法

Country Status (1)

Country Link
CN (1) CN102009917B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104724615A (zh) * 2015-01-23 2015-06-24 中建三局第二建设工程有限责任公司 大型动臂式塔机大直径变幅钢丝绳的穿绕方法
CN106044574A (zh) * 2016-06-06 2016-10-26 山东钢铁股份有限公司 同步更换铸造起重机龙门梁及钢丝绳的方法
CN108861899A (zh) * 2017-05-12 2018-11-23 上海船厂船舶有限公司 起重船变幅钢丝绳抽绳方法
CN109720965A (zh) * 2018-12-14 2019-05-07 中国华冶科工集团有限公司 一种竖井罐道钢丝绳更换方法及更换装置
CN110255376A (zh) * 2019-05-29 2019-09-20 邯郸钢铁集团有限责任公司 一种更换冶金桥式起重机钢丝绳的方法
CN110526123A (zh) * 2019-08-21 2019-12-03 攀钢集团工程技术有限公司 更换大型桥式吊车主卷大钩台的施工方法
CN111960184A (zh) * 2020-08-18 2020-11-20 马鞍山钢铁股份有限公司 一种冶金吊单根钢丝绳更换结构及其更换方法
CN112678746A (zh) * 2019-10-18 2021-04-20 中冶宝钢技术服务有限公司 低矮位置电机更换装置及其更换方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007137557A (ja) * 2005-11-16 2007-06-07 Mitsubishi Heavy Ind Ltd ロープ交換方法およびクレーン
CN101239695A (zh) * 2008-03-14 2008-08-13 首钢总公司 一种履带吊车主钢丝绳的穿绳方法
CN201325829Y (zh) * 2008-11-25 2009-10-14 无锡华东重型机械有限公司 轻型岸桥钢丝绳快速更换装置
CN101628696A (zh) * 2008-07-18 2010-01-20 卫华集团有限公司 一种地面移动自动换绳装置
CN101712443A (zh) * 2009-12-22 2010-05-26 舞阳钢铁有限责任公司 起重机钢丝绳快速更换方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007137557A (ja) * 2005-11-16 2007-06-07 Mitsubishi Heavy Ind Ltd ロープ交換方法およびクレーン
CN101239695A (zh) * 2008-03-14 2008-08-13 首钢总公司 一种履带吊车主钢丝绳的穿绳方法
CN101628696A (zh) * 2008-07-18 2010-01-20 卫华集团有限公司 一种地面移动自动换绳装置
CN201325829Y (zh) * 2008-11-25 2009-10-14 无锡华东重型机械有限公司 轻型岸桥钢丝绳快速更换装置
CN101712443A (zh) * 2009-12-22 2010-05-26 舞阳钢铁有限责任公司 起重机钢丝绳快速更换方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104724615A (zh) * 2015-01-23 2015-06-24 中建三局第二建设工程有限责任公司 大型动臂式塔机大直径变幅钢丝绳的穿绕方法
CN106044574A (zh) * 2016-06-06 2016-10-26 山东钢铁股份有限公司 同步更换铸造起重机龙门梁及钢丝绳的方法
CN106044574B (zh) * 2016-06-06 2017-07-07 山东钢铁股份有限公司 同步更换铸造起重机龙门梁及钢丝绳的方法
CN108861899A (zh) * 2017-05-12 2018-11-23 上海船厂船舶有限公司 起重船变幅钢丝绳抽绳方法
CN109720965A (zh) * 2018-12-14 2019-05-07 中国华冶科工集团有限公司 一种竖井罐道钢丝绳更换方法及更换装置
CN110255376A (zh) * 2019-05-29 2019-09-20 邯郸钢铁集团有限责任公司 一种更换冶金桥式起重机钢丝绳的方法
CN110526123A (zh) * 2019-08-21 2019-12-03 攀钢集团工程技术有限公司 更换大型桥式吊车主卷大钩台的施工方法
CN112678746A (zh) * 2019-10-18 2021-04-20 中冶宝钢技术服务有限公司 低矮位置电机更换装置及其更换方法
CN111960184A (zh) * 2020-08-18 2020-11-20 马鞍山钢铁股份有限公司 一种冶金吊单根钢丝绳更换结构及其更换方法
CN111960184B (zh) * 2020-08-18 2022-04-05 马鞍山钢铁股份有限公司 一种冶金吊单根钢丝绳更换结构及其更换方法

Also Published As

Publication number Publication date
CN102009917B (zh) 2012-05-02

Similar Documents

Publication Publication Date Title
CN102009917B (zh) 一种大型桥式起重机钢丝绳和龙门钩同时更换的方法
CN103274323B (zh) 一种起重机动滑轮组及钢丝绳快速更换法
CN105800490A (zh) 一种更换行车主钩钢丝绳的方法
CN104828696B (zh) 一种用于桥式起重机中动滑轮组和钢丝绳更换的方法
CN106988227A (zh) 一种悬索桥钢桁梁转体装置及施工方法
CN215249223U (zh) 一种建筑施工吊装装置
CN101239695A (zh) 一种履带吊车主钢丝绳的穿绳方法
CN105905806B (zh) 冶金天车钢丝绳更换装置及制作方法及使用方法
CN107150945B (zh) 井塔式四绳摩擦提升机首绳更换方法
CN106044574B (zh) 同步更换铸造起重机龙门梁及钢丝绳的方法
CN103588092B (zh) 一种采用辅助装置更换钢丝绳的方法
CN113387272A (zh) 一种桥式起重机更换钢丝绳的方法
CN110294427B (zh) 一种大型塔式起重机更换主起升系统钢丝绳的方法
CN202279632U (zh) 一种电缆和钢丝绳同卷筒型小车
CN109019306A (zh) 一种快速更换桥式起重机单钩头的方法
CN111960184B (zh) 一种冶金吊单根钢丝绳更换结构及其更换方法
CN203865920U (zh) 大吨位起重机起升机构钢丝绳缠绕结构
CN203612868U (zh) 索驱动的换绳机构
CN104724615A (zh) 大型动臂式塔机大直径变幅钢丝绳的穿绕方法
CN205802798U (zh) 冶金天车钢丝绳更换装置
CN111453530B (zh) 一种起升钢丝绳更换装置及其控制方法
CN105293333B (zh) 一种钢丝绳连接装置和更换行车钢丝绳的方法
CN202992022U (zh) 起重机起升机构钢丝绳连接专用装置
CN202657880U (zh) 起重机的吊钩和抓斗两用卷扬控制装置
CN207061730U (zh) 具备吊钩监控装置的卷扬机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120502

Termination date: 20211026

CF01 Termination of patent right due to non-payment of annual fee