CN1834353A - Road system having man, bicycle lane and motor vehicle separated, and traffic method thereof - Google Patents
Road system having man, bicycle lane and motor vehicle separated, and traffic method thereof Download PDFInfo
- Publication number
- CN1834353A CN1834353A CNA2006100986603A CN200610098660A CN1834353A CN 1834353 A CN1834353 A CN 1834353A CN A2006100986603 A CNA2006100986603 A CN A2006100986603A CN 200610098660 A CN200610098660 A CN 200610098660A CN 1834353 A CN1834353 A CN 1834353A
- Authority
- CN
- China
- Prior art keywords
- road
- bicycle
- slowly
- motor vehicle
- bilayer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/002—Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D1/00—Bridges in general
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
A road system with man-bicycle -motor vehicle separation is prepared as setting slow-traffic lane to be two layers structure being completely separated to motor vehicle road, making two layers slow-traffic lane be all weather road and using one layer as walkway and another layer as bicycle lane.
Description
Technical field
The present invention relates to a kind of urban road system and traffic method, approach system and traffic method thereof that particularly a kind of people, bicycle, motor vehicle three separate.
Background technology
At present in the urban traffic, the road of going slowly is divided into sidewalk and nonmotorized vehicle lane, sidewalk, nonmotorized vehicle lane and motorway all in one plane, the three is intersected mutually, the phase mutual interference is not only dangerous but also not quick; This upward is open-air structure sidewalk and bicycle Road Base, and its traffic is subjected to influences such as Exposure to Sunlight, wind, rain, snow, puts to no little inconvenience to trip.
Publication number is that the Chinese patent application of CN1125282A discloses a kind of traffic diversion bridge at junction of urban district, though its upper strata rotary island can solve the human and vehicle shunting problem, but the intersection motor vehicle still is lamp control crossing, the traffic ability is lower, people and bicycle need climb and fall to advance, and people, bicycle, motor vehicle three are all inconvenient.
Publication number is that the Chinese patent application of CN1105084A discloses a kind of double-layered non-cross overpass, and ground, ground floor, F2/B2 are arranged, and totally three layers, access bridge is longer, and structure is complicated, and cost is higher, is not suitable for big flow urban traffic.
Summary of the invention
The approach system and the traffic method thereof that the purpose of this invention is to provide a kind of people, bicycle, motor vehicle three separation, solve the current problem of spatially separating fully of people and bicycle, solve the problem that above-mentioned go slowly approach system and motor road also separate fully simultaneously; The present invention also solves the city approach system of going slowly is built up a kind of problem that is not subjected to the round-the-clock approach system of going slowly that Exposure to Sunlight and wind, rain, snow influences.
In order to realize purpose of the present invention, the approach system that this people of the present invention, bicycle, motor vehicle three separate comprises sidewalk, nonmotorized vehicle lane and motorway, it is characterized in that: sidewalk and nonmotorized vehicle lane are the bilayer road of going slowly.
The go slowly underpass highway of road of above-mentioned bilayer is set to all-weather road.
The go slowly top of upper strata road of road of above-mentioned bilayer is provided with the canopy lid, and the go slowly upper strata and the lower floor of road of bilayer is all-weather road.
The above-mentioned bilayer road of going slowly separates fully with motor road, does not have at grade intersection.
The traffic method of the approach system that this people, bicycle, motor vehicle three separate, it is characterized in that: the above-mentioned bilayer road of going slowly, wherein one deck is set to the sidewalk, and another layer is set to nonmotorized vehicle lane, current separating spatially of carrying out people and bicycle.
The definition of noun and term in the file of the present invention:
The go slowly definition of road: the road that people and bicycle are current.
The definition of bicycle: bicycle is meant bicycle, electric bicycle or the light vehicles of other low speed.
The definition of all-weather road: be meant the road that traffic is not influenced by Exposure to Sunlight and wind, rain, snow.
In this approach system of going slowly, walking is foolproof, neither is subjected to the threat of motor vehicle, also is not subjected to the influence of bicycle.In this approach system of going slowly, bicycle has the occupation road of oneself, does not wherein have pedestrian's interference, the quick and safe of riding.
Implement the present invention, can realize that the people separates with current dual people's car spatially of bicycle with motor vehicle, people, thoroughly solved the problem that people's car mixes in the present city, make walking and bicycle become the first-selection of go off daily, can reduce the traffic energy consumption significantly, reduce the pollution of traffic, realize the green traffic that people-oriented environment; The road of will going slowly is built on stilts, its output investment ratio motor vehicle viaduct and Underground Transportation Engineering are wanted simultaneously, people and bicycle to be separated from ground level road so that many, with increasing substantially the traffic capacity of motor vehicle on the ground level road, will produce huge economic results in society; Owing to realized the dual separation of people's car, stop the traffic accident that motor vehicle is thrusted into and bicycle is thrusted into, can fundamentally improve traffic safety.Build the bilayer road of going slowly, will increase investment outwardly, and, reduce the traffic volume of motor vehicle significantly, consequently saved the huge investment of motor road in a large number in fact owing to changed travel components.
Description of drawings
Fig. 1 is the schematic diagram of the embodiment of the invention 1.
Fig. 2 is the schematic diagram of the embodiment of the invention 2.
Fig. 3 is the schematic diagram of the embodiment of the invention 3.
Among the figure: 1. the bilayer upper strata road in the road of going slowly, 2. the underpass highway in the double-deck road of going slowly, 3. canopy covers, 4. stair or escalator, 5. bus-stop, ground and go slowly stair or escalator between the road, 6. bus-stop, 7. interconnection, 8. stair between interconnection and the ground or escalator, 9. motor road.
The specific embodiment
Referring to Fig. 1, Fig. 3, the bilayer road of going slowly separates fully with motor road 9, does not have at grade intersection.The go slowly traffic method of approach system of bilayer is, one deck that bilayer is gone slowly in the road is set to the sidewalk, and another layer is set to nonmotorized vehicle lane, current separating spatially of carrying out people and bicycle.
In the embodiment in figure 1, the road of going slowly is an elevated road, to avoid and the motor road at grade intersection; The go slowly underpass highway 2 of road of bilayer is set to round-the-clock bicycle road; The go slowly top of upper strata road 1 of road of bilayer is provided with canopy lid 3, and the upper strata road is set to round-the-clock pedestrian walkway.
Embodiment 3 is referring to Fig. 3, form the bilayer road of going slowly by go slowly upper strata road 1 in the road and the underpass highway 2 in the double-deck road of going slowly of bilayer, the bilayer road of going slowly is arranged on the central authorities of motor road 9, and it is built on stilts as shown in Figure 1, the road of going slowly is spatially separated with motor road, the road of going slowly communicates with the building in motorway roadside with same overhead interconnection 7, interconnection is set between interconnection and the ground communicates with ground with stair or escalator 8 between the ground.
Claims (5)
1, a kind of people, bicycle, the motor vehicle three approach system of separating comprises sidewalk, nonmotorized vehicle lane and motorway, it is characterized in that: sidewalk and nonmotorized vehicle lane are the bilayer road of going slowly.
2, people according to claim 1, bicycle, the motor vehicle three approach system of separating is characterized in that: the go slowly underpass highway of road of above-mentioned bilayer is set to all-weather road.
3, people according to claim 1, bicycle, the motor vehicle three approach system of separating is characterized in that: the go slowly top of upper strata road of road of above-mentioned bilayer is provided with the canopy lid, and the go slowly upper strata and the lower floor of road of bilayer is all-weather road.
4, people according to claim 1, bicycle, the motor vehicle three approach system of separating is characterized in that: the above-mentioned bilayer road of going slowly separates fully with motor road, does not have at grade intersection.
5, the traffic method of the approach system of a kind of people, bicycle, motor vehicle three separation, it is characterized in that: the bilayer as claimed in claim 1 road of going slowly, wherein one deck is set to the sidewalk, another layer is set to nonmotorized vehicle lane, current separating spatially of carrying out people and bicycle.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100986603A CN100425769C (en) | 2006-07-11 | 2006-07-11 | Road system having man, bicycle lane and motor vehicle separated, and traffic method thereof |
PCT/CN2007/001275 WO2008009190A1 (en) | 2006-07-11 | 2007-04-18 | A road system for passenger, motor vehicles and non-motor vehicles that separated and a method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100986603A CN100425769C (en) | 2006-07-11 | 2006-07-11 | Road system having man, bicycle lane and motor vehicle separated, and traffic method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1834353A true CN1834353A (en) | 2006-09-20 |
CN100425769C CN100425769C (en) | 2008-10-15 |
Family
ID=37002243
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100986603A Active CN100425769C (en) | 2006-07-11 | 2006-07-11 | Road system having man, bicycle lane and motor vehicle separated, and traffic method thereof |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN100425769C (en) |
WO (1) | WO2008009190A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101979767A (en) * | 2010-09-30 | 2011-02-23 | 董国良 | Method for forming compact and smooth city |
CN102031738A (en) * | 2010-10-08 | 2011-04-27 | 师自宽 | H-shaped urban arterial road public transportation system |
CN103498590A (en) * | 2013-10-10 | 2014-01-08 | 吴砺 | City hanging garden |
CN103835218A (en) * | 2013-12-26 | 2014-06-04 | 郑东武 | Gallery bridge type multifunctional skywalk |
WO2014139319A1 (en) * | 2013-03-12 | 2014-09-18 | Liu Changshou | Non-clover leaf interchange junction |
CN113481814A (en) * | 2021-07-19 | 2021-10-08 | 湖南望新建设集团股份有限公司 | Novel assembly type green pedestrian overpass and use method thereof |
CN113897828A (en) * | 2021-10-29 | 2022-01-07 | 无锡市政设计研究院有限公司 | Road intersection |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106256958A (en) * | 2016-06-24 | 2016-12-28 | 肖云山 | A kind of traffic system not stopped by crossroad |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0828073A (en) * | 1993-12-22 | 1996-01-30 | Hazama Gumi Ltd | Bicycle service system for commuter |
CN1150199A (en) * | 1996-01-06 | 1997-05-21 | 衢珑齉 | Universal multi-level space city traffic engineering |
DE29618174U1 (en) * | 1996-10-19 | 1997-11-13 | Chen, Xinfeng, 44227 Dortmund | Road surface on pedestals for cyclists |
CN1112480C (en) * | 1999-06-18 | 2003-06-25 | 陈清伟 | City overpass |
CN1179093C (en) * | 2000-09-08 | 2004-12-08 | 王英旭 | Overhead highway with parking lot |
JP2003082604A (en) * | 2001-09-10 | 2003-03-19 | Sumitomo Heavy Ind Ltd | Cycling road |
-
2006
- 2006-07-11 CN CNB2006100986603A patent/CN100425769C/en active Active
-
2007
- 2007-04-18 WO PCT/CN2007/001275 patent/WO2008009190A1/en active Application Filing
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101979767A (en) * | 2010-09-30 | 2011-02-23 | 董国良 | Method for forming compact and smooth city |
CN102031738A (en) * | 2010-10-08 | 2011-04-27 | 师自宽 | H-shaped urban arterial road public transportation system |
WO2014139319A1 (en) * | 2013-03-12 | 2014-09-18 | Liu Changshou | Non-clover leaf interchange junction |
US10309063B2 (en) | 2013-03-12 | 2019-06-04 | Changshou LIU | Multi-story crossroad and its traffic method with intensive land use and multiple functions |
CN103498590A (en) * | 2013-10-10 | 2014-01-08 | 吴砺 | City hanging garden |
CN103835218A (en) * | 2013-12-26 | 2014-06-04 | 郑东武 | Gallery bridge type multifunctional skywalk |
CN103835218B (en) * | 2013-12-26 | 2016-01-20 | 郑东武 | Pavement in covered bridge type Multifunctional air |
CN113481814A (en) * | 2021-07-19 | 2021-10-08 | 湖南望新建设集团股份有限公司 | Novel assembly type green pedestrian overpass and use method thereof |
CN113897828A (en) * | 2021-10-29 | 2022-01-07 | 无锡市政设计研究院有限公司 | Road intersection |
Also Published As
Publication number | Publication date |
---|---|
CN100425769C (en) | 2008-10-15 |
WO2008009190A1 (en) | 2008-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100425769C (en) | Road system having man, bicycle lane and motor vehicle separated, and traffic method thereof | |
CN100580181C (en) | Urban crossroad traffic split system | |
CN1834354A (en) | Ground saving and energy saving, unblocked ecological urban system with ordered space | |
CN201695288U (en) | Pedestrian and vehicular circulation separation crossed flyover | |
CN2797426Y (en) | Ring stacked 3-D steel structure interchange overpass | |
CN1916281A (en) | Underground system for dividing flow of vehicles and foot passengers at crossroad | |
WO2014071543A1 (en) | Municipal crossroads structure | |
WO2008031309A1 (en) | A thruway system for fewer stopping, no interchanging and expediently riding. | |
CN2706555Y (en) | Overhead parking area for use above urban road | |
CN100351468C (en) | Full stereoscopic city road system and traffic method using said system | |
CN202099708U (en) | Novel low overpass for road intersection | |
CN102031739B (en) | Overhead pavement for urban road | |
CN104562880A (en) | Interchange crossing designed for pedestrians walking on ground, cars running above or under ground level, and mutual accommodation only among cars on same road | |
CN1834350B (en) | Motor vehicle highway system able to fully isolate noise | |
CN2863864Y (en) | Crossroad of overground two-layer square pavement and underground well type furcated way | |
CN1908303A (en) | Overhead low-speed road | |
CN1834352A (en) | City system having man and vehicles fully separated | |
CN104109992A (en) | Miniature city cross overpass | |
CN1908304A (en) | Crossroad access bridge | |
CN2806549Y (en) | Single-layer separated-bridge type flyover | |
CN211547125U (en) | Special lane of multi-functional bicycle under city overpass | |
CN202688814U (en) | Traffic light-free fast transportation system arranged on city crossroad | |
CN2869104Y (en) | Parallel overhead expressway | |
CN1076771C (en) | Design plan of highway turnable single-deck stereo cross bridge | |
CN2756757Y (en) | Multilayer parking lot for cross road of big city central business area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |