CN1590213A - 由单壳油船改装成的双壳矿砂船及改装方法 - Google Patents
由单壳油船改装成的双壳矿砂船及改装方法 Download PDFInfo
- Publication number
- CN1590213A CN1590213A CNA200410056593XA CN200410056593A CN1590213A CN 1590213 A CN1590213 A CN 1590213A CN A200410056593X A CNA200410056593X A CN A200410056593XA CN 200410056593 A CN200410056593 A CN 200410056593A CN 1590213 A CN1590213 A CN 1590213A
- Authority
- CN
- China
- Prior art keywords
- ship
- cargo
- center cargo
- raised floor
- wing tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/14—Hull parts
- B63B3/16—Shells
- B63B3/20—Shells of double type
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B83/00—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems
- B63B83/40—Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems for reducing risks of pollution or contamination; for improving safety
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Health & Medical Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Ship Loading And Unloading (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
Claims (10)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/803,816 US7077071B2 (en) | 2004-03-18 | 2004-03-18 | Double-hull ore carrying vessel conversion from single-hull oil tanker and method of performing the same |
US10/803,816 | 2004-03-18 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1590213A true CN1590213A (zh) | 2005-03-09 |
CN100366504C CN100366504C (zh) | 2008-02-06 |
Family
ID=34620764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200410056593XA Expired - Fee Related CN100366504C (zh) | 2004-03-18 | 2004-08-11 | 由单壳油船改装成的双壳矿砂船及改装方法 |
Country Status (8)
Country | Link |
---|---|
US (1) | US7077071B2 (zh) |
EP (1) | EP1725445B1 (zh) |
CN (1) | CN100366504C (zh) |
AT (1) | ATE420814T1 (zh) |
AU (1) | AU2004318006B2 (zh) |
CY (1) | CY1108987T1 (zh) |
DE (1) | DE602004019148D1 (zh) |
WO (1) | WO2005095196A1 (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101913412A (zh) * | 2010-08-27 | 2010-12-15 | 上海交通大学 | 大型起重船的改装方法 |
CN102438889A (zh) * | 2010-04-27 | 2012-05-02 | 大宇造船海洋株式会社 | 用于油轮的货舱结构 |
CN103085944A (zh) * | 2011-10-27 | 2013-05-08 | 中集船舶海洋工程设计研究院有限公司 | 集装箱船 |
CN108583783A (zh) * | 2018-05-08 | 2018-09-28 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | 一种海工辅助船多功能挡货栏杆 |
CN109466693A (zh) * | 2018-10-31 | 2019-03-15 | 广船国际有限公司 | 一种矿砂船货舱改装方法 |
CN109803882A (zh) * | 2016-10-06 | 2019-05-24 | Bassoe科技公司 | 具有水密壁的船舶 |
CN110641628A (zh) * | 2019-08-28 | 2020-01-03 | 南通中远海运川崎船舶工程有限公司 | 一种矿砂船的新型横剖面结构 |
CN114348170A (zh) * | 2022-01-28 | 2022-04-15 | 广船国际有限公司 | 一种保护舱壁 |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT504464B1 (de) * | 2006-10-16 | 2008-08-15 | Donau Tankschiffahrtsgesellsch | Verfahren zum umbau eines einhüllentankschiffes in ein doppelhüllentankschiff |
CN102171094A (zh) * | 2008-10-09 | 2011-08-31 | 吉宝岸外与海事科技中心私人有限公司 | 用于舱整合的现有船舶的船体转换 |
TWI510414B (zh) * | 2012-12-25 | 2015-12-01 | Nippon Steel & Sumitomo Metal Corp | Oil tanker |
WO2015112188A1 (en) * | 2014-01-23 | 2015-07-30 | Bechtel Hydrocarbon Technology Solutions, Inc. | Method for conversion of a vessel for use as floating liquefied natural gas facility |
CN104627320B (zh) * | 2015-02-16 | 2018-01-23 | 广船国际有限公司 | 一种大型矿砂船的舯横剖面结构 |
JP2019014453A (ja) * | 2017-07-10 | 2019-01-31 | 三井E&S造船株式会社 | 船形構造物 |
CN114291201A (zh) * | 2021-12-01 | 2022-04-08 | 中国船舶工业集团公司第七0八研究所 | 一种超大型原油船无制荡舱壁的货舱结构 |
CN115556876B (zh) * | 2022-09-27 | 2024-06-11 | 沪东中华造船(集团)有限公司 | 一种化学品船货舱蒸发气回收系统及其使用方法 |
Family Cites Families (41)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3045631A (en) * | 1959-12-14 | 1962-07-24 | Macgregor A G | Water-tight flush hatch cover constructions |
US3399645A (en) * | 1967-04-17 | 1968-09-03 | Mobil Oil Corp | Tanker construction |
AT287454B (de) * | 1968-04-22 | 1971-01-25 | Vmw Ranshofen Berndorf Ag | Verfahren zur Herstellung versteifter metallischer plattenförmiger Verbundkörper durch Walzschweißen |
US3574921A (en) * | 1968-07-24 | 1971-04-13 | Kelso Marine Inc | Method of manufacturing structural panels |
US3811593A (en) * | 1971-01-27 | 1974-05-21 | Mc Millen J Ass Inc | Double wall cargo tank having insulating secondary barrier |
US3742889A (en) * | 1971-07-15 | 1973-07-03 | Newport News S & D Co | Method of constructing ships |
US3797099A (en) | 1972-01-04 | 1974-03-19 | Gen Dynamics Corp | Method for forming a ship hull section |
US3832966A (en) * | 1973-07-26 | 1974-09-03 | E Garcia | Method of building tankers for preventing oil spills in case of wreck |
JPS5340995A (en) * | 1976-09-21 | 1978-04-13 | Hitachi Zosen Corp | Method of revising oil tanker |
SU698835A1 (ru) * | 1977-05-17 | 1979-11-25 | Предприятие П/Я А-3907 | Способ сборки цилиндрической вставки корпуса судна |
SE407041B (sv) * | 1978-04-28 | 1979-03-12 | Margard Gunnar | Anordning for att uppdela en fri vetskeyta vid fartyg |
US4230061A (en) * | 1978-06-29 | 1980-10-28 | Baltek Corporation | Liquid cargo container |
JPS58174078A (ja) * | 1982-04-06 | 1983-10-13 | Ishikawajima Harima Heavy Ind Co Ltd | オイル・キヤリアの改造方法 |
US4476798A (en) * | 1982-08-17 | 1984-10-16 | Consolidated Olympic Corporation | Integrated multiple purpose universal ship hull and replacement module system |
JPS6015078U (ja) * | 1983-07-11 | 1985-02-01 | 日立造船株式会社 | 船体構造 |
JPS6015079U (ja) * | 1983-07-11 | 1985-02-01 | 日立造船株式会社 | 船体構造 |
JPS6015081U (ja) * | 1983-07-11 | 1985-02-01 | 日立造船株式会社 | 船体構造 |
JPS6022493U (ja) * | 1983-07-22 | 1985-02-15 | 日立造船株式会社 | 船体構造 |
JPS6124685A (ja) | 1984-07-13 | 1986-02-03 | Hitachi Zosen Corp | 既存タンカ−を二重船穀タンカ−に改造する方法 |
JPS6124686A (ja) | 1984-07-13 | 1986-02-03 | Hitachi Zosen Corp | 既存タンカ−を二重船穀タンカ−に改造する方法 |
JPS6181290A (ja) * | 1984-09-27 | 1986-04-24 | Nippon Kokan Kk <Nkk> | 多目的船舶 |
US4907524A (en) * | 1988-08-05 | 1990-03-13 | Special Projects Research Corporation | Method and device for controlling strain and/or deflection in superstructures |
US5347943A (en) * | 1990-05-23 | 1994-09-20 | Mitsubishi Jukogyo Kabushiki Kaisha | Tanker for the prevention of cargo oil spillage |
US5085161A (en) * | 1990-06-05 | 1992-02-04 | Metro Machine Corporation | Vessel hull and construction method |
EP0559806B1 (en) * | 1990-12-05 | 1997-08-06 | STUART, William | Watercraft hull modification |
US5218919A (en) * | 1991-02-19 | 1993-06-15 | Special Projects Research Corp. | Method and device for the installation of double hull protection |
US5090351A (en) * | 1991-04-01 | 1992-02-25 | Metro Machine Corporation | Vessel hull construction and method |
US5189975A (en) * | 1992-05-01 | 1993-03-02 | Mobil Oil Corporation | Method for reconfiguration tankers |
US5320056A (en) * | 1992-05-04 | 1994-06-14 | Marinzoli Carmelo L | Recessed bottom tanker |
JPH06293286A (ja) * | 1993-04-06 | 1994-10-21 | Hitachi Zosen Corp | 二重殻構造を有する液状貨物船 |
FR2719545B1 (fr) | 1994-05-06 | 1996-07-12 | Denis Ernest Celestin Buffet | Double coque allégée pour navire et sa méthode économique de fabrication. |
US5542365A (en) * | 1994-12-22 | 1996-08-06 | Jurisich; Peter L. | Ship having a crushable, energy absorbing hull assembly |
AU700992B2 (en) * | 1995-05-26 | 1999-01-14 | Les Industries Verreault (1991) Inc. | Tanker reconstruction |
US5582124A (en) * | 1995-07-26 | 1996-12-10 | The United States Of America As Represented By The Secretary Of The Navy | Hybrid framing system for vessels |
US6003459A (en) * | 1997-12-03 | 1999-12-21 | Ima International Maritime Advisers | Transport ship |
US6009821A (en) * | 1998-07-15 | 2000-01-04 | Saudi Arabian Oil Company | Double bottom hull for tank ship |
US6637359B1 (en) * | 1998-12-15 | 2003-10-28 | Maritrans Inc. | System and method for internally fitting a new inner hull to an existing outer hull to form a rebuilt double hull vessel |
US6170420B1 (en) * | 1998-12-15 | 2001-01-09 | Maritrans, Inc. | Rebuilt double hull vessel and method of rebuilding a single hull vessel into a double hull vessel |
US20020124784A1 (en) * | 2001-03-07 | 2002-09-12 | White Charles N. | Re-use of vessels for transporting deck payloads |
US6907836B2 (en) * | 2002-07-09 | 2005-06-21 | Maritrans, Inc. | Rebuilt double hull tanker and method of rebuilding an existing single hull tanker into a rebuilt double hull tanker |
US6708636B1 (en) * | 2002-07-09 | 2004-03-23 | Maritrans Inc. | Rebuilt double hull tanker and method of rebuilding an existing single hull tanker into a rebuilt double hull tanker |
-
2004
- 2004-03-18 US US10/803,816 patent/US7077071B2/en not_active Expired - Fee Related
- 2004-05-11 DE DE602004019148T patent/DE602004019148D1/de not_active Expired - Lifetime
- 2004-05-11 EP EP04751880A patent/EP1725445B1/en not_active Revoked
- 2004-05-11 WO PCT/US2004/014711 patent/WO2005095196A1/en active Application Filing
- 2004-05-11 AT AT04751880T patent/ATE420814T1/de not_active IP Right Cessation
- 2004-05-11 AU AU2004318006A patent/AU2004318006B2/en not_active Ceased
- 2004-08-11 CN CNB200410056593XA patent/CN100366504C/zh not_active Expired - Fee Related
-
2009
- 2009-04-07 CY CY20091100403T patent/CY1108987T1/el unknown
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102438889A (zh) * | 2010-04-27 | 2012-05-02 | 大宇造船海洋株式会社 | 用于油轮的货舱结构 |
CN101913412A (zh) * | 2010-08-27 | 2010-12-15 | 上海交通大学 | 大型起重船的改装方法 |
CN101913412B (zh) * | 2010-08-27 | 2012-11-28 | 上海交通大学 | 大型起重船的改装方法 |
CN103085944A (zh) * | 2011-10-27 | 2013-05-08 | 中集船舶海洋工程设计研究院有限公司 | 集装箱船 |
CN109803882A (zh) * | 2016-10-06 | 2019-05-24 | Bassoe科技公司 | 具有水密壁的船舶 |
CN109803882B (zh) * | 2016-10-06 | 2021-08-06 | Bassoe科技公司 | 具有水密壁的船舶 |
CN108583783A (zh) * | 2018-05-08 | 2018-09-28 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | 一种海工辅助船多功能挡货栏杆 |
CN109466693A (zh) * | 2018-10-31 | 2019-03-15 | 广船国际有限公司 | 一种矿砂船货舱改装方法 |
CN109466693B (zh) * | 2018-10-31 | 2021-05-14 | 广船国际有限公司 | 一种矿砂船货舱改装方法 |
CN110641628A (zh) * | 2019-08-28 | 2020-01-03 | 南通中远海运川崎船舶工程有限公司 | 一种矿砂船的新型横剖面结构 |
CN114348170A (zh) * | 2022-01-28 | 2022-04-15 | 广船国际有限公司 | 一种保护舱壁 |
Also Published As
Publication number | Publication date |
---|---|
CN100366504C (zh) | 2008-02-06 |
AU2004318006A2 (en) | 2005-10-13 |
AU2004318006B2 (en) | 2008-12-18 |
CY1108987T1 (el) | 2014-07-02 |
EP1725445A1 (en) | 2006-11-29 |
US20050204982A1 (en) | 2005-09-22 |
US7077071B2 (en) | 2006-07-18 |
AU2004318006A1 (en) | 2005-10-13 |
ATE420814T1 (de) | 2009-01-15 |
WO2005095196A1 (en) | 2005-10-13 |
EP1725445B1 (en) | 2009-01-14 |
DE602004019148D1 (de) | 2009-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100366504C (zh) | 由单壳油船改装成的双壳矿砂船及改装方法 | |
EP2259962B1 (en) | A ship | |
US6357373B1 (en) | Rebuilt double hull vessel and method of rebuilding a single hull vessel into a double hull vessel | |
US6708636B1 (en) | Rebuilt double hull tanker and method of rebuilding an existing single hull tanker into a rebuilt double hull tanker | |
CN1301228A (zh) | 一种obo型或散装货船型船只 | |
KR100664915B1 (ko) | 화물선 | |
US4660491A (en) | Double hull ship without reinforcing transverse members between the inner and outer hull platings | |
KR102525151B1 (ko) | 컨테이너 적재 보조장치, 이를 구비한 컨테이너 운반선 및 컨테이너 하역방법 | |
WO2011078032A1 (ja) | 船種変更が容易となる油槽船 | |
CN110304208B (zh) | 一种fpso的上层建筑总段驳运的海邦结构 | |
WO2014013584A1 (ja) | 船舶 | |
KR102719525B1 (ko) | 컨테이너 적재 보조장치, 이를 구비한 컨테이너 운반선 및 컨테이너 하역방법 | |
KR102719526B1 (ko) | 컨테이너 적재 보조장치, 이를 구비한 컨테이너 운반선 및 컨테이너 하역방법 | |
CN113104175B (zh) | 一种单壳油轮改造为双壳散货船的方法和双壳散货船 | |
KR102530035B1 (ko) | 컨테이너 적재 보조장치, 이를 구비한 컨테이너 운반선 및 컨테이너 하역방법 | |
US20020124784A1 (en) | Re-use of vessels for transporting deck payloads | |
TW202340040A (zh) | 貨櫃堆疊協助裝置、具有貨櫃堆疊協助裝置的貨櫃載具及裝載/卸載貨櫃的方法 | |
CN117377613A (zh) | 货柜堆叠协助装置、具有货柜堆叠协助装置的货柜载具及货柜装载和卸除方法 | |
CN117208135A (zh) | 敞口集装箱船舱口围角隅结构 | |
RU2451618C2 (ru) | Корпус судна | |
Buxton et al. | Ship Design and Selection of Access Equipment—Bulk Cargo | |
JP2017171068A (ja) | 多目的貨物船構造 | |
JPS63284091A (ja) | 撒積船の拡艙方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: United mining International Ltd Assignor: Richard W. Noy Contract fulfillment period: 2007.11.28 to 2024.5.11 Contract record no.: 2008990000067 Denomination of invention: Double shell ore sand ship refitted by single shell oil ship and refitting method Granted publication date: 20080206 License type: Exclusive license Record date: 2008.4.11 Assignee: Consolidated mineral transportation XIX Ltd Assignor: United mining International Ltd Contract fulfillment period: 2007.11.28 to 2024.5.11 Contract record no.: 2008990000068 Denomination of invention: Double shell ore sand ship refitted by single shell oil ship and refitting method Granted publication date: 20080206 License type: Fen Xuke Record date: 2008.4.11 Assignee: Consolidated mineral transportation XXX Ltd Assignor: United mining International Ltd Contract fulfillment period: 2007.11.28 to 2024.5.11 Contract record no.: 2008990000069 Denomination of invention: Double shell ore sand ship refitted by single shell oil ship and refitting method Granted publication date: 20080206 License type: Fen Xuke Record date: 2008.4.11 Assignee: Consolidated mineral transportation XVIII Ltd Assignor: United mining International Ltd Contract fulfillment period: 2007.11.28 to 2024.5.11 Contract record no.: 2008990000070 Denomination of invention: Double shell ore sand ship refitted by single shell oil ship and refitting method Granted publication date: 20080206 License type: Fen Xuke Record date: 2008.4.11 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: SEPARATELY LICENCE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.11.28 TO 2024.5.11 Name of requester: CONSOLIDATED MINES TRANSPORT XVIII CO., LTD. Effective date: 20080411 Free format text: EXCLUSIVE LICENCE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.11.28 TO 2024.5.11 Name of requester: CONSMIN INTERNATIONAL CO., LTD. Effective date: 20080411 Free format text: SEPARATELY LICENCE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.11.28 TO 2024.5.11 Name of requester: CONSOLIDATED MINES TRANSPORT XIX CO., LTD. Effective date: 20080411 Free format text: SEPARATELY LICENCE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.11.28 TO 2024.5.11 Name of requester: CONSOLIDATED MINES TRANSPORT XXX CO., LTD. Effective date: 20080411 |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080206 Termination date: 20180811 |