CN1190578C - 自承式房屋顶面整体顶升方法及其装置 - Google Patents

自承式房屋顶面整体顶升方法及其装置 Download PDF

Info

Publication number
CN1190578C
CN1190578C CNB011084081A CN01108408A CN1190578C CN 1190578 C CN1190578 C CN 1190578C CN B011084081 A CNB011084081 A CN B011084081A CN 01108408 A CN01108408 A CN 01108408A CN 1190578 C CN1190578 C CN 1190578C
Authority
CN
China
Prior art keywords
column
jacking
lifting pin
jack
house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNB011084081A
Other languages
English (en)
Other versions
CN1314534A (zh
Inventor
郑莆
袁赤
卢献荣
周云祥
郑元锵
徐丽
张莉
潘晓临
骆文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNB011084081A priority Critical patent/CN1190578C/zh
Publication of CN1314534A publication Critical patent/CN1314534A/zh
Application granted granted Critical
Publication of CN1190578C publication Critical patent/CN1190578C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种自承式房屋顶面整体顶升方法及其装置,它将顶升杆先与原房屋的立柱上部固定连接,并将底座固定在立柱的下部,将千斤顶放在底座上,将顶升支架连接在顶升杆上,然后将房屋立柱切断,通过千斤顶循环顶升房屋顶面到所需的高度,将顶升杆固定连接在立柱的下段立柱上,使顶升杆和立柱连接为一整体作为房屋顶面升高后的新支撑立柱。本发明将顶升构件和加高构件合二为一,具有施工不占用厂房场地、工期短、施工容易、投资少的优点。

Description

自承式房屋顶面整体顶升方法及其装置
本发明涉及一种自承式房屋顶面整体顶升方法及其装置,属于房屋改造技术领域。
目前,有许多厂房由于高度不够,需要进行加高改造,而现有技术中加高厂房屋顶的方法一般都是采用拆除原房屋顶面,加高后再重新盖顶面的方法,这种方法不仅存在着耗费大量资金、工期长的缺点,而且由于在原有的厂房内安装有许多设备和地面构筑物,使得施工吊装难以实施;为解决这些问题,在现有技术中又提出了将厂房顶面进行整体顶升加高的技术方案,在这种整体顶升的技术方案中,必须先在厂房内搭建顶升支承构件,然后将千斤顶放在支承构件上将房屋顶面顶升后,再在原有厂房的支撑立柱上进行接柱,然后将房屋顶面回落,最后将厂房内搭建的顶升支承构件拆除,现有技术中的这种整体顶升方案,主要存在的问题是:1、搭建顶升支承构件时要占用厂房内的场地,这对于有些布满了设备的厂房改造是无法进行的;2、在搭建顶升支承构件时,使用的材料多,费工费时;3、施工工艺复杂、难度大、安全性差、工期长。由于现有加高厂房的技术存在着上述缺点,因此在实际使用中还是不够理想。
本发明的目的是:提供一种施工时不占用厂房场地、施工工期短、施工简单、安全可靠、投资少的自承式房屋顶面整体顶升方法及其装置。
本发明的目的是这样实现的:它由自承式房屋顶面整体顶升方法和与该方法配套使用的自承式房屋顶面整体顶升装置组成,其自承式房屋顶面整体顶升方法为:它包括利用千斤顶将房屋顶面升高,并利用原支撑房屋顶面的立柱作为顶升后的立柱的一部分,它将顶升房屋顶面用的顶升杆先与原房屋的支撑立柱上部固定连接,并将支撑千斤顶用的底座固定在房屋立柱的下部,将千斤顶放在底座上,将可拆卸的顶升支架用螺栓连接在顶升杆上,并使千斤顶顶在该顶升支架的下方,然后将房屋立柱切断,立柱的切断处设在顶升杆和底座与立柱固定连接之间的位置,当立柱切断后按动千斤顶开始顶升,通过千斤顶的顶升使切断后的上半部分立柱连同房屋顶面随顶升杆一起上升,当顶升杆上升一段距离后,将顶升杆用螺栓固定在底座上,然后将顶升支架与顶升杆的连接螺栓松开并取下后,将顶升支架随千斤顶缩回到原位,再将其用螺栓连接在顶升杆上,然后将顶升杆与底座的连接螺栓松开并取下,再按动千斤顶再进行顶升,如此循环,直到将房屋顶面顶升到所需的高度位置后,将顶升杆固定连接在房屋立柱的下半段立柱上,使顶升杆和被切断的房屋立柱连接为一整体并作为房屋顶面升高后的新支撑立柱。
本发明的自承式房屋顶面整体顶升装置为:它包括千斤顶(1),千斤顶(1)置于底座(2)上,并且千斤顶(1)的顶端顶在顶升支架(4)的底部,底座(2)和顶升支架(4)均可通过螺栓与顶升杆(3)连接,底座(2)由两根支座梁a和两根螺栓连接梁b连接组成框型结构,在支座梁a上固定有放置千斤顶的支座架c,顶升支架(4)由两根顶梁d和两根移动梁e连接组成框型结构,在顶升杆(3)、螺栓连接梁b和移动梁e上都有螺栓孔f,防回落吊杆(5)装在螺栓接梁b上,吊杆下横梁(6)套在防回落吊杆(5)上,并且吊杆下横梁(6)与顶升杆(3)连接。
由于采用了上述技术方案,本发明与现有的房屋加高改造技术相比,本发明将顶升支承构件和加高构件合二为一,将支承、顶升、接柱、连接等多个工艺过程一次完成,并且将顶升支承构件直接安装在房屋的支撑立柱上,因此,本发明不仅具有施工时不占用厂房场地、施工工期短、施工容易、投资少的优点,而且还具有安全可靠、快捷简单、节省材料等优点。
附图1为本发明用于厂房的支撑立柱是工字钢型立柱时的施工及装置安装结构示意图;
附图2为附图1的A向示意图;
附图3为附图1的B-B剖面示意图。
本发明的实施例:在本实施例中,底座(2)由两根支座梁a和两根螺栓连接梁b连接组成框型结构,并在支座梁a上固定连接有放置千斤顶(1)用的支座架c,顶升支架(4)由两根顶梁d和两根移动梁e连接组成框型结构,在顶升杆(3)、螺栓连接梁b和移动梁e上都钻有螺栓孔f,施工时,在被改造厂房的每根立柱(8)的上部分别固定连接四根顶升杆(3),并将底座(2)的支座梁a固定在立柱(8)的下部,在底座(2)的支座架c上分别对称放置一个千斤顶(1),将顶升支架(4)的两根移动梁e用螺栓(7)连接在顶升杆(3)上,并使千斤顶(1)顶在顶升支架(4)的顶梁d的下方,将防回落吊杆(5)分别装在底座(2)两边的螺栓连接梁b上,再将吊杆下横梁(6)套在防回落吊杆(5)上,并将吊杆下横梁(6)与顶升杆(3)的下端可靠连接,然后将房屋的立柱(8)切断,切割立柱(8)时的切割线Q选在顶升杆(3)和底座(2)与立柱(8)固定连接之间的空间位置处进行切割,当立柱(8)被切断后,按动千斤顶(1)开始顶升,通过千斤顶(1)的顶升使切断后的上半部分立柱连同房屋顶面随顶升杆(3)一起上升,在顶升杆(3)上升的过程中同时将防回落吊杆(5)上的螺帽g拧紧,这样可以防止顶升杆(3)在顶升的过程中回落,当顶升杆(3)上升一段距离后,将顶升杆(3)用螺栓(7)固定在底座(2)的螺栓连接梁b上,然后将顶升支架(4)与顶升杆(3)的连接螺栓(7)松开并取下后,将顶升支架(4)随千斤顶(1)缩回到原位,再将其用螺栓(7)连接在顶升杆(3)上,然后将顶升杆(3)与底座(2)的螺栓连接梁b上的连接螺栓(7)松开并取下,再按动千斤顶(1)进行顶升,如此循环,直到将房屋顶面顶升到所需的高度位置后,将顶升杆(1)的下部分固定连接在房屋立柱的下半段立柱上,使顶升杆(3)和被切断的房屋立柱(8)连接为一整体并作为房屋顶面升高后的新支撑立柱,然后将其它顶升构件拆除即成。

Claims (2)

1、一种自承式房屋顶面整体顶升方法,它包括利用千斤顶将房屋顶面升高,并利用原支撑房屋顶面的立柱作为顶升后的立柱的一部分,其特征在于:它将顶升房屋顶面用的顶升杆先与原房屋的立柱上部固定连接,并将支撑千斤顶用的底座固定在房屋立柱的下部,将千斤顶放在底座上,将可拆卸的顶升支架用螺栓连接在顶升杆上,并使千斤顶顶在该顶升支架的下方,然后将房屋立柱切断,立柱的切断处设在顶升杆和底座与立柱固定连接之间的位置,当立柱切断后按动千斤顶开始顶升,通过千斤顶的顶升使切断后的上半部分立柱连同房屋顶面随顶升杆一起上升,当顶升杆上升一段距离后,将顶升杆用螺栓固定在底座上,然后将顶升支架与顶升杆的连接螺栓松开并取下后,将顶升支架随千斤顶缩回到原位,再将其用螺栓连接在顶升杆上,然后将顶升杆与底座的连接螺栓松开并取下,再按动千斤顶再进行顶升,如此循环,直到将房屋顶面顶升到所需的高度位置后,将顶升杆连接在房屋立柱的下半段立柱上,使顶升杆和被切断的房屋立柱连接为一整体并作为房屋顶面升高后的新支撑立柱。
2、一种自承式房屋顶面整体顶升装置,它包括千斤顶(1),其特征在于:千斤顶(1)置于底座(2)上,并且千斤顶(1)的顶端顶在顶升支架(4)的底部,底座(2)和顶升支架(4)均可通过螺栓与顶升杆(3)连接,底座(2)由两根支座梁(a)和两根螺栓连接梁(b)连接组成框型结构,在支座梁(a)上固定有放置千斤顶的支座架(c),顶升支架(4)由两根顶梁(d)和两根移动梁(e)连接组成框型结构,在顶升杆(3)、螺栓连接梁(b)和移动梁(e)上都有螺栓孔(f),防回落吊杆(5)装在螺栓接梁(b)上,吊杆下横梁(6)套在防回落吊杆(5)上,并且吊杆下横梁(6)与顶升杆(3)连接。
CNB011084081A 2001-04-30 2001-04-30 自承式房屋顶面整体顶升方法及其装置 Expired - Lifetime CN1190578C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB011084081A CN1190578C (zh) 2001-04-30 2001-04-30 自承式房屋顶面整体顶升方法及其装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB011084081A CN1190578C (zh) 2001-04-30 2001-04-30 自承式房屋顶面整体顶升方法及其装置

Publications (2)

Publication Number Publication Date
CN1314534A CN1314534A (zh) 2001-09-26
CN1190578C true CN1190578C (zh) 2005-02-23

Family

ID=4657227

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB011084081A Expired - Lifetime CN1190578C (zh) 2001-04-30 2001-04-30 自承式房屋顶面整体顶升方法及其装置

Country Status (1)

Country Link
CN (1) CN1190578C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476397A (zh) * 2009-01-15 2009-07-08 二十三冶建设集团有限公司 钢屋架与砼柱铰接的厂房屋盖整体顶升方法

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277980B (zh) * 2011-05-06 2013-01-02 河海大学 一种单层工业厂房屋盖整体顶升的装置及其施工方法
CN103669576A (zh) * 2013-11-18 2014-03-26 中色十二冶金建设有限公司 一种钢构车间整体顶升施工装置及方法
CN104060842B (zh) * 2014-07-08 2016-02-24 七冶建设有限责任公司 一种工业厂房钢屋盖整体倒装提升施工方法
CN107476597A (zh) * 2017-07-12 2017-12-15 杭州圣基建筑特种工程有限公司 整体屋盖同步顶升方法
CN108517795A (zh) * 2018-05-25 2018-09-11 中铁第勘察设计院集团有限公司 铁路桥梁防护棚架结构及其施工方法
CN108868193B (zh) * 2018-07-27 2021-05-11 建研科技股份有限公司 钢结构建筑逆向拆除的施工方法
CN110616913A (zh) * 2019-09-28 2019-12-27 山东建固特种专业工程有限公司 一种框架结构建筑物同步顶升的方法
CN114319929A (zh) * 2021-12-28 2022-04-12 上海建为历保科技股份有限公司 房屋整体顶升装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476397A (zh) * 2009-01-15 2009-07-08 二十三冶建设集团有限公司 钢屋架与砼柱铰接的厂房屋盖整体顶升方法

Also Published As

Publication number Publication date
CN1314534A (zh) 2001-09-26

Similar Documents

Publication Publication Date Title
CN1190578C (zh) 自承式房屋顶面整体顶升方法及其装置
CN2275615Y (zh) 液压爬升模板装置
CN1372059A (zh) 钢筋砼柱单层工业厂房屋盖整体顶升的方法
US4782634A (en) Building construction
CN2476611Y (zh) 自承式房屋顶面整体顶升装置
JPH04161566A (ja) 大空間建物の構築装置
JPH06323503A (ja) 大型吊下げ式ボイラの組立方法
CN209907435U (zh) 一种综合管廊建筑施工用管廊台车
JPH04161565A (ja) 大空間建物の構築方法
JP2890341B2 (ja) 構造物構築用最上階フレームのリフトアップ方法及び装置
AU627212B2 (en) Building lifting
JP2768237B2 (ja) 大型吊下げ式ボイラの組立て併進工法および梁結合方法、並びに梁結合構造体
CN214090936U (zh) 一种钢梁结构体施工简易平台支撑结构
CN214090975U (zh) 适用于房建悬空梁顶模支撑机构
CN219638391U (zh) 一种进水塔施工标准平面多卡模板
CN209874418U (zh) 一种脚手架
CN113216288B (zh) 一种木结构房屋顶升施工方法
CN219604164U (zh) 变截面异形钢塔冠安装装置
CN221094883U (zh) 一种大悬臂盖梁的模具支架拆装结构
CN221346294U (zh) 一种用于混凝土浇筑的滑动模板装置
CN219194326U (zh) 一种公路桥梁调坡顶升结构
JP3787657B2 (ja) 構造物構築用梁部材のストック用架台
JP3263504B2 (ja) 塔状構造物の架設工法
JPH0431412Y2 (zh)
JPH06101348A (ja) 塔体の構築方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110607

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550001 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO. 2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110607

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550001 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CX01 Expiry of patent term

Granted publication date: 20050223

CX01 Expiry of patent term