CN115159003A - 一种受限空间顶管管节运输方法 - Google Patents
一种受限空间顶管管节运输方法 Download PDFInfo
- Publication number
- CN115159003A CN115159003A CN202210765799.8A CN202210765799A CN115159003A CN 115159003 A CN115159003 A CN 115159003A CN 202210765799 A CN202210765799 A CN 202210765799A CN 115159003 A CN115159003 A CN 115159003A
- Authority
- CN
- China
- Prior art keywords
- pipe
- track
- jacking
- conveying
- pipe joints
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 210000001503 joint Anatomy 0.000 claims description 18
- 238000010276 construction Methods 0.000 abstract description 11
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G35/00—Mechanical conveyors not otherwise provided for
Abstract
本发明涉及一种受限空间顶管管节运输方法。本发明中通过铺设有轨运输轨道,以避开电线、通讯线等线路,从而使管节运输、对接更加便捷,解决了有限空间管节运输难的技术难题,提高了顶管管节的运输效率,从而有效缩短工期;且传送车的使用解决了管节运输过程的安全风险,保证了管节的运输安全;同时,垂直升降机的使用降低了管道从地面运送至顶管轨道上的安全风险,保证了管节运输的安全,提高了施工效率。
Description
技术领域
本发明涉及沉井管道施工领域,尤其涉及一种受限空间顶管管节运输方法。
背景技术
现有的沉井管道顶管需投入的人员及相关物资较多,特别是在进行沉井顶管施工过程中由于沉井附近因环境等不具备运输条件,或管道卸车上空有电线、通讯线等线路,无法将管道送至沉井附近,这无疑导致施工难度增加、工期延长,也同时会产生大量的人工及机械费用,造成不必要的损失。
发明内容
针对上述问题,现提供一种受限空间顶管管节运输方法,以有效提高施工效率及施工质量、减少人工及机械费用支出。
上述方案的有益效果是:
本发明中可通过旋转平台多次调整管节运输装置方向,从而大大提高管材运输效率,降低运输过程中的安全风险,同时提高了施工的效率,减少人工、机械费用的支出。
具体实施方式
下面将结合本发明实施例对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。
需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。
下面结合具体实施例对本发明作进一步说明,但不作为本发明的限定。
一种受限空间顶管管节运输方法,包括如下步骤:
步骤一:根据管节运输路线及控制点设置第一运输轨道、第二运输轨道、旋转平台、垂直升降机及底部运输轨道;
步骤二:将管节吊装至传送车上,再以滑轮锁链将管节捆绑于传送车上,通过第一运输轨道将传送车送至旋转平台上,以木塞将传送车固定于旋转平台上,以防止传送车滑动;
步骤三:控制并旋转旋转平台,使旋转平台与第二运输轨道对接;
步骤四:通过第二运输轨道将传送车送至垂直升降机上,再通过垂直升降机将传送车送至沉井底部;
步骤五:通过底部运输轨道将传送车送至顶管轨道旁,利用轨道自重使其滚落至顶管轨道上。
本发明中可设置多个旋转平台,以通过旋转平台多次改变运输方向,从而解决管道运输过程中因场地限制影响管节运输的问题,保证顶管施工的连贯性。
本发明中可于顶管轨道旁安装挡板,以利用挡板使管节精确滚落至顶管轨道上。
本发明中通过铺设有轨运输轨道,以避开电线、通讯线等线路,从而使管节运输、对接更加便捷,解决了有限空间管节运输难的技术难题,提高了顶管管节的运输效率,从而有效缩短工期;且传送车的使用解决了管节运输过程的安全风险,保证了管节的运输安全;同时,垂直升降机的使用降低了管道从地面运送至顶管轨道上的安全风险,保证了管节运输的安全,提高了施工效率。
需要说明的是,本发明中旋转平台、垂直升降机等部件可直接使用现有公开技术中相应部件,因而本申请中不再对相关结构进行赘述。
以上仅为本发明较佳的实施例,并非因此限制本发明的实施方式及保护范围,对于本领域技术人员而言,应当能够意识到凡运用本发明说明书内容所作出的等同替换和显而易见的变化所得到的方案,均应当包含在本发明的保护范围内。
Claims (4)
1.一种受限空间顶管管节运输方法,其特征在于,包括如下步骤:
步骤一:根据管节运输路线及控制点设置第一运输轨道、第二运输轨道、旋转平台、垂直升降机及底部运输轨道;
步骤二:将管节吊装至传送车上,通过所述第一运输轨道将所述传送车送至所述旋转平台上;
步骤三:控制并旋转所述旋转平台,使所述旋转平台与第二运输轨道对接;
步骤四:通过所述第二运输轨道将所述传送车送至垂直升降机上,再通过垂直升降机将所述传送车送至沉井底部;
步骤五:通过所述底部运输轨道将所述传送车送至顶管轨道旁,利用轨道自重使其滚落至顶管轨道上。
2.根据权利要求1所述的受限空间顶管管节运输方法,其特征在于,步骤二中当管节吊装至所述传送车上后以滑轮锁链将管节捆绑于所述传送车上。
3.根据权利要求1所述的受限空间顶管管节运输方法,其特征在于,步骤二中以木塞将所述传送车固定于所述旋转平台上,以防止所述传送车滑动。
4.根据权利要求1所述的受限空间顶管管节运输方法,其特征在于,步骤五中可于所述顶管轨道旁安装挡板,以利用所述挡板使管节精确滚落至所述顶管轨道上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210765799.8A CN115159003A (zh) | 2022-06-30 | 2022-06-30 | 一种受限空间顶管管节运输方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210765799.8A CN115159003A (zh) | 2022-06-30 | 2022-06-30 | 一种受限空间顶管管节运输方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN115159003A true CN115159003A (zh) | 2022-10-11 |
Family
ID=83489439
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210765799.8A Pending CN115159003A (zh) | 2022-06-30 | 2022-06-30 | 一种受限空间顶管管节运输方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN115159003A (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4684314A (en) * | 1984-09-24 | 1987-08-04 | Weatherford/Lamb, Inc. | Pipe handling apparatus |
CN203699239U (zh) * | 2013-10-31 | 2014-07-09 | 首钢京唐钢铁联合有限责任公司 | 一种双排式托盘运输结构 |
CN111533056A (zh) * | 2020-04-16 | 2020-08-14 | 安徽正兴和光电科技有限公司 | 一种非开挖顶管施工用运输装置 |
CN112009965A (zh) * | 2020-09-16 | 2020-12-01 | 北京首钢国际工程技术有限公司 | 一种钢卷运输装置及钢卷运输系统 |
CN212768185U (zh) * | 2020-09-16 | 2021-03-23 | 北京首钢国际工程技术有限公司 | 一种钢卷运输装置及钢卷运输系统 |
CN112664241A (zh) * | 2021-01-21 | 2021-04-16 | 中铁工程装备集团(天津)有限公司 | 一种临时管片运输装置及施工方法 |
CN114524008A (zh) * | 2022-01-25 | 2022-05-24 | 中国一冶集团有限公司 | 管节运输装置及管节运输系统 |
CN114590568A (zh) * | 2022-04-18 | 2022-06-07 | 山东威宝节能科技集团有限公司 | 一种旋转平台机构及应用其的生产线 |
-
2022
- 2022-06-30 CN CN202210765799.8A patent/CN115159003A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4684314A (en) * | 1984-09-24 | 1987-08-04 | Weatherford/Lamb, Inc. | Pipe handling apparatus |
CN203699239U (zh) * | 2013-10-31 | 2014-07-09 | 首钢京唐钢铁联合有限责任公司 | 一种双排式托盘运输结构 |
CN111533056A (zh) * | 2020-04-16 | 2020-08-14 | 安徽正兴和光电科技有限公司 | 一种非开挖顶管施工用运输装置 |
CN112009965A (zh) * | 2020-09-16 | 2020-12-01 | 北京首钢国际工程技术有限公司 | 一种钢卷运输装置及钢卷运输系统 |
CN212768185U (zh) * | 2020-09-16 | 2021-03-23 | 北京首钢国际工程技术有限公司 | 一种钢卷运输装置及钢卷运输系统 |
CN112664241A (zh) * | 2021-01-21 | 2021-04-16 | 中铁工程装备集团(天津)有限公司 | 一种临时管片运输装置及施工方法 |
CN114524008A (zh) * | 2022-01-25 | 2022-05-24 | 中国一冶集团有限公司 | 管节运输装置及管节运输系统 |
CN114590568A (zh) * | 2022-04-18 | 2022-06-07 | 山东威宝节能科技集团有限公司 | 一种旋转平台机构及应用其的生产线 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102182147B (zh) | 一种钢箱梁架设方法 | |
US4061231A (en) | Pipe handling apparatus for pipe laying barges | |
CN109352815B (zh) | 一种预制构件生产线及具有该预制构件生产线的产存线 | |
CN108222943B (zh) | 一种露天矿端帮提升机 | |
US8800725B2 (en) | Elevator liner apparatus and utilization method thereof | |
CN2793147Y (zh) | 多跨悬索桥无索区钢箱吊梁 | |
CN110886233A (zh) | 用于桥梁连接t梁的施工方法 | |
US4029215A (en) | Pipe handling apparatus for pipe laying barges | |
JP2019044453A (ja) | 架替工法及び架設機 | |
CN115159003A (zh) | 一种受限空间顶管管节运输方法 | |
CN106149570A (zh) | 一种步履式架桥机架设预制箱梁施工方法 | |
CN111042095B (zh) | 一种导管架合拢工艺、支撑架和支撑组件 | |
CN110316662B (zh) | 一种大跨度门式起重机安装施工方法 | |
CN106315407A (zh) | 狭小空间内超大型吊车梁滑移拆除方法 | |
CN107313356A (zh) | 一种双层桥建造的运梁方法 | |
CN204847847U (zh) | 天车运行轨道和天车系统 | |
KR101077092B1 (ko) | 기존 도로의 교통 원활을 위한 트롤리를 이용하여 거더를 시공하는 방법 | |
CN208105903U (zh) | 大跨度不等高支座钢桁架结构吊装滑移结构 | |
CN104294763B (zh) | 一种移动模架钢筋网片转运装置 | |
CN110439292A (zh) | 用于大型封闭式工业堆场屋架的制作安装系统及施工工艺 | |
CN110388122B (zh) | 一种烟囱钢内筒安装系统及安装方法 | |
CN103879795A (zh) | 管状结构物滚动装船方法 | |
CN103849709A (zh) | 炼钢转炉的倾动系统的安装方法 | |
CN210598373U (zh) | 一种烟囱钢内筒安装系统 | |
CN106078229B (zh) | 电除尘器阳极板生产线 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20221011 |