CN115102002B - Pin针装配方法及设备 - Google Patents
Pin针装配方法及设备Info
- Publication number
- CN115102002B CN115102002B CN202210578887.7A CN202210578887A CN115102002B CN 115102002 B CN115102002 B CN 115102002B CN 202210578887 A CN202210578887 A CN 202210578887A CN 115102002 B CN115102002 B CN 115102002B
- Authority
- CN
- China
- Prior art keywords
- pin needle
- pin
- push block
- block
- pushing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R43/00—Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
- H01R43/20—Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors for assembling or disassembling contact members with insulating base, case or sleeve
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/50—Manufacturing or production processes characterised by the final manufactured product
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Automatic Assembly (AREA)
Abstract
本发明一种PIN针装配方法,所述方法步骤为:步骤一、供料机构送入PIN针至待装配产品的上表面上;步骤二、位于PIN针左端上方的推块一在动力机构的作用下向下按压PIN针将PIN针压斜;步骤三、正对PIN针右端的推块二在动力机构的推动下沿PIN针长度方向推压PIN针,使得PIN针的左端插入待装配产品的插孔内;步骤四、推块三在动力机构的推动下沿垂直于PIN针长度方向接触PIN针右端并继续前进、使得PIN针弯折;步骤五、推块四在动力机构的推动下向下将PIN针压入PIN针安装槽内。本发明一种PIN针装配方法,极大的提高了PIN针的装配效率。
Description
技术领域
本发明涉及一种装配方法及设备,尤其是涉及一种用于对PIN针进行自动化装配的方法及设备,属于电气自动化技术领域。
背景技术
目前,仪器仪表等各类设备上均会用到PIN针起到定位、导电等作用,常规的PIN针装配采用人工插接按压等方式进行,效率低下,尤其是对于一些在装配过程中需要对PIN进行弯折操作的场景,人工方式不但效率低下,且由于操作人员的手工误差,使得装配一致性较差,导致装配效果不尽如人意,为此,亟需一种自动化设备以解决上述问题。
发明内容
本发明的目的在于克服上述不足,提供一种通过自动化方式实现PIN针装配的PIN针装配方法及设备,从而极大的提高了PIN针的装配效率。
本发明的目的是这样实现的:
一种PIN针装配方法,所述方法步骤为:
步骤一、供料机构送入PIN针至待装配产品的上表面上;
步骤二、位于PIN针左端上方的推块一在动力机构的作用下向下按压PIN针将PIN针压斜;
步骤三、正对PIN针右端的推块二在动力机构的推动下沿PIN针长度方向推压PIN针,使得PIN针的左端插入待装配产品的插孔内;
步骤四、推块三在动力机构的推动下沿垂直于PIN针长度方向接触PIN针右端并继续前进、使得PIN针弯折;
步骤五、推块四在动力机构的推动下向下将PIN针压入PIN针安装槽内。
优选的,所述动力机构为气缸、油缸或直线电动机构(如电动推杆或电机驱动的丝杆螺母模组等)。
优选的,所述步骤二中的推块一的底面为一斜面,
一种PIN针装配设备,包含分别由四组动力机构驱动的推块一、推块二、推块三和推块四,推块一和推块四位于待装配产品的上方,待装配产品固定设置于工作台板上(具体的讲,可在工作台板上安装定位模具对待装配产品进行定位和固定,以免在后续PIN针装配过程中其发生位移而影响装配效率和效果),且推块一和推块四由动力机构驱动做升降运动,推块二位于待装配产品的左侧上方,且推块二由动力机构驱动做左右移动,推块三位于待装配产品的前端上方,且推块三由动力机构驱动做前后移动。
优选的,推块二安装于下支撑架上,推块一和推块四安装于上支撑架上,下支撑架和上支撑架均安装于支架上,推块三安装于支架或工作台板上。
优选的,所述推块一的底面为一斜面。
优选的,推块二的前行路径位于定位导向块和推块一的下方,推块三的前行路径位于定位导向块和推块四的下方。
与现有技术相比,本发明的有益效果是:
本发明通过由气缸等动力机构驱动的四个推块(推块一、推块二、推块三和推块四)实现了对PIN针的导向、推料、插孔、折弯和入槽操作,整个过程全部实现了机械自动化,从而与人工方式相比,极大的提高了装配作业的效率且机械化操作方式与人工方式相比,一致性更佳,尤其是面对折弯操作,机械方式更为统一,保证了装配效果。
附图说明
图1为本发明一种PIN针装配设备的俯视图。
图2为本发明一种PIN针装配设备的图1的正视图。
图3为本发明一种PIN针装配设备的图1的左视图。
图4为本发明一种PIN针装配设备的局部放大示意图。
图5为本发明一种PIN针装配设备的PIN针的结构示意图。
图6为本发明一种PIN针装配设备的待装配产品的示意图。
其中:
支架101;
下支撑架201、上支撑架202;
PIN针安装槽301;
待装配产品401;
供料机构1、定位导向块2、推块一3、推块二4、推块三5、推块四6。
具体实施方式
参见图1~6,本发明涉及的一种PIN针装配设备,包含有提供PIN针的供料机构1,前置的振动送料盘(振动送料盘为常规机构,说明书附图中并未示意其整体,仅仅示意了其出料段)作为供料机构1将PIN针输入,此时PIN针贴着定位导向块2导入,呈倒置的“L”形结构的定位导向块2固定于下支撑架201上,PIN针到位后中部搁置在待装配产品401的中间凸起上,随后推块一3下压,推块一3的底部为一斜面,从而当推块一3压住PIN针的左端将PIN针压斜,即使得PIN针的右端翘起;此时,推块二4在气动的推动下向左推动接触PIN针,从而将向下倾斜的PIN针的左端在推块一3底部斜面的引导下、使得PIN针的左端插入待装配产品401上的A点插孔内。
随后,推块三5在气缸的作用下向前推进,从PIN针侧面接触PIN针后继续向前将PIN针弯折,并将弯折部分推送至PIN针安装槽301的上方,此时推块四6在气动作用下向下将PIN针压入PIN针安装槽301内,从而完整对PIN针的装配。
另外:需要注意的是,上述具体实施方式仅为本专利的一个优化方案,本领域的技术人员根据上述构思所做的任何改动或改进,均在本专利的保护范围之内。
Claims (5)
1.一种PIN针装配方法,其特征在于:所述方法步骤为:
步骤一、PIN针贴着定位导向块导入,PIN针到位后中部搁置在待装配产品的中间凸起上;
步骤二、随后推块一下压,推块一的底部为一斜面,从而当推块一压住PIN针的左端将PIN针压斜,即使得PIN针的右端翘起;
步骤三、正对PIN针右端的推块二在动力机构的推动下沿PIN针长度方向推压PIN针,使得PIN针的左端插入待装配产品的插孔内;
步骤四、推块三在动力机构的推动下沿垂直于PIN针长度方向接触PIN针右端并继续前进、使得PIN针弯折;
步骤五、推块四在动力机构的推动下向下将PIN针压入PIN针安装槽内。
2.根据权利要求1所述一种PIN针装配方法,其特征在于:所述动力机构为气缸、油缸或直线电动机构。
3.根据权利要求1或2所述一种PIN针装配方法,其特征在于:所述步骤二中的推块一的底面为一斜面。
4.一种PIN针装配设备,其特征在于:包含分别由四组动力机构驱动的推块一(3)、推块二(4)、推块三(5)和推块四(6),推块一(3)和推块四(6)位于待装配产品(401)的上方,且推块一(3)和推块四(6)由动力机构驱动做升降运动,推块二(4)位于待装配产品(401)的左侧上方,且推块二(4)由动力机构驱动做左右移动,推块三(5)位于待装配产品(401)的前端上方,且推块三(5)由动力机构驱动做前后移动;
PIN针贴着定位导向块(2)导入,PIN针到位后中部搁置在待装配产品(401)的中间凸起上;
随后推块一(3)下压,推块一(3)的底部为一斜面,从而当推块一(3)压住PIN针的左端将PIN针压斜,使得PIN针的右端翘起;
推块二(4)在气动的推动下向左推动接触PIN针,从而将向下倾斜的PIN针的左端在推块一(3)底部斜面的引导下、使得PIN针的左端插入待装配产品(401)上的A点插孔内;
推块三(5)在气缸的作用下向前推进,从PIN针侧面接触PIN针后继续向前将PIN针弯折,并将弯折部分推送至PIN针安装槽(301)的上方;
推块四(6)在气动作用下向下将PIN针压入PIN针安装槽(301)内,从而完整对PIN针的装配;
且推块二(4)的前行路径位于定位导向块(2)和推块一(3)的下方,推块三(5)的前行路径位于定位导向块(2)和推块四(6)的下方。
5.根据权利要求4所述一种PIN针装配设备,其特征在于:推块二(4)安装于下支撑架(201)上,推块一(3)和推块四(6)安装于上支撑架(202)上,下支撑架(201)和上支撑架(202)均安装于支架(101)上,推块三(5)安装于支架(101)上。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210578887.7A CN115102002B (zh) | 2022-05-26 | 2022-05-26 | Pin针装配方法及设备 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210578887.7A CN115102002B (zh) | 2022-05-26 | 2022-05-26 | Pin针装配方法及设备 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115102002A CN115102002A (zh) | 2022-09-23 |
| CN115102002B true CN115102002B (zh) | 2025-08-22 |
Family
ID=83289461
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210578887.7A Active CN115102002B (zh) | 2022-05-26 | 2022-05-26 | Pin针装配方法及设备 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115102002B (zh) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109980479A (zh) * | 2019-05-08 | 2019-07-05 | 苏州优瑞信电子科技有限公司 | 插针机 |
| CN111463636A (zh) * | 2020-04-17 | 2020-07-28 | 广东造裕力讯智能科技有限公司 | 插头插针自动备料机 |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3019182B2 (ja) * | 1994-04-28 | 2000-03-13 | 矢崎総業株式会社 | 端子付き電線の移載装置 |
| JP3983485B2 (ja) * | 2001-03-01 | 2007-09-26 | 矢崎総業株式会社 | 端子段取装置と端子保持ブロック及び端子段取方法 |
| JP5506772B2 (ja) * | 2011-12-26 | 2014-05-28 | 三菱電機株式会社 | 角線端子の製造方法および製造装置並びに電動機の固定子、送風機用電動機、空気調和機 |
| CN103107474B (zh) * | 2013-01-15 | 2015-05-27 | 东莞市凯昶德电子科技股份有限公司 | 连接器端子自动化组装设备 |
| CN205195030U (zh) * | 2015-12-19 | 2016-04-27 | 乐清市嘉得电子有限公司 | 一种自动插针机 |
| CN205303929U (zh) * | 2016-01-08 | 2016-06-08 | 深圳市爱特姆科技有限公司 | 一种用于连接器插针折弯的自动组装机 |
| CN209805073U (zh) * | 2019-07-06 | 2019-12-17 | 东莞市丰强电子有限公司 | 一种改进型自动插Pin打扁装管一体机 |
| CN211218430U (zh) * | 2019-11-05 | 2020-08-11 | 宁波舸凯电子有限公司 | Pin针折弯装置 |
| CN113644519B (zh) * | 2021-07-28 | 2024-02-09 | 深圳市豪塑科技有限公司 | 一种连接器pin针插接装置 |
| CN114284052B (zh) * | 2021-12-28 | 2024-01-16 | 惠州一诺精密电子有限公司 | 一种变压器骨架自动化插针装置 |
-
2022
- 2022-05-26 CN CN202210578887.7A patent/CN115102002B/zh active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109980479A (zh) * | 2019-05-08 | 2019-07-05 | 苏州优瑞信电子科技有限公司 | 插针机 |
| CN111463636A (zh) * | 2020-04-17 | 2020-07-28 | 广东造裕力讯智能科技有限公司 | 插头插针自动备料机 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115102002A (zh) | 2022-09-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110087447B (zh) | 一种编带元器件自动裁切、成型及切脚装置及其加工工艺 | |
| CN103107474B (zh) | 连接器端子自动化组装设备 | |
| CN108704959B (zh) | 用以对fpc板进行折弯的半自动折弯设备 | |
| CN114221197A (zh) | 一种连接器端子自动化组装设备 | |
| CN116417869B (zh) | 一种带有定位组件的线束压接机 | |
| CN109461960B (zh) | 一种电池连接器组装设备 | |
| CN112017860A (zh) | 一种电磁铁线圈机的插件装置 | |
| CN221185432U (zh) | 一种散热器生产用自动插针设备 | |
| CN209830790U (zh) | 一种自动种芯机 | |
| CN119216463A (zh) | 一种导电触片复合成型装置 | |
| CN220217424U (zh) | 一种电机后盖装配装置 | |
| CN215658849U (zh) | 一种电路板压装装置 | |
| CN217701070U (zh) | 一种电机齿轮板铆接设备 | |
| CN216442700U (zh) | 一种提升效率的led灯加工设备 | |
| CN115102002A (zh) | Pin针装配工艺及设备 | |
| CN211759641U (zh) | 一种定子铜套的自动组装设备 | |
| CN212286554U (zh) | 一种适用于弯脚连接器绝缘塑胶体的90°翻转机构 | |
| CN115213317A (zh) | 插针装配设备及装配方法 | |
| CN216828387U (zh) | 一种电缆线束用端头折弯机构 | |
| CN217492579U (zh) | 一种用于机器人冲压件的打拉钉机构 | |
| CN117960853B (zh) | 一种折弯机 | |
| CN221406229U (zh) | 一种背光源自动点亮装置 | |
| CN219542228U (zh) | 一种半自动压螺母机 | |
| CN112017859A (zh) | 一种电磁铁线圈生产机的输送装置 | |
| CN220710819U (zh) | Tf卡座用端子的自动铆压机构及自动铆压设备 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |