CN112726444A - 一种封闭式声屏障地基优化结构及其处理工艺 - Google Patents
一种封闭式声屏障地基优化结构及其处理工艺 Download PDFInfo
- Publication number
- CN112726444A CN112726444A CN202011606731.2A CN202011606731A CN112726444A CN 112726444 A CN112726444 A CN 112726444A CN 202011606731 A CN202011606731 A CN 202011606731A CN 112726444 A CN112726444 A CN 112726444A
- Authority
- CN
- China
- Prior art keywords
- cable
- arch
- sound barrier
- foundation
- prestressed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F8/00—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
- E01F8/0005—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F8/00—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
- E01F8/0005—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
- E01F8/0023—Details, e.g. foundations
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
本申请涉及一种封闭式声屏障地基优化结构及其处理工艺,涉及声屏障的领域,封闭式声屏障地基优化结构包括两个基础、固设在基础上的侧墙以及连接在两侧墙之间的拱架,所述拱架下方设有预应力拉索,所述预应力拉索两端分别与拱架连接。处理工艺包括以下步骤:步骤1:基础施工;步骤2:侧墙施工;步骤3:在两侧墙之间安装拱架;步骤4:在拱架下弦位置连接预应力拉索,并进行张拉、锁定。通过在拱架上设置预应力拉索,预应力拉索平衡拱架对基础的推力,减少基础收到的推力,从而在满足拱架稳定性的情况下,可以缩小地基的大小,从而减少地基的占地面积,减小征地面积,降低施工成本。
Description
技术领域
本申请涉及声屏障的领域,尤其是涉及一种封闭式声屏障地基优化结构及其处理工艺。
背景技术
声屏障是为减轻行车噪声对附近居民的影响而设置在铁路和公路侧旁的墙式构造物。
目前,声屏障一般包括基础、设置在基础上的拱架以及设置在拱架上的单元板,所述单元板将拱架封闭形成封闭式声屏障。基础用于承受拱架产生的推力,从而保证拱架的稳定性。
针对上述中的相关技术,发明人认为存在有需要设置大体积的基础去承受拱架的推力,造成额外增加征地,增加施工成本的问题。
发明内容
为了改善基础占地面积大,施工成本高的技术问题,本申请提供一种封闭式声屏障地基优化结构及其处理工艺。
第一方面,本申请提供的一种封闭式声屏障地基优化结构,采用如下的技术方案:
一种封闭式声屏障地基优化结构,包括两个基础、固设在基础上的侧墙以及连接在两侧墙之间的拱架,所述拱架下方设有预应力拉索,所述预应力拉索两端分别与拱架连接。
通过采用上述技术方案,在拱架上设置预应力拉索,预应力拉索平衡拱架对基础的推力,减小拱架对地基的推力,从而在满足拱架稳定性的情况下,可以缩小地基的大小,从而减少地基的占地面积,减小征地面积,降低施工成本。
可选的,所述基础为重力式挡墙基础。
通过采用上述技术方案,重力式挡墙基础以自身重力的作用维持基础在拱架推力作用下的稳定,结构简单,承力能力强。
第二方面,本申请提供一种封闭式声屏障地基优化结构的处理工艺,采用如下的技术方案:
一种封闭式声屏障地基优化结构的处理工艺,包括以下步骤:
步骤1:基础施工;
步骤2:侧墙施工;
步骤3:在两侧墙之间安装拱架;
步骤4:在拱架下弦位置连接预应力拉索,并进行张拉、锁定。
通过采用上述技术方案,在拱架安装完成后,在拱架下方安装预应力拉索,通过预应力拉索平衡拱架对地基的推力,具有工艺简单,减小征地面积,降低施工成本的优点。
可选的,步骤4中,在声屏障一侧放置放索盘,另一侧放置卷扬机,将拉索吊至放索盘上,利用卷扬机将拉索从声屏障的一侧向另一侧牵引。
通过采用上述技术方案,由于预应力拉索直径大,重量重,利用卷扬机配合放索盘便于将预应力拉索展开并牵引至拱架下方,以便预应力拉索安装。
可选的,在拱架上于拱架与侧墙连接点的上方安装第一滑轮,卷扬机上的钢丝绳绕过第一滑轮与预应力拉索连接,将预应力拉索的索头牵引至拱架上的连接耳板处,使索头与连接耳板连接。
通过采用上述技术方案,利用卷扬机将预应力拉索的索头牵引至拱架的连接耳板处,省力,施工效率高,且方便控制索头与连接耳板连接。
可选的,在拱架靠近放索盘的一端于拱架与侧墙连接点的上方安装第二滑轮,卷扬机上的钢丝绳绕过第二滑轮与预应力拉索连接,将预应力拉索的索头牵引至拱架上的连接耳板处,使索头与连接耳板连接。
通过采用上述技术方案,配合卷扬机和第二滑轮,方便预应力拉索的安装。
可选的,分级对预应力拉索进行张拉。
通过采用上述技术方案,减小预应力的损失,避免一次性的张拉完成,出现预应力拉索松弛现象。
可选的,所述拱架设置多道,在张拉时,从位于中间的拱架到两侧依次张拉,并同时张拉两道对称设置的拱架。
通过采用上述技术方案,对称张拉,使拱架的受力均匀,保证拱架的稳定性。
可选的,张拉过程中对拱架顶的竖向位移和预应力拉索的锚点位置的水平位移进行实时监测。
通过采用上述技术方案,通过对变形较大的关键点进行监测,从而能够反应出结构的整体变形规律,便于根据监测数据,控制结构在张拉时的稳定性。
综上所述,本申请包括以下至少一种有益技术效果:
1.通过在拱架上设置预应力拉索,预应力拉索平衡拱架对基础的推力,减少基础收到的推力,从而在满足拱架稳定性的情况下,可以缩小地基的大小,从而减少地基的占地面积,减小征地面积,降低施工成本;
2.通过设置卷扬机、放索盘、第一滑轮和第二滑轮便于预应力拉索的安装;
3.通过对变形较大的关键点进行监测,从而能够反应出结构的整体变形规律,便于根据监测数据,控制结构在张拉时的稳定性。
附图说明
图1是本申请的结构示意图。
附图标记说明:1、基础;2、侧墙;3、拱架;4、预应力拉索。
具体实施方式
以下结合附图1对本申请作进一步详细说明。
本申请实施例公开一种封闭式声屏障地基优化结构及其处理工艺。
参照图1,封闭式声屏障地基优化结构包括两个对称设置的基础1、设置在基础1上的侧墙2以及连接在两侧墙2之间的拱架3,拱架3下方设有预应力拉索4,预应力拉索4的两端分别与拱架3连接,基础1、侧墙2、拱架3和预应力拉索4形成一道声屏障骨架结构,声屏障骨架结构间隔设置多道。
基础1为重力式挡墙基础1,钢筋混凝土结构,主要承受拱架3的侧向推力。
侧墙2为钢筋混凝土结构,在基础1浇筑完成并达到强度后,绑扎侧墙2钢筋,立模,浇筑混凝土形成侧墙2。
拱架3为弧形钢架或者钢桁架结构,其两端分别于侧墙2焊接固定。
预应力拉索4优选锌—5%铝—混合稀土合金镀层钢索,对于拉索用的钢丝应为低松弛钢丝,有良好的冷镦性能。
一种封闭式声屏障地基优化结构的处理工艺,包括以下步骤:
步骤1:开挖基坑,绑扎基础1钢筋,立模,浇筑混凝土形成基础1。
步骤2:在基础1强度达到强度后,绑扎侧墙2钢筋,立模,浇筑混凝土形成侧墙2。
步骤3:吊装拱架3,并将拱架3与侧墙2焊接固定。
步骤4:待所有拱架3安装完成后,进行预应力拉索4安装。在声屏障的一侧放置放索盘,另一侧安装卷扬机,并且拱架3下方的铁轨或者路面上铺设木板,将拉索吊至放索盘上。
在设置卷扬机一侧的侧墙2上安装滑轮,将卷扬机的钢丝绳与预应力拉索4的索头连接,利用卷扬机牵引预应力拉索4,使预应力拉索4在木板上放开。
然后在拱架3靠近卷扬机的一端于拱架3与侧墙2连接点的上方安装第一滑轮,卷扬机上的钢丝绳绕过第一滑轮与预应力拉索4的索头连接,将预应力拉索4的索头牵引至拱架3上的连接耳板处,配合倒链将预应力拉索4定位,使预应力拉索4的索头与连接耳板固定连接形成固定端。
在拱架3靠近放索盘的一端于拱架3与侧墙2连接点的上方安装第二滑轮,利用卷扬机上的钢丝绳绕过第二滑轮与预应力拉索4的另一端连接,将预应力拉索4的索头牵引至拱架3上的连接耳板处,使索头与连接耳板连接形成张拉端。其中预应力拉索4的张拉端和固定端的位置可以互换。
在预应力拉索4安装完成后,对预应力拉索4进行张拉,张拉时,将多道拉索依次进行编号,然后从位于中间的拱架3到两侧依次进行张拉,并同时张拉两道位置对称设置的预应力拉索4。
此外,张拉时,采用分级对预应力拉索4进行张拉,在所有拉索第一级张拉完成后,再循环上述步骤进行第二级、第三级张拉,第一级、第二级和第三级张拉优选为全部拉索索力的30%、70%、100%,当压力设备达到预应力拉索4设计拉力时,超张拉5%左右,然后停止加压,完成预应力拉索4张拉。
由于每根预应力拉索4的索力都关系到结构的成形状态和支座的安全,因此张拉时,应对所有拉索进行索力监测。在张拉过程中,对拱架3顶的竖向位移和预应力拉索4的锚点位置的水平位置进行实时监测,监测时用全站仪或者水准仪进行测量。通过对变形较大的关键点进行监测,从而能够反应出结构的整体变形规律,便于根据监测数据,控制结构在张拉时的稳定性。
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。
Claims (9)
1.一种封闭式声屏障地基优化结构,其特征在于:包括两个基础(1)、固设在基础(1)上的侧墙(2)以及连接在两侧墙(2)之间的拱架(3),所述拱架(3)下方设有预应力拉索(4),所述预应力拉索(4)两端分别与拱架(3)连接。
2.根据权利要求1所述的一种封闭式声屏障地基优化结构,其特征在于:所述基础(1)为重力式挡墙基础(1)。
3.一种实施权利要求1-2任一所述的一种封闭式声屏障地基优化结构的处理工艺,其特征在于,包括以下步骤:
步骤1:基础(1)施工;
步骤2:侧墙(2)施工;
步骤3:在两侧墙(2)之间安装拱架(3);
步骤4:在拱架(3)下弦位置连接预应力拉索(4),并进行张拉、锁定。
4.根据权利要求3所述的一种封闭式声屏障地基优化结构的处理工艺,其特征在于:步骤4中,在声屏障一侧放置放索盘,另一侧放置卷扬机,将拉索吊至放索盘上,利用卷扬机将拉索从声屏障的一侧向另一侧牵引。
5.根据权利要求4所述的一种封闭式声屏障地基优化结构的处理工艺,其特征在于:在拱架(3)上于拱架(3)与侧墙(2)连接点的上方安装第一滑轮,卷扬机上的钢丝绳绕过第一滑轮与预应力拉索(4)连接,将预应力拉索(4)的索头牵引至拱架(3)上的连接耳板处,使索头与连接耳板连接。
6.根据权利要求5所述的一种封闭式声屏障地基优化结构的处理工艺,其特征在于:在拱架(3)靠近放索盘的一端于拱架(3)与侧墙(2)连接点的上方安装第二滑轮,卷扬机上的钢丝绳绕过第二滑轮与预应力拉索(4)连接,将预应力拉索(4)的索头牵引至拱架(3)上的连接耳板处,使索头与连接耳板连接。
7.根据权利要求3所述的一种封闭式声屏障地基优化结构的处理工艺,其特征在于:分级对预应力拉索(4)进行张拉。
8.根据权利要求7所述的一种封闭式声屏障地基优化结构的处理工艺,其特征在于:所述拱架(3)设置多道,在张拉时,从位于中间的拱架(3)到两侧依次张拉,并同时张拉两道对称设置的拱架(3)。
9.根据权利要求3所述的一种封闭式声屏障地基优化结构的处理工艺,其特征在于:张拉过程中对拱架(3)顶的竖向位移和预应力拉索(4)的锚点位置的水平位移进行实时监测。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011606731.2A CN112726444A (zh) | 2020-12-30 | 2020-12-30 | 一种封闭式声屏障地基优化结构及其处理工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011606731.2A CN112726444A (zh) | 2020-12-30 | 2020-12-30 | 一种封闭式声屏障地基优化结构及其处理工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112726444A true CN112726444A (zh) | 2021-04-30 |
Family
ID=75610697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011606731.2A Pending CN112726444A (zh) | 2020-12-30 | 2020-12-30 | 一种封闭式声屏障地基优化结构及其处理工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112726444A (zh) |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATA252989A (de) * | 1988-11-04 | 1991-03-15 | Rotondo Penn Cast Inc | Wand, insbesondere schallschutzwand |
CN2670430Y (zh) * | 2003-12-05 | 2005-01-12 | 宜兴市强洁防噪声工程有限公司 | 全封闭道路声屏障 |
CN102182152A (zh) * | 2011-04-06 | 2011-09-14 | 上海船舶运输科学研究所 | 用于城市快速车道和隧道口的全影型声屏障 |
CN202416198U (zh) * | 2011-12-22 | 2012-09-05 | 中铁第四勘察设计院集团有限公司 | 高速铁路声屏障结构 |
CN102677604A (zh) * | 2011-03-15 | 2012-09-19 | 江苏远兴环保集团有限公司 | 全封闭声屏障板 |
KR101188485B1 (ko) * | 2011-09-30 | 2012-10-08 | 테크스타 코리아 주식회사 | 경량 방음터널 |
CN102828473A (zh) * | 2012-08-20 | 2012-12-19 | 中铁工程设计咨询集团有限公司 | 声屏障及安装方法 |
CN203334199U (zh) * | 2013-06-14 | 2013-12-11 | 上海申华声学装备有限公司 | 一种全封闭式声屏障 |
KR101406873B1 (ko) * | 2014-04-04 | 2014-06-16 | 주용산업주식회사 | 경량 골조를 이용한 터널형 방음벽 |
CN104712083A (zh) * | 2015-03-24 | 2015-06-17 | 中国建筑第八工程局有限公司 | 大跨度拉索玻璃幕墙的拉索张拉方法 |
CN104894990A (zh) * | 2015-06-05 | 2015-09-09 | 山西尚风科技股份有限公司 | 一种全封闭隔音屏障 |
CN206090348U (zh) * | 2016-08-30 | 2017-04-12 | 安平县亚荣星环保科技有限公司 | 一种封闭式声屏障 |
KR101896278B1 (ko) * | 2017-10-24 | 2018-09-07 | 신영기술개발(주) | 경량형 트러스 방음터널 |
KR101954737B1 (ko) * | 2018-04-16 | 2019-03-07 | 신영기술개발(주) | 케이블 보강형 방음터널 |
CN109488038A (zh) * | 2018-11-27 | 2019-03-19 | 北京市建筑工程研究院有限责任公司 | 跨越既有建筑的张弦梁柔性拉索的安装结构及安装方法 |
CN111764517A (zh) * | 2020-07-14 | 2020-10-13 | 陕西建工机械施工集团有限公司 | 一种大跨度张弦桁架导向牵引高空装索方法 |
KR102173687B1 (ko) * | 2019-05-17 | 2020-11-03 | 주식회사 택한 | 교량용 방음 터널 |
-
2020
- 2020-12-30 CN CN202011606731.2A patent/CN112726444A/zh active Pending
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATA252989A (de) * | 1988-11-04 | 1991-03-15 | Rotondo Penn Cast Inc | Wand, insbesondere schallschutzwand |
CN2670430Y (zh) * | 2003-12-05 | 2005-01-12 | 宜兴市强洁防噪声工程有限公司 | 全封闭道路声屏障 |
CN102677604A (zh) * | 2011-03-15 | 2012-09-19 | 江苏远兴环保集团有限公司 | 全封闭声屏障板 |
CN102182152A (zh) * | 2011-04-06 | 2011-09-14 | 上海船舶运输科学研究所 | 用于城市快速车道和隧道口的全影型声屏障 |
KR101188485B1 (ko) * | 2011-09-30 | 2012-10-08 | 테크스타 코리아 주식회사 | 경량 방음터널 |
CN202416198U (zh) * | 2011-12-22 | 2012-09-05 | 中铁第四勘察设计院集团有限公司 | 高速铁路声屏障结构 |
CN102828473A (zh) * | 2012-08-20 | 2012-12-19 | 中铁工程设计咨询集团有限公司 | 声屏障及安装方法 |
CN203334199U (zh) * | 2013-06-14 | 2013-12-11 | 上海申华声学装备有限公司 | 一种全封闭式声屏障 |
KR101406873B1 (ko) * | 2014-04-04 | 2014-06-16 | 주용산업주식회사 | 경량 골조를 이용한 터널형 방음벽 |
CN104712083A (zh) * | 2015-03-24 | 2015-06-17 | 中国建筑第八工程局有限公司 | 大跨度拉索玻璃幕墙的拉索张拉方法 |
CN104894990A (zh) * | 2015-06-05 | 2015-09-09 | 山西尚风科技股份有限公司 | 一种全封闭隔音屏障 |
CN206090348U (zh) * | 2016-08-30 | 2017-04-12 | 安平县亚荣星环保科技有限公司 | 一种封闭式声屏障 |
KR101896278B1 (ko) * | 2017-10-24 | 2018-09-07 | 신영기술개발(주) | 경량형 트러스 방음터널 |
KR101954737B1 (ko) * | 2018-04-16 | 2019-03-07 | 신영기술개발(주) | 케이블 보강형 방음터널 |
CN109488038A (zh) * | 2018-11-27 | 2019-03-19 | 北京市建筑工程研究院有限责任公司 | 跨越既有建筑的张弦梁柔性拉索的安装结构及安装方法 |
KR102173687B1 (ko) * | 2019-05-17 | 2020-11-03 | 주식회사 택한 | 교량용 방음 터널 |
CN111764517A (zh) * | 2020-07-14 | 2020-10-13 | 陕西建工机械施工集团有限公司 | 一种大跨度张弦桁架导向牵引高空装索方法 |
Non-Patent Citations (1)
Title |
---|
党辉: "京沈客运专线全封闭声屏障设计与研究", 《铁路节能环保与安全卫生》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211815489U (zh) | 一种带有自锚悬索体系的超大跨径飞燕式钢管混凝土拱桥 | |
CN111119059B (zh) | 高墩现浇箱梁超高复合式支架体系及施工方法 | |
CN108342982B (zh) | 一种混合组合梁斜拉桥缆索吊机承重索梁端自锚结构 | |
CN106012872B (zh) | 连续刚构桥的无背索斜拉加固体系及施工方法 | |
CN201106155Y (zh) | 斜拉索辅助全悬臂架设钢桁梁装置 | |
CN110886187B (zh) | 缆索吊系统安装体系及其施工方法 | |
CN111807232A (zh) | 一种缆索吊机系统及起吊方法及方法 | |
CN110593114A (zh) | 基于大跨度箱梁多抱箍桁架支撑贝雷支架的箱梁施工方法 | |
CN110984001A (zh) | 一种轻型拆桥吊机系统及其施工方法 | |
JP3635004B2 (ja) | 橋梁の片持式架設工法 | |
KR100981982B1 (ko) | 프리캐스트 코핑용 인양 시스템 | |
CN109577206B (zh) | 空心高墩支模体系及施工方法 | |
CN216891994U (zh) | 用于斜拉桥主梁安装的三跨缆索吊机 | |
CN215925647U (zh) | 一种用于塔扣合一的拱肋扣索锚固梁 | |
CN112726444A (zh) | 一种封闭式声屏障地基优化结构及其处理工艺 | |
CN214459535U (zh) | 斜拉桥不对称悬臂梁的施工系统 | |
CN112681150B (zh) | 箱型拱桥预制吊装体系及施工方法 | |
CN110745707B (zh) | 用于拆除临近铁路侧混凝土现浇梁装配式支架的吊运装置 | |
CN211312214U (zh) | 缆索吊系统安装体系 | |
CN113308997A (zh) | 用于斜拉桥主梁安装的三跨缆索吊机及其施工方法 | |
CN112575948A (zh) | 一种张弦梁与悬挑桁架组合屋架及施工方法 | |
CN217102749U (zh) | 屋顶大型钢梁滑移系统 | |
CN217810527U (zh) | 波形钢腹板自承重异步挂篮吊装系统 | |
CN214531431U (zh) | 一种张弦梁与悬挑桁架组合屋架 | |
CN215800924U (zh) | 高空原位现浇桥梁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210430 |