CN112442991A - 一种在土层夹石块地质条件下基坑支护的方法 - Google Patents
一种在土层夹石块地质条件下基坑支护的方法 Download PDFInfo
- Publication number
- CN112442991A CN112442991A CN202011311018.5A CN202011311018A CN112442991A CN 112442991 A CN112442991 A CN 112442991A CN 202011311018 A CN202011311018 A CN 202011311018A CN 112442991 A CN112442991 A CN 112442991A
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- stone
- stone block
- supporting
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Earth Drilling (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
一种在土层夹石块地质条件下基坑支护的方法,包括如下步骤:S1,地质勘探,确定基坑开挖路径上石块的位置;S2,对基坑边界测量和定位;S3,钻孔机沿着基坑支护的边界对石块钻取多个钻孔;S4,在钻孔设置支护结构后,开挖表层土方、安装钢围檁和打入钢板桩。本发明用于解决现有对土层中夹石块地质条件基坑支护无法打穿石块,只能对石块进行爆破或破碎,超挖换填后打支护桩,再反开槽施工,造成工程投资急剧增加、工期延长和对周边的道路或房屋造成影响的问题。
Description
技术领域
本发明涉及一种在土层夹石块地质条件下基坑支护的方法。
背景技术
在新建基坑开挖施工过程中,不同类型的基坑支护结构被广泛应用,有工字钢桩支护、拉森钢板桩支护、水泥搅拌桩支护等形式。遇到土层夹有较多大石块的地质条件,工字钢、拉森桩还是水泥搅拌桩的桩头都无法打穿石块,这些支护结构均无法直接应用,只能对石块进行爆破或破碎,超挖换填后打支护桩,再反开槽施工,不仅造成工程投资急剧增加,工期延长,而且易造成安全事故,对周边的道路或房屋造成影响。
发明内容
本发明要解决的技术问题是提供一种在土层夹石块地质条件下基坑支护的方法,用于解决现有对土层中夹石块地质条件基坑支护无法打穿石块,只能对石块进行爆破或破碎,超挖换填后打支护桩,再反开槽施工,造成工程投资急剧增加、工期延长和对周边的道路或房屋造成影响的问题。
为了解决上述问题,本发明要解决的技术方案为:
一种在土层夹石块地质条件下基坑支护的方法,包括如下步骤:
S1,地质勘探,确定基坑开挖路径上石块的位置;
S2,对基坑边界测量和定位;
S3,钻孔机沿着基坑支护的边界对石块钻取多个钻孔;
S4,在钻孔设置支护结构后,开挖表层土方、安装钢围檁和打入钢板桩。
在进行上述S3步骤时,钻孔要求穿过石块。
所述支护结构包括护管,护管穿过钻孔,在护管内设有工字钢,工字钢和护管之间填充有水泥浆。
在进行上述S3步骤时,钻孔机先在石块上方土层钻取大孔后,将护管插入到大孔内,而后在石块上钻取小孔,接着将液压劈裂机插入到小孔内,利用液压劈裂机将石块劈出一条裂缝。
所述支护结构包括多块插板和接板,接板两侧设有与插板相对应的卡槽,在液压劈裂机将石块劈出一条裂缝后,打桩机先将各块插板插入到相邻两个护管之间裂缝中,而后拆除液压劈裂机和护管,将接板插入到插板之间缝隙。
本发明的有益效果是:
1、工程造价低,施工工期短。采用此种基坑支护的方法,工程造价比超挖换填反开槽的工艺,降低至少40%以上,而且可同时多个工作面开工,节省工期,同时对环境不会造成污染。
2、占地面积小、对周边地形适应性强,安全性高。基本不受周边地形和建筑物限制,基坑支护完成后再开挖安全性高,不会影响周边道路及建筑物。
3、支护结构可拔出后可实现循环使用的工艺,提高资源利用率,尽量减少采用一次性材料消耗。
4、支护结构的间距可根据基坑深度进行结构计算调节,适应性强。
附图说明
下面结合附图对本发明做进一步的说明:
图1为实施例1的俯视结构示意图,
图2为实施例1的主视结构示意图,
图3为实施例2的俯视结构示意图,
图4为实施例2的主视局部剖面结构示意图,
图5为实施例2的局部剖面结构示意图,
图6为实施例2的局部俯视结构示意图。
图中:钢板桩1、护管2、工字钢3、钢围檁4、石块5、接板6、插板7、液压劈裂机8。
具体实施方式
一种在土层夹石块地质条件下基坑支护的方法,包括如下步骤:
S1,地质勘探,确定基坑开挖路径上石块5的位置;
S2,对基坑边界测量和放线定位;
S3,钻孔机沿着基坑支护的边界对石块5钻取多个钻孔;
S4,在钻孔设置支护结构后,开挖表层土方、安装钢围檁4和打入钢板桩1。
下面的两种支护结构做出进一步说明:
实施例1:
如图3和4所示,石块5厚度在1m以下时,则可以使用PE护管2和工字钢3组成的支护结构,实施时,如图1和2所示,钻孔机将石块5钻穿,而后在护管2内壁涂抹润滑油,将护管2插入到钻孔内,在钻孔内下放工字钢3,并在工字钢3和护管2之间填充有水泥浆,在水泥浆固化后,开挖土层表层50cm左右的土方或石方,安装钢围檁4和打入钢板桩1,基坑开挖完成后,在通过打桩机将PE护管2和工字钢3拔出重复使用。
实施例2:
在石块5厚度1m以上,钻机钻穿石块5比较困难时,就可以使用由多块插板7、接板6和钢护管2组成的支护结构,实施时,如图5和6所示,钻孔机先在石块5上方土层钻取大孔后,将钢护管2插入到大孔内,而后在石块5上钻取小孔,接着将液压劈裂机8插入到小孔内,利用多个液压劈裂机8将石块5劈出一条宽度为2~3cm裂缝后,打桩机先将各块插板7插入到相邻两个护管2之间裂缝中,而后拆除液压劈裂机8和护管2,将接板6插入到插板7之间缝隙,要求插板7两侧位于接板6卡槽内,石块5和土层将插板7进行夹紧固定,接着打桩机将打入钢板桩1和安装钢围檁4,完成对基坑四周支护的安装。
Claims (5)
1.一种在土层夹石块地质条件下基坑支护的方法,其特征在于,包括如下步骤:
S1,地质勘探,确定基坑开挖路径上石块(5)的位置;
S2,对基坑边界测量和定位;
S3,钻孔机沿着基坑支护的边界对石块(5)钻取多个钻孔;
S4,在钻孔设置支护结构后,开挖表层土方、安装钢围檁(4)和打入钢板桩(1)。
2.根据权利要求1所述的一种在土层夹石块地质条件下基坑支护的方法,其特征在于,在进行上述S3步骤时,钻孔要求穿过石块(5)。
3.根据权利要求2所述的一种在土层夹石块地质条件下基坑支护的方法,其特征在于,所述支护结构包括护管(2),护管(2)穿过钻孔,在护管(2)内设有工字钢(3),工字钢(3)和护管(2)之间填充有水泥浆。
4.根据权利要求1所述的一种在土层夹石块地质条件下基坑支护的方法,其特征在于,在进行上述S3步骤时,钻孔机先在石块(5)上方土层钻取大孔后,将护管(2)插入到大孔内,而后在石块(5)上钻取小孔,接着将液压劈裂机(8)插入到小孔内,利用液压劈裂机(8)将石块(5)劈出一条裂缝。
5.根据权利要求4所述的一种在土层夹石块地质条件下基坑支护的方法,其特征在于,所述支护结构包括多块插板(7)和接板(6),接板(6)或插板(7)两侧设有卡槽,在液压劈裂机(8)将石块(5)劈出一条裂缝后,打桩机先将各块插板(7)插入到相邻两个护管(2)之间裂缝中,而后拆除液压劈裂机(8)和护管(2),将接板(6)插入到插板(7)之间缝隙。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011311018.5A CN112442991B (zh) | 2020-11-20 | 2020-11-20 | 一种在土层夹石块地质条件下基坑支护的方法 |
DE112021000151.5T DE112021000151B4 (de) | 2020-11-20 | 2021-08-20 | Verfahren zur Unterstützung der Baugrube unter der geologischen Bedingung der mit Steinblöcken gemischten Bodenschicht |
GB2207292.0A GB2605291B (en) | 2020-11-20 | 2021-08-20 | Method for retaining and protection of foundation excavations under geological condition of soil layer containing stones |
PCT/CN2021/113859 WO2022017541A1 (zh) | 2020-11-20 | 2021-08-20 | 一种在土层夹石块地质条件下基坑支护的方法 |
JP2022528579A JP7381747B2 (ja) | 2020-11-20 | 2021-08-20 | 土層に石が混在した地質条件での基礎ピット支保方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011311018.5A CN112442991B (zh) | 2020-11-20 | 2020-11-20 | 一种在土层夹石块地质条件下基坑支护的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112442991A true CN112442991A (zh) | 2021-03-05 |
CN112442991B CN112442991B (zh) | 2021-09-07 |
Family
ID=74737115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011311018.5A Active CN112442991B (zh) | 2020-11-20 | 2020-11-20 | 一种在土层夹石块地质条件下基坑支护的方法 |
Country Status (5)
Country | Link |
---|---|
JP (1) | JP7381747B2 (zh) |
CN (1) | CN112442991B (zh) |
DE (1) | DE112021000151B4 (zh) |
GB (1) | GB2605291B (zh) |
WO (1) | WO2022017541A1 (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022017541A1 (zh) * | 2020-11-20 | 2022-01-27 | 中国长江三峡集团有限公司 | 一种在土层夹石块地质条件下基坑支护的方法 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114837088A (zh) * | 2022-04-27 | 2022-08-02 | 中国建筑第七工程局有限公司 | 一种公路上承台的施工方法 |
CN115369888A (zh) * | 2022-08-31 | 2022-11-22 | 中交一公局集团有限公司 | 一种深水裸岩基坑成型方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101985836A (zh) * | 2010-09-10 | 2011-03-16 | 广东省基础工程公司 | 一种桩、墙式深基坑支护结构遇大块孤石的处理方法 |
JP2013174086A (ja) * | 2012-02-24 | 2013-09-05 | Ohbayashi Corp | ソイルセメント壁の構築方法及びソイルセメント壁 |
CN109989405A (zh) * | 2017-12-30 | 2019-07-09 | 广州协安建设工程有限公司 | 孤石场地条件下基坑支护施工方法 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52155817A (en) * | 1976-06-21 | 1977-12-24 | Aichi Kinzoku Kougiyou Kk | Execution method *equpment for driving sheet piles and crossbeam connecting tools for pit excavation for steel tower |
DD150400A3 (de) | 1979-03-27 | 1981-09-02 | Peter Stoll | Verfahren zur herstellung eines profilstahlrammpfahles |
DE3442559A1 (de) | 1984-11-22 | 1986-05-28 | Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen | Verfahren zur herstellung einer flexiblen untergrundabdichtung |
JPS62112820A (ja) * | 1985-11-12 | 1987-05-23 | Kajima Corp | 土留支保工の架設先行工法 |
JP3244324B2 (ja) * | 1993-01-27 | 2002-01-07 | 東洋テクノ株式会社 | 山留め工法 |
JPH08253930A (ja) * | 1995-03-17 | 1996-10-01 | Fujita Corp | 逆打工法における中間杭の補強方法 |
JP3178506B2 (ja) * | 1995-10-09 | 2001-06-18 | 日特建設株式会社 | 土留工法 |
JP2916596B2 (ja) * | 1995-12-12 | 1999-07-05 | 鹿島建設株式会社 | ニューマチックケーソン工法における岩盤掘削方法 |
JP4021056B2 (ja) | 1998-06-24 | 2007-12-12 | ナブコシステム株式会社 | 駐車場設置用地下ピット等の地下構造物工事工法 |
JP4905296B2 (ja) | 2007-08-29 | 2012-03-28 | 株式会社大林組 | 山留め壁の構築方法及び山留め壁 |
JP6194206B2 (ja) | 2013-08-19 | 2017-09-06 | 鹿島建設株式会社 | 杭頭処理方法および揚重治具 |
CN110424434B (zh) * | 2019-07-26 | 2021-09-07 | 中冶集团武汉勘察研究院有限公司 | 用于填海深厚块石区的搅拌桩止水帷幕及施工方法 |
CN112442991B (zh) * | 2020-11-20 | 2021-09-07 | 中国长江三峡集团有限公司 | 一种在土层夹石块地质条件下基坑支护的方法 |
-
2020
- 2020-11-20 CN CN202011311018.5A patent/CN112442991B/zh active Active
-
2021
- 2021-08-20 DE DE112021000151.5T patent/DE112021000151B4/de active Active
- 2021-08-20 JP JP2022528579A patent/JP7381747B2/ja active Active
- 2021-08-20 WO PCT/CN2021/113859 patent/WO2022017541A1/zh active Application Filing
- 2021-08-20 GB GB2207292.0A patent/GB2605291B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101985836A (zh) * | 2010-09-10 | 2011-03-16 | 广东省基础工程公司 | 一种桩、墙式深基坑支护结构遇大块孤石的处理方法 |
JP2013174086A (ja) * | 2012-02-24 | 2013-09-05 | Ohbayashi Corp | ソイルセメント壁の構築方法及びソイルセメント壁 |
CN109989405A (zh) * | 2017-12-30 | 2019-07-09 | 广州协安建设工程有限公司 | 孤石场地条件下基坑支护施工方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022017541A1 (zh) * | 2020-11-20 | 2022-01-27 | 中国长江三峡集团有限公司 | 一种在土层夹石块地质条件下基坑支护的方法 |
GB2605291A (en) * | 2020-11-20 | 2022-09-28 | China Three Gorges Corp | Method for retaining and protection of foundation excavations under geological condition of soil layer containing stones |
GB2605291B (en) * | 2020-11-20 | 2023-03-29 | China Three Gorges Corp | Method for retaining and protection of foundation excavations under geological condition of soil layer containing stones |
Also Published As
Publication number | Publication date |
---|---|
WO2022017541A1 (zh) | 2022-01-27 |
CN112442991B (zh) | 2021-09-07 |
JP7381747B2 (ja) | 2023-11-15 |
DE112021000151T5 (de) | 2022-08-18 |
GB202207292D0 (en) | 2022-06-29 |
JP2023501743A (ja) | 2023-01-18 |
DE112021000151B4 (de) | 2024-06-13 |
GB2605291A (en) | 2022-09-28 |
GB2605291B (en) | 2023-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112442991B (zh) | 一种在土层夹石块地质条件下基坑支护的方法 | |
EP0810327B1 (en) | Method and device for laying underground continuous walls | |
CN113669073B (zh) | 一种控制临近建筑变形的富水砂性地层先隧后站施工方法 | |
CN111608192B (zh) | 在大直径漂石和砂岩地层中安装钢板桩的方法及装置 | |
CN110984132B (zh) | 复杂地质条件下地下连续墙成槽的施工方法 | |
CN110318388B (zh) | 地下连续墙开挖成槽方法 | |
KR100375020B1 (ko) | 흙막이 설치용 원통기둥 및 그것을 이용한 흙막이 설치공법 | |
KR101381325B1 (ko) | 다단식 소구경 강관을 이용한 비개착식 터널공법 | |
CN106087996A (zh) | 基于自我调平反压装置的人工挖孔桩施工方法 | |
CN114215066B (zh) | 一种明挖基坑侧壁防坍塌开挖施工方法 | |
CN115655362A (zh) | 一种浅埋大断面暗挖隧道工法优化的施工综合监测方法 | |
JP5524642B2 (ja) | 開削工法 | |
CN113529830B (zh) | 浅埋隧道邻近建筑隔离-托换组合加固构造及其施工工艺 | |
CN115075249A (zh) | 一种桩基清除装置及桩基清除工艺 | |
JP2008274746A (ja) | 地下構造物の解体撤去工法 | |
CN211623308U (zh) | 一种用于复杂地质快速成孔的桩基组合设备 | |
CN102505724B (zh) | 复杂地层引孔器及引孔方法 | |
KR101835389B1 (ko) | 지하 콘크리트구조물 철거방법 | |
CN111021948A (zh) | 一种用于复杂地质快速成孔的桩基组合设备 | |
CN220377262U (zh) | 一种桥梁桩基水下护筒结构 | |
CN112253155B (zh) | 一种基于cd功法的平衡顶管施工方法 | |
CN113389552B (zh) | 针对硬塑岩层小断面超深竖井的死角区域施工方法 | |
CN115198797B (zh) | 一种三面围合管幕法与明挖结合的地下连通道施工方法 | |
TWI258530B (en) | Tunnel-face excavation construction method using water jet device | |
TW201621121A (zh) | 沉箱結構及其應用工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |