GB2605291B - Method for retaining and protection of foundation excavations under geological condition of soil layer containing stones - Google Patents
Method for retaining and protection of foundation excavations under geological condition of soil layer containing stones Download PDFInfo
- Publication number
- GB2605291B GB2605291B GB2207292.0A GB202207292A GB2605291B GB 2605291 B GB2605291 B GB 2605291B GB 202207292 A GB202207292 A GB 202207292A GB 2605291 B GB2605291 B GB 2605291B
- Authority
- GB
- United Kingdom
- Prior art keywords
- retaining
- protection
- layer containing
- soil layer
- geological condition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Earth Drilling (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011311018.5A CN112442991B (en) | 2020-11-20 | 2020-11-20 | Method for supporting foundation pit under condition of stone block included in soil layer |
PCT/CN2021/113859 WO2022017541A1 (en) | 2020-11-20 | 2021-08-20 | Method for retaining and protection of foundation excavations under geological condition of soil layer containing stones |
Publications (3)
Publication Number | Publication Date |
---|---|
GB202207292D0 GB202207292D0 (en) | 2022-06-29 |
GB2605291A GB2605291A (en) | 2022-09-28 |
GB2605291B true GB2605291B (en) | 2023-03-29 |
Family
ID=74737115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB2207292.0A Active GB2605291B (en) | 2020-11-20 | 2021-08-20 | Method for retaining and protection of foundation excavations under geological condition of soil layer containing stones |
Country Status (5)
Country | Link |
---|---|
JP (1) | JP7381747B2 (en) |
CN (1) | CN112442991B (en) |
DE (1) | DE112021000151B4 (en) |
GB (1) | GB2605291B (en) |
WO (1) | WO2022017541A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112442991B (en) * | 2020-11-20 | 2021-09-07 | 中国长江三峡集团有限公司 | Method for supporting foundation pit under condition of stone block included in soil layer |
CN114837088A (en) * | 2022-04-27 | 2022-08-02 | 中国建筑第七工程局有限公司 | Construction method of bearing platform on highway |
CN115369888A (en) * | 2022-08-31 | 2022-11-22 | 中交一公局集团有限公司 | Deep water bare rock foundation pit forming method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08253930A (en) * | 1995-03-17 | 1996-10-01 | Fujita Corp | Reinforcing method for middle pile in inverted construction method |
JPH09158197A (en) * | 1995-12-12 | 1997-06-17 | Kajima Corp | Rock mass excavation method in pneumatic caisson method |
CN101985836A (en) * | 2010-09-10 | 2011-03-16 | 广东省基础工程公司 | Processing method of pile-wall type deep base pit supporting structure in case of encountering large boulder stone |
CN109989405A (en) * | 2017-12-30 | 2019-07-09 | 广州协安建设工程有限公司 | Base pit stand construction under boulder site condition |
CN110424434A (en) * | 2019-07-26 | 2019-11-08 | 中冶集团武汉勘察研究院有限公司 | For filling out the stirring pile water stopping curtain and construction method in the deep area Kuai Shi in sea |
CN112442991A (en) * | 2020-11-20 | 2021-03-05 | 中国长江三峡集团有限公司 | Method for supporting foundation pit under condition of stone block included in soil layer |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52155817A (en) * | 1976-06-21 | 1977-12-24 | Aichi Kinzoku Kougiyou Kk | Execution method *equpment for driving sheet piles and crossbeam connecting tools for pit excavation for steel tower |
DD150400A3 (en) | 1979-03-27 | 1981-09-02 | Peter Stoll | METHOD FOR PRODUCING A PROFILE STEEL RAMMPFAFAES |
DE3442559A1 (en) | 1984-11-22 | 1986-05-28 | Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen | Method of producing a flexible subsoil seal |
JPS62112820A (en) * | 1985-11-12 | 1987-05-23 | Kajima Corp | Erection preceding work for sheathing and timbering work |
JP3244324B2 (en) * | 1993-01-27 | 2002-01-07 | 東洋テクノ株式会社 | Mountain retaining method |
JP3178506B2 (en) * | 1995-10-09 | 2001-06-18 | 日特建設株式会社 | Earth retaining method |
JP4021056B2 (en) | 1998-06-24 | 2007-12-12 | ナブコシステム株式会社 | Underground structure construction method such as underground pit for parking lot installation |
JP4905296B2 (en) | 2007-08-29 | 2012-03-28 | 株式会社大林組 | Method for constructing retaining wall and retaining wall |
JP2013174086A (en) * | 2012-02-24 | 2013-09-05 | Ohbayashi Corp | Method for constructing soil cement wall, and soil cement wall |
JP6194206B2 (en) | 2013-08-19 | 2017-09-06 | 鹿島建設株式会社 | Pile head processing method and lifting jig |
-
2020
- 2020-11-20 CN CN202011311018.5A patent/CN112442991B/en active Active
-
2021
- 2021-08-20 DE DE112021000151.5T patent/DE112021000151B4/en active Active
- 2021-08-20 JP JP2022528579A patent/JP7381747B2/en active Active
- 2021-08-20 WO PCT/CN2021/113859 patent/WO2022017541A1/en active Application Filing
- 2021-08-20 GB GB2207292.0A patent/GB2605291B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08253930A (en) * | 1995-03-17 | 1996-10-01 | Fujita Corp | Reinforcing method for middle pile in inverted construction method |
JPH09158197A (en) * | 1995-12-12 | 1997-06-17 | Kajima Corp | Rock mass excavation method in pneumatic caisson method |
CN101985836A (en) * | 2010-09-10 | 2011-03-16 | 广东省基础工程公司 | Processing method of pile-wall type deep base pit supporting structure in case of encountering large boulder stone |
CN109989405A (en) * | 2017-12-30 | 2019-07-09 | 广州协安建设工程有限公司 | Base pit stand construction under boulder site condition |
CN110424434A (en) * | 2019-07-26 | 2019-11-08 | 中冶集团武汉勘察研究院有限公司 | For filling out the stirring pile water stopping curtain and construction method in the deep area Kuai Shi in sea |
CN112442991A (en) * | 2020-11-20 | 2021-03-05 | 中国长江三峡集团有限公司 | Method for supporting foundation pit under condition of stone block included in soil layer |
Also Published As
Publication number | Publication date |
---|---|
WO2022017541A1 (en) | 2022-01-27 |
CN112442991B (en) | 2021-09-07 |
JP7381747B2 (en) | 2023-11-15 |
DE112021000151T5 (en) | 2022-08-18 |
GB202207292D0 (en) | 2022-06-29 |
CN112442991A (en) | 2021-03-05 |
JP2023501743A (en) | 2023-01-18 |
DE112021000151B4 (en) | 2024-06-13 |
GB2605291A (en) | 2022-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2605291B (en) | Method for retaining and protection of foundation excavations under geological condition of soil layer containing stones | |
CN110221357B (en) | Large-span shallow-buried limestone goaf comprehensive exploration method | |
Peng et al. | Characteristics and mechanism of Sanyuan ground fissures in the Weihe Basin, China | |
Zeng et al. | Responses of deep soil layers to combined recharge in a leaky aquifer | |
Misra et al. | Granite-gneiss basement below Deccan Traps in the Koyna region, western India: Outcome from scientific drilling | |
CN106759390B (en) | A kind of rubble-non-uniform pile composite construction and its construction method with draining and AsA -GSH cycle | |
CN106121659B (en) | The narrow-bore tunnel excavation method of major urban arterial highway upper-soft lower-hard ground is worn under one kind | |
Wang et al. | The origin and impact of the Shizhuang ground fissure, Yingxian area, Datong Basin, China | |
CN104141311A (en) | Mechanical holing method for protecting wall and structure formed with method | |
CN110018290A (en) | One kind being based on two-dimensional analog testing stand overlying strata crack evolution Fractal Methods | |
Seol et al. | Ground Collapse in EPB shield TBM site: A case study of railway tunnels in the deltaic region near Nak-Dong River in Korea | |
Li et al. | Analysis and construction techniques for a water seal for underground mines subjected to water inrush | |
ZA202209594B (en) | Method for reinforcement construction of foundation pit in silty soil layer | |
ZA202300014B (en) | Grouting method for preventing stratum soil loss or ground surface settlement | |
Thapa | Occurrence of landslides in Nepal and their mitigation options | |
Durgunoglu et al. | Soil improvement with jet-grout columns: A case study from the 1999 Kocaeli earthquake | |
CN105297700B (en) | A kind of mud, drift sand ground processing method | |
Tham et al. | Tunnelling under Woodleigh Workers’ Quarters on Contract 705 | |
Manimaran et al. | Characterization and disaster management of landslides in the Nilgiris mountainous terrain of Tamil Nadu, India | |
Iwasaki et al. | Preservation of the main tower of Bayon temple, Angkor, Cambodia | |
Wang et al. | Activity Characteristics and Safety distance of Gaoliying Ground Fissure in Beijing | |
Tambatamba et al. | Control Methods and Influence Factors of Silt Liquefaction: Case of the Wangqingtuo Reservoir in the South-North Water Diversion project (Tianjin, China) | |
Farid et al. | Ground shear strain and rate of erosion in the coastal area of north Bengkulu, Indonesia | |
MD3490B1 (en) | Process for dam erection against landslides | |
Bastin et al. | Characterisation of modern and paleo-liquefaction features in eastern Christchurch, NZ, following the 2010–2011 Canterbury earthquake sequence |