CN111025898A - 一种用于流程工业大规模过程控制的降维辨识方法 - Google Patents
一种用于流程工业大规模过程控制的降维辨识方法 Download PDFInfo
- Publication number
- CN111025898A CN111025898A CN201911079525.8A CN201911079525A CN111025898A CN 111025898 A CN111025898 A CN 111025898A CN 201911079525 A CN201911079525 A CN 201911079525A CN 111025898 A CN111025898 A CN 111025898A
- Authority
- CN
- China
- Prior art keywords
- dimension reduction
- identification method
- steps
- reduction identification
- following
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/042—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Feedback Control In General (AREA)
Abstract
本发明提供一种用于流程工业大规模过程控制的降维辨识方法,其计算过程通无需人工参与,可以在确保计算精度的基础上,以很低的计算量实现高阶系统的参数辨识。本发明的技术方案中,进行系统参数辨识的过程中,将待辨识的2n维的参数利用Arnoldi方法构建Krylov子空间,实现了由2n维降低到k维,降低了系统的计算量;随后通过Givens变换方法求解参数寻优步长,确保了本发明的计算方法是收敛的;通过预先设置的阈值以及迭代的方法,提高系统参数的辨识精度。
Description
技术领域
本发明涉及参数辨识技术领域,具体为一种用于流程工业大规模过程控制的降维辨识方法。
背景技术
随着物联网技术的高速发展,流程工业控制系统之间相互联系、相互通信,控制系统规模越来越大, 需要用高阶的系统来描述其动态过程。现有技术中,使用传统的辨识算法如梯度迭代方法(Gradient Iterative,GI)和最小二乘方法(Least Squares,LS)针对大规模系统进行参数辨识。但是传统的辨识 算法存在如下问题:
(1)梯度算法在计算每次步长时,需要计算高阶矩阵的特征值从而来确定步长的区间,而求解特征 值时,高次方程求根属于数学难题,导致目前对步长的选择都是依赖于技术人员的经验,无法确保计算结 果的准确性;
(2)最小二乘算法应用在大规模系统的在参数辨识时,需要计算高阶矩阵的逆,导致计算量很大, 影响辨识效率。
发明内容
为了解决现有技术中使用传统辨识算法存在过大的计算量导致辨识失败或者辨识效率过低的问题,本 发明提供一种用于流程工业大规模过程控制的降维辨识方法,其计算过程通无需人工参与,可以在确保计 算精度的基础上,以很低的计算量实现高阶系统的参数辨识。
本发明的技术方案是这样的:一种用于流程工业大规模过程控制的降维辨识方法,其包括以下步骤:
S1:根据工业过程系统的输入输出关系,构建系统的时间序列模型:
A(z)y(t)=B(z)u(t)+v(t)
其中:y(t)是系统的输出,u(t)是系统的输入,v(t)是系统的噪声,A(z)、B(z)分别是模型多项式, z是后移算子;
S2:根据系统模型做如下定义:
Y(L)=[y(1),y(2),L,y(L)]T∈RL
V(L)=[v(1),v(2),L,v(L)]T∈RL;
可得到系统的方程为:
Y(L)=Φ(L)θ+V(L);
其特征在于,其还包括以下步骤:
S3:初始化;
给系统变量赋初始值:
S4:通过现有的数据通信与采集技术获取系统控制参数,共获取L组
u(1),L,u(L),y(1),L,y(L);
Vm(k)=[vm(1),L,vm(k)]
其中:k为正整数,满足1≤k<2n;
预先设置阈值δ,δ为正常数;
否则,m+1后赋值给m;
S11:重复步骤S6~S11。
其进一步特征在于:
式中,i=2,L,k,j=1,L,i-1;
N=ΦT(L)Φ(L);
式中,ηm∈R1×k是一个k阶行向量;
式中Pm的计算方法如下:
由公式NVm(k)=Vm(k+1)Pm计算得出Pm;
步骤S1中,u(t)、y(t)、v(t)都是服从均值为零、方差为σ的高斯分布;
步骤S1中,A(z)、B(z)可以表示如下:
A(z)=1+a1z-1+L+anz-n
B(z)=b1z-1+b2z-2+L+bnz-n;
步骤S1中,所述后移算子z表达式如下:
(z-1y(t)=y(t-1))。
本发明提供的一种用于流程工业大规模过程控制的降维辨识方法,进行系统参数辨识的过程中,将待 辨识的2n维的参数利用Arnoldi方法构建Krylov子空间,实现了由2n维降低到k维,降低了系统的计 算量;随后通过Givens变换方法求解参数寻优步长,确保了本发明的计算方法是收敛的;通过预先设置 的阈值δ以及迭代的方法,提高系统参数的辨识精度;通过本发明的参数辨识方法,其计算过程通无需人 工参与,可以在确保计算精度的基础上,以很低的计算量快速的实现高阶系统的参数辨识,进而确保整个 系统的调整过程都会以更短的时间实现。
附图说明
图1为双容水箱系统的仿真示意图;
图2为基于双容水箱系统,使用传统梯度迭代方法辨识参数的效果图;
图3为基于双容水箱系统,使用本发明技术方案进行参数辨识的效果图。
具体实施方式
如图1~图3所示,本发明一种用于流程工业大规模过程控制的降维辨识方法,其包括以下步骤:
S1:根据工业过程系统的输入输出关系,构建系统的时间序列模型:
A(z)y(t)=B(z)u(t)+v(t)
其中:y(t)是系统的输出,u(t)是系统的输入,v(t)是系统的噪声,u(t)、y(t)、v(t)都是服从均 值为零、方差为σ的高斯分布,A(z)、B(z)分别是模型多项式;
A(z)、B(z)可以表示如下:
A(z)=1+a1z-1+L+anz-n
B(z)=b1z-1+b2z-2+L+bnz-n;
后移算子z表达式如下:
(z-1y(t)=y(t-1))。
S2:根据系统模型做如下定义:
Y(L)=[y(1),y(2),L,y(L)]T∈RL
V(L)=[v(1),v(2),L,v(L)]T∈RL;
可得到系统的方程为:
Y(L)=Φ(L)θ+V(L);
S3:初始化;
给系统变量赋初始值:
S4:通过现有的数据通信与采集技术获取系统控制参数,共获取L组
u(1),L,u(L),y(1),L,y(L);
进行归一化操作:
式中,i=2,L,k,j=1,L,i-1;N为转换矩阵:N=ΦT(L)Φ(L);
生成Krylov子空间Vm(k):
Vm(k)=[vm(1),L,vm(k)]
其中:k为正整数,满足1≤k<2n;
由公式NVm(k)=Vm(k+1)Pm计算得出Pm;
式中,ηm∈R1×k是一个k阶行向量;
预先设置阈值δ,δ为正常数;
否则,m+1后赋值给m;
S11:重复步骤S6~S11。
即每次需要求解一个大型矩阵的逆(2n×2n);
的阶数为k×k远远小于2n×2n,因而系统计算量也是大大降低,确保了使用较少的系统资源, 在更短的时间内得到准确的参数辨识结果。由于k<2n,用降维算法得到的参数可能不是最优估计,因此 为得到最优估计,进一步引入迭代算法,即,前一次得到的参数作为初始参数,重新进行下一次计算 过程,通过迭代方法来提高参数的辨识精度,进而确保参数辨识结果的精确度。
双容水箱是工业生产过程中的常见控制对象,如图1所示,它是由两个具有自平衡能力的单容水箱: 上水箱1和下水箱2,上下串联而成,通常要求对其下水箱2的液位进行定值控制,双容水箱中的下水箱 2液位即为这个系统中的被控量(输出y(t)),通常选取上水箱1的进水流量为操纵量(输入u(t))。
利用本发明所提出的大规模控制系统降维方法对一个双容水箱进行了建模,水箱模型具有十个参数, 分别是由水箱的横截面积,阀的横截面积,液位以及水的密度等组合而成的,即:
θ=[a1,a2,a3,a4,a5,b1,b2,b3,b4,b5]T=[0.2,0.1,1,0.4,0.3,0.7,0.2,0.6,1,1]T
系统的输入u(t)是上水箱1的进水量大小,根据下水箱2的液位来调节上水箱1进水量的大小,当下 水箱2液位低于理想值时,调大上水箱1的进水量;当下水箱2的液位高于理想值时,调低上水箱1的进 水量。输出y(t)是下水箱2的液位测量值,在下水箱2的底部放置压力传感器3,由传感器3采集的真实 水箱的液位通过网络传输到控制中心,由于网络的不确定性,导致测量误差的产生,用v(t)来表示误差。 即测量值y(t)是由真实液位值加噪声v(t)构成。
实验过程中,当下水箱2的液位稳定在理想值附近时,可以认为双容水箱模型达到稳定状态,此时采 集L组数据:
输入数据u(1),L,u(L)、对应的利用传感器3采集并传输到控制中心的输出值为y(1),L,y(L),、对 应的测量误差v(1),L,v(L);
利用传统梯度迭代方法和本专利技术方案对双容水箱分别进行建模,实验结果验证了本发明的有效 性。如图2和图3所示其中横坐标m代表迭代的次数,纵坐标δ代表估计的参数和真实参数之间的误差, 从图中可以看出,本发明所提出的降维方法速度快,能快速辨识出双容水箱的参数,只需迭代12次,而 传统的方法需要迭代1000次。
针对最小二乘方法(LS)以及本发明提出的降维方法(I-RO),采用不同的采集数据量、不同的迭代次 数以及Krylov空间不同的维数,将算法中的乘除法个数作为统计量(Flops),比较LS和I-RO的Flops; 如:5×3+2÷3×5,其Flops为3;
具体的情况如下面表1中所示;通过表格中的数据可知,本发明所提出的降维方法(I-RO),和传统最小二 乘方法方法(LS)相比较,每种情况下,本发明方法的计算量都大大小于LS方法;也即是说,同样的前 提条件下,本发明的技术方案所需的计算量的更低,因而本发明的技术方案的辨识效率更高。
表1:不同条件下的计算量的比较
算法 | LS | I-RO |
Flops | (M<sup>2</sup>-1)M!+M+ML+ML<sup>2</sup> | [2ML+kM<sup>2</sup>+k<sup>2</sup>M+kM+(k<sup>2</sup>-1)k!]m |
m=10,L=20,M=10,k=5 | 359255410 | 40800 |
m=100,L=20,M=10,k=5 | 359255410 | 408000 |
m=10,L=60,M=50,k=10 | 7.6×10<sup>67</sup> | 3592877000 |
m=10,L=100,M=50,k=10 | 7.6×10<sup>67</sup> | 3592917000 |
m=10,L=100,M=50,k=20 | 7.6×10<sup>67</sup> | 9.7×10<sup>21</sup> |
表1中,m是迭代次数,L为采集的数据个数,M为未知参数的个数,k是Krylov子空间中列向量的个 数。
Claims (10)
1.一种用于流程工业大规模过程控制的降维辨识方法,其包括以下步骤:
S1:根据工业过程系统的输入输出关系,构建系统的时间序列模型:
A(z)y(t)=B(z)u(t)+v(t)
其中:y(t)是系统的输出,u(t)是系统的输入,v(t)是系统的噪声,A(z)、B(z)分别是模型多项式,z是后移算子;
S2:根据系统模型做如下定义:
Y(L)=[y(1),y(2),L,y(L)]T∈RL
V(L)=[v(1),v(2),L,v(L)]T∈RL;
可得到系统的方程为:
Y(L)=Φ(L)θ+V(L);
其特征在于,其还包括以下步骤:
S3:初始化;
给系统变量赋初始值:
设置中间变量m,且赋初始值值m=0;
S4:通过现有的数据通信与采集技术获取系统控制参数,共获取L组
u(1),L,u(L),y(1),L,y(L);
Vm(k)=[vm(1),L,vm(k)]
其中:k为正整数,满足1≤k<2n;
预先设置阈值δ,δ为正常数;
否则,m+1后赋值给m;
S11:重复步骤S6~S11。
7.根据权利要求1所述一种用于流程工业大规模过程控制的降维辨识方法,其特征在于:式中Pm的计算方法如下:
由公式NVm(k)=Vm(k+1)Pm计算得出Pm。
8.根据权利要求1所述一种用于流程工业大规模过程控制的降维辨识方法,其特征在于:步骤S1中,u(t)、y(t)、v(t)都是服从均值为零、方差为σ的高斯分布。
9.根据权利要求1所述一种用于流程工业大规模过程控制的降维辨识方法,其特征在于:步骤S1中,A(z)、B(z)可以表示如下:
A(z)=1+a1z-1+L+anz-n
B(z)=b1z-1+b2z-2+L+bnz-n。
10.根据权利要求1所述一种用于流程工业大规模过程控制的降维辨识方法,其特征在于:步骤S1中,所述后移算子z表达式如下:
(z-1y(t)=y(t-1))。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911079525.8A CN111025898B (zh) | 2019-11-07 | 2019-11-07 | 一种用于流程工业大规模过程控制的降维辨识方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911079525.8A CN111025898B (zh) | 2019-11-07 | 2019-11-07 | 一种用于流程工业大规模过程控制的降维辨识方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111025898A true CN111025898A (zh) | 2020-04-17 |
CN111025898B CN111025898B (zh) | 2021-08-24 |
Family
ID=70204982
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911079525.8A Active CN111025898B (zh) | 2019-11-07 | 2019-11-07 | 一种用于流程工业大规模过程控制的降维辨识方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111025898B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112989275A (zh) * | 2021-03-10 | 2021-06-18 | 江南大学 | 一种用于网络大规模控制系统的多方向方法 |
CN115034337A (zh) * | 2022-08-10 | 2022-09-09 | 江西科骏实业有限公司 | 一种轨道交通车辆中牵引电机状态辨识方法及装置、介质 |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1999010783A1 (en) * | 1997-08-22 | 1999-03-04 | Voyan Technology | A method for real-time nonlinear system state estimation and control |
EP1441268A1 (en) * | 2003-01-24 | 2004-07-28 | Pavilion Technologies, Inc. | Parameterizing a steady-state model using derivative constraints |
EP1447727A2 (en) * | 2003-02-14 | 2004-08-18 | United Technologies Corporation | System and method of accelerated active set search for quadratic programming in real-time model predictive control |
WO2007046816A2 (en) * | 2004-11-05 | 2007-04-26 | Honeywell International Inc. | Method and apparatus for system monitoring and maintenance |
US20110184707A1 (en) * | 2010-01-28 | 2011-07-28 | Yamatake Corporation | Pid adjustment support device and method |
US20110257788A1 (en) * | 2007-08-01 | 2011-10-20 | Wiemers Reginald A | Mobile station and methods for diagnosing and modeling site specific full-scale effluent treatment facility requirements |
CN103258093A (zh) * | 2013-05-10 | 2013-08-21 | 无锡科技职业学院 | 一种基于辨识的双率系统的参数辨识方法 |
CN103760768A (zh) * | 2013-12-30 | 2014-04-30 | 广东电网公司电力科学研究院 | 基于正常运行数据的发电机组多变量系统辨识方法 |
EP2728425A1 (en) * | 2012-11-05 | 2014-05-07 | Rockwell Automation Technologies, Inc. | Online integration of model-based optimization and model-less control |
CN103915840A (zh) * | 2014-04-08 | 2014-07-09 | 国家电网公司 | 一种基于Givens正交增量行变换的大电网状态估计方法 |
CN104166405A (zh) * | 2014-08-06 | 2014-11-26 | 东北大学 | 一种基于虚拟未建模动态补偿的液位系统pi控制方法 |
US20160357169A1 (en) * | 2015-06-02 | 2016-12-08 | Mitsubishi Electric Research Laboratories, Inc. | Model Predictive Control with Uncertainties |
CN106707762A (zh) * | 2017-02-20 | 2017-05-24 | 海南大学 | 一种两输入两输出网络控制系统不确定时延混杂控制方法 |
CN106873379A (zh) * | 2017-03-31 | 2017-06-20 | 北京工业大学 | 一种基于迭代adp算法的污水处理最优控制方法 |
CN107179689A (zh) * | 2017-06-22 | 2017-09-19 | 星际(重庆)智能装备技术研究院有限公司 | 一种基于子空间辨识的工业数据驱动预测控制方法 |
CN108614434A (zh) * | 2018-06-13 | 2018-10-02 | 东华大学 | 基于预测pi与串级控制相结合的双容系统控制方法 |
CN108828945A (zh) * | 2018-06-28 | 2018-11-16 | 杭州电子科技大学 | 一种流程工业过程预测优化控制方法 |
CN110334315A (zh) * | 2019-06-24 | 2019-10-15 | 南通大学 | 基于极大似然和梯度优化的辛烷值推断模型辨识方法 |
CN110398942A (zh) * | 2019-07-02 | 2019-11-01 | 江南大学 | 一种用于工业生产过程控制的参数辨识方法 |
-
2019
- 2019-11-07 CN CN201911079525.8A patent/CN111025898B/zh active Active
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1999010783A1 (en) * | 1997-08-22 | 1999-03-04 | Voyan Technology | A method for real-time nonlinear system state estimation and control |
EP1441268A1 (en) * | 2003-01-24 | 2004-07-28 | Pavilion Technologies, Inc. | Parameterizing a steady-state model using derivative constraints |
EP1447727A2 (en) * | 2003-02-14 | 2004-08-18 | United Technologies Corporation | System and method of accelerated active set search for quadratic programming in real-time model predictive control |
WO2007046816A2 (en) * | 2004-11-05 | 2007-04-26 | Honeywell International Inc. | Method and apparatus for system monitoring and maintenance |
US20110257788A1 (en) * | 2007-08-01 | 2011-10-20 | Wiemers Reginald A | Mobile station and methods for diagnosing and modeling site specific full-scale effluent treatment facility requirements |
US20110184707A1 (en) * | 2010-01-28 | 2011-07-28 | Yamatake Corporation | Pid adjustment support device and method |
EP2728425A1 (en) * | 2012-11-05 | 2014-05-07 | Rockwell Automation Technologies, Inc. | Online integration of model-based optimization and model-less control |
CN103258093A (zh) * | 2013-05-10 | 2013-08-21 | 无锡科技职业学院 | 一种基于辨识的双率系统的参数辨识方法 |
CN103760768A (zh) * | 2013-12-30 | 2014-04-30 | 广东电网公司电力科学研究院 | 基于正常运行数据的发电机组多变量系统辨识方法 |
CN103915840A (zh) * | 2014-04-08 | 2014-07-09 | 国家电网公司 | 一种基于Givens正交增量行变换的大电网状态估计方法 |
CN104166405A (zh) * | 2014-08-06 | 2014-11-26 | 东北大学 | 一种基于虚拟未建模动态补偿的液位系统pi控制方法 |
US20160357169A1 (en) * | 2015-06-02 | 2016-12-08 | Mitsubishi Electric Research Laboratories, Inc. | Model Predictive Control with Uncertainties |
CN106707762A (zh) * | 2017-02-20 | 2017-05-24 | 海南大学 | 一种两输入两输出网络控制系统不确定时延混杂控制方法 |
CN106873379A (zh) * | 2017-03-31 | 2017-06-20 | 北京工业大学 | 一种基于迭代adp算法的污水处理最优控制方法 |
CN107179689A (zh) * | 2017-06-22 | 2017-09-19 | 星际(重庆)智能装备技术研究院有限公司 | 一种基于子空间辨识的工业数据驱动预测控制方法 |
CN108614434A (zh) * | 2018-06-13 | 2018-10-02 | 东华大学 | 基于预测pi与串级控制相结合的双容系统控制方法 |
CN108828945A (zh) * | 2018-06-28 | 2018-11-16 | 杭州电子科技大学 | 一种流程工业过程预测优化控制方法 |
CN110334315A (zh) * | 2019-06-24 | 2019-10-15 | 南通大学 | 基于极大似然和梯度优化的辛烷值推断模型辨识方法 |
CN110398942A (zh) * | 2019-07-02 | 2019-11-01 | 江南大学 | 一种用于工业生产过程控制的参数辨识方法 |
Non-Patent Citations (3)
Title |
---|
JIA TANG ET AL.: "Parameter identification to an approximated function of the Weierstrass approximation formula", 《2012 24TH CHINESE CONTROL AND DECISION CONFERENCE(CCDC)》 * |
孙忠林 等: "复杂双容水箱系统的递阶预测控制优化算法", 《上海电力学院学报》 * |
袁平 等: "水箱液位多变量系统辨识方法的比较", 《江南大学学报(自然科学版)》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112989275A (zh) * | 2021-03-10 | 2021-06-18 | 江南大学 | 一种用于网络大规模控制系统的多方向方法 |
CN112989275B (zh) * | 2021-03-10 | 2022-03-25 | 江南大学 | 一种用于网络大规模控制系统的多方向方法 |
CN115034337A (zh) * | 2022-08-10 | 2022-09-09 | 江西科骏实业有限公司 | 一种轨道交通车辆中牵引电机状态辨识方法及装置、介质 |
Also Published As
Publication number | Publication date |
---|---|
CN111025898B (zh) | 2021-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102693451B (zh) | 基于多参数的氨法烟气脱硫效率预测方法 | |
CN108520111B (zh) | 一种基于正交成分最优选择与最优回归的软测量方法 | |
CN109214708B (zh) | 基于交叉熵理论优化支持向量机的电力系统风险评估方法 | |
CN111025898B (zh) | 一种用于流程工业大规模过程控制的降维辨识方法 | |
CN112115419B (zh) | 系统状态估计方法、系统状态估计装置 | |
CN108334994B (zh) | 一种供热管网流量及压力监测点优化布置方法 | |
CN112818595B (zh) | 一种火电厂蒸发区的数字孪生模型数据的修正方法及系统 | |
CN108508865A (zh) | 一种基于分散式osc-pls回归模型的故障检测方法 | |
CN108181894B (zh) | 一种基于修剪独立元回归策略的非高斯过程监测方法 | |
CN113191092A (zh) | 一种基于正交增量随机配置网络的工业过程产品质量软测量方法 | |
CN112016253A (zh) | 一种适用于cfd不确定度量化的高保真度混沌多项式修正方法 | |
CN114692507A (zh) | 基于堆叠泊松自编码器网络的计数数据软测量建模方法 | |
CN108492026B (zh) | 一种基于集成正交成分最优化回归分析的软测量方法 | |
CN110398942B (zh) | 一种用于工业生产过程控制的参数辨识方法 | |
CN116090310A (zh) | 基于田口试验和响应面法的多目标塑封工艺参数优化方法 | |
CN114757269A (zh) | 一种基于局部子空间-邻域保持嵌入的复杂过程精细化故障检测方法 | |
CN108491878B (zh) | 一种基于多个误差生成模型的故障分类诊断方法 | |
CN114357870A (zh) | 基于局部加权偏最小二乘的计量设备运行性能预测分析方法 | |
CN114137829A (zh) | 基于almbo优化算法的质子交换膜燃料电池子空间辨识方法 | |
CN107066741B (zh) | 基于数据挖掘的气动外形优化设计方法 | |
CN108536943B (zh) | 一种基于多生产单元变量交叉相关解耦策略的故障监测方法 | |
CN106503456B (zh) | 基于超球体变换的集合卡尔曼滤波油藏动态历史拟合方法 | |
CN116047753B (zh) | 光学系统正交优化模型的构建及优化方法 | |
CN111861002A (zh) | 基于数据驱动高斯学习技术的建筑物冷热负荷预测方法 | |
CN109543263B (zh) | 一种集成化常压精馏过程代理模型的建立方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |