CN110521503A - Wet shot plant cover concrete ecological vestige - Google Patents

Wet shot plant cover concrete ecological vestige Download PDF

Info

Publication number
CN110521503A
CN110521503A CN201910726433.8A CN201910726433A CN110521503A CN 110521503 A CN110521503 A CN 110521503A CN 201910726433 A CN201910726433 A CN 201910726433A CN 110521503 A CN110521503 A CN 110521503A
Authority
CN
China
Prior art keywords
plant cover
cover concrete
wet shot
parts
substrate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910726433.8A
Other languages
Chinese (zh)
Other versions
CN110521503B (en
Inventor
叶建军
陈阳阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910726433.8A priority Critical patent/CN110521503B/en
Publication of CN110521503A publication Critical patent/CN110521503A/en
Application granted granted Critical
Publication of CN110521503B publication Critical patent/CN110521503B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/10Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/20Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/20Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
    • A01G24/22Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material containing plant material
    • A01G24/25Dry fruit hulls or husks, e.g. chaff or coir
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/30Growth substrates; Culture media; Apparatus or methods therefor based on or containing synthetic organic compounds
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/40Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
    • A01G24/44Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form
    • A01G24/46Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form multi-layered
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/0028Aspects relating to the mixing step of the mortar preparation
    • C04B40/0039Premixtures of ingredients
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A kind of wet shot plant cover concrete ecological vestige, it is constructed using wet-spraying machine, on the basis of original dry spray plant cover concrete formula, grass fiber and soil binder (doubling as water-retaining agent), which is added, improves the globality of substrate and the adhesion in slope surface, by the way that long-acting Common compound fertilizer is added in the substrate instead of the common Common compound fertilizer in part, to improve wet shot substrate later period nutrition condition;Novel wet shot plant cover concrete additive is developed to substitute original additive, improves workability, pH value and microorganism and the nutrition condition of substrate.Material therefor of the present invention is common, and construction efficiency is high, and Construction on Environment is friendly, is suitable for all kinds of engineering slope ecological protections and the restorations of the ecosystem such as building, mine, water conservancy, traffic, has wide popularization and application prospect.

Description

Wet shot plant cover concrete ecological vestige
Technical field
The invention belongs to slope ecological reparations (also referred to as slope greening) and protecting slope ecology (also known as ecological slope protection or side slope Slope protection greening) field, and in particular to arrive wet shot plant cover concrete ecological vestige.
Background technique
Plant cover concrete ecological vestige is by cement, loam, organic matter, vegetable seeds, fertilizer and plant cover concrete Additive is mixed to get plant cover concrete slope protection greening substrate (abbreviation substrate, similarly hereinafter) according to proper ratio, then is sprayed with spraying machine It is mapped in the side slope for needing restoration of the ecosystem or ecological protection and (is mainly used for abrupt slope), the technology of subsequent sprinkling maintenance.On most sides On slope, often first construct before ejecting anchor pole and linked network, with enhancing base materials spray-up globality and stability.The technology was from 2000 Since front and back comes out, always using dry pressure spray process (using dry type spraying anchor mechanical equipment), large-scale promotion application is various In water conservancy, mine, building, road slope restoration of the ecosystem and ecological protective measures.By a large amount of engineering practices, it is found that the technology has There is the mechanical equipment used simple;Substrate spray-up has the advantages that good slope protection performance and erosion resistibility.But there is also bases Material is hardened, pH value is higher, the not high problem of certain plants germination percentage.Although being developed successively between past more than 10 years a series of Patented technology (such as modified plant cover concrete green additive preparation method ZL201110380711.2, a kind of vegetation coagulation Land reform good figure microbial bacterial agent extremely preparation method ZL201611021143.6 etc.) upgrading is subject to original technology, but it is dry (every set equipment is difficult to break through 300m daily low efficiency formula sprayed construction (referred to as dry spray)2Workload), dust pollution it is big, spray Gunman's large labor intensity, the high disadvantage of security risk never overcome.
Although wet spraying process has without dust pollution, work efficiency is high, and (every set equipment is daily more than 500m2Work Amount) the advantages of.But when using wet spraying process, in order to reach spray distance requirement, mixture mobility is larger, for holding when abrupt slope Easily trickling.The exactly presence of this problem causes wet spraying process not to be used in plant cover concrete ecological slope protection field.
Summary of the invention
The purpose of the present invention is to provide the wet shot plant cover concrete ecological slope protections that one kind good can be attached to abrupt slope Technology, with low efficiency, big, the sprayed construction risk height of dust pollution etc. for overcoming the dry spray construction technology of existing plant cover concrete Problem.
The object of the present invention is achieved like this:
Wet shot plant cover concrete ecological vestige, there is plane net and anchor pole in slope surface, and plane net is embedded in new spray vegetation In concrete substrate spray-up;The new spray plant cover concrete substrate spray-up includes loam, cement, the addition of wet shot plant cover concrete Agent, organic matter, depot fertilizer, Common compound fertilizer and soil binder;New spray plant cover concrete substrate spray-up is applied using wet spraying process Work, i.e., above-mentioned substrate composition material add water and stir into and are ejected into formation substrate spray-up in slope surface using wet-spraying machine after mud;It is described Substrate spray-up includes base and surface layer, and surface layer also contains vegetable seeds.
The base include loam, cement, wet shot plant cover concrete additive, organic matter, depot fertilizer, Common compound fertilizer and Soil binder, the construction proportion of base are (every cube is newly mixed substrate) and preparation method are as follows: loam 0.2-0.6m3, organic matter 0.1-0.15m3, cement 20-50kg, wet shot plant cover concrete additive 15-40kg, depot fertilizer 0.4-0.8kg, Common compound fertilizer 0.3-0.7kg, soil binder 0.1-0.3kg;Wherein, the volume of grass fiber accounts for 40%-50%, rotten rice husk in organic matter Or the volume of vinasse accounts for 50%-60%;Grass fiber uses length for the cutted straw of 20-80mm or broken wheat straw;When preparing substrate, first Water is added, adds loam, organic matter, cement, depot fertilizer, Common compound fertilizer, fully mixes and make mixture volume 1m3, It is eventually adding wet shot plant cover concrete additive and soil binder, mix is uniformly rear to be painted.
The surface layer includes loam, cement, wet shot plant cover concrete additive, Common compound fertilizer, depot fertilizer, soil bonding Agent, organic matter and vegetable seeds, the construction proportion of surface layer are (every cube is newly mixed substrate) and preparation method are as follows: loam 0.2- 0.6m3, organic matter 0.1-0.2m3, cement 0-30kg, wet shot plant cover concrete additive 0-25kg, Common compound fertilizer 0.5- 0.8kg, depot fertilizer 0.4-1.2kg, soil binder 0.2-0.3kg, vegetable seeds 100-200g;Wherein, vegetable seeds medium-height grass The granule number ratio of this and shrub is 2-3:1-2;The volume of grass fiber accounts for 20%-40%, rotten rice husk or wine in organic matter The volume of grain accounts for 60%-80%;Grass fiber uses length for the cutted straw of 20-80mm or broken wheat straw;When preparing substrate, first it is added Water adds loam, organic matter, cement, depot fertilizer, Common compound fertilizer, fully mixes and makes mixture volume 1m3, finally Wet shot plant cover concrete additive, soil binder and vegetable seeds is added, mix is uniformly rear to be painted.
The loam selects surface soil, and native depth is taken to be less than 3m, and removes the sand grains that partial size is greater than 0.75cm.
The soil binder selects polyacrylamide, doubles as water-retaining agent.
The depot fertilizer uses durable composite fertilizer, and wherein N-P-K content ratio is 3-4:4-5:1-2;In Common compound fertilizer N-P-K content ratio is 2-3:1-2:1-2.
The groundwork thickness is 5-10cm, surface thickness 1-2cm.
Three dimensional network+plane net substitution can also be used in the plane net;When using three dimensional network+plane net, lower layer three Net is tieed up, upper layer is plane net.
Centrifugal pump or plunger pump type wet-spraying machine may be selected in the wet-spraying machine;It is general to combine when using plunger pump hydroseeder It is conveyed using pressure wind.
Wet shot plant cover concrete additive used is prepared by the following steps:
(1) composite bacterial powders A (abbreviation powders A) is prepared:
In parts by weight, by 5-8 parts of raw material strain bacillus megaterium phosphorus decomposing Gongzhuling mutation, Pseudomonas fluorescens 2-4 After part, 5-10 parts of Plesiomonas, 40-70 parts of colloid bacillus cereus mixing, it is put into the aqueous sucrose solution that concentration is 2% at room temperature Culture 24 hours, re-dry obtain the powder B rich in bacterium;By false indigo Autoinducer and Mo Leilan Sinorhizobium 10-20 parts are put into the aqueous solution that sucrose concentration is 2%, urea concentration is 0.5% and cultivate at room temperature 72 hours, and re-dry obtains Powder C containing bacterium;Powder B and powder C mix are finally obtained into powders A;
Two kinds of raw material bacterium false indigo Autoinducers and Mo Leilan Sinorhizobium are added with arbitrary proportion;
(2) composite bacterial powder D (abbreviation powder D) is prepared:
In parts by weight, it by 20-30 parts of raw material strain Trichoderma viride, 10-15 parts of aspergillus oryzae, 15-20 parts of saccharomyces cerevisiae, puts Enter and cultivated at room temperature in the aqueous solution of starch-containing 8%, glucose 2%, agar 1% 24 hours, obtains the powder containing bacterium after dry Last D;
(3) mixture E is prepared:
In parts by weight, it by 8-15 parts of land plaster, 40-45 parts of ground phosphate rock, 10-15 parts of Iron Ore Powder mixing, is obtained after dry Mixture E;
(4) wet shot plant cover concrete additive is prepared:
In parts by weight, it by 1-2 parts of powders A, 1-2 parts of powder D, 80-90 parts of mixture E, fully mixes to obtain wet shot Plant cover concrete additive;
Iron Ore Powder used, ground phosphate rock partial size are 40-60 mesh;Land plaster partial size is 100-200 mesh;
Powders A, powder D and the mixture E moisture content is less than 8%;
The land plaster is beta-type semi-hydrated gypsum powder;
Raw material strain living bacteria count (cfu) used is greater than 0.20 hundred million/g.
The construction method of above-mentioned wet shot plant cover concrete ecological vestige, comprising the following steps:
1) slope surface is arranged net: being laid with plane net in slope surface and is fixed with anchor pole, anchor pole is inserted into slope according to certain spacing Face, and it is exposed;
2) plant cover concrete substrate is prepared;
3) plant cover concrete substrate is sprayed using wet spraying process, construct respectively base and surface layer, using multiple layering injection Form of construction work reach design jetting thickness.
In conjunction with above technical scheme, the beneficial effects of the present invention are:
(1) wet spraying process is used, construction efficiency can be greatly improved, reduce dust pollution;Also using centrifugal pump wet-spraying machine The risk and labor intensity of sprayed construction can be reduced;Thicker substrate is sprayed using plunger pump wet shot function, wide adaptation range is raw It produces high-efficient.
(2) formula is improved, grass fiber is introduced and substitutes part organic matter, to increase the globality of wet shot substrate;Introduce tool Having the soil binder (as water-retaining agent) of cementation reduces wet shot substrate mobility by its water suction and the colloid generated With its adhesion of raising;Expand the use scope of wet spraying process.
(3) it introduces long-acting Common compound fertilizer and replaces the common Common compound fertilizer in part, to improve wet shot substrate later period nutrition shape Condition.
(4) material therefor of the present invention is common, and most of material or local material can be effectively controlled construction cost.Have Great application value, every set equipment achievable 500m daily2Above workload.
(5) construction in layer technique is used, each jetting thickness is reduced, the moisture in new spray-up is enable to be absorbed by old spray-up A part reduces the mobility of new spray-up, improves its adhesion.Joint soil binder and wet shot plant cover concrete additive The hydration of the water sorption of middle gypsum, cement, can quickly improve substrate consistency, make its be used in abrupt slope also and have it is attached well .
(6) novel wet shot plant cover concrete additive is used, it is public that bacillus megaterium phosphorus decomposing is introduced in additive Main ridge mutation, Pseudomonas fluorescens, the nucleic acid and phosphatide of organic matter, release phosphorus nutrient in the substrate that can degrade very well;It introduces adjacent Monad can decompose the phosphorus contained in the rock phosphate in powder in substrate, provide enough phosphorus nutrients in the middle and later periods for side slope vegetation;
The mixture that false indigo Autoinducer or Mo Leilan Sinorhizobium or both are introduced in additive is conducive to promote Into widely used pionner --- the germination and growth of leguminous plant (such as false indigo, alfalfa) improve substrate nitrogen The sustainable supply of nutrient;
Colloid bacillus cereus is introduced in wet shot plant cover concrete additive, auxin substance, gibberellin substance Yin can be secreted The growth promoting substances such as indolylbutyric acid, extraneous root strong sprout, directly enhancing plant anti-adversity ability;
Colloid bacillus cereus can decompose hydrolysis product of cement in substrate --- and the element silicon in silicate is utilized for plant, is made The wax coat for obtaining plant thickens, and improves plant drought ability.Colloid bacillus cereus is by somatic cells in seed or crop root Surrounding growth breeding, a large amount of organic acid and enzyme are generated in its metabolic process, makes the silicate and aluminosilicate of indissoluble in substrate The mineral such as salt decompose, and K, P, Si, Mg, Zn etc. are released in the form of an ion, absorb, utilize for root system of plant;
Colloid bacillus cereus can also promote substrate crumb structure to be formed, and prevent substrate hardened;Substrate capillary phenomenon is destroyed, is prevented Only substrate moisture evaporates, and further increases drought-resistant ability;
Trichoderma viride, aspergillus oryzae and saccharomyces cerevisiae are introduced in wet shot plant cover concrete additive, can comparatively fast degrade base Plant fiber present in material provides enough nutrients for root system of plant.These nutrients discharge after usually after construction 6 months, energy Chemical fertilizer is taken over well, and nutrient is provided.Root system of plant has been formed at this time, can be taken over plant fiber and be made to the reinforcement of substrate reinforcement With, will not because of plant fiber rot and adversely affect;
Joined more land plaster in wet shot plant cover concrete additive, not only can early stage can be quickly anti-with tricalcium aluminate Entringite should be generated, the mobility of substrate is reduced, improves substrate adhesion;Free and hydration reaction in cement can also be digested The alkali of generation generates Na2SO4、K2SO4With Ca (OH)2(generating entringite), realizes the pH value for reducing substrate, is conducive to plant germination. In addition, semi-hydrated gypsum powder more than needed can also rapid condensation hardening (part moisture content can be consumed by generating dihydrate gypsum), reduce new spray The mobility of substrate improves the cohesiveness of new spray substrate, attachment when steep side slope is used for conducive to substrate;
The ground phosphate rock and Iron Ore Powder being added in substrate are mentioned using the nutrient balance of substrate for middle and later periods slope surface nutrient supply It has supplied to ensure.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.
Fig. 1 is the floor plan of anchor pole of the present invention and plane net in slope surface.
Fig. 2 is the schematic diagram of the section structure of the Fig. 1 at A-A.
In figure: plane net 1, anchor pole 2, base 3, surface layer 4.
Specific embodiment
The preparation of wet shot plant cover concrete additive:
Bacterium used in the present invention is specific as follows:
Bacillus megaterium phosphorus decomposing Gongzhuling mutation (Bacillus.megatherium var.phosphaticum kungchuling);
Pseudomonas fluorescens (P.fluorescens);
Plesiomonas (Plesiomonas Habs and Schubert);
Colloid bacillus cereus (Bacillus mucilaginosus Krassilnikov);
False indigo Autoinducer (M.amorphae) or Mo Leilan Sinorhizobium (S.morelense);
Colloid bacillus cereus (Bacillus mucilaginosus Krassilnikov);
Strain Trichoderma viride (Trichoderma viride);
Aspergillus oryzae (Aspergillus oryzae (Asp.oryzae));
Saccharomyces cerevisiae (Saccharomyces cerevisiae).
Wet shot plant cover concrete addictive preparation method, steps are as follows:
(1) composite bacterial powders A is prepared:
In parts by weight, by 5-8 parts of raw material strain bacillus megaterium phosphorus decomposing Gongzhuling mutation, Pseudomonas fluorescens 2-4 After part, 5-10 parts of Plesiomonas, 40-70 parts of colloid bacillus cereus mixing, it is put into the aqueous sucrose solution that concentration is 2% at room temperature Culture 24 hours, re-dry obtain the powder B rich in bacterium;By false indigo Autoinducer or Mo Leilan Sinorhizobium or 10-20 parts of mixture of the two are put into the aqueous solution that sucrose concentration is 2%, urea concentration is 0.5% that cultivate 72 at room temperature small When, re-dry obtains the powder C containing bacterium;Powder B and powder C mix are finally obtained into powders A.The original of composite bacterial powders A Material strain specific formula is shown in Table 1.
Raw material strain specific formula (unit: Kg) table 1 of composite bacterial powders A
Raw material strain living bacteria count (cfu) used is greater than 0.20 hundred million/g.
(2) composite bacterial powder D is prepared:
In parts by weight, it by 20-30 parts of raw material strain Trichoderma viride, 10-15 parts of aspergillus oryzae, 15-20 parts of saccharomyces cerevisiae, puts Enter and cultivated at room temperature in the aqueous solution of starch-containing 8%, glucose 2%, agar 1% 24 hours, obtains the powder containing bacterium after dry Last D.
The raw material strain specific formula of composite bacterial powder D is shown in Table 2.
Raw material strain specific formula (unit: Kg) table 2 of composite bacterial powder D
Serial number Trichoderma viride Aspergillus oryzae Saccharomyces cerevisiae
1 20 10 15
2 25 12 17
3 30 15 20
4 20 15 15
5 25 10 20
Raw material strain living bacteria count (cfu) used is greater than 0.20 hundred million/g.
(3) mixture E is prepared:
In parts by weight, it by 8-15 parts of land plaster, 40-45 parts of ground phosphate rock, 10-15 parts of Iron Ore Powder mixing, is obtained after dry Mixture E;The raw material specific formula of mixture E is shown in Table 3.
Raw material specific formula (unit: Kg) table 3 of mixture E
Serial number Land plaster Ground phosphate rock Iron Ore Powder
1 8 40 10
2 12 42 12
3 15 45 15
4 15 40 15
5 8 45 10
Iron Ore Powder used, ground phosphate rock partial size are 40-60 mesh;Land plaster partial size is 100-200 mesh;The land plaster is Beta-type semi-hydrated gypsum powder.
(4) wet shot plant cover concrete additive is prepared:
In parts by weight, by 1-2 parts of composite bacterial powders A, D1-2 parts of composite bacterial powder and mixture E 80-90 Part is uniformly mixed, and obtains this wet shot plant cover concrete additive.
The raw material specific formula of wet shot plant cover concrete additive is shown in Table 4.
Raw material specific formula (unit: Kg) table 4 of wet shot plant cover concrete additive
Serial number Composite bacterial powders A Composite bacterial powder D Mixture E
1 1 1 80
2 1.5 1.5 85
3 2 2 90
4 1 2 90
5 1.5 2 80
1-2 parts of composite bacterial powders A, composite bacterial powder D and mixture E moisture content are less than 8%.
It will be stand-by by wet shot plant cover concrete additive obtained by the above method.
Construction embodiment 1
Bank slope under the road of In Middle And Lower Reaches of Changjiang River, side slope be weak weathering limestone, 55 ° of the gradient.The proposed adoption present invention gives birth to State slope protection.
14# iron wire is laid in slope surface, mesh is that the zinc-plated plane wire netting of 6cm × 6cm machine volume is used in combinationScrew-thread steel anchor Bar is fixed, and anchor pole is inserted into slope surface 30cm, exposed 6-8cm according to the spacing of 1.5m × 1.5m.Plane net is apart from slope surface 5-6cm;Newly It sprays plant cover concrete substrate to construct using wet spraying process, that is, includes 8cm thickness base and 1cm thickness surface layer.
The base is by loam, cement, wet shot plant cover concrete additive, organic matter, depot fertilizer, Common compound fertilizer, soil Earth adhesive composition, the construction proportion of base are (every cube is newly mixed substrate): loam 0.6m3, organic matter 0.1m3, cement 20kg, Wet shot plant cover concrete additive 20kg, depot fertilizer 0.8kg, Common compound fertilizer 0.3kg, soil binder 0.1kg;Wherein, have The volume of grass fiber accounts for 40% in machine matter, and the volume of rotten rice husk or vinasse accounts for 60%;Grass fiber uses length for 20-80mm Cutted straw;When preparing substrate, water is first added, adds loam, organic matter, cement, depot fertilizer, Common compound fertilizer, sufficiently mixes Merging makes mixture volume 1m3, be eventually adding wet shot plant cover concrete additive and soil binder, after mix is uniform to Spray.
The surface layer is bonded by loam, cement, wet shot plant cover concrete additive, Common compound fertilizer, depot fertilizer, soil Agent, organic matter, vegetable seeds composition, the construction proportion of surface layer are (every cube is newly mixed substrate): loam 0.6m3, organic matter 0.15m3, wet shot plant cover concrete additive 10kg, Common compound fertilizer 0.5kg, depot fertilizer 0.4kg, soil binder 0.3kg, Lily magnolia, false indigo, alfalfa, herba eleusines indicae, Bermuda grass, coreopsis, Zinnia are spent more in vegetable seeds 100g, vegetable seeds selection Composition, every kind of plant minimum dosage 2g;Wherein, the granule number ratio of draft and shrub is 2:1 in vegetable seeds;Organic matter medium-height grass The volume of fiber accounts for 20%, and the volume of rotten rice husk or vinasse accounts for 80%;Grass fiber uses length for the broken rice of 20-80mm Grass;When preparing substrate, water is first added, adds loam, organic matter, cement, depot fertilizer, Common compound fertilizer, fully mixes and makes Mixture volume is 1m3, it is eventually adding wet shot plant cover concrete additive, soil binder and vegetable seeds, after mix is uniform It is to be painted.
The cement uses Portland pozzolana cement or slag silicate cement.
The loam selects surface soil, and native depth is taken to be less than 3m, and removes the sand grains that partial size is greater than 0.75cm.
The soil binder selects polyacrylamide, doubles as water-retaining agent.
The depot fertilizer uses durable composite fertilizer, and wherein N-P-K content ratio is 3:4:2;N P and K in Common compound fertilizer Content ratio 3:1:1.
The GYP-90 type wet-spraying machine of wet blasting construction selection Henan Geng Li machinery production (while assisting pressure using 9 cubes/point Wind), base reaches design jetting thickness using the form of construction work that the injection of two secondary clearings, surface layer are once sprayed.
Construction embodiment 2
Certain southwestern mine quarrying slab field side slope (road side slope), side slope are weak-weathered rock side slope, and the gradient is 70 °, height 40m, The proposed adoption present invention carries out restoration of the ecosystem.
14# iron wire is laid in slope surface, mesh is that the zinc-plated plane wire netting of 6cm × 6cm machine volume is used in combinationScrew-thread steel anchor Bar is fixed, and anchor pole is inserted into slope surface 35cm, exposed 8-10cm according to the spacing of 1m × 1m.Plane net is apart from slope surface 6-8cm;New spray is planted It is constructed by concrete substrate using wet spraying process, that is, includes 9cm thickness base and 1cm thickness surface layer.
The base is by loam, cement, wet shot plant cover concrete additive, organic matter, depot fertilizer, Common compound fertilizer, soil Earth adhesive composition, the construction proportion of base are (every cube is newly mixed substrate): loam 0.4m3, organic matter 0.15m3, cement 45kg, Wet shot plant cover concrete additive 35kg, depot fertilizer 0.6kg, Common compound fertilizer 0.6kg, soil binder 0.2kg;Wherein, have The volume of grass fiber accounts for 50% in machine matter, and the volume of rotten rice husk or vinasse accounts for 50%;Grass fiber uses length for 20-80mm Cutted straw;When preparing substrate, water is first added, adds loam, organic matter, cement, depot fertilizer, Common compound fertilizer, sufficiently mixes Merging makes mixture volume 1m3, be eventually adding wet shot plant cover concrete additive and soil binder, after mix is uniform to Spray.
The surface layer is bonded by loam, cement, wet shot plant cover concrete additive, Common compound fertilizer, depot fertilizer, soil Agent, organic matter, vegetable seeds composition, the construction proportion of surface layer are (every cube is newly mixed substrate): loam 0.4m3, organic matter 0.10m3, cement 25kg, wet shot plant cover concrete additive 25kg, Common compound fertilizer 0.8kg, depot fertilizer 0.8kg, soil bonding Agent 0.3kg, vegetable seeds 150g;Vegetable seeds selection spend more lily magnolia, false indigo, alfalfa, horse spine, Manila, Trifolium repense, Korea lawn grass, Zinnia;Every kind of plant is no less than 3g;Wherein, the granule number ratio of draft and shrub is 3:1 in vegetable seeds;Have The volume of grass fiber accounts for 30% in machine matter, and the volume of rotten rice husk or vinasse accounts for 70%;Grass fiber uses length for 20-80mm Cutted straw;When preparing substrate, water is first added, adds loam, organic matter, cement, depot fertilizer, Common compound fertilizer, sufficiently mixes Merging makes mixture volume 1m3, it is eventually adding wet shot plant cover concrete additive, soil binder and vegetable seeds, mix It is to be painted after uniformly.
The cement uses ordinary portland cement.
The loam selects surface soil, and native depth is taken to be less than 3m, and removes the sand grains that partial size is greater than 0.75cm.
The soil binder selects polyacrylamide, doubles as water-retaining agent.
The depot fertilizer uses durable composite fertilizer, and wherein N-P-K content ratio is 4:5:2;N P and K in Common compound fertilizer Content ratio is 3:2:2.
Wet blasting construction selection is gloomy to make every effort to overcome HPB80120K type wet type removed-earth jet sowing machine, using the construction party of multiple layering injection Formula reaches design jetting thickness (3 injections of base, surface layer 1 time injection).
Construction embodiment 3
North China highway subgrade slope (cut slope), side slope are granite, and rock is complete, 75 ° of the gradient, height 60m.It is quasi- Ecological Slope protection is carried out using the present invention.
Plastic three-dimensional net is first laid in slope surface, re-laying mesh is 5cm × 5cm flat plastic net, if at the top of three dimensional network Dry place is bound with plane net, and plane net is fixed onOn twisted steel anchor rod;Anchor pole is inserted into slope surface according to the spacing of 1m × 1m 40cm, exposed 8-10cm.Plane net is apart from slope surface 7-8cm;New spray plant cover concrete substrate is constructed using wet spraying process, that is, includes 9cm thickness base and 2cm thickness surface layer.
The base is by loam, cement, wet shot plant cover concrete additive, organic matter, depot fertilizer, Common compound fertilizer, soil Earth adhesive composition, the construction proportion of base are (every cube is newly mixed substrate): loam 0.2m3, organic matter 0.15m3, cement 50kg, Wet shot plant cover concrete additive 40kg, depot fertilizer 0.8kg, Common compound fertilizer 0.7kg, soil binder 0.3kg;Wherein, have The volume of grass fiber accounts for 50% in machine matter, and the volume of rotten rice husk or vinasse accounts for 50%;Grass fiber uses length for 20-80mm Broken wheat straw;When preparing substrate, water is first added, adds loam, organic matter, cement, depot fertilizer, Common compound fertilizer, sufficiently mixes Merging makes mixture volume 1m3, be eventually adding wet shot plant cover concrete additive and soil binder, after mix is uniform to Spray.
The surface layer is bonded by loam, cement, wet shot plant cover concrete additive, Common compound fertilizer, depot fertilizer, soil Agent, organic matter, vegetable seeds composition, the construction proportion of surface layer are (every cube is newly mixed substrate): loam 0.2m3, organic matter 0.10m3, cement 30kg, wet shot plant cover concrete additive 30kg, Common compound fertilizer 0.5kg, depot fertilizer 1.2kg, soil bonding Agent 0.3kg, vegetable seeds 200g;Vegetable seeds selection spend more lily magnolia, false indigo, alfalfa, Vitex negundo var cannabifolia, Chinese pennisetum, Bermuda grass, Rye grass, coreopsis;Every kind of plant is no less than 3g;Wherein, the granule number ratio of draft and shrub is 3:2 in vegetable seeds;Have The volume of grass fiber accounts for 40% in machine matter, and the volume of rotten rice husk or vinasse accounts for 60%;Grass fiber uses length for 20-80mm Cutted straw;When preparing substrate, water is first added, adds loam, organic matter, cement, depot fertilizer, Common compound fertilizer, sufficiently mixes Merging makes mixture volume 1m3, it is eventually adding wet shot plant cover concrete additive, soil binder and vegetable seeds, mix It is to be painted after uniformly.
The cement uses portland cement.
The loam selects surface soil, and native depth is taken to be less than 3m, and removes the sand grains that partial size is greater than 0.75cm.
The soil binder selects polyacrylamide, doubles as water-retaining agent.
The depot fertilizer uses durable composite fertilizer, and wherein N-P-K content ratio is 3:5:2;N P and K in Common compound fertilizer Content ratio is 2:2:2.
Wet blasting construction selection is gloomy to make every effort to overcome HPB80120K type wet type removed-earth jet sowing machine, using the construction party of multiple layering injection Formula reaches design jetting thickness (5 injections of base, surface layer 2 times injections).

Claims (10)

1. a kind of wet shot plant cover concrete ecological vestige, including have plane net (1) and anchor pole (2), feature in slope surface Be: plane net (1) is embedded in new spray plant cover concrete substrate spray-up;The new spray plant cover concrete substrate spray-up mainly by Loam, cement, wet shot plant cover concrete additive, organic matter, depot fertilizer, Common compound fertilizer, soil binder composition;New spray is planted It is constructed by concrete substrate spray-up using wet spraying process, i.e., above-mentioned substrate composition material utilizes wet-spraying machine after adding water and stirring into mud It is ejected into formation substrate spray-up in slope surface;The substrate spray-up includes base (3) and surface layer (4), and surface layer (4) also contains plant species Son.
2. wet shot plant cover concrete ecological vestige according to claim 1, it is characterised in that: base (3) packet Loam, cement, wet shot plant cover concrete additive, organic matter, depot fertilizer, Common compound fertilizer, soil binder are included, base applies Work proportion is (every cube is newly mixed substrate) and preparation method are as follows: loam 0.2-0.6 m3, organic matter 0.1-0.15 m3, cement 20- 50 kg, wet shot plant cover concrete additive 15-40 kg, depot fertilizer 0.4-0.8 kg, Common compound fertilizer 0.3-0.7 kg, soil Adhesive 0.1-0.3 kg;Wherein, the volume of grass fiber accounts for 40%-50% in organic matter, and the volume of rotten rice husk or vinasse accounts for 50%-60%;Grass fiber uses length for the cutted straw of 20-80mm or broken wheat straw;When preparing substrate, water is first added, adds earth Soil, organic matter, cement, depot fertilizer, Common compound fertilizer fully mix and make 1 m of mixture volume3, it is eventually adding wet shot plant By concrete additive and soil binder, mix is uniformly rear to be painted.
3. wet shot plant cover concrete ecological vestige according to claim 1, it is characterised in that: surface layer (4) packet Include loam, cement, wet shot plant cover concrete additive, Common compound fertilizer, depot fertilizer, soil binder, organic matter, vegetable seeds Composition, the construction proportion of surface layer are (every cube is newly mixed substrate) and preparation method are as follows: loam 0.2-0.6 m3, organic matter 0.1- 0.2 m3, cement 0-30 kg, wet shot plant cover concrete additive 0-25 kg, Common compound fertilizer 0.5-0.8 kg, depot fertilizer 0.4-1.2 kg, soil binder 0.2-0.3 kg, vegetable seeds 100-200 g;Wherein, draft and shrub in vegetable seeds Granule number ratio is 2-3:1-2;The volume of grass fiber accounts for 20%-40% in organic matter, and the volume of rotten rice husk or vinasse accounts for 60%-80%;Grass fiber uses length for the cutted straw of 20-80mm or broken wheat straw;When preparing substrate, water is first added, adds earth Soil, organic matter, cement, depot fertilizer, Common compound fertilizer fully mix and make 1 m of mixture volume3, it is eventually adding wet shot plant By concrete additive, soil binder and vegetable seeds, mix is uniformly rear to be painted.
4. wet shot plant cover concrete ecological vestige according to claim 1, it is characterised in that: the loam selects table Soil takes native depth less than 3 m, and removes the sand grains that partial size is greater than 0.75 cm.
5. wet shot plant cover concrete ecological vestige according to claim 1, it is characterised in that: the soil binder Polyacrylamide is selected, water-retaining agent is doubled as.
6. wet shot plant cover concrete ecological vestige according to claim 1, it is characterised in that: the depot fertilizer uses Durable composite fertilizer, wherein N-P-K content ratio is 3-4:4-5:1-2;N-P-K content ratio is 2-3:1- in Common compound fertilizer 2:1-2.
7. wet shot plant cover concrete ecological vestige according to claim 1, it is characterised in that: the base (3) is thick Degree is 5-10 cm, and surface layer (4) is with a thickness of 1-2 cm.
8. wet shot plant cover concrete ecological vestige according to claim 1, it is characterised in that: the plane net (1) using three dimensional network+plane net substitution;When using three dimensional network+plane net, lower layer is three dimensional network, and upper layer is plane net.
9. wet shot plant cover concrete ecological vestige according to claim 1, it is characterised in that: wet shot vegetation used is mixed Solidifying soil additive is prepared by the following steps:
(1) composite bacterial powders A is prepared:
In parts by weight, by 5-8 parts of raw material strain bacillus megaterium phosphorus decomposing Gongzhuling mutation, 2-4 parts of Pseudomonas fluorescens, neighbour After 5-10 parts of monad, 40-70 parts of colloid bacillus cereus mixing, it is put into the aqueous sucrose solution that concentration is 2% and cultivates 24 at room temperature Hour, re-dry obtains the powder B rich in bacterium;By false indigo Autoinducer or Mo Leilan Sinorhizobium or both 10-20 parts of mixture are put into the aqueous solution that sucrose concentration is 2%, urea concentration is 0.5% and cultivate at room temperature 72 hours, re-dry Obtain the powder C containing bacterium;Powder B and powder C mix are finally obtained into powders A;
Kind raw material bacterium false indigo Autoinducer and the mixing of Mo Leilan Sinorhizobium are added when using with arbitrary proportion;
(2) composite bacterial powder D is prepared:
In parts by weight, it by 20-30 parts of raw material strain Trichoderma viride, 10-15 parts of aspergillus oryzae, 15-20 parts of saccharomyces cerevisiae, is put into Starch-containing 8%, it is cultivated at room temperature 24 hours in the aqueous solution of glucose 2%, agar 1%, obtains the powder D containing bacterium after dry;
(3) mixture E is prepared:
In parts by weight, it by 8-15 parts of land plaster, 40-45 parts of ground phosphate rock, 10-15 parts of Iron Ore Powder mixing, is mixed after dry Object E;
(4) wet shot plant cover concrete additive is prepared:
In parts by weight, it by 1-2 parts of powders A, 1-2 parts of powder D, 80-90 parts of mixture E, fully mixes to obtain wet shot plant By concrete additive;
Iron Ore Powder used, ground phosphate rock partial size are 40-60 mesh;Land plaster partial size is 100-200 mesh;
Powders A, powder D and the mixture E moisture content is less than 8%;
The land plaster is beta-type semi-hydrated gypsum powder;
Raw material strain living bacteria count (cfu) used is greater than 0.20 hundred million/g.
10. the construction method of wet shot plant cover concrete ecological vestige described in any claim in claim 1-9, It is characterized in that: the following steps are included:
1) slope surface is arranged net: it is laid with plane net in slope surface and is fixed with anchor pole, anchor pole is inserted into slope surface according to certain spacing, and It is exposed;
2) plant cover concrete substrate is prepared;
3) plant cover concrete substrate is sprayed using wet spraying process, construct respectively base and surface layer, using applying for multiple layering injection Work mode reaches design jetting thickness.
CN201910726433.8A 2019-08-07 2019-08-07 Wet-spraying vegetation concrete ecological slope protection technology Active CN110521503B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910726433.8A CN110521503B (en) 2019-08-07 2019-08-07 Wet-spraying vegetation concrete ecological slope protection technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910726433.8A CN110521503B (en) 2019-08-07 2019-08-07 Wet-spraying vegetation concrete ecological slope protection technology

Publications (2)

Publication Number Publication Date
CN110521503A true CN110521503A (en) 2019-12-03
CN110521503B CN110521503B (en) 2021-09-17

Family

ID=68662075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910726433.8A Active CN110521503B (en) 2019-08-07 2019-08-07 Wet-spraying vegetation concrete ecological slope protection technology

Country Status (1)

Country Link
CN (1) CN110521503B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112195940A (en) * 2020-09-11 2021-01-08 湖北工业大学 Ecological protection structure suitable for uneven rock slope in hollow and construction method
CN112390660A (en) * 2020-10-29 2021-02-23 成都聚力混凝土有限公司 Special vegetation concrete for slope protection and greening and preparation method thereof
CN112456895A (en) * 2020-12-22 2021-03-09 华新水泥股份有限公司 Vegetation concrete and preparation method thereof
CN113529754A (en) * 2021-07-14 2021-10-22 湖北工业大学 Granular-body slope ecological slope protection structure and construction method
CN113897979A (en) * 2021-10-09 2022-01-07 三峡大学 Vegetation concrete ecological restoration method for combination of dry spraying, wet spraying and spraying of high and steep side slope
CN113944174A (en) * 2021-09-26 2022-01-18 明达海洋工程有限公司 Vegetation concrete ecological slope protection construction method
CN114277815A (en) * 2022-01-30 2022-04-05 湖北工业大学 Geogrid reverse-wrapped modified expansive soil flexible ecological slope protection structure and construction method
CN114538872A (en) * 2022-01-11 2022-05-27 淮阴工学院 Mine restoration ecological concrete based on phosphate rock tailings and preparation method and application thereof
CN114790751A (en) * 2022-05-12 2022-07-26 湖北工业大学 Fruit and mud composite ecological slope protection structure and construction method thereof
CN115362785A (en) * 2022-09-02 2022-11-22 三峡大学 Method for promoting germination of Douglas fir-tree seeds in cement-based habitat base material
CN115991582A (en) * 2022-12-26 2023-04-21 湖南中核建设工程有限公司 Vegetation concrete and preparation method and application thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363227A (en) * 2008-09-03 2009-02-11 陈振峰 Continuous spray lawn nursery method
US20100281774A1 (en) * 2007-08-06 2010-11-11 Transcorea Development Co. Ltd. Artificial soil and method for growing vegetation on sloped surface using the same
CN102696307A (en) * 2012-06-27 2012-10-03 三峡大学 Greening hydro-seeding method used for arid areas
CN103650974A (en) * 2012-09-26 2014-03-26 路域生态工程有限公司 High-strength waterproof spray seeding greening base material and method
CN105714836A (en) * 2016-02-22 2016-06-29 中国环境科学研究院 Ecological restoration method applicable to oxidized ore waste-rock yard and capable of realizing acidification control on basis of phosphate fertilizer
CN107460884A (en) * 2017-09-30 2017-12-12 中铁十六局集团第工程有限公司 A kind of careless cage reinforcement spray-up ecological slope protection structure and its construction method
CN108484267A (en) * 2018-05-04 2018-09-04 东北农业大学 A kind of complex microorganism ecological organic fertilier and its preparation method and application
CN109329259A (en) * 2018-09-04 2019-02-15 湖北二零九工程有限公司 A kind of granule capsule for water and soil conservation is sowed grass seeds by duster plant measures method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100281774A1 (en) * 2007-08-06 2010-11-11 Transcorea Development Co. Ltd. Artificial soil and method for growing vegetation on sloped surface using the same
CN101363227A (en) * 2008-09-03 2009-02-11 陈振峰 Continuous spray lawn nursery method
CN102696307A (en) * 2012-06-27 2012-10-03 三峡大学 Greening hydro-seeding method used for arid areas
CN103650974A (en) * 2012-09-26 2014-03-26 路域生态工程有限公司 High-strength waterproof spray seeding greening base material and method
CN105714836A (en) * 2016-02-22 2016-06-29 中国环境科学研究院 Ecological restoration method applicable to oxidized ore waste-rock yard and capable of realizing acidification control on basis of phosphate fertilizer
CN107460884A (en) * 2017-09-30 2017-12-12 中铁十六局集团第工程有限公司 A kind of careless cage reinforcement spray-up ecological slope protection structure and its construction method
CN108484267A (en) * 2018-05-04 2018-09-04 东北农业大学 A kind of complex microorganism ecological organic fertilier and its preparation method and application
CN109329259A (en) * 2018-09-04 2019-02-15 湖北二零九工程有限公司 A kind of granule capsule for water and soil conservation is sowed grass seeds by duster plant measures method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112195940B (en) * 2020-09-11 2022-01-07 湖北工业大学 Ecological protection structure suitable for uneven rock slope in hollow and construction method
CN112195940A (en) * 2020-09-11 2021-01-08 湖北工业大学 Ecological protection structure suitable for uneven rock slope in hollow and construction method
CN112390660B (en) * 2020-10-29 2022-08-09 成都聚力混凝土有限公司 Special vegetation concrete for slope protection and greening and preparation method thereof
CN112390660A (en) * 2020-10-29 2021-02-23 成都聚力混凝土有限公司 Special vegetation concrete for slope protection and greening and preparation method thereof
CN112456895A (en) * 2020-12-22 2021-03-09 华新水泥股份有限公司 Vegetation concrete and preparation method thereof
CN113529754A (en) * 2021-07-14 2021-10-22 湖北工业大学 Granular-body slope ecological slope protection structure and construction method
CN113944174A (en) * 2021-09-26 2022-01-18 明达海洋工程有限公司 Vegetation concrete ecological slope protection construction method
CN113944174B (en) * 2021-09-26 2023-08-25 明达海洋工程有限公司 Construction method for vegetation concrete ecological slope protection
CN113897979A (en) * 2021-10-09 2022-01-07 三峡大学 Vegetation concrete ecological restoration method for combination of dry spraying, wet spraying and spraying of high and steep side slope
CN114538872A (en) * 2022-01-11 2022-05-27 淮阴工学院 Mine restoration ecological concrete based on phosphate rock tailings and preparation method and application thereof
CN114277815A (en) * 2022-01-30 2022-04-05 湖北工业大学 Geogrid reverse-wrapped modified expansive soil flexible ecological slope protection structure and construction method
CN114790751A (en) * 2022-05-12 2022-07-26 湖北工业大学 Fruit and mud composite ecological slope protection structure and construction method thereof
CN114790751B (en) * 2022-05-12 2023-11-28 湖北工业大学 Fruit and mud composite ecological slope protection structure and construction method thereof
CN115362785A (en) * 2022-09-02 2022-11-22 三峡大学 Method for promoting germination of Douglas fir-tree seeds in cement-based habitat base material
CN115991582A (en) * 2022-12-26 2023-04-21 湖南中核建设工程有限公司 Vegetation concrete and preparation method and application thereof
CN115991582B (en) * 2022-12-26 2023-09-01 湖南中核建设工程有限公司 Vegetation concrete and preparation method and application thereof

Also Published As

Publication number Publication date
CN110521503B (en) 2021-09-17

Similar Documents

Publication Publication Date Title
CN110521503A (en) Wet shot plant cover concrete ecological vestige
CN102031786B (en) Greening vegetation concrete and construction method thereof
CN100596269C (en) Plant slope protection method for low maintenance of exposed rock mass slope
CN105036956B (en) Compound plant cover concrete green additive
CN103073362B (en) Preserve moisture and fertility cultivation matrix of a kind of wilkinite and bacterium slag compound and preparation method thereof
CN102491836B (en) Preparation method of improved greening additive for vegetation growing concrete
CN103626584B (en) Method for preparing vegetation concrete greening additive AB bacteria
CN108570993B (en) Ecological vegetation concrete slope protection structure and construction method thereof
CN101743790B (en) Soil water ecological effectiveness control method
CN102643137B (en) Microbial ecological brick and preparation method thereof
CN108911672A (en) A kind of ardealite base plant cover concrete and its construction method
CN108093729A (en) Side-slope greening and protection method
CN107601980A (en) A kind of cement enhancing and alkalescence improvement alien earth sparging composite plant for side slope protection is native, prepares and applies
CN109258323A (en) A kind of greening for the exposed barren rock side slope in FIX CHARGE RATE ABOUT THE WASTE ROCK field is sowed grass seeds by duster method
CN103265957B (en) Erosion resistant matrix suitable for spray seeding for greening
CN106941802A (en) A kind of ecologic sand control method
CN105112067A (en) Saline-alkali soil modifier containing phosphogypsum and slow-release binder and use method of saline-alkali soil modifier
CN102422761B (en) Method for planting sedum lineare on slope
CN101857474B (en) Aeolian sandy soil modifier
CN111837528A (en) Bare rock spray-seeding green-recovering structure and construction method
CN109133751A (en) A kind of ecological revetment brick and preparation method thereof
CN110066159A (en) A kind of purified water type greening brick and preparation method thereof applied to ecological slope protection
CN116003026A (en) Ecological vegetation concrete base material and preparation method thereof
KR20040079885A (en) A base for artificial seed growing soil for slope and therefor construction method
CN113951091A (en) A-type phosphogypsum plant growing material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant