CN110457801A - The monitoring method and system of assembled project component - Google Patents
The monitoring method and system of assembled project component Download PDFInfo
- Publication number
- CN110457801A CN110457801A CN201910697681.4A CN201910697681A CN110457801A CN 110457801 A CN110457801 A CN 110457801A CN 201910697681 A CN201910697681 A CN 201910697681A CN 110457801 A CN110457801 A CN 110457801A
- Authority
- CN
- China
- Prior art keywords
- assembled
- component
- project component
- project
- assembled project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 90
- 238000012544 monitoring process Methods 0.000 title claims abstract description 28
- 238000001514 detection method Methods 0.000 claims description 48
- 238000010276 construction Methods 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 6
- 238000007639 printing Methods 0.000 claims description 6
- 238000012797 qualification Methods 0.000 claims description 6
- 239000013589 supplement Substances 0.000 claims description 6
- 238000012790 confirmation Methods 0.000 claims description 4
- 238000007689 inspection Methods 0.000 claims 2
- 238000007726 management method Methods 0.000 abstract description 53
- 238000013461 design Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 7
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 230000003993 interaction Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
- G06K17/0025—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Computer Networks & Wireless Communication (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides the monitoring methods and system of a kind of assembled project component, management method of the present invention compared to the existing prefabricated component for site operation personnel, prefabricated components carry out " one one yard " in management platform, the two dimensional code that every prefabricated component generates is corresponding with its information on design drawing, data, size, while reducing administrative staff's workload, management accuracy rate and efficiency are improved.
Description
Technical field
The present invention relates to the monitoring methods and system of a kind of assembled project component.
Background technique
Prefabricated assembled project largely uses fabricated construction, prefabricated panel, laminated floor slab, precast beam, precast stair,
Prefabricated balcony plate, prefabricated bay window etc., building is numerous in variety, moulding is complicated, and it is very high that management requirement is stacked at scene.Construction site pair
Archives of paper quality is rested in the file administration of prefabricated component.In the case where advocating a component portion archives, construction
Personnel are difficult to table be managed component correspondingly, but batch is filled in, managed.
Prefabricated assembled project unit of taking part in building is more, is related to the coordination of numerous professional units, cooperates and look after, large-scale assembled
Project even can several prefabricated components manufacturers.
It is found after investigating, current prefabricated artifact management method has the following deficiencies:
1. construction site and the schedule of prefabricated components factory are variant, live component stacking or scene is caused to stop
Work;
2. the statistics of the number of components and component model generates error;
3. the search of component archives is difficult, it is difficult to realize the corresponding a archives of a component, instead fill in people
Member causes form data inaccurate by batch filling up a form;
4. owner and other unit can only link up project process, situation by weekly meeting, cannot understand in time;
5. examining report with component archives by batch filling in, can not be by duty fulfillment to specific testing staff.
Summary of the invention
The purpose of the present invention is to provide the monitoring methods and system of a kind of assembled project component.
To solve the above problems, the present invention provides a kind of monitoring method of assembled project component, comprising:
Establish the BIM buildings model of each assembled project component, and by the data input of each assembled project component
In corresponding BIM buildings model;
The BIM buildings model of each assembled project component and its corresponding information lead-in item manage platform, and in institute
State the corresponding progress process that each assembled project component is set in project management platform, detection list and the progress stream
Journey, detection list fill in permission;
It is that each assembled project component generates corresponding two dimensional code in the project management platform;
The two dimensional code of each assembled project component is obtained from the project management platform, and the two dimensional code that will acquire is beaten
It is pasted on after print on corresponding assembled project component;
Staff is scanned entrucking and finished by cell phone application to be prepared to transport the two dimension on the assembled project component to dispatch from the factory
Code to log in the project management platform, and fills in permission based on described, fills in corresponding progress process and detection list, with
Complete the factory process of assembled project component.
Further, in the above-mentioned methods, the information of each assembled project component includes:
Component name, block number, Lou Hao, floor information.
Further, in the above-mentioned methods, after the factory process for completing assembled project component, further includes:
When haulage vehicle reaches construction site, general contracting unit materials arrival administrative staff pass through scanning assembled project component
On two dimensional code, to log in the project management platform, and fill in permission based on described, fill in corresponding progress process and detection
List, to confirm assembled project component admission.
Further, in the above-mentioned methods, after confirmation assembled project component admission, further includes:
After supervisor checks and accepts assembled project component qualification, by two dimensional code on scanning assembled project component, to step on
The project management platform is recorded, and fills in permission based on described, corresponding progress process and detection list are filled in, to confirm assembly
The examination of formula project component finishes.
Further, in the above-mentioned methods, after the examination of confirmation assembled project component finishes, further includes:
By two dimensional code on scanning assembled project component, to log in the project management platform, and filled in based on described
Permission fills in corresponding progress process and detection list, to carry out the data supplement of assembled project component.
Another side according to the present invention provides a kind of monitoring system of assembled project component characterized by comprising
First module, for establishing the BIM buildings model of each assembled project component, and by each assembled project structure
In the corresponding BIM buildings model of the data input of part;
Second module, for by the BIM buildings model of each assembled project component and its corresponding information lead-in item
Platform is managed, and corresponding progress process, the detection table of each assembled project component are set in the project management platform
The single and described progress process, detection list fill in permission;
Third module, for being that each assembled project component generates corresponding two dimension in the project management platform
Code;
4th module for obtaining the two dimensional code of each assembled project component from the project management platform, and will obtain
It is pasted on corresponding assembled project component after the two dimensional code printing got;
5th module finishes the assembled item for preparing to transport factory for scanning entrucking by cell phone application for staff
Two dimensional code on mesh component to log in the project management platform, and fills in permission based on described, fills in corresponding progress process
With detection list, to complete the factory process of assembled project component.
Further, in above system, the information of each assembled project component includes:
Component name, block number, Lou Hao, floor information.
It further, further include the 6th module in above system, for supplying when haulage vehicle reaches construction site
General contracting unit materials arrival administrative staff are flat to log in the project management by the two dimensional code on scanning assembled project component
Platform, and permission is filled in based on described, corresponding progress process and detection list are filled in, to confirm assembled project component admission.
It further, further include the 7th module in above system, for checking and accepting assembled project component for supervisor
After qualification, by two dimensional code on scanning assembled project component, to log in the project management platform, and based on the power of filling in
Limit fills in corresponding progress process and detection list, to confirm that the examination of assembled project component finishes.
It further, further include the 8th module in above system, for passing through two dimension on scanning assembled project component
Code to log in the project management platform, and fills in permission based on described, fills in corresponding progress process and detection list, with
Carry out the data supplement of assembled project component.
Compared with prior art, management of the present invention compared to the existing prefabricated component for site operation personnel
Method, prefabricated components carry out " one one yard " in management platform, two dimensional code that every prefabricated component generates and its
Information, data, size on design drawing is corresponding, while reducing administrative staff's workload, improve management accuracy rate and
Efficiency.Specifically there is following advantage:
1. improving prefabricated components quantity, the statistical accuracy of model;
2. each unit of taking part in building's real-time update project process, data, and adjust with this process of respective unit;
3. due to the accurate interaction of " one one yard " data, it is ensured that information, data, size it is accurate, be convenient for construction site
Management and implementation;
4. the trace that state updates implements detection, checks and accepts responsibility system, make itself clear responsibility such as project manager, management
And supervise its work.
The one-to-one correspondence that " 5. one one grade " makes archives and component.It realizes and fills in detection table on line, accelerate table and complete
Speed.Convenient for the collection, arrangement and search of archives.
Detailed description of the invention
Fig. 1 is the flow chart of the monitoring method of the assembled project component of one embodiment of the invention;
Fig. 2 is the schematic diagram that one embodiment of the invention establishes model, typing related data;
Fig. 3 is the schematic diagram of the progress process of the creation assembled project component of one embodiment of the invention;
Fig. 4 is the detection list and fill flow path, permission of the creation assembled project component information of one embodiment of the invention
Schematic diagram;
Fig. 5 is the detection list finished product schematic of the assembled project component information of one embodiment of the invention;
Fig. 6 is that the assembled project component of one embodiment of the invention generates the schematic diagram of corresponding two dimensional code;
Fig. 7 is the schematic diagram of the two dimensional code of the assembled project component for printing certain batch of one embodiment of the invention;
Fig. 8 is that the processing factory administrative staff of one embodiment of the invention paste the schematic diagram of two dimensional code;
Fig. 9 is that the construction site management personnel of one embodiment of the invention scan the two-dimensional code the schematic diagram of more new state.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present invention provides a kind of monitoring method of assembled project component, comprising:
Step S1, establishes the BIM buildings model of each assembled project component, and by the letter of each assembled project component
It ceases in the corresponding BIM buildings model of typing;
Here, firstly, to establish BIM buildings model (the Building Information of each assembled project component
Modeling, Building Information Model), according to the requirement of each unit of taking part in building, need each assembled project structure in the modelling phase
In the corresponding BIM buildings model of the relevant information typing of part
Step S2 equals the BIM buildings model of each assembled project component and its corresponding information lead-in item management
Platform, and corresponding progress process, detection list and the institute of each assembled project component are set in the project management platform
State progress process, detection list fills in permission;
Here, secondly, by the BIM buildings model and its corresponding information lead in item of each assembled project component of completion
Mesh manage platform, and in platform set prefabricated components each progress stage, draw the detection list of prefabricated components and by its
Invest each assembled project component;Wherein, the progress process of assembled project component is created as shown in figure 3, setting is each
Corresponding progress process, detection list and the progress process of assembled project component, the permission of filling in of detection list are such as schemed
Shown in 4 and 5;
Step S3 is that each assembled project component generates corresponding two dimensional code in the project management platform;
Here, as shown in fig. 6, finally unique two dimensional code can be generated for the assembled project component of each ID;
Step S4, the two dimensional code of each assembled project component is obtained from the project management platform, and will acquire
It is pasted on corresponding assembled project component after two dimensional code printing;
Here, as shown in fig. 7, the staff of the management two dimensional code of component processing factory is by the component batch that will be dispatched from the factory
Two dimensional code is printed by project management platform;As shown in figure 8, and two dimensional code is pasted onto corresponding assembled project component
On;
Step S5, staff are scanned entrucking by cell phone application and are finished on the assembled project component for preparing to transport factory
Two dimensional code, to log in the project management platform, and fill in permission based on described, fill in corresponding progress process and detection table
It is single, to complete the factory process of assembled project component.
Here, the invention proposes a kind of prefabricated assembled project component management sides based on architecture informationization management platform
Method avoids the statistical error of prefabricated components quantity, model;Each unit of taking part in building's real-time update project process, data, and adjusted with this
The process of whole respective unit;Realize component and archives one-to-one correspondence, it is ensured that information and date it is accurate;It implements detection, check and accept
Responsibility system.
In one embodiment of monitoring method of assembled project component of the invention, the packet of each assembled project component
It includes:
Component name, block number, Lou Hao, floor information.
Here, as shown in Fig. 2, may include in the information table of each component its component name, block number, Lou Hao, building
Layer information.
As shown in Figure 1, completing assembled project structure in one embodiment of monitoring method of assembled project component of the invention
After the factory process of part, further includes:
As shown in figure 9, general contracting unit materials arrival administrative staff pass through scanning assembly when haulage vehicle reaches construction site
Two dimensional code on formula project component to log in the project management platform, and fills in permission based on described, fills in corresponding progress
Process and detection list, to confirm assembled project component admission.
As shown in Figure 1, confirming assembled project structure in one embodiment of monitoring method of assembled project component of the invention
After part admission, further includes:
After supervisor checks and accepts assembled project component qualification, by two dimensional code on scanning assembled project component, to step on
The project management platform is recorded, and fills in permission based on described, corresponding progress process and detection list are filled in, to confirm assembly
The examination of formula project component finishes.
As shown in Figure 1, confirming assembled project structure in one embodiment of monitoring method of assembled project component of the invention
After part examination finishes, further includes:
By two dimensional code on scanning assembled project component, to log in the project management platform, and filled in based on described
Permission fills in corresponding progress process and detection list, to carry out the data supplement of assembled project component.
The present invention also provides the monitoring systems of another assembled project component, comprising:
First module, for establishing the BIM buildings model of each assembled project component, and by each assembled project structure
In the corresponding BIM buildings model of the data input of part;
Here, firstly, to establish BIM buildings model (the Building Information of each assembled project component
Modeling, Building Information Model), according to the requirement of each unit of taking part in building, need each assembled project structure in the modelling phase
In the corresponding BIM buildings model of the relevant information typing of part
Second module, for by the BIM buildings model of each assembled project component and its corresponding information lead-in item
Platform is managed, and corresponding progress process, the detection table of each assembled project component are set in the project management platform
The single and described progress process, detection list fill in permission;
Here, secondly, by the BIM buildings model and its corresponding information lead in item of each assembled project component of completion
Mesh manage platform, and in platform set prefabricated components each progress stage, draw the detection list of prefabricated components and by its
Invest each assembled project component;Wherein, the progress process of assembled project component is created as shown in figure 3, setting is each
Corresponding progress process, detection list and the progress process of assembled project component, the permission of filling in of detection list are such as schemed
Shown in 4 and 5;
Third module, for being that each assembled project component generates corresponding two dimension in the project management platform
Code;
Here, as shown in fig. 6, finally unique two dimensional code can be generated for the assembled project component of each ID;
4th module for obtaining the two dimensional code of each assembled project component from the project management platform, and will obtain
It is pasted on corresponding assembled project component after the two dimensional code printing got;
Here, as shown in fig. 7, the staff of the management two dimensional code of component processing factory is by the component batch that will be dispatched from the factory
Two dimensional code is printed by project management platform;As shown in figure 8, and two dimensional code is pasted onto corresponding assembled project component
On;
5th module finishes the assembled item for preparing to transport factory for scanning entrucking by cell phone application for staff
Two dimensional code on mesh component to log in the project management platform, and fills in permission based on described, fills in corresponding progress process
With detection list, to complete the factory process of assembled project component.
Here, the invention proposes a kind of prefabricated assembled project component management sides based on architecture informationization management platform
Method avoids the statistical error of prefabricated components quantity, model;Each unit of taking part in building's real-time update project process, data, and adjusted with this
The process of whole respective unit;Realize component and archives one-to-one correspondence, it is ensured that information and date it is accurate;It implements detection, check and accept
Responsibility system.
In one embodiment of monitoring method of assembled project component of the invention, the packet of each assembled project component
It includes:
Component name, block number, Lou Hao, floor information.
Here, as shown in Fig. 2, may include in the information table of each component its component name, block number, Lou Hao, building
Layer information.
As shown in Figure 1, in one embodiment of monitoring method of assembled project component of the invention, as shown in figure 9, further including
6th module, for passing through scanning assembly for general contracting unit materials arrival administrative staff when haulage vehicle reaches construction site
Two dimensional code on formula project component to log in the project management platform, and fills in permission based on described, fills in corresponding progress
Process and detection list, to confirm assembled project component admission.
As shown in Figure 1, further include the 7th module in one embodiment of monitoring method of assembled project component of the invention,
After checking and accepting assembled project component qualification for supervisor, by two dimensional code on scanning assembled project component, to log in
The project management platform, and permission is filled in based on described, corresponding progress process and detection list are filled in, to confirm assembled
The examination of project component finishes.
As shown in Figure 1, further include the 8th module in one embodiment of monitoring method of assembled project component of the invention,
For to log in the project management platform, and filling in permission based on described by two dimensional code on scanning assembled project component,
Corresponding progress process and detection list are filled in, to carry out the data supplement of assembled project component.
In conclusion management method of the present invention compared to the existing prefabricated component for site operation personnel,
Prefabricated components carry out " one one yard " in management platform, two dimensional code that every prefabricated component generates and its in design drawing
Information, data, size on paper is corresponding, while reducing administrative staff's workload, improves management accuracy rate and efficiency.Tool
Body has following advantage:
1. improving prefabricated components quantity, the statistical accuracy of model;
2. each unit of taking part in building's real-time update project process, data, and adjust with this process of respective unit;
3. due to the accurate interaction of " one one yard " data, it is ensured that information, data, size it is accurate, be convenient for construction site
Management and implementation;
4. the trace that state updates implements detection, checks and accepts responsibility system, make itself clear responsibility such as project manager, management
And supervise its work.
The one-to-one correspondence that " 5. one one grade " makes archives and component.It realizes and fills in detection table on line, accelerate table and complete
Speed.Convenient for the collection, arrangement and search of archives.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure
And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession
Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered
Think beyond the scope of this invention.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the invention is also intended to include including these modification and variations.
Claims (10)
1. a kind of monitoring method of assembled project component characterized by comprising
The BIM buildings model of each assembled project component is established, and the data input of each assembled project component is corresponding
BIM buildings model in;
The BIM buildings model of each assembled project component and its corresponding information lead-in item manage platform, and in the item
Corresponding progress process, detection list and the progress process, the inspection of each assembled project component are set in mesh management platform
That surveys list fills in permission;
It is that each assembled project component generates corresponding two dimensional code in the project management platform;
After the two dimensional code printing that obtains the two dimensional code of each assembled project component from the project management platform, and will acquire
It is pasted on corresponding assembled project component;
Staff is scanned entrucking and finished by cell phone application to be prepared to transport the two dimensional code on the assembled project component to dispatch from the factory, with
The project management platform is logged in, and fills in permission based on described, corresponding progress process and detection list are filled in, to complete to fill
Factory process with formula project component.
2. the monitoring method of assembled project component as described in claim 1, which is characterized in that each assembled project component
Information include:
Component name, block number, Lou Hao, floor information.
3. the monitoring method of assembled project component as described in claim 1, which is characterized in that complete assembled project component
Factory process after, further includes:
When haulage vehicle reaches construction site, general contracting unit materials arrival administrative staff pass through on scanning assembled project component
Two dimensional code to log in the project management platform, and fills in permission based on described, fills in corresponding progress process and detection table
It is single, to confirm assembled project component admission.
4. the monitoring method of assembled project component as claimed in claim 3, which is characterized in that confirmation assembled project component
After admission, further includes:
After supervisor checks and accepts assembled project component qualification, by two dimensional code on scanning assembled project component, to log in
Project management platform is stated, and fills in permission based on described, corresponding progress process and detection list are filled in, to confirm assembled item
The examination of mesh component finishes.
5. the monitoring method of assembled project component as claimed in claim 4, which is characterized in that confirmation assembled project component
After examination finishes, further includes:
By two dimensional code on scanning assembled project component, to log in the project management platform, and permission is filled in based on described,
Corresponding progress process and detection list are filled in, to carry out the data supplement of assembled project component.
6. a kind of monitoring system of assembled project component characterized by comprising
First module, for establishing the BIM buildings model of each assembled project component, and by each assembled project component
In the corresponding BIM buildings model of data input;
Second module, for by the BIM buildings model of each assembled project component and its corresponding information lead-in item management
Platform, and the corresponding progress process of each assembled project component, detection list are set in the project management platform, and
The progress process, detection list fill in permission;
Third module, for being that each assembled project component generates corresponding two dimensional code in the project management platform;
4th module for obtaining the two dimensional code of each assembled project component from the project management platform, and will acquire
Two dimensional code printing after be pasted on corresponding assembled project component;
5th module finishes the assembled project structure for preparing to transport factory for scanning entrucking by cell phone application for staff
Two dimensional code on part to log in the project management platform, and fills in permission based on described, fills in corresponding progress process and inspection
List is surveyed, to complete the factory process of assembled project component.
7. the monitoring system of assembled project component as claimed in claim 6, which is characterized in that each assembled project component
Information include:
Component name, block number, Lou Hao, floor information.
8. the monitoring system of assembled project component as claimed in claim 6, which is characterized in that further include the 6th module, use
In when haulage vehicle reaches construction site, pass through on scanning assembled project component for general contracting unit materials arrival administrative staff
Two dimensional code, to log in the project management platform, and fill in permission based on described, fill in corresponding progress process and detection table
It is single, to confirm assembled project component admission.
9. the monitoring system of assembled project component as claimed in claim 8, which is characterized in that further include the 7th module, use
After checking and accepting assembled project component qualification for supervisor, by two dimensional code on scanning assembled project component, to log in
Project management platform is stated, and fills in permission based on described, corresponding progress process and detection list are filled in, to confirm assembled item
The examination of mesh component finishes.
10. the monitoring system of assembled project component as claimed in claim 9, which is characterized in that further include the 8th module, use
The two dimensional code on through scanning assembled project component to log in the project management platform, and is filled in permission based on described, is filled out
Corresponding progress process and detection list are write, to carry out the data supplement of assembled project component.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910697681.4A CN110457801A (en) | 2019-07-30 | 2019-07-30 | The monitoring method and system of assembled project component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910697681.4A CN110457801A (en) | 2019-07-30 | 2019-07-30 | The monitoring method and system of assembled project component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110457801A true CN110457801A (en) | 2019-11-15 |
Family
ID=68484148
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910697681.4A Pending CN110457801A (en) | 2019-07-30 | 2019-07-30 | The monitoring method and system of assembled project component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110457801A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112508151A (en) * | 2020-11-09 | 2021-03-16 | 上海建工集团股份有限公司 | Method for reusing integral climbing steel platform formwork component |
CN113177623A (en) * | 2021-05-21 | 2021-07-27 | 铜陵有色建安钢构有限责任公司 | Steel structure modular installation method based on two-dimensional code and Tekla technology |
CN114881392A (en) * | 2022-03-10 | 2022-08-09 | 中国建筑第二工程局有限公司 | Management method and system of assembled component |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107067223A (en) * | 2016-12-16 | 2017-08-18 | 上海建工集团股份有限公司 | Construction information collection processing method |
CN108717623A (en) * | 2018-05-18 | 2018-10-30 | 深圳大学 | A kind of assembled architecture tracks of device, method and system based on BIM |
CN109034736A (en) * | 2018-07-10 | 2018-12-18 | 李磊 | Project management system and operating platform based on BIM |
CN109087048A (en) * | 2018-08-17 | 2018-12-25 | 青岛理工大学 | Assembled architecture component method for tracing based on two dimensional code |
-
2019
- 2019-07-30 CN CN201910697681.4A patent/CN110457801A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107067223A (en) * | 2016-12-16 | 2017-08-18 | 上海建工集团股份有限公司 | Construction information collection processing method |
CN108717623A (en) * | 2018-05-18 | 2018-10-30 | 深圳大学 | A kind of assembled architecture tracks of device, method and system based on BIM |
CN109034736A (en) * | 2018-07-10 | 2018-12-18 | 李磊 | Project management system and operating platform based on BIM |
CN109087048A (en) * | 2018-08-17 | 2018-12-25 | 青岛理工大学 | Assembled architecture component method for tracing based on two dimensional code |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112508151A (en) * | 2020-11-09 | 2021-03-16 | 上海建工集团股份有限公司 | Method for reusing integral climbing steel platform formwork component |
CN113177623A (en) * | 2021-05-21 | 2021-07-27 | 铜陵有色建安钢构有限责任公司 | Steel structure modular installation method based on two-dimensional code and Tekla technology |
CN114881392A (en) * | 2022-03-10 | 2022-08-09 | 中国建筑第二工程局有限公司 | Management method and system of assembled component |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110457801A (en) | The monitoring method and system of assembled project component | |
CN109785436B (en) | BIM technology-based reinforcing steel bar information full life cycle management method | |
Ding et al. | A digital construction framework integrating building information modeling and reverse engineering technologies for renovation projects | |
CN106485411A (en) | Prefabricated concrete structure based on BIM technology builds management method and system | |
CN108532953B (en) | BIM-based cantilever plate construction method and building construction method | |
CN111091304A (en) | Digital work ticket management and control system and method for power industry | |
CN107292068A (en) | A kind of assembled architecture BIM model treatments method and processing system | |
CN111861512B (en) | System and method for tracking block chain of component information of assembled building parts | |
JP2002248692A (en) | Three-dimensional shaping system, three-dimensional shaping center, program, memory medium and method for ordering three-dimensional shaping | |
CN111105167A (en) | Steel structure engineering visual testing and accepting method based on BIM technology | |
CN112101905A (en) | Block chain technology-based fabricated building integrated construction cooperative management method and system thereof | |
CN108154340A (en) | Prefabricated component informationization management system based on BIM cloud platforms | |
CN103077432A (en) | Printed circuit board (PCB) production management system | |
CN112252548A (en) | Curtain wall dry-hanging prefabricating method based on BIM | |
CN109214679A (en) | A kind of projects management system based on Building Information Model | |
CN110414170A (en) | A kind of construction pre-assembly method and system based on BIM technology | |
CN113656505A (en) | Digitalization of distributed project management system and method for synchronizing data thereof | |
CN113298496A (en) | Business and process configurable operation ticket management system | |
CN104268708A (en) | Building template intelligent managing system and method based on cloud intelligence technology | |
CN114511296A (en) | High-standard farmland construction project management platform | |
CN113159248A (en) | Pile foundation construction management method and system based on two-dimensional code | |
CN108428110A (en) | A kind of acquisition methods of construction-engineering project management information | |
Disney et al. | Total BIM on the construction site: a dynamic single source of information. | |
CN109697547A (en) | The management method and management system of safe mass inspection | |
CN115358706A (en) | Cross-domain communication method based on government affair service cooperation technology and support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191115 |
|
RJ01 | Rejection of invention patent application after publication |