CN110457801A - The monitoring method and system of assembled project component - Google Patents

The monitoring method and system of assembled project component Download PDF

Info

Publication number
CN110457801A
CN110457801A CN201910697681.4A CN201910697681A CN110457801A CN 110457801 A CN110457801 A CN 110457801A CN 201910697681 A CN201910697681 A CN 201910697681A CN 110457801 A CN110457801 A CN 110457801A
Authority
CN
China
Prior art keywords
assembled
component
project component
project
assembled project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910697681.4A
Other languages
Chinese (zh)
Inventor
崔满
李�灿
胡弘毅
李淏頔
王勇
李晓婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201910697681.4A priority Critical patent/CN110457801A/en
Publication of CN110457801A publication Critical patent/CN110457801A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0025Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides the monitoring methods and system of a kind of assembled project component, management method of the present invention compared to the existing prefabricated component for site operation personnel, prefabricated components carry out " one one yard " in management platform, the two dimensional code that every prefabricated component generates is corresponding with its information on design drawing, data, size, while reducing administrative staff's workload, management accuracy rate and efficiency are improved.

Description

The monitoring method and system of assembled project component
Technical field
The present invention relates to the monitoring methods and system of a kind of assembled project component.
Background technique
Prefabricated assembled project largely uses fabricated construction, prefabricated panel, laminated floor slab, precast beam, precast stair, Prefabricated balcony plate, prefabricated bay window etc., building is numerous in variety, moulding is complicated, and it is very high that management requirement is stacked at scene.Construction site pair Archives of paper quality is rested in the file administration of prefabricated component.In the case where advocating a component portion archives, construction Personnel are difficult to table be managed component correspondingly, but batch is filled in, managed.
Prefabricated assembled project unit of taking part in building is more, is related to the coordination of numerous professional units, cooperates and look after, large-scale assembled Project even can several prefabricated components manufacturers.
It is found after investigating, current prefabricated artifact management method has the following deficiencies:
1. construction site and the schedule of prefabricated components factory are variant, live component stacking or scene is caused to stop Work;
2. the statistics of the number of components and component model generates error;
3. the search of component archives is difficult, it is difficult to realize the corresponding a archives of a component, instead fill in people Member causes form data inaccurate by batch filling up a form;
4. owner and other unit can only link up project process, situation by weekly meeting, cannot understand in time;
5. examining report with component archives by batch filling in, can not be by duty fulfillment to specific testing staff.
Summary of the invention
The purpose of the present invention is to provide the monitoring methods and system of a kind of assembled project component.
To solve the above problems, the present invention provides a kind of monitoring method of assembled project component, comprising:
Establish the BIM buildings model of each assembled project component, and by the data input of each assembled project component In corresponding BIM buildings model;
The BIM buildings model of each assembled project component and its corresponding information lead-in item manage platform, and in institute State the corresponding progress process that each assembled project component is set in project management platform, detection list and the progress stream Journey, detection list fill in permission;
It is that each assembled project component generates corresponding two dimensional code in the project management platform;
The two dimensional code of each assembled project component is obtained from the project management platform, and the two dimensional code that will acquire is beaten It is pasted on after print on corresponding assembled project component;
Staff is scanned entrucking and finished by cell phone application to be prepared to transport the two dimension on the assembled project component to dispatch from the factory Code to log in the project management platform, and fills in permission based on described, fills in corresponding progress process and detection list, with Complete the factory process of assembled project component.
Further, in the above-mentioned methods, the information of each assembled project component includes:
Component name, block number, Lou Hao, floor information.
Further, in the above-mentioned methods, after the factory process for completing assembled project component, further includes:
When haulage vehicle reaches construction site, general contracting unit materials arrival administrative staff pass through scanning assembled project component On two dimensional code, to log in the project management platform, and fill in permission based on described, fill in corresponding progress process and detection List, to confirm assembled project component admission.
Further, in the above-mentioned methods, after confirmation assembled project component admission, further includes:
After supervisor checks and accepts assembled project component qualification, by two dimensional code on scanning assembled project component, to step on The project management platform is recorded, and fills in permission based on described, corresponding progress process and detection list are filled in, to confirm assembly The examination of formula project component finishes.
Further, in the above-mentioned methods, after the examination of confirmation assembled project component finishes, further includes:
By two dimensional code on scanning assembled project component, to log in the project management platform, and filled in based on described Permission fills in corresponding progress process and detection list, to carry out the data supplement of assembled project component.
Another side according to the present invention provides a kind of monitoring system of assembled project component characterized by comprising
First module, for establishing the BIM buildings model of each assembled project component, and by each assembled project structure In the corresponding BIM buildings model of the data input of part;
Second module, for by the BIM buildings model of each assembled project component and its corresponding information lead-in item Platform is managed, and corresponding progress process, the detection table of each assembled project component are set in the project management platform The single and described progress process, detection list fill in permission;
Third module, for being that each assembled project component generates corresponding two dimension in the project management platform Code;
4th module for obtaining the two dimensional code of each assembled project component from the project management platform, and will obtain It is pasted on corresponding assembled project component after the two dimensional code printing got;
5th module finishes the assembled item for preparing to transport factory for scanning entrucking by cell phone application for staff Two dimensional code on mesh component to log in the project management platform, and fills in permission based on described, fills in corresponding progress process With detection list, to complete the factory process of assembled project component.
Further, in above system, the information of each assembled project component includes:
Component name, block number, Lou Hao, floor information.
It further, further include the 6th module in above system, for supplying when haulage vehicle reaches construction site General contracting unit materials arrival administrative staff are flat to log in the project management by the two dimensional code on scanning assembled project component Platform, and permission is filled in based on described, corresponding progress process and detection list are filled in, to confirm assembled project component admission.
It further, further include the 7th module in above system, for checking and accepting assembled project component for supervisor After qualification, by two dimensional code on scanning assembled project component, to log in the project management platform, and based on the power of filling in Limit fills in corresponding progress process and detection list, to confirm that the examination of assembled project component finishes.
It further, further include the 8th module in above system, for passing through two dimension on scanning assembled project component Code to log in the project management platform, and fills in permission based on described, fills in corresponding progress process and detection list, with Carry out the data supplement of assembled project component.
Compared with prior art, management of the present invention compared to the existing prefabricated component for site operation personnel Method, prefabricated components carry out " one one yard " in management platform, two dimensional code that every prefabricated component generates and its Information, data, size on design drawing is corresponding, while reducing administrative staff's workload, improve management accuracy rate and Efficiency.Specifically there is following advantage:
1. improving prefabricated components quantity, the statistical accuracy of model;
2. each unit of taking part in building's real-time update project process, data, and adjust with this process of respective unit;
3. due to the accurate interaction of " one one yard " data, it is ensured that information, data, size it is accurate, be convenient for construction site Management and implementation;
4. the trace that state updates implements detection, checks and accepts responsibility system, make itself clear responsibility such as project manager, management And supervise its work.
The one-to-one correspondence that " 5. one one grade " makes archives and component.It realizes and fills in detection table on line, accelerate table and complete Speed.Convenient for the collection, arrangement and search of archives.
Detailed description of the invention
Fig. 1 is the flow chart of the monitoring method of the assembled project component of one embodiment of the invention;
Fig. 2 is the schematic diagram that one embodiment of the invention establishes model, typing related data;
Fig. 3 is the schematic diagram of the progress process of the creation assembled project component of one embodiment of the invention;
Fig. 4 is the detection list and fill flow path, permission of the creation assembled project component information of one embodiment of the invention Schematic diagram;
Fig. 5 is the detection list finished product schematic of the assembled project component information of one embodiment of the invention;
Fig. 6 is that the assembled project component of one embodiment of the invention generates the schematic diagram of corresponding two dimensional code;
Fig. 7 is the schematic diagram of the two dimensional code of the assembled project component for printing certain batch of one embodiment of the invention;
Fig. 8 is that the processing factory administrative staff of one embodiment of the invention paste the schematic diagram of two dimensional code;
Fig. 9 is that the construction site management personnel of one embodiment of the invention scan the two-dimensional code the schematic diagram of more new state.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present invention provides a kind of monitoring method of assembled project component, comprising:
Step S1, establishes the BIM buildings model of each assembled project component, and by the letter of each assembled project component It ceases in the corresponding BIM buildings model of typing;
Here, firstly, to establish BIM buildings model (the Building Information of each assembled project component Modeling, Building Information Model), according to the requirement of each unit of taking part in building, need each assembled project structure in the modelling phase In the corresponding BIM buildings model of the relevant information typing of part
Step S2 equals the BIM buildings model of each assembled project component and its corresponding information lead-in item management Platform, and corresponding progress process, detection list and the institute of each assembled project component are set in the project management platform State progress process, detection list fills in permission;
Here, secondly, by the BIM buildings model and its corresponding information lead in item of each assembled project component of completion Mesh manage platform, and in platform set prefabricated components each progress stage, draw the detection list of prefabricated components and by its Invest each assembled project component;Wherein, the progress process of assembled project component is created as shown in figure 3, setting is each Corresponding progress process, detection list and the progress process of assembled project component, the permission of filling in of detection list are such as schemed Shown in 4 and 5;
Step S3 is that each assembled project component generates corresponding two dimensional code in the project management platform;
Here, as shown in fig. 6, finally unique two dimensional code can be generated for the assembled project component of each ID;
Step S4, the two dimensional code of each assembled project component is obtained from the project management platform, and will acquire It is pasted on corresponding assembled project component after two dimensional code printing;
Here, as shown in fig. 7, the staff of the management two dimensional code of component processing factory is by the component batch that will be dispatched from the factory Two dimensional code is printed by project management platform;As shown in figure 8, and two dimensional code is pasted onto corresponding assembled project component On;
Step S5, staff are scanned entrucking by cell phone application and are finished on the assembled project component for preparing to transport factory Two dimensional code, to log in the project management platform, and fill in permission based on described, fill in corresponding progress process and detection table It is single, to complete the factory process of assembled project component.
Here, the invention proposes a kind of prefabricated assembled project component management sides based on architecture informationization management platform Method avoids the statistical error of prefabricated components quantity, model;Each unit of taking part in building's real-time update project process, data, and adjusted with this The process of whole respective unit;Realize component and archives one-to-one correspondence, it is ensured that information and date it is accurate;It implements detection, check and accept Responsibility system.
In one embodiment of monitoring method of assembled project component of the invention, the packet of each assembled project component It includes:
Component name, block number, Lou Hao, floor information.
Here, as shown in Fig. 2, may include in the information table of each component its component name, block number, Lou Hao, building Layer information.
As shown in Figure 1, completing assembled project structure in one embodiment of monitoring method of assembled project component of the invention After the factory process of part, further includes:
As shown in figure 9, general contracting unit materials arrival administrative staff pass through scanning assembly when haulage vehicle reaches construction site Two dimensional code on formula project component to log in the project management platform, and fills in permission based on described, fills in corresponding progress Process and detection list, to confirm assembled project component admission.
As shown in Figure 1, confirming assembled project structure in one embodiment of monitoring method of assembled project component of the invention After part admission, further includes:
After supervisor checks and accepts assembled project component qualification, by two dimensional code on scanning assembled project component, to step on The project management platform is recorded, and fills in permission based on described, corresponding progress process and detection list are filled in, to confirm assembly The examination of formula project component finishes.
As shown in Figure 1, confirming assembled project structure in one embodiment of monitoring method of assembled project component of the invention After part examination finishes, further includes:
By two dimensional code on scanning assembled project component, to log in the project management platform, and filled in based on described Permission fills in corresponding progress process and detection list, to carry out the data supplement of assembled project component.
The present invention also provides the monitoring systems of another assembled project component, comprising:
First module, for establishing the BIM buildings model of each assembled project component, and by each assembled project structure In the corresponding BIM buildings model of the data input of part;
Here, firstly, to establish BIM buildings model (the Building Information of each assembled project component Modeling, Building Information Model), according to the requirement of each unit of taking part in building, need each assembled project structure in the modelling phase In the corresponding BIM buildings model of the relevant information typing of part
Second module, for by the BIM buildings model of each assembled project component and its corresponding information lead-in item Platform is managed, and corresponding progress process, the detection table of each assembled project component are set in the project management platform The single and described progress process, detection list fill in permission;
Here, secondly, by the BIM buildings model and its corresponding information lead in item of each assembled project component of completion Mesh manage platform, and in platform set prefabricated components each progress stage, draw the detection list of prefabricated components and by its Invest each assembled project component;Wherein, the progress process of assembled project component is created as shown in figure 3, setting is each Corresponding progress process, detection list and the progress process of assembled project component, the permission of filling in of detection list are such as schemed Shown in 4 and 5;
Third module, for being that each assembled project component generates corresponding two dimension in the project management platform Code;
Here, as shown in fig. 6, finally unique two dimensional code can be generated for the assembled project component of each ID;
4th module for obtaining the two dimensional code of each assembled project component from the project management platform, and will obtain It is pasted on corresponding assembled project component after the two dimensional code printing got;
Here, as shown in fig. 7, the staff of the management two dimensional code of component processing factory is by the component batch that will be dispatched from the factory Two dimensional code is printed by project management platform;As shown in figure 8, and two dimensional code is pasted onto corresponding assembled project component On;
5th module finishes the assembled item for preparing to transport factory for scanning entrucking by cell phone application for staff Two dimensional code on mesh component to log in the project management platform, and fills in permission based on described, fills in corresponding progress process With detection list, to complete the factory process of assembled project component.
Here, the invention proposes a kind of prefabricated assembled project component management sides based on architecture informationization management platform Method avoids the statistical error of prefabricated components quantity, model;Each unit of taking part in building's real-time update project process, data, and adjusted with this The process of whole respective unit;Realize component and archives one-to-one correspondence, it is ensured that information and date it is accurate;It implements detection, check and accept Responsibility system.
In one embodiment of monitoring method of assembled project component of the invention, the packet of each assembled project component It includes:
Component name, block number, Lou Hao, floor information.
Here, as shown in Fig. 2, may include in the information table of each component its component name, block number, Lou Hao, building Layer information.
As shown in Figure 1, in one embodiment of monitoring method of assembled project component of the invention, as shown in figure 9, further including 6th module, for passing through scanning assembly for general contracting unit materials arrival administrative staff when haulage vehicle reaches construction site Two dimensional code on formula project component to log in the project management platform, and fills in permission based on described, fills in corresponding progress Process and detection list, to confirm assembled project component admission.
As shown in Figure 1, further include the 7th module in one embodiment of monitoring method of assembled project component of the invention, After checking and accepting assembled project component qualification for supervisor, by two dimensional code on scanning assembled project component, to log in The project management platform, and permission is filled in based on described, corresponding progress process and detection list are filled in, to confirm assembled The examination of project component finishes.
As shown in Figure 1, further include the 8th module in one embodiment of monitoring method of assembled project component of the invention, For to log in the project management platform, and filling in permission based on described by two dimensional code on scanning assembled project component, Corresponding progress process and detection list are filled in, to carry out the data supplement of assembled project component.
In conclusion management method of the present invention compared to the existing prefabricated component for site operation personnel, Prefabricated components carry out " one one yard " in management platform, two dimensional code that every prefabricated component generates and its in design drawing Information, data, size on paper is corresponding, while reducing administrative staff's workload, improves management accuracy rate and efficiency.Tool Body has following advantage:
1. improving prefabricated components quantity, the statistical accuracy of model;
2. each unit of taking part in building's real-time update project process, data, and adjust with this process of respective unit;
3. due to the accurate interaction of " one one yard " data, it is ensured that information, data, size it is accurate, be convenient for construction site Management and implementation;
4. the trace that state updates implements detection, checks and accepts responsibility system, make itself clear responsibility such as project manager, management And supervise its work.
The one-to-one correspondence that " 5. one one grade " makes archives and component.It realizes and fills in detection table on line, accelerate table and complete Speed.Convenient for the collection, arrangement and search of archives.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered Think beyond the scope of this invention.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it Interior, then the invention is also intended to include including these modification and variations.

Claims (10)

1. a kind of monitoring method of assembled project component characterized by comprising
The BIM buildings model of each assembled project component is established, and the data input of each assembled project component is corresponding BIM buildings model in;
The BIM buildings model of each assembled project component and its corresponding information lead-in item manage platform, and in the item Corresponding progress process, detection list and the progress process, the inspection of each assembled project component are set in mesh management platform That surveys list fills in permission;
It is that each assembled project component generates corresponding two dimensional code in the project management platform;
After the two dimensional code printing that obtains the two dimensional code of each assembled project component from the project management platform, and will acquire It is pasted on corresponding assembled project component;
Staff is scanned entrucking and finished by cell phone application to be prepared to transport the two dimensional code on the assembled project component to dispatch from the factory, with The project management platform is logged in, and fills in permission based on described, corresponding progress process and detection list are filled in, to complete to fill Factory process with formula project component.
2. the monitoring method of assembled project component as described in claim 1, which is characterized in that each assembled project component Information include:
Component name, block number, Lou Hao, floor information.
3. the monitoring method of assembled project component as described in claim 1, which is characterized in that complete assembled project component Factory process after, further includes:
When haulage vehicle reaches construction site, general contracting unit materials arrival administrative staff pass through on scanning assembled project component Two dimensional code to log in the project management platform, and fills in permission based on described, fills in corresponding progress process and detection table It is single, to confirm assembled project component admission.
4. the monitoring method of assembled project component as claimed in claim 3, which is characterized in that confirmation assembled project component After admission, further includes:
After supervisor checks and accepts assembled project component qualification, by two dimensional code on scanning assembled project component, to log in Project management platform is stated, and fills in permission based on described, corresponding progress process and detection list are filled in, to confirm assembled item The examination of mesh component finishes.
5. the monitoring method of assembled project component as claimed in claim 4, which is characterized in that confirmation assembled project component After examination finishes, further includes:
By two dimensional code on scanning assembled project component, to log in the project management platform, and permission is filled in based on described, Corresponding progress process and detection list are filled in, to carry out the data supplement of assembled project component.
6. a kind of monitoring system of assembled project component characterized by comprising
First module, for establishing the BIM buildings model of each assembled project component, and by each assembled project component In the corresponding BIM buildings model of data input;
Second module, for by the BIM buildings model of each assembled project component and its corresponding information lead-in item management Platform, and the corresponding progress process of each assembled project component, detection list are set in the project management platform, and The progress process, detection list fill in permission;
Third module, for being that each assembled project component generates corresponding two dimensional code in the project management platform;
4th module for obtaining the two dimensional code of each assembled project component from the project management platform, and will acquire Two dimensional code printing after be pasted on corresponding assembled project component;
5th module finishes the assembled project structure for preparing to transport factory for scanning entrucking by cell phone application for staff Two dimensional code on part to log in the project management platform, and fills in permission based on described, fills in corresponding progress process and inspection List is surveyed, to complete the factory process of assembled project component.
7. the monitoring system of assembled project component as claimed in claim 6, which is characterized in that each assembled project component Information include:
Component name, block number, Lou Hao, floor information.
8. the monitoring system of assembled project component as claimed in claim 6, which is characterized in that further include the 6th module, use In when haulage vehicle reaches construction site, pass through on scanning assembled project component for general contracting unit materials arrival administrative staff Two dimensional code, to log in the project management platform, and fill in permission based on described, fill in corresponding progress process and detection table It is single, to confirm assembled project component admission.
9. the monitoring system of assembled project component as claimed in claim 8, which is characterized in that further include the 7th module, use After checking and accepting assembled project component qualification for supervisor, by two dimensional code on scanning assembled project component, to log in Project management platform is stated, and fills in permission based on described, corresponding progress process and detection list are filled in, to confirm assembled item The examination of mesh component finishes.
10. the monitoring system of assembled project component as claimed in claim 9, which is characterized in that further include the 8th module, use The two dimensional code on through scanning assembled project component to log in the project management platform, and is filled in permission based on described, is filled out Corresponding progress process and detection list are write, to carry out the data supplement of assembled project component.
CN201910697681.4A 2019-07-30 2019-07-30 The monitoring method and system of assembled project component Pending CN110457801A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910697681.4A CN110457801A (en) 2019-07-30 2019-07-30 The monitoring method and system of assembled project component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910697681.4A CN110457801A (en) 2019-07-30 2019-07-30 The monitoring method and system of assembled project component

Publications (1)

Publication Number Publication Date
CN110457801A true CN110457801A (en) 2019-11-15

Family

ID=68484148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910697681.4A Pending CN110457801A (en) 2019-07-30 2019-07-30 The monitoring method and system of assembled project component

Country Status (1)

Country Link
CN (1) CN110457801A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112508151A (en) * 2020-11-09 2021-03-16 上海建工集团股份有限公司 Method for reusing integral climbing steel platform formwork component
CN113177623A (en) * 2021-05-21 2021-07-27 铜陵有色建安钢构有限责任公司 Steel structure modular installation method based on two-dimensional code and Tekla technology
CN114881392A (en) * 2022-03-10 2022-08-09 中国建筑第二工程局有限公司 Management method and system of assembled component

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107067223A (en) * 2016-12-16 2017-08-18 上海建工集团股份有限公司 Construction information collection processing method
CN108717623A (en) * 2018-05-18 2018-10-30 深圳大学 A kind of assembled architecture tracks of device, method and system based on BIM
CN109034736A (en) * 2018-07-10 2018-12-18 李磊 Project management system and operating platform based on BIM
CN109087048A (en) * 2018-08-17 2018-12-25 青岛理工大学 Assembled architecture component method for tracing based on two dimensional code

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107067223A (en) * 2016-12-16 2017-08-18 上海建工集团股份有限公司 Construction information collection processing method
CN108717623A (en) * 2018-05-18 2018-10-30 深圳大学 A kind of assembled architecture tracks of device, method and system based on BIM
CN109034736A (en) * 2018-07-10 2018-12-18 李磊 Project management system and operating platform based on BIM
CN109087048A (en) * 2018-08-17 2018-12-25 青岛理工大学 Assembled architecture component method for tracing based on two dimensional code

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112508151A (en) * 2020-11-09 2021-03-16 上海建工集团股份有限公司 Method for reusing integral climbing steel platform formwork component
CN113177623A (en) * 2021-05-21 2021-07-27 铜陵有色建安钢构有限责任公司 Steel structure modular installation method based on two-dimensional code and Tekla technology
CN114881392A (en) * 2022-03-10 2022-08-09 中国建筑第二工程局有限公司 Management method and system of assembled component

Similar Documents

Publication Publication Date Title
CN110457801A (en) The monitoring method and system of assembled project component
CN109785436B (en) BIM technology-based reinforcing steel bar information full life cycle management method
CN108532953B (en) BIM-based cantilever plate construction method and building construction method
CN107292068A (en) A kind of assembled architecture BIM model treatments method and processing system
CN111861512B (en) System and method for tracking block chain of component information of assembled building parts
CN106295993B (en) Curtain wall GRC Three-dimensional Visualization Management Systems and its application method based on wechat platform
JP2002248692A (en) Three-dimensional shaping system, three-dimensional shaping center, program, memory medium and method for ordering three-dimensional shaping
CN111561182A (en) Assembly type building deepening design and construction method based on BIM and big data
CN112101905A (en) Block chain technology-based fabricated building integrated construction cooperative management method and system thereof
CN108154340A (en) Prefabricated component informationization management system based on BIM cloud platforms
CN103077432A (en) Printed circuit board (PCB) production management system
CN112252548A (en) Curtain wall dry-hanging prefabricating method based on BIM
CN109214679A (en) A kind of projects management system based on Building Information Model
CN110414170A (en) A kind of construction pre-assembly method and system based on BIM technology
CN113656505A (en) Digitalization of distributed project management system and method for synchronizing data thereof
CN104268708A (en) Building template intelligent managing system and method based on cloud intelligence technology
CN114511296A (en) High-standard farmland construction project management platform
Peiris et al. Digitalising modular construction: Enhancement of off-site manufacturing productivity via a manufacturing execution & control (MEC) system
CN113159248A (en) Pile foundation construction management method and system based on two-dimensional code
CN109697547A (en) The management method and management system of safe mass inspection
CN109784693B (en) Three-dimensional dynamic production management system for prefabricated part field
CN115358706A (en) Cross-domain communication method based on government affair service cooperation technology and support system
WO2023019102A1 (en) Virtual building construction inspection for permitting
CN106845841A (en) A kind of Life cycle informatization management method of the type track plates of CRTS III based on BIM technology
Peiris et al. Digitalising Modular Construction: Action Research Study on Manufacturing Execution & Control (Mec) System to Enhance Offsite Manufacturing (Osm) Productivity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191115

RJ01 Rejection of invention patent application after publication