CN104268708A - Building template intelligent managing system and method based on cloud intelligence technology - Google Patents

Building template intelligent managing system and method based on cloud intelligence technology Download PDF

Info

Publication number
CN104268708A
CN104268708A CN201410527938.9A CN201410527938A CN104268708A CN 104268708 A CN104268708 A CN 104268708A CN 201410527938 A CN201410527938 A CN 201410527938A CN 104268708 A CN104268708 A CN 104268708A
Authority
CN
China
Prior art keywords
template
building
cloud
building template
intelligent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410527938.9A
Other languages
Chinese (zh)
Other versions
CN104268708B (en
Inventor
叶常富
王�忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN PUYUN INTELLIGENT TECHNOLOGY Co Ltd
Original Assignee
HUNAN PUYUN INTELLIGENT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN PUYUN INTELLIGENT TECHNOLOGY Co Ltd filed Critical HUNAN PUYUN INTELLIGENT TECHNOLOGY Co Ltd
Priority to CN201410527938.9A priority Critical patent/CN104268708B/en
Publication of CN104268708A publication Critical patent/CN104268708A/en
Application granted granted Critical
Publication of CN104268708B publication Critical patent/CN104268708B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a building template intelligent managing system and method based on the cloud intelligence technology. The system is characterized by comprising a building template system, a cloud intelligence label, a template sorting system, a template delivery system, a cloud intelligence channel identification system and a data processing center. By means of the integrated management mode of the cloud intelligence technology application of the systems, information management of production, packaging, delivery, out-put and in-put of warehouse, construction site entering, construction installation, detachment, sending back and tracking of various building templates can be achieved. By the adoption of the system and method, construction labor intensity is relieved, labor is saved, labor efficiency is improved, construction period is shortened, and a firm foundation is provided for future unmanned construction, building intelligentization, work standardization and information-based management.

Description

A kind of building template intelligent management system based on cloud intellectual technology and method
Technical field
The present invention relates to a kind of building template intelligent management system based on cloud intellectual technology and method, belong to technical field of building construction.
Background technology
At present, although the template of building operation is of a great variety, but in use there is a lot of problem, as building template to be connected the material of securing member and template support with template and specification different, in stencil design, type selecting, selection and template apolegamy and Template Manager etc., do not form system, bring inconvenience to building operation; In prior art, due to standard size, specification that all kinds of building template is ununified, make the work progress of model sheetinstallat and dismounting and complexity, length consuming time; And in the storage of building template and logistics link, because building template and relevant accessory are all single assembly of elements, and plurality of specifications quantity is many, be difficult to reach each building template management expectancy one to one, like this with regard to the generation of situations such as easily occurring building template loss, string goods and the different product in strange land, exchange goods; With regard to building templates all at present, no matter be from the initial design selection of template, or the dismounting construction of the installation of template, template, until last template reclaims, the management of storage and logistics all needs the manpower and materials of at substantial, also seriously constrain the progress of construction, thus extend the integrated engineering cycle.And at present, on market not one for building trade the choosing of building template and building materials is provided, join and installs, dismantle, deliver, reclaim and building template is stored in a warehouse, logistics and building products quality, construction standardization, construction safety a whole set of management system platform.
Reduce based on present building operation personnel and traditional technician's aging and practitioner, cause that building trade labor cost significantly rises, efficiency low, construction period extends; Following be badly in need of providing a kind of and reduce labour intensity, save the amount of labour used, raise labour efficiency, the reduce building template of construction period and the intelligent management system of fit drawing die, for realizing that construction is unmanned in the future, building intelligent, job standardization, IT application in management lay a solid foundation.
Summary of the invention
For above-mentioned technical matters, the object of the invention is on the basis integrating existing electronic label technology, a kind of building template intelligent management system based on cloud intellectual technology and method are provided, by cloud intelligent management system of the present invention and method, multiple intelligent label is combined, become a kind of comprehensive, flexile intelligent integration, make each independently building template acquisition unique identity information certification, the building materials such as building template can be made from design, type selecting, selection is to standardization, safe mounting or dismounting construction, the management system of complete set is formed between the process steps such as storage and logistics, provide a kind of reduce labour intensity, save the amount of labour used, raise labour efficiency, the reduce building template of construction period and the intelligent management system of fit drawing die, for realizing in the future that construction is unmanned, building intelligent, job standardization, IT application in management lay a solid foundation.
In order to solve problems of the prior art, enforcement principle design of the present invention is: on the building template and template supporter of existing structure, bind the cloud intelligent label that has storage products identifier, building template and template supporter is made to obtain unique identities identifier, build a cloud Intelligent Recognition passage and data processing centre (DPC) or/and database, this data processing centre (DPC) is or/and database has the building template of cloud intelligent label and the data message of template supporter to carry out overall treatment to binding, design one to be convenient to building template and template supporter loading or to pack to collect to fill carry and be suitable for the current multi-layer material frame for conveying vehicle equipment/instrument of cloud Intelligent Recognition passage, building template and template supporter is made to carry out uniqueness certification by cloud intelligent channel, be equipped with software and hardware total management system again, form the integrated management system of the wider building template of coverage rate and template supporter cloud intellectual technology, make require reach fast according to working-yard with the various material classification of cloud intelligent label and the building template of model and template supporter and join mould like clockwork, die-filling, existing building template production firm can be solved like this produce, pin, the unsystematic problem of deposit flow management, also a difficult problem of building template follow-up of quality Suo Yuan can be solved, more can solve production firm evidence-based to product right-safeguarding evidence obtaining.
In order to achieve the above object, technical solution of the present invention is:
A kind of building template intelligent management system based on cloud intellectual technology, it is characterized in that: comprise building template system, be located at the cloud intelligent label in building template system, for the template separation system of building template system decomposition classification and ordination, template delivery system, the data processing centre (DPC) of cloud intelligent channel recognition system and overall treatment all cloud intelligent labels data message, by the integration management mode of described each system cloud intellectualized technology application, multiclass building template can be realized from production, collection dress, delivery, go out warehouse-in to entering building site, construction and installation, dismounting and giving an encore and the function of the information system management such as tracking of products.
In technical scheme of the present invention, preferably, described building template system comprises building template, template supporter, and wherein building template comprises the section bar template such as forming panel, plastic extrusion template, plastic pressing forming template, sandwich foamed plastic formwork, combined type enhanced plastic template, single routine formula template, plank sheathing, bamboo plank sheathing, composite shuttering, steel form, Steel-wood forming board, aluminum alloy mould plate of band reinforcement further; Template supporter comprises further: template lock firmware, template connecting piece and template support.
In technical scheme of the present invention, preferably, described cloud intelligent label comprises the combination of one or more in the various identification codes such as FIRD, NFC, one-dimension code, Quick Response Code and associated electrical label.
In technical scheme of the present invention, preferably, described template separation system comprises template and distributes sorting unit and template distribution sorting software sharing.
In technical scheme of the present invention, preferably, described template delivery system comprises template set assembling platform and has the toter in many storage layers space.
In technical scheme of the present invention, preferably, described cloud intelligent channel recognition system comprises cloud Intelligent Recognition passage and cloud Intelligent Processing Platform.
A kind of building template intelligent management based on cloud intellectual technology is also provided according to object of the present invention, it is characterized in that, comprise building template system, be located at the cloud intelligent label in building template system, for the template separation system of building template system decomposition classification and ordination, template delivery system, the data processing centre (DPC) of the data message of cloud intelligent channel recognition system and all cloud intelligent labels of overall treatment, by the integration management mode of described each system cloud intellectualized technology application, multiclass building template can be realized from production, collection dress, delivery, go out warehouse-in to entering building site, construction and installation, dismounting and giving an encore and the function of the information system management such as tracking of products,
Described system works step is as follows:
S01, by the data message such as permanent product identification number write cloud intelligent label, the building template had in the cloud intelligent label of product identification number and building template system and template supporter are bound, makes its building template and template supporter entity and product data information one_to_one corresponding;
S02, binding have the information of the building template of cloud intelligent label and template supporter to be input to template separation system, distribute sorting module and coordinate by distributing sorting unit and template and modularization decomposition is carried out to building template and template supporter and intelligent sequencing is classified, and form a set of Product Assembly instructions and be stored in data processing centre (DPC);
S03, by the building template of S02 step and template supporter by the toter in template delivery system coordinate template set assembling platform carry out sectional classify load place, the management of collection assembling platform and library information of coming in and going out.
S04, for the building template and the template supporter that need outbound, loaded by toter, by cloud intelligent channel recognition system, scanning is carried out to it and make outbound judgement, judge that the building template that information is correct and template supporter can transport building ground to by outbound;
Behind S05, arrival building ground, the building template loaded by toter and template supporter carry out arrival building site through cloud intelligent channel recognition system scanning recognition again and judge, it can be allowed to enter construction site to by the building template after judgement and template supporter;
S06, by cloud intelligent channel recognition system to the cloud intelligent label on building template and template supporter carry out scanning read, read according to scanning the feedback information obtained and form corresponding Product Assembly instructions, carry out intelligent connecting construction molding according to Product Assembly instructions;
S07, after construction usage terminates, the building template and template supporter installed is dismantled according to Product Assembly instructions method, and load toter by sequence number collection, deliver again by cloud Intelligent Recognition passage by toter, through cloud Intelligent Recognition Channel scan cloud intelligent label, by cloud Intelligent Processing Platform, the data message that scanning is read is verified, then to being verified that by product information correct building template and template supporter permit its recovery of giving an encore, finally entering data processing centre (DPC) for scrap products by cloud Intelligent Processing Platform destroys its product data information.
Advantage of the present invention and beneficial effect are:
1, in technical scheme of the present invention, the cloud intelligent label of the permanent product identification number of write is bound mutually with building template and template supporter, so just make the product information one_to_one corresponding that each building template and template supporter can be loaded with cloud intelligent label, thus ensure that the uniqueness of product certification, building template and template supporter carry out modularization decomposition by template separation system simultaneously, and according to project under construction need each building template and template supporter are numbered in order, form detailed Product Assembly instructions, and by the data information memory of instructions in data processing centre (DPC).
2, due in technical solution of the present invention, have employed structure cloud intelligent channel recognition system and be convenient to the current multi-layer material frame for conveying toter of this cloud intelligent channel identification, make it to define a delivery--lane identification system, this system passes through scanning cloud intelligent label when building template and template supporter go out warehouse-in or turnover building ground, the Various types of data information such as the identifier of this product are read from data processing centre (DPC), thus the production firm of this template and template supporter can be determined, the information such as the place of production and product quality guarantee period, ensure the Suo Yuan of building template product information, effectively prevent the different product in strange land, the generation of the situation such as to exchange goods, and by after the cloud intelligent label on this cloud intelligent channel recognition system scanning building template and template supporter, the assembling of building template and supporting template supporter conveniently can be carried out according to the assembly method in the Product Assembly instructions of data processing centre (DPC), thus effectively raise building template assembling operating efficiency, also shorten the integral cycle of engineering.
3, adopt technical scheme of the present invention, by cloud intellectual technology being applied on building template and template supporter, and by template separation system, template delivery system, cooperatively interacting between cloud intelligent channel recognition system and data processing centre (DPC), building template and template supporter can be formed from design selection, model sheetinstallat, the construction of dismounting and template are given an encore recovery and the complete management system of warehouse logistics, be convenient to the follow-up of quality of template manufacturer, the Suo Yuan of quality guarantee period, also be convenient to working-yard template by specification, size is placed, lessor's fast searching of convenient on-the-spot arrangement and template, sorting different size, the template of different size, and builder searches the installation of similar construction cell, support, reinforce, the case of security protection.
4, because the cloud intelligent label in the present invention adopts FIRD, NFC, one-dimension code, the combination of one or more in the various identification code such as Quick Response Code and associated electrical label is packaged on building template and template supporter, ensure that the product data information one_to_one corresponding that product and cloud intelligent label are loaded with, after product abandonment or the displacement that expires read number again, read and write with new chip, thus ensure that building template and template supporter during normal use there will not be artificial replacement or unloading, and whole system is the specification and the size that adopt animation dynamic form typing building template and template supporter, the correspondence of building template and template supporter when determining to assemble by distribution software.
Based on above-mentioned all many-sided beneficial effects, whole intelligent management system of the present invention can meet the requirement realizing construction unmanned, building intelligent, job standardization, IT application in management.
Accompanying drawing explanation
Fig. 1 is system of the present invention composition structured flowchart.
Fig. 2 is the intelligent implementing procedure block diagram of building template system cloud of the present invention.
Fig. 3 is cloud intelligent channel recognition system workflow block diagram of the present invention.
Fig. 4 is building template system intelligence of the present invention splicing implementing procedure block diagram.
Fig. 5 is building template system recoveries implementing procedure block diagram of the present invention.
Embodiment
Below, by the present invention will be described in more detail with specific embodiment by reference to the accompanying drawings.
Fig. 1 shows a kind of building template intelligent management system based on cloud intellectual technology of the present invention, it is characterized in that: comprise building template system, be located at the cloud intelligent label in building template system, for the template separation system of building template system decomposition classification and ordination, template delivery system, the data processing centre (DPC) of cloud intelligent channel recognition system and overall treatment all cloud intelligent labels data message, by the integration management mode of described each system cloud intellectualized technology application, multiclass building template can be realized from production, collection dress, delivery, go out warehouse-in to entering building site, construction and installation, dismounting and giving an encore and the function of the information system management such as tracking of products.
Should be noted that, in present embodiment, described building template system comprises building template, template supporter, and wherein building template comprises the section bar template such as forming panel, plastic extrusion template, plastic pressing forming template, sandwich foamed plastic formwork, combined type enhanced plastic template, single routine formula template, plank sheathing, bamboo plank sheathing, composite shuttering, steel form, Steel-wood forming board, aluminum alloy mould plate of band reinforcement further; Template supporter comprises further: template lock firmware, template connecting piece and template support.
More particularly, template lock firmware includes but not limited to: set lever, split pin, locking pin, securing member, size adjustable fastener, direction adjustable fastener; Template connecting piece includes but not limited to: active joint, universal joint; Template support includes but not limited to: round steel pipe, square steel tube, grooved steel pipe, square mould pipe, grooved moulds pipe.
In the embodiment that some improve, described cloud intelligent label comprises the combination of one or more in the various identification codes such as FIRD, NFC, one-dimension code, Quick Response Code and associated electrical label.
This cloud intelligent label plays the effect of product data information carrier.
In present embodiment, preferably, described template separation system comprises template and distributes sorting unit and template distribution sorting software sharing.
In this embodiment, described template delivery system comprises template set assembling platform and has the toter in many storage layers space, and such as toter can be configured to bin car or arbitraryly can realize building template and template supporter is in bulk or vehicle equipment/the instrument at least with two-layer parking space of packing collection dress.
In present embodiment, described cloud intelligent channel recognition system comprises cloud Intelligent Recognition passage and cloud Intelligent Processing Platform, and this cloud intelligent channel recognition system is mainly used in scanning the product data information read and write cloud intelligent label and be loaded with.
A kind of building template intelligent management based on cloud intellectual technology of the present invention, it is characterized in that, comprise building template system, be located at the cloud intelligent label in building template system, for the template separation system of building template system decomposition classification and ordination, template delivery system, the data processing centre (DPC) of the data message of cloud intelligent channel recognition system and all cloud intelligent labels of overall treatment, by the integration management mode of described each system cloud intellectualized technology application, multiclass building template can be realized from production, collection dress, delivery, go out warehouse-in to entering building site, construction and installation, dismounting and giving an encore and the function of the information system management such as tracking of products,
Fig. 2 shows the intelligent implementing procedure of building template system cloud of the present invention, by data message write cloud intelligent labels such as permanent product identification numbers, the building template had in the cloud intelligent label of product identification number and building template system and template supporter are bound, makes its building template and template supporter entity and product data information one_to_one corresponding; Binding has the information of the building template of cloud intelligent label and template supporter to be input to template separation system, distribute sorting module and coordinate by distributing sorting unit and template and modularization decomposition is carried out to building template and template supporter and intelligent sequencing is classified, and form a set of Product Assembly instructions and be stored in data processing centre (DPC); Building template after being decomposed by modularization and template supporter coordinate template set assembling platform to carry out the placement of sectional classification loading, collect assembling platform and the management of library information of coming in and going out by the toter in template delivery system;
Say further, as shown in Figure 3, for the building template and the template supporter that need outbound, loaded by toter, by cloud intelligent channel recognition system, scanning is carried out to it and make outbound judgement, judge that the building template that information is correct and template supporter can transport building ground to by outbound; After arriving building ground, the building template loaded by toter and template supporter carry out arrival building site through cloud intelligent channel recognition system scanning recognition again and judge, it can be allowed to enter construction site to by the building template after judgement and template supporter;
Carry out scanning by cloud intelligent channel recognition system to the cloud intelligent label on building template and template supporter to read, read according to scanning the feedback information obtained and form corresponding Product Assembly instructions, carry out intelligent connecting construction molding according to Product Assembly instructions, say further, as shown in Figure 4, when building template and template supporter are after scanning cloud intelligent label by cloud intelligent channel identification system, show a dynamic spliced map on the display device, this dynamic spliced map is that the product data information obtained after scanning cloud intelligent label by data center by cloud intelligent channel identification system is fed back, building template and the correct installation site of template supporter and method can be determined by this dynamic spliced map thus carry out installation, the progress of installation is simultaneously transferred to data processing centre (DPC), completed construction content is marked by data processing centre (DPC), and implementation modification is carried out to construction speed, to reach the object that dynamic spliced map is implemented to upgrade,
Furthermore, as shown in Figure 5, after construction usage terminates, the building template and template supporter installed is dismantled according to Product Assembly instructions method, and load toter by sequence number collection, deliver again by cloud Intelligent Recognition passage by toter, through cloud Intelligent Recognition Channel scan cloud intelligent label, by cloud Intelligent Processing Platform, the data message that scanning is read is verified, then to being verified that by product information correct building template and template supporter permit its recovery of giving an encore, finally entering data processing centre (DPC) for scrap products by cloud Intelligent Processing Platform destroys its product data information.
Below be only the preferred embodiments of the present invention, protection scope of the present invention be not only confined to above-mentioned embodiment, all technical schemes belonged under thinking of the present invention all belong to protection scope of the present invention.It should be pointed out that for those skilled in the art, some improvement without departing from the principles of the present invention and conversion, should be considered as protection scope of the present invention.

Claims (7)

1. the building template intelligent management system based on cloud intellectual technology, it is characterized in that: comprise building template system, be located at the cloud intelligent label in building template system, for the template separation system of building template system decomposition classification and ordination, template delivery system, the data processing centre (DPC) of cloud intelligent channel recognition system and overall treatment all cloud intelligent labels data message, by the integration management mode of described each system cloud intellectualized technology application, multiclass building template can be realized from production, collection dress, delivery, go out warehouse-in to entering building site, construction and installation, dismounting and giving an encore and the function of the information system management such as tracking of products.
2. a kind of building template intelligent management system based on cloud intellectual technology according to claim 1, it is characterized in that: described building template system comprises building template, template supporter, wherein building template comprises the section bar template such as forming panel, plastic extrusion template, plastic pressing forming template, sandwich foamed plastic formwork, combined type enhanced plastic template, single routine formula template, plank sheathing, bamboo plank sheathing, composite shuttering, steel form, Steel-wood forming board, aluminum alloy mould plate of band reinforcement further; Template supporter comprises further: template lock firmware, template connecting piece and template support.
3. a kind of building template intelligent management system based on cloud intellectual technology according to claim 1, is characterized in that: described cloud intelligent label comprises the combination of one or more in the various identification codes such as FIRD, NFC, one-dimension code, Quick Response Code and associated electrical label.
4. a kind of building template intelligent management system based on cloud intellectual technology according to claim 1, is characterized in that: described template separation system comprises template and distributes sorting unit and template distribution sorting software sharing.
5. a kind of building template intelligent management system based on cloud intellectual technology according to claim 1, is characterized in that: described template delivery system comprises template set assembling platform and has the toter in many storage layers space.
6. a kind of building template intelligent management system based on cloud intellectual technology according to claim 1, is characterized in that: described cloud intelligent channel recognition system comprises cloud Intelligent Recognition passage and cloud Intelligent Processing Platform.
7. the building template intelligent management based on cloud intellectual technology, it is characterized in that, comprise building template system, be located at the cloud intelligent label in building template system, for the template separation system of building template system decomposition classification and ordination, template delivery system, the data processing centre (DPC) of the data message of cloud intelligent channel recognition system and all cloud intelligent labels of overall treatment, by the integration management mode of described each system cloud intellectualized technology application, multiclass building template can be realized from production, collection dress, delivery, go out warehouse-in to entering building site, construction and installation, dismounting and giving an encore and the function of the information system management such as tracking of products,
Described system works step is as follows:
S01, by the data message such as permanent product identification number write cloud intelligent label, the building template had in the cloud intelligent label of product identification number and building template system and template supporter are bound, makes its building template and template supporter entity and product data information one_to_one corresponding;
S02, binding have the information of the building template of cloud intelligent label and template supporter to be input to template separation system, distribute sorting module and coordinate by distributing sorting unit and template and modularization decomposition is carried out to building template and template supporter and intelligent sequencing is classified, and form a set of Product Assembly instructions and be stored in data processing centre (DPC);
S03, by the building template of S02 step and template supporter by the toter in template delivery system coordinate template set assembling platform carry out sectional classify load place, the management of collection assembling platform and library information of coming in and going out.
S04, for the building template and the template supporter that need outbound, loaded by toter, by cloud intelligent channel recognition system, scanning is carried out to it and make outbound judgement, judge that the building template that information is correct and template supporter can transport building ground to by outbound;
Behind S05, arrival building ground, the building template loaded by toter and template supporter carry out arrival building site through cloud intelligent channel recognition system scanning recognition again and judge, it can be allowed to enter construction site to by the building template after judgement and template supporter;
S06, by cloud intelligent channel recognition system to the cloud intelligent label on building template and template supporter carry out scanning read, read according to scanning the feedback information obtained and form corresponding Product Assembly instructions, carry out intelligent connecting construction molding according to Product Assembly instructions;
S07, after construction usage terminates, the building template and template supporter installed is dismantled according to Product Assembly instructions method, and load toter by sequence number collection, deliver again by cloud Intelligent Recognition passage by toter, through cloud Intelligent Recognition Channel scan cloud intelligent label, by cloud Intelligent Processing Platform, the data message that scanning is read is verified, then to being verified that by product information correct building template and template supporter permit its recovery of giving an encore, finally entering data processing centre (DPC) for scrap products by cloud Intelligent Processing Platform destroys its product data information.
CN201410527938.9A 2014-10-09 2014-10-09 A kind of building template intelligent management system and method based on cloud intellectual technology Expired - Fee Related CN104268708B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410527938.9A CN104268708B (en) 2014-10-09 2014-10-09 A kind of building template intelligent management system and method based on cloud intellectual technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410527938.9A CN104268708B (en) 2014-10-09 2014-10-09 A kind of building template intelligent management system and method based on cloud intellectual technology

Publications (2)

Publication Number Publication Date
CN104268708A true CN104268708A (en) 2015-01-07
CN104268708B CN104268708B (en) 2017-11-14

Family

ID=52160228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410527938.9A Expired - Fee Related CN104268708B (en) 2014-10-09 2014-10-09 A kind of building template intelligent management system and method based on cloud intellectual technology

Country Status (1)

Country Link
CN (1) CN104268708B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107025469A (en) * 2017-06-02 2017-08-08 山东新活新材料科技有限公司 Template automatic sorting system and its method and readable storage medium storing program for executing and computer equipment
CN108499050A (en) * 2018-03-20 2018-09-07 东莞市硕科塑胶五金制品有限公司 The joining method of ball embedding dough sheet
CN108590028A (en) * 2018-05-18 2018-09-28 深圳大学 A kind of assembled architecture interior wall partition and its composition method based on BIM
CN109680924A (en) * 2018-12-31 2019-04-26 宁波二十冶建设有限公司 A kind of aluminum alloy mould plate and construction method with planar bar code technology
CN110924673A (en) * 2019-10-28 2020-03-27 中国化学工程第六建设有限公司 Construction method of aluminum alloy building template
CN112613695A (en) * 2020-11-27 2021-04-06 中建三局第一建设工程有限责任公司 Plastic formwork and full-period construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473641A (en) * 2013-09-06 2013-12-25 上海大学 Tunnel segment production and management method
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
CN103714429A (en) * 2013-12-25 2014-04-09 中国铁道科学研究院电子计算技术研究所 Motor train unit accessory tracing system and method based on RFID technology
CN103793783A (en) * 2014-01-09 2014-05-14 中建钢构有限公司 Steel-structure overall-process tracking method and system
WO2014145592A1 (en) * 2013-03-15 2014-09-18 Aditazz, Inc. System and method for realizing a building system that involves computer based matching of form to function

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014145592A1 (en) * 2013-03-15 2014-09-18 Aditazz, Inc. System and method for realizing a building system that involves computer based matching of form to function
CN103473641A (en) * 2013-09-06 2013-12-25 上海大学 Tunnel segment production and management method
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
CN103714429A (en) * 2013-12-25 2014-04-09 中国铁道科学研究院电子计算技术研究所 Motor train unit accessory tracing system and method based on RFID technology
CN103793783A (en) * 2014-01-09 2014-05-14 中建钢构有限公司 Steel-structure overall-process tracking method and system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107025469A (en) * 2017-06-02 2017-08-08 山东新活新材料科技有限公司 Template automatic sorting system and its method and readable storage medium storing program for executing and computer equipment
CN108499050A (en) * 2018-03-20 2018-09-07 东莞市硕科塑胶五金制品有限公司 The joining method of ball embedding dough sheet
CN108590028A (en) * 2018-05-18 2018-09-28 深圳大学 A kind of assembled architecture interior wall partition and its composition method based on BIM
CN109680924A (en) * 2018-12-31 2019-04-26 宁波二十冶建设有限公司 A kind of aluminum alloy mould plate and construction method with planar bar code technology
CN110924673A (en) * 2019-10-28 2020-03-27 中国化学工程第六建设有限公司 Construction method of aluminum alloy building template
CN112613695A (en) * 2020-11-27 2021-04-06 中建三局第一建设工程有限责任公司 Plastic formwork and full-period construction method thereof

Also Published As

Publication number Publication date
CN104268708B (en) 2017-11-14

Similar Documents

Publication Publication Date Title
CN104268708A (en) Building template intelligent managing system and method based on cloud intelligence technology
CN104460506B (en) Method for achieving template unmanned construction
CN102446303B (en) Distribution method and device of process route assembly
CN111882275A (en) Trade big data management method and system based on industrial identification analysis
CN207192347U (en) A kind of coal yard intelligence shipping system
CN116303819B (en) Data processing method and device based on digital twin implementation under warehousing system
CN110472913A (en) A kind of shipment monitoring method and device
CN111079957A (en) Battery monitoring management method, device, equipment and storage medium
CN112085351A (en) Warehouse reservation queuing system
CN110963219A (en) Intelligent production line for disassembling and assembling container freight yard station
CN113780941A (en) Multi-type intermodal document system based on block chain
CN101446816B (en) Freight handling early-warning system and method
CN108898343A (en) A kind of warehouse and its control method convenient for managing logistics transportation
CN111832675A (en) Method for realizing whole-process tracing of solid waste through two-dimensional code label
CN117236868A (en) 'examine and store up and join in marriage' integration management and control platform suitable for wisdom commodity circulation garden
CN110826926A (en) Intelligent manufacturing execution system for surface assembly production line
CN111523816A (en) Transportation method and terminal with swinging and hanging coordination
CN103676892B (en) A kind of number plate suppression mission management method and system
CN102879075B (en) Metal-smelting vehicular material-distributing monitoring device and material-distributing method
CN112184185B (en) ERP system of commercial concrete mixing plant
CN113706083A (en) Intelligent logistics scheduling method
CN112200511A (en) Method for self-service container lifting and port entering of container truck
CN111832992A (en) Unmanned aerial vehicle monitoring method, system, equipment and storage medium based on block chain
CN116579694B (en) Intelligent communication scheduling system and method for container-mounted automobile
CN109840736A (en) A kind of intelligent transport management process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 410157 Changsha City, Changsha economic and Technological Development Zone, No. 31, No. 1 road, industrial park, the city of the 3 floor of the building (cluster registration) (31)

Applicant after: HUNAN PUYUN INTELLIGENT TECHNOLOGY CO., LTD.

Address before: Xingsha industrial base of Hunan province 410157 Changsha Changsha City Economic and Technological Development Zone Kaiyuan Road No. 1318 building room 407

Applicant before: HUNAN PUYUN INTELLIGENT TECHNOLOGY CO., LTD.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171114

Termination date: 20201009