CN109680924A - A kind of aluminum alloy mould plate and construction method with planar bar code technology - Google Patents
A kind of aluminum alloy mould plate and construction method with planar bar code technology Download PDFInfo
- Publication number
- CN109680924A CN109680924A CN201811651041.1A CN201811651041A CN109680924A CN 109680924 A CN109680924 A CN 109680924A CN 201811651041 A CN201811651041 A CN 201811651041A CN 109680924 A CN109680924 A CN 109680924A
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- mould plate
- alloy mould
- information
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000838 Al alloy Inorganic materials 0.000 title claims abstract description 89
- 238000010276 construction Methods 0.000 title claims abstract description 47
- 238000005516 engineering process Methods 0.000 title claims abstract description 24
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 230000007306 turnover Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 abstract description 5
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- 239000004411 aluminium Substances 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/02—Forming boards or similar elements
- E04G9/06—Forming boards or similar elements the form surface being of metal
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
- G06K17/0025—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Computer Networks & Wireless Communication (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention provides a kind of aluminum alloy mould plate and construction method with planar bar code technology, belongs to architectural engineering construction technique field;It solves the low technical problem of existing aluminum alloy mould plate installation effectiveness;A kind of aluminum alloy mould plate with planar bar code technology, including aluminum alloy mould plate use Building Information Model technology according to engineering drawing, establish Building Information Model, and carry out information coding to corresponding aluminum alloy mould plate by model;Two-dimension code image is corresponded with encoded information and is attached on corresponding aluminum alloy mould plate;Handheld scanning device can carry out two-dimensional code scanning to random two-dimensional code picture and obtain the information of corresponding aluminum alloy mould plate;By the scanning of handheld scanning device, the relevant information of each aluminum alloy mould plate can be obtained, so that each piece of aluminum alloy mould plate can be installed to accurate position according to self information, improve the accuracy of aluminum alloy mould plate installation.
Description
Technical field
The invention belongs to architectural engineering construction technique field, it is related to a kind of aluminum alloy mould plate with planar bar code technology and applies
Work method.
Background technique
As Building Information Model (BIM) technology in the propulsion of building trade and is popularized, Building Information Model is applied in building
Work engineering is gradually applied.
In the work progress of traditional aluminum alloy pattern plate engineering, the situ configuration of aluminum alloy mould plate needs construction worker couple
According to drawing, required template is ransackd one by one, and number one by one to every piece of template, re-start volume after the completion of each floor construction
Number, and once replacement construction teams and groups, number are not just available, and expend sizable manpower and time, construction efficiency phase
When low, the duration is delayed.
In conclusion needing to design a kind of knot to solve above-mentioned aluminum alloy mould plate construction technology
Structure is simple, saves manpower, the aluminum alloy mould plate and construction method with planar bar code technology that time and construction efficiency are high.
Summary of the invention
The purpose of the present invention is in view of the above-mentioned problems existing in the prior art, propose a kind of structure is simple, save manpower,
Time and the high aluminum alloy mould plate with planar bar code technology of construction efficiency.
Object of the invention can be realized by the following technical scheme: a kind of aluminum alloy mould plate with planar bar code technology,
Including
Aluminum alloy mould plate uses Building Information Model technology according to engineering drawing, establishes Building Information Model, and pass through
Model carries out information coding to corresponding aluminum alloy mould plate;
Two-dimension code image is corresponded with encoded information and is attached on corresponding aluminum alloy mould plate;
Handheld scanning device can carry out two-dimensional code scanning to random two-dimensional code picture and obtain corresponding aluminum alloy mould plate
Information.
Another object of the present invention is in view of the above-mentioned problems existing in the prior art, to propose a kind of with two dimensional code skill
The construction method of the aluminum alloy mould plate of art.
A kind of aluminum alloy mould plate construction method with planar bar code technology, comprising the following steps:
S1: engineering construction information model is established according to engineering drawing;
S2: aluminium alloy model is established according to the Building Information Model of foundation;
S3: according to building size, dividing aluminum alloy mould plate blank size, and marks each layer standard form and nonstandard template
Quantity, size, position;
S4: the Template Location and turnover scheme of each floor are analyzed using Building Information Model;
S5: production aluminum alloy mould plate;
S6: production dynamic two-dimension code is pasted on each piece of aluminum alloy mould plate;
S7: aluminum alloy mould plate needed for first layer is built is transported to construction site;
S8: construction personnel scans the two dimensional code of each aluminum alloy mould plate using handheld device, acquires each aluminum alloy mould plate
Information, and template is mounted on corresponding position;
S9: according to second layer design feature, construction site aluminum alloy mould plate is adjusted;
S10: update first layer aluminum alloy mould plate two-dimensional barcode information is two layers of information;
S11: first layer aluminum alloy mould plate is removed;
S12: step 7- step 11, each layer of successively constructing are repeated.
S13: after the completion of construction, updating dynamic two-dimension code information, in case next time uses.
Compared with prior art, the invention has the following advantages:
1, structure of the invention is comparatively simple, by establishing Building Information Model to each aluminum alloy mould plate, and passes through the mould
Type encodes each piece of aluminum alloy mould plate, and then two-dimension code image corresponding with coding is sticked to each piece of aluminium alloy mould
On plate, by the scanning of handheld scanning device, the relevant information of each aluminum alloy mould plate can be obtained, so that each block of aluminium alloy
Template can be installed to accurate position according to self information, improve the accuracy of aluminum alloy mould plate installation.
2, this construction method is in such a way that Building Information Model is in conjunction with dynamic two-dimension code technology to each block of aluminium alloy
Template is encoded, construction personnel by the Handheld two-dimensional code scanning device two dimensional code that is pasted on aluminum alloy mould plate of scanning come
The installation site for determining template, using this construction technology, can effectively save construction period, the operation for reducing construction personnel is strong
Degree, meanwhile, using this construction method.It can effectively ensure that the installation accuracy of aluminum alloy mould plate, it is ensured that construction quality.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
In figure, 10, aluminum alloy mould plate;20, two-dimension code image;30, handheld scanning device.
Specific embodiment
Following is a specific embodiment of the present invention in conjunction with the accompanying drawings, technical scheme of the present invention will be further described,
However, the present invention is not limited to these examples.
As shown in Figure 1, a kind of aluminum alloy mould plate with planar bar code technology of the present invention, including aluminum alloy mould plate 10, aluminium close
Golden template 10 and handheld scanning device 30, aluminum alloy mould plate 10 use Building Information Model technology according to engineering drawing, establish
Building Information Model, and information coding, aluminum alloy mould plate 10 and encoded information are carried out to corresponding aluminum alloy mould plate 10 by model
It corresponds and is attached on corresponding aluminum alloy mould plate 10, handheld scanning device 30 is carried with construction personnel, hand-held scanner
Equipment 30 can carry out two-dimensional code scanning to any aluminum alloy mould plate 10 and obtain the information of corresponding aluminum alloy mould plate 10.
Inventive structure is comparatively simple, by establishing Building Information Model to each aluminum alloy mould plate 10, and passes through the model
Each piece of aluminum alloy mould plate 10 is encoded, then aluminum alloy mould plate 10 corresponding with coding is sticked to each block of aluminium alloy
In template 10, by the scanning of handheld scanning device 30, the relevant information of each aluminum alloy mould plate 10 can be obtained, so that each
Block aluminum alloy mould plate 10 can be installed to accurate position according to self information, improve the accurate of the installation of aluminum alloy mould plate 10
Property.
A kind of aluminum alloy mould plate construction method with planar bar code technology of the present invention, comprising the following steps:
S1: engineering construction information model is established according to engineering drawing;
S2: aluminium alloy model is established according to the Building Information Model of foundation;
S3: according to building size, dividing aluminum alloy mould plate blank size, and marks each layer standard form and nonstandard template
Quantity, size, position;
S4: the Template Location and turnover scheme of each floor are analyzed using Building Information Model;
S5: production aluminum alloy mould plate;
S6: production dynamic two-dimension code picture is pasted on each piece of aluminum alloy mould plate;
S7: aluminum alloy mould plate needed for first layer is built is transported to construction site;
S8: construction personnel scans the two-dimension code image of each aluminum alloy mould plate using handheld scanning device, acquires each aluminium
The information of alloy templates, and template is mounted on corresponding position;
S9: according to second layer design feature, construction site aluminum alloy mould plate is adjusted;
S10: update first layer aluminum alloy mould plate two-dimensional barcode information is two layers of information;
S11: first layer aluminum alloy mould plate is removed;
S12: step 7- step 11, each layer of successively constructing are repeated.
S13: after the completion of construction, updating dynamic two-dimension code information, in case next time uses.
Above-mentioned construction method is in such a way that Building Information Model is in conjunction with dynamic two-dimension code technology to each block of aluminium alloy
Template is encoded, construction personnel by the Handheld two-dimensional code scanning device two dimensional code that is pasted on aluminum alloy mould plate of scanning come
The installation site for determining template, using this construction technology, can effectively save construction period, the operation for reducing construction personnel is strong
Degree, meanwhile, using this construction method.It can effectively ensure that the installation accuracy of aluminum alloy mould plate, it is ensured that construction quality.
Specific embodiment described herein is only an example for the spirit of the invention.The neck of technology belonging to the present invention
The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method
In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.
Claims (2)
1. a kind of aluminum alloy mould plate with planar bar code technology, including
Aluminum alloy mould plate uses Building Information Model technology according to engineering drawing, establishes Building Information Model, and pass through model
Information coding is carried out to corresponding aluminum alloy mould plate;
Two-dimension code image is corresponded with encoded information and is attached on corresponding aluminum alloy mould plate;
Handheld scanning device can carry out two-dimensional code scanning to random two-dimensional code picture and obtain the letter of corresponding aluminum alloy mould plate
Breath.
2. a kind of aluminum alloy mould plate construction method with planar bar code technology, comprising the following steps:
S1: engineering construction information model is established according to engineering drawing;
S2: aluminium alloy model is established according to the Building Information Model of foundation;
S3: according to building size, aluminum alloy mould plate blank size is divided, and marks the number of each layer standard form and nonstandard template
Amount, size, position;
S4: the Template Location and turnover scheme of each floor are analyzed using Building Information Model;
S5: production aluminum alloy mould plate;
S6: production dynamic two-dimension code is pasted on each piece of aluminum alloy mould plate;
S7: aluminum alloy mould plate needed for first layer is built is transported to construction site;
S8: construction personnel scans the two dimensional code of each aluminum alloy mould plate using handheld device, acquires the information of each aluminum alloy mould plate,
And template is mounted on corresponding position;
S9: according to second layer design feature, construction site aluminum alloy mould plate is adjusted;
S10: update first layer aluminum alloy mould plate two-dimensional barcode information is two layers of information;
S11: first layer aluminum alloy mould plate is removed;
S12: step 7- step 11, each layer of successively constructing are repeated.
S13: after the completion of construction, updating dynamic two-dimension code information, in case next time uses.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811651041.1A CN109680924A (en) | 2018-12-31 | 2018-12-31 | A kind of aluminum alloy mould plate and construction method with planar bar code technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811651041.1A CN109680924A (en) | 2018-12-31 | 2018-12-31 | A kind of aluminum alloy mould plate and construction method with planar bar code technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109680924A true CN109680924A (en) | 2019-04-26 |
Family
ID=66191743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811651041.1A Pending CN109680924A (en) | 2018-12-31 | 2018-12-31 | A kind of aluminum alloy mould plate and construction method with planar bar code technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109680924A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924673A (en) * | 2019-10-28 | 2020-03-27 | 中国化学工程第六建设有限公司 | Construction method of aluminum alloy building template |
CN111305549A (en) * | 2020-03-26 | 2020-06-19 | 福建省闽发铝业股份有限公司 | Aluminum alloy template with two-dimensional code label |
CN112325771A (en) * | 2020-10-27 | 2021-02-05 | 晟通科技集团有限公司 | Template size detection method and template size detection device |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011074601A (en) * | 2009-09-29 | 2011-04-14 | Just Will Co Ltd | Resin form |
KR101301716B1 (en) * | 2013-03-26 | 2013-08-30 | 박광춘 | Method of manufacturing mold for free form architecture |
CN104268708A (en) * | 2014-10-09 | 2015-01-07 | 湖南普云智能科技有限公司 | Building template intelligent managing system and method based on cloud intelligence technology |
CN104460506A (en) * | 2014-11-13 | 2015-03-25 | 湖南普云智能科技有限公司 | Method for achieving template unmanned construction |
KR20150125238A (en) * | 2014-04-30 | 2015-11-09 | 주식회사 빔케어교육연구소 | BIM Server Using QR-code and Method and Printed Documents |
CN105205199A (en) * | 2014-06-30 | 2015-12-30 | 上海神机软件有限公司 | Identification code management system and method for construction engineering formworks and formwork discharging system and method for construction engineering formworks |
CN105279292A (en) * | 2014-06-30 | 2016-01-27 | 上海神机软件有限公司 | Drawing output system and method of construction engineering templates as well as template layout system and method |
CN105302931A (en) * | 2014-06-30 | 2016-02-03 | 上海神机软件有限公司 | Recognition system and method for construction engineering drawing, and template arrangement system and method |
CN105302930A (en) * | 2014-06-30 | 2016-02-03 | 上海神机软件有限公司 | Engineering drawing recognition system and method based on longitudinal and transverse beams, and template arrangement system and method |
CN205080575U (en) * | 2014-11-28 | 2016-03-09 | 华北水利水电大学 | Steel construction building locating pasting piece based on BIM |
CN106481880A (en) * | 2016-11-16 | 2017-03-08 | 中铁上海工程局集团有限公司 | One kind is based on BIM and aluminum alloy mould plate correct embedment water supply and drainage sleeve pipe and construction method |
CN106869308A (en) * | 2017-03-13 | 2017-06-20 | 同济大学 | A kind of quick turnover method of assembled architecture support system based on BIM |
CN108491631A (en) * | 2018-03-23 | 2018-09-04 | 中国十七冶集团有限公司 | A kind of aluminum alloy mould plate construction method based on BIM technology |
CN211499761U (en) * | 2018-12-31 | 2020-09-15 | 浙江二十冶建设有限公司 | Aluminum alloy template with two-dimensional code technology |
-
2018
- 2018-12-31 CN CN201811651041.1A patent/CN109680924A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011074601A (en) * | 2009-09-29 | 2011-04-14 | Just Will Co Ltd | Resin form |
KR101301716B1 (en) * | 2013-03-26 | 2013-08-30 | 박광춘 | Method of manufacturing mold for free form architecture |
KR20150125238A (en) * | 2014-04-30 | 2015-11-09 | 주식회사 빔케어교육연구소 | BIM Server Using QR-code and Method and Printed Documents |
CN105302930A (en) * | 2014-06-30 | 2016-02-03 | 上海神机软件有限公司 | Engineering drawing recognition system and method based on longitudinal and transverse beams, and template arrangement system and method |
CN105205199A (en) * | 2014-06-30 | 2015-12-30 | 上海神机软件有限公司 | Identification code management system and method for construction engineering formworks and formwork discharging system and method for construction engineering formworks |
CN105279292A (en) * | 2014-06-30 | 2016-01-27 | 上海神机软件有限公司 | Drawing output system and method of construction engineering templates as well as template layout system and method |
CN105302931A (en) * | 2014-06-30 | 2016-02-03 | 上海神机软件有限公司 | Recognition system and method for construction engineering drawing, and template arrangement system and method |
CN104268708A (en) * | 2014-10-09 | 2015-01-07 | 湖南普云智能科技有限公司 | Building template intelligent managing system and method based on cloud intelligence technology |
CN104460506A (en) * | 2014-11-13 | 2015-03-25 | 湖南普云智能科技有限公司 | Method for achieving template unmanned construction |
CN205080575U (en) * | 2014-11-28 | 2016-03-09 | 华北水利水电大学 | Steel construction building locating pasting piece based on BIM |
CN106481880A (en) * | 2016-11-16 | 2017-03-08 | 中铁上海工程局集团有限公司 | One kind is based on BIM and aluminum alloy mould plate correct embedment water supply and drainage sleeve pipe and construction method |
CN106869308A (en) * | 2017-03-13 | 2017-06-20 | 同济大学 | A kind of quick turnover method of assembled architecture support system based on BIM |
CN108491631A (en) * | 2018-03-23 | 2018-09-04 | 中国十七冶集团有限公司 | A kind of aluminum alloy mould plate construction method based on BIM technology |
CN211499761U (en) * | 2018-12-31 | 2020-09-15 | 浙江二十冶建设有限公司 | Aluminum alloy template with two-dimensional code technology |
Non-Patent Citations (1)
Title |
---|
任兵, 中国市场出版社 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924673A (en) * | 2019-10-28 | 2020-03-27 | 中国化学工程第六建设有限公司 | Construction method of aluminum alloy building template |
CN111305549A (en) * | 2020-03-26 | 2020-06-19 | 福建省闽发铝业股份有限公司 | Aluminum alloy template with two-dimensional code label |
CN112325771A (en) * | 2020-10-27 | 2021-02-05 | 晟通科技集团有限公司 | Template size detection method and template size detection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109680924A (en) | A kind of aluminum alloy mould plate and construction method with planar bar code technology | |
CN104746884B (en) | Method for hoisting prefabricated parts of assembled building | |
CN107832498A (en) | A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method | |
CN108532953B (en) | BIM-based cantilever plate construction method and building construction method | |
CN106779476A (en) | A kind of Construction Schedule management platform and method based on BIM IFC technologies | |
Guamán-Rivera et al. | Recent developments and challenges of 3D-printed construction: A review of research fronts | |
CN108427782A (en) | A kind of three-dimensional building model treatment method and device based on BIM | |
CN108268707A (en) | A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT | |
CN207348087U (en) | A kind of assembled building block retaining wall | |
CN106934092A (en) | The modeling method of the high speed railway prefabricating Liang Chang based on BIM | |
CN101538907B (en) | Construction method for building concrete superface with surface modeling | |
CN107992643A (en) | It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification | |
CN109583085A (en) | A kind of Construction Quality control method based on BIM Yu VR technology | |
CN111339601A (en) | BIM + VR construction site arrangement method | |
CN109019343A (en) | Prefabricated panel information collection and hanging method based on NB-IoT technology | |
CN116229003A (en) | Three-dimensional model monomerization rapid construction method based on multi-source data | |
CN106683191A (en) | Distance reinforcement placement method suitable for complex surface and simple surface | |
CN114186305A (en) | Building construction method and system | |
Salam | HBIM-a sustainable approach for heritage buildings restoration in Egypt | |
CN112966325B (en) | BIM-based prefabricated laminated slab joint mold lifting device processing method and system | |
CN109881892A (en) | A kind of overlarge area floor construction flatness control device and construction method | |
CN110189392B (en) | Automatic framing method for flow velocity and flow direction map | |
CN109138149A (en) | The construction method of installation of assembled architecture PC component and its assembled architecture obtained | |
CN106869490B (en) | The production method of cambered surface plain form panel | |
CN211499761U (en) | Aluminum alloy template with two-dimensional code technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province Applicant after: Zhejiang 20 Smelter Construction Co.,Ltd. Applicant after: CHINA MCC20 GROUP Corp.,Ltd. Address before: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province Applicant before: NINGBO MCC 20 CONSTRUCTION Co.,Ltd. Applicant before: CHINA MCC20 GROUP Corp.,Ltd. |
|
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190426 |