CN205080575U - Steel construction building locating pasting piece based on BIM - Google Patents

Steel construction building locating pasting piece based on BIM Download PDF

Info

Publication number
CN205080575U
CN205080575U CN201520147517.3U CN201520147517U CN205080575U CN 205080575 U CN205080575 U CN 205080575U CN 201520147517 U CN201520147517 U CN 201520147517U CN 205080575 U CN205080575 U CN 205080575U
Authority
CN
China
Prior art keywords
information
bim
dimension code
code
dimensional code
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520147517.3U
Other languages
Chinese (zh)
Inventor
魏群
魏鲁双
高阳秋晔
刘尚蔚
马颖
尹伟波
卜祥云
王维洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN201520147517.3U priority Critical patent/CN205080575U/en
Application granted granted Critical
Publication of CN205080575U publication Critical patent/CN205080575U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a steel construction building locating pasting piece based on BIM, includes outlying two -dimensional code or the three -dimension code surveyor's beacon central with being located two -dimensional code or three -dimension code, contains BIM information among two -dimensional code or the three -dimension code. The design information, construction process information, the material information that contain building element in two -dimensional code or the three -dimension code to and the connection information between the adjacent member with other. This steel construction building locating pasting piece based on BIM is used for pasting at steel structural member's both ends, BIM information that its inside two -dimensional code or three -dimension code can provide the component, and the construction workman selects suitable component according to these information to and with the position of this components are installed to the accuracy, can improve construction speed and construction quality by a wide margin. Adding the terminal of loading onto two -dimensional code or three -dimension code scanning on the theodolite, can scanning out with the information among two -dimensional code or the three -dimension code, measurement personnel just can abandon handheld technical data like this, by a wide margin promotion detection efficiency.

Description

Based on the steel building site of BIM
Technical field
The utility model relates to BIM technology field, particularly relates to a kind of steel building site based on BIM.
Background technology
The spelling of BIM is BuildingInformationModeling, that is: BIM.BIM is based on 3-dimensional digital technology, is integrated with the data model of the various relevant information of construction-engineering project, and BIM is the digital expression to engineering project infrastructure entities and functional characteristic.A perfect information model, can the data of connecting building project life cycle different phase, process and resource, is the complete description to engineering object, generally can be used by each participant of construction project.BIM has single project data source, can solve the consistance between distributed, isomery project data and overall sharing problem, supports that in the construction project lifetime, dynamic engineering information creates, management and sharing.BIM is again a kind of digitizing solution being applied to design, construction, management simultaneously, and this method supports the integrated management environment of construction work, and construction work can be made in its whole process, to significantly improve efficiency and reduce risks in a large number.
In fact, it is a kind of new technology leading Information industry technological direction higher level, its overall application, the scientific-technical progress for building industry being produced beyond measure impact, greatly improving the integration degree of construction work.Meanwhile, also for the development of building industry brings huge benefit, the quality of design and even whole engineering and efficiency are significantly improved, cost reduces.
But in practical engineering application, build labourer is as the personnel directly contacted with buildings, how BIM simple and easyly can pass to them, and to allow them be applied in construction be a difficult problem, special steel building field, build labourer is inadequate to the familiarity of component, in installation process, how shaping component selects, concerning being all a difficult problem them, have to be solved.
Surveyor's beacon is as survey mark, be used to detect the important certification mark whether buildings carries out according to design drawing requirement constructing, surveyor's beacon of the prior art is all a single mark, does not comprise any information, technical information is contrasted in addition while measurement, cumbersome.
Utility model content
The purpose of this utility model is: provide the steel building site based on BIM that a kind of structure is simple, easy to use.
The technical solution of the utility model is: a kind of steel building site based on BIM, is characterized in that: comprise peripheral Quick Response Code or three-dimension code and be positioned at the surveyor's beacon at Quick Response Code or three-dimension code center, comprise BIM information in Quick Response Code or three-dimension code.
Comprise design information, construction technology information, the material information of building element in described Quick Response Code or three-dimension code, and and other adjacent members between link information.
Described design information comprises component name, the position of component in whole building, the shape of component, the installation site of component, the material of component, the engineering property of component.
Described construction technology information comprises working procedure, method, progress, cost, quality requirements.
Described link information comprises the title of coupled component, and link position and connected mode.
Described spacer has the unique identification number suitable with BIM in whole structural steelwork component.
Technique effect of the present utility model:
Should based on the steel building site of BIM for being attached to the two ends of steel structure member, the Quick Response Code of its inside or three-dimension code can provide the BIM information of component, construction worker can by obtaining after special terminal scanning, thus suitable component can be selected according to these information, and by this Components installation to position accurately, can significantly improve speed of application and construction quality.
Steel building after installation is complete, should can be detected personnel based on the steel building site of BIM to detect as surveyor's beacon, transit adds the terminal loading onto Quick Response Code or three-dimension code scanning, can by the information scanning in Quick Response Code or three-dimension code out, the technical information needed for testing staff is included in these information, such testing staff just can abandon hand-held technical information, significantly promotes detection efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the steel building site based on BIM;
1. Quick Response Codes or three-dimension code, 2. surveyor's beacon in figure.
Embodiment
Embodiment: see the steel building site based on BIM a kind of in Fig. 1, figure, comprises peripheral Quick Response Code or three-dimension code and is positioned at the surveyor's beacon at Quick Response Code or three-dimension code center, comprise BIM information in Quick Response Code or three-dimension code.Comprise design information, construction technology information, the material information of building element in described Quick Response Code or three-dimension code, and and other adjacent members between link information.Described design information comprises component name, the position of component in whole building, the shape of component, the installation site of component, the material of component, the engineering property of component.Described construction technology information comprises working procedure, method, progress, cost, quality requirements.Described link information comprises the title of coupled component, and link position and connected mode.Described spacer has the unique identification number suitable with BIM in whole structural steelwork component.
Workman according to the information of carrying on the BIM digital figure sheet on web joint, can determine position and the angle of location-plate; Ensure the correct and precision in web joint position and hole site; Construction manager can carry out an acceptance inspection according to these information and check.
This spacer is according to the difference of purposes, and entrained information is different, but all information is all in the Quick Response Code or three-dimension code entering spacer according to form and the data organization of BIM, and is printed on spacer;
The application of this spacer, can make the Various types of data in BIM transmit accurately and identify,
Also provide the weld information needed for welding robot in the Quick Response Code of spacer or three-dimension code, welding robot can be helped to complete the welding process of robotization.
Described end of scan can be special end of scan or the mobile phone that can identify Quick Response Code or three-dimension code.
nanometer microelectronics sheet can also be added in addition, for the two-way corner of Real-time Feedback component in this paster.

Claims (2)

1. based on a steel building site of BIM, it is characterized in that: comprise peripheral Quick Response Code or three-dimension code and be positioned at the surveyor's beacon at Quick Response Code or three-dimension code center, in Quick Response Code or three-dimension code, comprise BIM information.
2. the steel building site based on BIM according to claim 1, is characterized in that: described spacer has the unique identification number suitable with BIM in whole structural steelwork component.
CN201520147517.3U 2014-11-28 2015-03-16 Steel construction building locating pasting piece based on BIM Withdrawn - After Issue CN205080575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520147517.3U CN205080575U (en) 2014-11-28 2015-03-16 Steel construction building locating pasting piece based on BIM

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201410701533 2014-11-28
CN2014107015332 2014-11-28
CN201520147517.3U CN205080575U (en) 2014-11-28 2015-03-16 Steel construction building locating pasting piece based on BIM

Publications (1)

Publication Number Publication Date
CN205080575U true CN205080575U (en) 2016-03-09

Family

ID=53619941

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510113614.5A Active CN104778488B (en) 2014-11-28 2015-03-16 Steel building site based on BIM
CN201520147517.3U Withdrawn - After Issue CN205080575U (en) 2014-11-28 2015-03-16 Steel construction building locating pasting piece based on BIM

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201510113614.5A Active CN104778488B (en) 2014-11-28 2015-03-16 Steel building site based on BIM

Country Status (1)

Country Link
CN (2) CN104778488B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104778488A (en) * 2014-11-28 2015-07-15 华北水利水电大学 Steel-structure building positioning paster based on BIM
CN105976274A (en) * 2016-05-03 2016-09-28 郑州科技学院 Positioning patch-based ancient building management system
CN106296014A (en) * 2016-08-15 2017-01-04 上海宝冶集团有限公司 Steel construction based on BIM and Quick Response Code produces delivery system
CN109680924A (en) * 2018-12-31 2019-04-26 宁波二十冶建设有限公司 A kind of aluminum alloy mould plate and construction method with planar bar code technology

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106600137A (en) * 2016-12-08 2017-04-26 东莞华南设计创新院 Application method of steel structure BIM (building information modeling) informatization platform
CN106777751A (en) * 2016-12-30 2017-05-31 译筑信息科技(上海)有限公司 Architecture information processing method and processing device
WO2018143151A1 (en) * 2017-01-31 2018-08-09 三井住友建設株式会社 Surveying marker and surveying system
CN106869308B (en) * 2017-03-13 2019-06-11 同济大学 A kind of quick turnover method of assembled architecture support system based on BIM
CN106951939A (en) * 2017-03-22 2017-07-14 安固士(天津)建筑材料有限公司 A kind of antidetonation suspension and support identification Quick Response Code obtains information engineering method
CN107300723B (en) * 2017-08-01 2023-09-26 贺州学院 Assembly type building assembly detection device and method
CN108427811A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of PC components Life cycle tracking, apparatus and system
CN108428031A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of method and device of the status inquiry based on assembled architecture
CN109653400A (en) * 2019-01-31 2019-04-19 陈志敏 Building and two dimensional code architectural image construct system
JP6693616B1 (en) * 2019-12-11 2020-05-13 計測技研株式会社 Surveying system and surveying method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473720B (en) * 2013-09-06 2016-08-24 上海大学 Shield method tunnel construction based on BIM management system
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
CN104778488B (en) * 2014-11-28 2018-04-10 华北水利水电大学 Steel building site based on BIM

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104778488A (en) * 2014-11-28 2015-07-15 华北水利水电大学 Steel-structure building positioning paster based on BIM
CN104778488B (en) * 2014-11-28 2018-04-10 华北水利水电大学 Steel building site based on BIM
CN105976274A (en) * 2016-05-03 2016-09-28 郑州科技学院 Positioning patch-based ancient building management system
CN105976274B (en) * 2016-05-03 2019-06-18 郑州科技学院 It is a kind of for managing the site of ancient architecture building body
CN106296014A (en) * 2016-08-15 2017-01-04 上海宝冶集团有限公司 Steel construction based on BIM and Quick Response Code produces delivery system
CN109680924A (en) * 2018-12-31 2019-04-26 宁波二十冶建设有限公司 A kind of aluminum alloy mould plate and construction method with planar bar code technology

Also Published As

Publication number Publication date
CN104778488A (en) 2015-07-15
CN104778488B (en) 2018-04-10

Similar Documents

Publication Publication Date Title
CN205080575U (en) Steel construction building locating pasting piece based on BIM
CN101324428B (en) Method for measuring construction steel structure special-shaped component three-dimensional coordinates
CN102538646A (en) Tolerance test template for master node of ship hull and detection method thereof
CN104764415A (en) Steel bridge structure three-dimensional measurement and detection system and measurement method
CN205785144U (en) Articulated flexible COMERO
CN203964794U (en) A kind of nuclear power station penetration piece is installed location Cross ruler
CN108489381A (en) A kind of ship fast accurate trepanning localization method
CN104573211A (en) Steel structure detailed drawing labeling method based on BIM (building information modeling) system
CN102042822B (en) Tunnel section measurement method
CN204988223U (en) Detection apparatus for steel member preparation size precision
CN104567763A (en) Steel structure detection method based on BIM (building information modeling) system
Kivimäki et al. Infra BIM based real-time quality control of infrastructure construction projects
CN104318610B (en) Large-space three-dimensional entity line-putting method
CN106654516B (en) High precision measuring device and method suitable for multiple spot distribution deployable antenna
CN204694208U (en) Bridge steel structure three-dimensional measurement detection system
CN107724689B (en) Construction engineering steel structure measurement construction method
CN204725482U (en) Device is refuted in the punching of a kind of ocean
Hatoum et al. Optimization of locating robotic total stations for determining the deformations of buildings and structures< TITLE lang=""> OпTiniзaцiya necTa pacпoлoжeнiya poбoTiзipoвaнныx cTaнцiй нaблюдeнiй зa дeфopnaцiyani здaнiй i coopyжeнiй
CN202421075U (en) Image-based normal contact stiffness measuring device for assembly joint surfaces of large machine tools
CN204122975U (en) Tower crane standard section main chord adapter sleeve location assembly welding frock
CN102435607A (en) Image-based measuring device for normal contact stiffness of assembled jointing surface of large-size machine tool
CN105841572A (en) Cardboard detecting assembling structure contraposition deviation and detection method
CN111691682A (en) Assembling method for double-layer skew and skew drum node latticed shell units
CN105138642A (en) Dynamic plotting method and device based on HTML5
CN105066837A (en) A thermal state ring part internal and external diameter measuring tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160309

Effective date of abandoning: 20180410