CN205080575U - Steel construction building locating pasting piece based on BIM - Google Patents
Steel construction building locating pasting piece based on BIM Download PDFInfo
- Publication number
- CN205080575U CN205080575U CN201520147517.3U CN201520147517U CN205080575U CN 205080575 U CN205080575 U CN 205080575U CN 201520147517 U CN201520147517 U CN 201520147517U CN 205080575 U CN205080575 U CN 205080575U
- Authority
- CN
- China
- Prior art keywords
- information
- bim
- dimension code
- code
- dimensional code
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
The utility model provides a steel construction building locating pasting piece based on BIM, includes outlying two -dimensional code or the three -dimension code surveyor's beacon central with being located two -dimensional code or three -dimension code, contains BIM information among two -dimensional code or the three -dimension code. The design information, construction process information, the material information that contain building element in two -dimensional code or the three -dimension code to and the connection information between the adjacent member with other. This steel construction building locating pasting piece based on BIM is used for pasting at steel structural member's both ends, BIM information that its inside two -dimensional code or three -dimension code can provide the component, and the construction workman selects suitable component according to these information to and with the position of this components are installed to the accuracy, can improve construction speed and construction quality by a wide margin. Adding the terminal of loading onto two -dimensional code or three -dimension code scanning on the theodolite, can scanning out with the information among two -dimensional code or the three -dimension code, measurement personnel just can abandon handheld technical data like this, by a wide margin promotion detection efficiency.
Description
Technical field
The utility model relates to BIM technology field, particularly relates to a kind of steel building site based on BIM.
Background technology
The spelling of BIM is BuildingInformationModeling, that is: BIM.BIM is based on 3-dimensional digital technology, is integrated with the data model of the various relevant information of construction-engineering project, and BIM is the digital expression to engineering project infrastructure entities and functional characteristic.A perfect information model, can the data of connecting building project life cycle different phase, process and resource, is the complete description to engineering object, generally can be used by each participant of construction project.BIM has single project data source, can solve the consistance between distributed, isomery project data and overall sharing problem, supports that in the construction project lifetime, dynamic engineering information creates, management and sharing.BIM is again a kind of digitizing solution being applied to design, construction, management simultaneously, and this method supports the integrated management environment of construction work, and construction work can be made in its whole process, to significantly improve efficiency and reduce risks in a large number.
In fact, it is a kind of new technology leading Information industry technological direction higher level, its overall application, the scientific-technical progress for building industry being produced beyond measure impact, greatly improving the integration degree of construction work.Meanwhile, also for the development of building industry brings huge benefit, the quality of design and even whole engineering and efficiency are significantly improved, cost reduces.
But in practical engineering application, build labourer is as the personnel directly contacted with buildings, how BIM simple and easyly can pass to them, and to allow them be applied in construction be a difficult problem, special steel building field, build labourer is inadequate to the familiarity of component, in installation process, how shaping component selects, concerning being all a difficult problem them, have to be solved.
Surveyor's beacon is as survey mark, be used to detect the important certification mark whether buildings carries out according to design drawing requirement constructing, surveyor's beacon of the prior art is all a single mark, does not comprise any information, technical information is contrasted in addition while measurement, cumbersome.
Utility model content
The purpose of this utility model is: provide the steel building site based on BIM that a kind of structure is simple, easy to use.
The technical solution of the utility model is: a kind of steel building site based on BIM, is characterized in that: comprise peripheral Quick Response Code or three-dimension code and be positioned at the surveyor's beacon at Quick Response Code or three-dimension code center, comprise BIM information in Quick Response Code or three-dimension code.
Comprise design information, construction technology information, the material information of building element in described Quick Response Code or three-dimension code, and and other adjacent members between link information.
Described design information comprises component name, the position of component in whole building, the shape of component, the installation site of component, the material of component, the engineering property of component.
Described construction technology information comprises working procedure, method, progress, cost, quality requirements.
Described link information comprises the title of coupled component, and link position and connected mode.
Described spacer has the unique identification number suitable with BIM in whole structural steelwork component.
Technique effect of the present utility model:
Should based on the steel building site of BIM for being attached to the two ends of steel structure member, the Quick Response Code of its inside or three-dimension code can provide the BIM information of component, construction worker can by obtaining after special terminal scanning, thus suitable component can be selected according to these information, and by this Components installation to position accurately, can significantly improve speed of application and construction quality.
Steel building after installation is complete, should can be detected personnel based on the steel building site of BIM to detect as surveyor's beacon, transit adds the terminal loading onto Quick Response Code or three-dimension code scanning, can by the information scanning in Quick Response Code or three-dimension code out, the technical information needed for testing staff is included in these information, such testing staff just can abandon hand-held technical information, significantly promotes detection efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the steel building site based on BIM;
1. Quick Response Codes or three-dimension code, 2. surveyor's beacon in figure.
Embodiment
Embodiment: see the steel building site based on BIM a kind of in Fig. 1, figure, comprises peripheral Quick Response Code or three-dimension code and is positioned at the surveyor's beacon at Quick Response Code or three-dimension code center, comprise BIM information in Quick Response Code or three-dimension code.Comprise design information, construction technology information, the material information of building element in described Quick Response Code or three-dimension code, and and other adjacent members between link information.Described design information comprises component name, the position of component in whole building, the shape of component, the installation site of component, the material of component, the engineering property of component.Described construction technology information comprises working procedure, method, progress, cost, quality requirements.Described link information comprises the title of coupled component, and link position and connected mode.Described spacer has the unique identification number suitable with BIM in whole structural steelwork component.
Workman according to the information of carrying on the BIM digital figure sheet on web joint, can determine position and the angle of location-plate; Ensure the correct and precision in web joint position and hole site; Construction manager can carry out an acceptance inspection according to these information and check.
This spacer is according to the difference of purposes, and entrained information is different, but all information is all in the Quick Response Code or three-dimension code entering spacer according to form and the data organization of BIM, and is printed on spacer;
The application of this spacer, can make the Various types of data in BIM transmit accurately and identify,
Also provide the weld information needed for welding robot in the Quick Response Code of spacer or three-dimension code, welding robot can be helped to complete the welding process of robotization.
Described end of scan can be special end of scan or the mobile phone that can identify Quick Response Code or three-dimension code.
nanometer microelectronics sheet can also be added in addition, for the two-way corner of Real-time Feedback component in this paster.
Claims (2)
1. based on a steel building site of BIM, it is characterized in that: comprise peripheral Quick Response Code or three-dimension code and be positioned at the surveyor's beacon at Quick Response Code or three-dimension code center, in Quick Response Code or three-dimension code, comprise BIM information.
2. the steel building site based on BIM according to claim 1, is characterized in that: described spacer has the unique identification number suitable with BIM in whole structural steelwork component.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520147517.3U CN205080575U (en) | 2014-11-28 | 2015-03-16 | Steel construction building locating pasting piece based on BIM |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410701533 | 2014-11-28 | ||
CN2014107015332 | 2014-11-28 | ||
CN201520147517.3U CN205080575U (en) | 2014-11-28 | 2015-03-16 | Steel construction building locating pasting piece based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205080575U true CN205080575U (en) | 2016-03-09 |
Family
ID=53619941
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510113614.5A Active CN104778488B (en) | 2014-11-28 | 2015-03-16 | Steel building site based on BIM |
CN201520147517.3U Withdrawn - After Issue CN205080575U (en) | 2014-11-28 | 2015-03-16 | Steel construction building locating pasting piece based on BIM |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510113614.5A Active CN104778488B (en) | 2014-11-28 | 2015-03-16 | Steel building site based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN104778488B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104778488A (en) * | 2014-11-28 | 2015-07-15 | 华北水利水电大学 | Steel-structure building positioning paster based on BIM |
CN105976274A (en) * | 2016-05-03 | 2016-09-28 | 郑州科技学院 | Positioning patch-based ancient building management system |
CN106296014A (en) * | 2016-08-15 | 2017-01-04 | 上海宝冶集团有限公司 | Steel construction based on BIM and Quick Response Code produces delivery system |
CN109680924A (en) * | 2018-12-31 | 2019-04-26 | 宁波二十冶建设有限公司 | A kind of aluminum alloy mould plate and construction method with planar bar code technology |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106600137A (en) * | 2016-12-08 | 2017-04-26 | 东莞华南设计创新院 | Application method of steel structure BIM (building information modeling) informatization platform |
CN106777751A (en) * | 2016-12-30 | 2017-05-31 | 译筑信息科技(上海)有限公司 | Architecture information processing method and processing device |
WO2018143151A1 (en) * | 2017-01-31 | 2018-08-09 | 三井住友建設株式会社 | Surveying marker and surveying system |
CN106869308B (en) * | 2017-03-13 | 2019-06-11 | 同济大学 | A kind of quick turnover method of assembled architecture support system based on BIM |
CN106951939A (en) * | 2017-03-22 | 2017-07-14 | 安固士(天津)建筑材料有限公司 | A kind of antidetonation suspension and support identification Quick Response Code obtains information engineering method |
CN107300723B (en) * | 2017-08-01 | 2023-09-26 | 贺州学院 | Assembly type building assembly detection device and method |
CN108427811A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | A kind of PC components Life cycle tracking, apparatus and system |
CN108428031A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | A kind of method and device of the status inquiry based on assembled architecture |
CN109653400A (en) * | 2019-01-31 | 2019-04-19 | 陈志敏 | Building and two dimensional code architectural image construct system |
JP6693616B1 (en) * | 2019-12-11 | 2020-05-13 | 計測技研株式会社 | Surveying system and surveying method |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103473720B (en) * | 2013-09-06 | 2016-08-24 | 上海大学 | Shield method tunnel construction based on BIM management system |
CN103530827A (en) * | 2013-09-26 | 2014-01-22 | 中铁建设集团有限公司 | Assembly type building component intelligent management system based on BIM (building information modeling) |
CN104778488B (en) * | 2014-11-28 | 2018-04-10 | 华北水利水电大学 | Steel building site based on BIM |
-
2015
- 2015-03-16 CN CN201510113614.5A patent/CN104778488B/en active Active
- 2015-03-16 CN CN201520147517.3U patent/CN205080575U/en not_active Withdrawn - After Issue
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104778488A (en) * | 2014-11-28 | 2015-07-15 | 华北水利水电大学 | Steel-structure building positioning paster based on BIM |
CN104778488B (en) * | 2014-11-28 | 2018-04-10 | 华北水利水电大学 | Steel building site based on BIM |
CN105976274A (en) * | 2016-05-03 | 2016-09-28 | 郑州科技学院 | Positioning patch-based ancient building management system |
CN105976274B (en) * | 2016-05-03 | 2019-06-18 | 郑州科技学院 | It is a kind of for managing the site of ancient architecture building body |
CN106296014A (en) * | 2016-08-15 | 2017-01-04 | 上海宝冶集团有限公司 | Steel construction based on BIM and Quick Response Code produces delivery system |
CN109680924A (en) * | 2018-12-31 | 2019-04-26 | 宁波二十冶建设有限公司 | A kind of aluminum alloy mould plate and construction method with planar bar code technology |
Also Published As
Publication number | Publication date |
---|---|
CN104778488A (en) | 2015-07-15 |
CN104778488B (en) | 2018-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205080575U (en) | Steel construction building locating pasting piece based on BIM | |
CN101324428B (en) | Method for measuring construction steel structure special-shaped component three-dimensional coordinates | |
CN102538646A (en) | Tolerance test template for master node of ship hull and detection method thereof | |
CN104764415A (en) | Steel bridge structure three-dimensional measurement and detection system and measurement method | |
CN205785144U (en) | Articulated flexible COMERO | |
CN203964794U (en) | A kind of nuclear power station penetration piece is installed location Cross ruler | |
CN108489381A (en) | A kind of ship fast accurate trepanning localization method | |
CN104573211A (en) | Steel structure detailed drawing labeling method based on BIM (building information modeling) system | |
CN102042822B (en) | Tunnel section measurement method | |
CN204988223U (en) | Detection apparatus for steel member preparation size precision | |
CN104567763A (en) | Steel structure detection method based on BIM (building information modeling) system | |
Kivimäki et al. | Infra BIM based real-time quality control of infrastructure construction projects | |
CN104318610B (en) | Large-space three-dimensional entity line-putting method | |
CN106654516B (en) | High precision measuring device and method suitable for multiple spot distribution deployable antenna | |
CN204694208U (en) | Bridge steel structure three-dimensional measurement detection system | |
CN107724689B (en) | Construction engineering steel structure measurement construction method | |
CN204725482U (en) | Device is refuted in the punching of a kind of ocean | |
Hatoum et al. | Optimization of locating robotic total stations for determining the deformations of buildings and structures< TITLE lang=""> OпTiniзaцiya necTa pacпoлoжeнiya poбoTiзipoвaнныx cTaнцiй нaблюдeнiй зa дeфopnaцiyani здaнiй i coopyжeнiй | |
CN202421075U (en) | Image-based normal contact stiffness measuring device for assembly joint surfaces of large machine tools | |
CN204122975U (en) | Tower crane standard section main chord adapter sleeve location assembly welding frock | |
CN102435607A (en) | Image-based measuring device for normal contact stiffness of assembled jointing surface of large-size machine tool | |
CN105841572A (en) | Cardboard detecting assembling structure contraposition deviation and detection method | |
CN111691682A (en) | Assembling method for double-layer skew and skew drum node latticed shell units | |
CN105138642A (en) | Dynamic plotting method and device based on HTML5 | |
CN105066837A (en) | A thermal state ring part internal and external diameter measuring tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160309 Effective date of abandoning: 20180410 |