CN106600137A - Application method of steel structure BIM (building information modeling) informatization platform - Google Patents
Application method of steel structure BIM (building information modeling) informatization platform Download PDFInfo
- Publication number
- CN106600137A CN106600137A CN201611124589.1A CN201611124589A CN106600137A CN 106600137 A CN106600137 A CN 106600137A CN 201611124589 A CN201611124589 A CN 201611124589A CN 106600137 A CN106600137 A CN 106600137A
- Authority
- CN
- China
- Prior art keywords
- information
- bim
- steel structure
- structure member
- bim informatization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses an application method of a steel structure BIM (building information modeling) informatization platform. The method includes the following steps that: S1, the basic information of steel structural components is introduced into a BIM informatization platform in the form of data streams, the data are integrated through using the BIM informatization platform, and the three-dimensional information models of the steel structural components are automatically produced; S2, the project information and material information of the steel structural components are introduced into the BIM informatization platform in the form of data streams again, the data are integrated through using the BIM informatization platform, and the project information and material information are automatically marked on the three-dimensional information models; and S3, the BIM informatization platform is adopted to number the three-dimensional information models of each steel structural component. With the application method adopted, working efficiency can be improved; problems can be found out as early as possible, so that the problems can be handled; costs can be reduced; the degree of refinement can be improved; and seamless handover of each link and the real-time information sharing of each party can be realized. The method has the advantages of simplicity and low cost.
Description
Technical field
The present invention relates to BIM informatization platform technical fields, more particularly to a kind of application of steel construction BIM informatization platforms
Method.
Background technology
BIM is the abbreviation of Building Information Modeling, and the technology promoted it from 2002 in North America
Afterwards, the fashionable whole world;The traditional two-dintension CAD drawing epoch have been shaken in its appearance, and the technology subversiveness ground will build item
The all relevant informations of purpose are all incorporated among three-dimensional visualization model, and each participant of project project each stage in spy
Formula is interacted on fixed platform to the model to manage and perfect, the real time information of the seamless handover and each side that realize each link is total to
Enjoy;Efficiency can be improved using BIM technology, is reduced and is repeated and fruitless labour, lifting become more meticulous degree, reducing energy consumption.
It is reported that, the method currently without BIM informatization platforms are applied to into steel structure member processing and fabricating, therefore, I
Propose a kind of application process of steel construction BIM informatization platforms for solving the above problems.
The content of the invention
Based on the technical problem that background technology is present, the present invention proposes a kind of application of steel construction BIM informatization platforms
Method.
A kind of application process of steel construction BIM informatization platforms proposed by the present invention, comprises the following steps:
S1:The essential information of steel structure member is imported in BIM informatization platforms in the form of data flow, Ran Houyong
BIM informatization platform integral datas, produce the three-dimensional information model of steel structure member automatically;
S2:The project information and material information of steel structure member are imported to into again BIM in the form of data flow information-based
In platform, then with BIM informatization platform integral datas, project information and material information are marked in three-dimensional information model automatically
On;
S3:The three-dimensional information model of each steel structure member is numbered with BIM informatization platforms, is then believed with BIM
The three-dimensional information model of the steel structure member being adapted is simulated combination and is installed by breathization platform;
S4:Steel structure member is made according to three-dimensional information mould processing, per after the completion of procedure, each operation director is by steel
, to BIM informatization platforms, BIM informatization platforms are automatically by the crudy letter of feedback for the crudy feedback of the information of structural elements
Breath is made an addition on three-dimensional information model.
Preferably, in the S4, according to three-dimensional information mould processing steel structure member, after the completion of every procedure, each operation
The crudy information and real-time progress status information of steel structure member are fed back to BIM informatization platforms, BIM information by director
Change platform automatically the crudy information and real-time progress status information of feedback to be made an addition on three-dimensional information model.
Preferably, in the S4, each operation director is with handheld terminal, mobile phone A PP end or PC ends by steel structure member
Crudy feedback of the information is to BIM informatization platforms.
Preferably, the related personnel of steel structure member processing logs in BIM informatization platforms, checks that steel is tied according to its own right
The three-dimensional information model and crudy information of structure component.
Preferably, the related personnel of steel structure member processing logs in BIM informatization platforms, root with mobile phone A PP end or PC ends
The three-dimensional information model and crudy information of steel structure member are checked according to its own right.
Preferably, in the S3, the three-dimensional information model of each steel structure member is compiled with BIM informatization platforms
Number, then the three-dimensional information model of the steel structure member being adapted is simulated into combination with BIM informatization platforms and is installed, according to
Produced problem is adjusted to the three-dimensional information model of steel structure member in simulation combination installation process, until simulation combination peace
Dress up work(.
In the present invention, a kind of application process of steel construction BIM informatization platforms is by automatic with BIM informatization platforms
Producing the three-dimensional information model of steel structure member can improve work efficiency, by by project information and material information mark in
The degree of becoming more meticulous can be lifted on three-dimensional information model, by with BIM informatization platforms by the three of the steel structure member being adapted
Dimension information model be simulated combination install can be early pinpoint the problems, and processed, and can reduces cost, lift essence
Degree of refinement, can be real on three-dimensional information model by the way that the crudy information and real-time progress status information of feedback are made an addition to
Information sharing when real, the present invention can improve work efficiency, and can be early pinpoint the problems, and processed, can drop
Low cost, lifts the degree that becomes more meticulous, and can more realize that the seamless handover of each link and the real time information of each side are shared, method letter
It is single, easy to use, low cost.
Specific embodiment
The present invention is made with reference to specific embodiment further explain.
Embodiment
The present embodiment proposes a kind of application process of steel construction BIM informatization platforms, comprises the following steps:
S1:The essential information of steel structure member is imported in BIM informatization platforms in the form of data flow, Ran Houyong
BIM informatization platform integral datas, produce the three-dimensional information model of steel structure member automatically;
S2:The project information and material information of steel structure member are imported to into again BIM in the form of data flow information-based
In platform, then with BIM informatization platform integral datas, project information and material information are marked in three-dimensional information model automatically
On;
S3:The three-dimensional information model of each steel structure member is numbered with BIM informatization platforms, is then believed with BIM
The three-dimensional information model of the steel structure member being adapted is simulated combination and is installed by breathization platform, is installed according to simulation combination
Produced problem is adjusted to the three-dimensional information model of steel structure member in journey, until simulation combination is installed successfully;
S4:According to three-dimensional information mould processing steel structure member, after the completion of every procedure, operation director uses hand-held end
End, mobile phone A PP end or PC ends are by the crudy feedback of the information of steel structure member to BIM informatization platforms, BIM informatization platforms
Automatically the crudy information and real-time progress status information of feedback are made an addition on three-dimensional information model.
In the present embodiment, the related personnel of steel structure member processing logs in BIM informationizations and puts down with mobile phone A PP end or PC ends
Platform, according to its own right the three-dimensional information model and crudy information of steel structure member are checked, a kind of steel construction BIM is information-based
The application process of platform can improve work by producing the three-dimensional information model of steel structure member automatically with BIM informatization platforms
Make efficiency, by the way that project information and material information are marked into the degree of becoming more meticulous that can be lifted on three-dimensional information model, by with
The three-dimensional information model of the steel structure member being adapted is simulated the discovery that combination installation can be early by BIM informatization platforms
Problem, and being processed, and can reduces cost, lifting becomes more meticulous degree, by will feedback crudy information and in real time
Progress status information make an addition to can realize on three-dimensional information model real time information share, the present invention can improve work efficiency,
And can be early pinpoint the problems, and processed, can reduces cost, lifting becomes more meticulous degree, can more realize each link
The real time information of seamless handover and each side share, method is simple, easy to use, low cost.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto,
Any those familiar with the art the invention discloses technical scope in, technology according to the present invention scheme and its
Inventive concept equivalent or change in addition, all should be included within the scope of the present invention.
Claims (6)
1. a kind of application process of steel construction BIM informatization platforms, it is characterised in that comprise the following steps:
S1:The essential information of steel structure member is imported in BIM informatization platforms in the form of data flow, is then believed with BIM
Breathization Platform integration data, produce the three-dimensional information model of steel structure member automatically;
S2:The project information and material information of steel structure member are imported to into again BIM informatization platforms in the form of data flow
In, then with BIM informatization platform integral datas, project information and material information are marked on three-dimensional information model automatically;
S3:The three-dimensional information model of each steel structure member is numbered with BIM informatization platforms, it is then information-based with BIM
The three-dimensional information model of the steel structure member being adapted is simulated combination and is installed by platform;
S4:Steel structure member is made according to three-dimensional information mould processing, per after the completion of procedure, each operation director is by steel construction
To BIM informatization platforms, BIM informatization platforms automatically add the crudy information of feedback the crudy feedback of the information of component
It is added on three-dimensional information model.
2. a kind of application process of steel construction BIM informatization platforms according to claim 1, it is characterised in that the S4
In, according to three-dimensional information mould processing steel structure member, after the completion of every procedure, each operation director adding steel structure member
Work quality information and real-time progress status information feed back to BIM informatization platforms, and BIM informatization platforms are automatically by the processing of feedback
Quality information and real-time progress status information are made an addition on three-dimensional information model.
3. a kind of application process of steel construction BIM informatization platforms according to claim 1, it is characterised in that the S4
In, each operation director is with handheld terminal, mobile phone A PP end or PC ends by the crudy feedback of the information of steel structure member to BIM
Informatization platform.
4. a kind of application process of steel construction BIM informatization platforms according to claim 1, it is characterised in that steel construction
The related personnel of component processing logs in BIM informatization platforms, and according to its own right the three-dimensional information model of steel structure member is checked
With crudy information.
5. a kind of application process of steel construction BIM informatization platforms according to claim 4, it is characterised in that steel construction
The related personnel of component processing logs in BIM informatization platforms with mobile phone A PP end or PC ends, and according to its own right steel construction structure is checked
The three-dimensional information model and crudy information of part.
6. a kind of application process of steel construction BIM informatization platforms according to claim 1, it is characterised in that the S3
In, the three-dimensional information model of each steel structure member is numbered with BIM informatization platforms, then use BIM informatization platforms
The three-dimensional information model of the steel structure member being adapted is simulated into combination to install, is combined in installation process according to simulation and is occurred
Problem the three-dimensional information model of steel structure member is adjusted, until simulation combination install successfully.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611124589.1A CN106600137A (en) | 2016-12-08 | 2016-12-08 | Application method of steel structure BIM (building information modeling) informatization platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611124589.1A CN106600137A (en) | 2016-12-08 | 2016-12-08 | Application method of steel structure BIM (building information modeling) informatization platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106600137A true CN106600137A (en) | 2017-04-26 |
Family
ID=58597566
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611124589.1A Pending CN106600137A (en) | 2016-12-08 | 2016-12-08 | Application method of steel structure BIM (building information modeling) informatization platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106600137A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107563089A (en) * | 2017-09-15 | 2018-01-09 | 中建海峡建设发展有限公司 | The method and computing device of PC components generation task list based on BIM |
CN109472517A (en) * | 2018-12-05 | 2019-03-15 | 上海宝冶集团有限公司 | Construction material informationization management-control method, device and equipment based on BIM model |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103337006A (en) * | 2013-05-31 | 2013-10-02 | 中建钢构有限公司 | Management method of steel structured project management system |
CN104573999A (en) * | 2015-01-30 | 2015-04-29 | 浙江精工钢结构集团有限公司 | Application method of steel structure BIM (building information modeling) information platform |
CN104778488A (en) * | 2014-11-28 | 2015-07-15 | 华北水利水电大学 | Steel-structure building positioning paster based on BIM |
CN106095989A (en) * | 2016-06-21 | 2016-11-09 | 上海市建筑科学研究院(集团)有限公司 | A kind of architectural engineering information switching method based on BIM |
-
2016
- 2016-12-08 CN CN201611124589.1A patent/CN106600137A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103337006A (en) * | 2013-05-31 | 2013-10-02 | 中建钢构有限公司 | Management method of steel structured project management system |
CN104778488A (en) * | 2014-11-28 | 2015-07-15 | 华北水利水电大学 | Steel-structure building positioning paster based on BIM |
CN104573999A (en) * | 2015-01-30 | 2015-04-29 | 浙江精工钢结构集团有限公司 | Application method of steel structure BIM (building information modeling) information platform |
CN106095989A (en) * | 2016-06-21 | 2016-11-09 | 上海市建筑科学研究院(集团)有限公司 | A kind of architectural engineering information switching method based on BIM |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107563089A (en) * | 2017-09-15 | 2018-01-09 | 中建海峡建设发展有限公司 | The method and computing device of PC components generation task list based on BIM |
CN109472517A (en) * | 2018-12-05 | 2019-03-15 | 上海宝冶集团有限公司 | Construction material informationization management-control method, device and equipment based on BIM model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107862105A (en) | The method confided a technological secret based on BIM to component working procedure | |
CN107423458A (en) | Steel manufacture process analogue system | |
CN105808835A (en) | Method for assembling pipelines of electromechanical system based on BIM (Building Information Modeling) | |
CN106326556A (en) | Calculation and three-dimensional modeling method of structural reinforcing bars | |
CN108453884A (en) | Prefabricated components information updating method and system | |
CN109710069B (en) | Automatic three-dimensional part assembling method for virtual assembly | |
CN106600137A (en) | Application method of steel structure BIM (building information modeling) informatization platform | |
CN109108642B (en) | Robot forearm assembly system modeling method based on timed Petri network | |
Abe | The developmental state and educational advance in East Asia | |
CN111339601A (en) | BIM + VR construction site arrangement method | |
CN107194112A (en) | The method being laid out based on BIM to garden landscape | |
CN103093653A (en) | Augmented reality training system and method | |
CN100593789C (en) | Technology for providing network game anti external hanging image origin by 3D technology | |
CN113806840B (en) | Building structure hybrid design method based on Revit and CAD | |
CN109739471A (en) | Computer network game development system and method based on internet B/S structure | |
CN112069562B (en) | Zero-collision rapid arrangement method for three-way hoop reinforcement cage structure in rectangular component | |
CN109190317A (en) | A method of rack BIM model is created using Dynamo fast accurate | |
CN109800509A (en) | A kind of building method of the curved wall based on BIM | |
CN105243681A (en) | Construction method and device for three-dimensional dynamic model of power device | |
CN103241054B (en) | Method for manufacturing colored metal model by three-dimensional (3d) digital model | |
CN107464465A (en) | A kind of active emergency evacuation virtual training system | |
CN104850724A (en) | Rapid airplane template design system and method | |
CN105589989B (en) | Process modeling construction method and system | |
CN108122273A (en) | A kind of number animation generation system and method | |
CN107067172A (en) | The method that rapid translating building decoration material can be realized |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170426 |