CN107563089A CN201710830148.1A CN201710830148A CN107563089A CN 107563089 A CN107563089 A CN 107563089A CN 201710830148 A CN201710830148 A CN 201710830148A CN 107563089 A CN107563089 A CN 107563089A
Authority
CN
China
Prior art keywords
components
production
information
task list
bim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710830148.1A
Other languages
Chinese (zh)
Inventor
吴志鸿
王耀
朱瑞添
郑邱
郭立贵
陈兵
卢恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Yonyou Network Technology Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Yonyou Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd, Yonyou Network Technology Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN201710830148.1A priority Critical patent/CN107563089A/en
Publication of CN107563089A publication Critical patent/CN107563089A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The method and computing device of PC components generation task list of the present invention based on BIM, the overall BIM models of design are split, are decomposed into each PC components, and include details.The preliminary production schedule is established, the production schedule of the PC components is set based on time conditions, prevents production delay.The BIM models of each PC components decomposed will be split, classification set is carried out by PC Component Categories, be integrated to the resources of production demand classification template, improve scheduling production efficiency.Gather the production schedule of each PC components under the resources of production requirement templet, generate task list set.Output and parameter according to each PC components generate production planning and sequencing data, adjust the actual production planning and sequencing parameter of each PC components, improve production work efficiency.PC component task lists are uniformly issued by the format and content of setting, realize PC element factories standardization of information management, unitized, solve PC components and manufactured the data source standard in management source to differ problem.

Description

The method and computing device of PC components generation task list based on BIM
Technical field
The present invention relates to architectural design field, more particularly to the PC components based on BIM generate task list method and Computing device.
Background technology
In modern architecture construction, PC is precast concrete(Precast concrete)English abbreviation, in house Industrialization field is referred to as PC components.Corresponding traditional cast-in-place concrete needs building-site molding, cast-in-site and showed Field maintenance.Precast concrete is widely used in the fields such as building, traffic, water conservancy, and important angle is played the part of in national economy Color.Concrete prefabricated element factory establishes purchase order and manufacturing schedule with change release, is appointed with what is worked out according to design drawing Business is single to carry out production technology and production line resource planning distribution.
PC element factories scheduling of production table and job order are the autonomous working text of different departments establishment in the prior art Part, it can run into often in the case of manufacturing schedule establishment does not refer to job order and assign generation and plan, to production line, to cause because of technique It is required that it is different and cause manufacturing schedule not perform according to plan, the uncontrollable of manufacturing schedule is caused, PC element factory pipes can not be realized Information standardization, unitized is managed, solves PC components and manufactured the data source standard in management source to differ problem.
The content of the invention
Therefore, the technical problem to be solved in the present invention is how to realize PC element factories standardization of information management, unitize, Solve PC and manufactured the data source standard in management source to differ problem.
To achieve the above object, the present invention uses following technical scheme:
The method of PC components generation task list based on BIM, suitable for being performed in computing device, is comprised the steps of:
Block mold is split, the overall BIM models of design are split, are decomposed into the BIM models of each PC components, each PC The BIM models of component include 3-D view, node X-Y scheme, two-dimensional localization figure, scantling information, material information, technique will Ask and quantities information;
The preliminary production schedule is established, the production schedule of the PC components is set based on time conditions;
Establish resources of production demand classification template, according to the characteristics of PC components, production technology establish using PC Component Categories as dimension Resources of production demand classification template;
Resources integration, the BIM models of each PC components decomposed will be split, carry out classification set by PC Component Categories, be integrated to The resources of production demand classification template;
Task list set is generated, gathers the production schedule of each PC components under the resources of production requirement templet, generates task List collection;
Scheduling parameter regulation, output and parameter according to each PC components generate production planning and sequencing data, adjust the reality of each PC components Border production planning and sequencing parameter;
Form is set, and sets output content and form;
Issue PC component task lists, task list include PC components essential information, project information, actual production plan information with And owner information, the essential information include:PC component names, PC scantlings information, material information.
Wherein, also comprise the steps of:
Confirm link, check the availability for examining production planning and sequencing data, check not by then readjusting production planning and sequencing data.
Wherein, clicking on the PC component names in the PC components task list will deploy to generate PC component job orders, described PC component job orders include:PC components three-dimensionals view, node X-Y scheme, two-dimensional localization figure, project information, Quick Response Code of tracing to the source letter Breath, progress msg, scantling information, material information, technological requirement, quantities information.
The computing device of PC components generation task list based on BIM, comprising:
Processor, it is adapted for carrying out each instruction;And
Storage device, suitable for storing a plurality of instruction, the instruction is suitable to be loaded and performed by processor;
The fractionation instruction that the processor is sent is received, the overall BIM models of design are split, are decomposed into each PC components BIM models, the BIM models of each PC components include 3-D view, node X-Y scheme, two-dimensional localization figure, scantling information, Material information, technological requirement and quantities information;
The production schedule of the PC components is set based on time conditions;
Establish resources of production demand classification template, according to the characteristics of PC components, production technology establish using PC Component Categories as dimension Resources of production demand classification template;
The BIM models of each PC components decomposed will be split, classification set is carried out by PC Component Categories, be integrated to the production money Source demand classification template;
Gather the production schedule of each PC components under the resources of production requirement templet, generate task list set;
Output and parameter according to each PC components produce production planning and sequencing data, adjust the actual production plan of each PC components;
Output content and form are set;
Task list includes PC components essential information, project information, actual production plan information and owner information, the base This packet contains:PC component names, PC scantlings information, material information.
Wherein, also include:
The availability for examining production planning and sequencing data is checked, is checked not by then readjusting production planning and sequencing data.
Wherein, clicking on the PC component names in the PC components task list will deploy to generate PC component job orders, described PC component job orders include:PC components three-dimensionals view, node X-Y scheme, two-dimensional localization figure, project information, Quick Response Code of tracing to the source letter Breath, progress msg, scantling information, material information, technological requirement, quantities information.
The present invention has the advantages that:
1st, the method and computing device of the PC components generation task list of the present invention based on BIM, by the overall BIM of design Model is split, and is decomposed into each PC components, and include details.The preliminary production schedule is established, is set based on time conditions The production schedule of the fixed PC components, prevents production delay.The BIM models of each PC components decomposed will be split, by PC components Classification carries out classification set, is integrated to the resources of production demand classification template, improves scheduling production efficiency.Gather the production The production schedule of each PC components under resource requirement template, generate task list set.Output and ginseng according to each PC components Number generation production planning and sequencing data, adjust the actual production planning and sequencing parameter of each PC components, improve production work efficiency.By the lattice of setting Formula and content uniformly issue PC component task lists, realize PC element factories standardization of information management, unitized, solution PC components The data source standard for manufacturing management source differs problem.
2nd, the method and computing device of the PC components generation task list of the present invention based on BIM, also comprising confirmation Link, the availability for examining production planning and sequencing data is checked, prevent occurring delivering sequence error, production effect during formal scheduling Rate is low.
3rd, the method and computing device of the PC components generation task list of the present invention based on BIM, clicks on the PC PC component names in component task list will deploy to generate PC component job orders, and the PC components job order includes:PC components 3-D view, node X-Y scheme, two-dimensional localization figure, project information, 2 D code information of tracing to the source, progress msg, scantling information, The details such as material information, technological requirement, quantities information, convenient follow-up tracking.
Brief description of the drawings
In order that the content of invention is more likely to be clearly understood, the specific embodiment below according to the present invention simultaneously combines attached Figure, the present invention is further detailed explanation, wherein
Fig. 1 is the flow chart of the method for PC component generation task list of the present invention based on BIM.
Embodiment
Embodiment one
Referring to Fig. 1, the method for the PC components generation task list based on BIM, suitable for being performed in computing device, inserted using BIM Part is applied on the basis of Revit modelings, is completed the generation of job order by a series of clicking operations of plug-in unit, is included following step Suddenly:
Block mold is split, the overall BIM models of design are split, using each PC components as classification, are decomposed into each PC structures The BIM models of part.Such as by the overall BIM model decompositions of house desigh it is each PC components such as wall, beam, plate, post.Each PC structures The BIM models of part include 3-D view, node X-Y scheme, two-dimensional localization figure, scantling information, material information, technological requirement And quantities information.
The preliminary production schedule is established, the production schedule of the PC components is set based on time conditions, such as:Post, production are handed over It is December 1 to pay the date.
Establish resources of production demand classification template, according to the characteristics of PC components, production technology establish using PC Component Categories as The resources of production demand classification template of dimension, such as the PC components by all walls, are classified under " wall ".
Resources integration, the BIM models of each PC components decomposed will be split, classification set is carried out by PC Component Categories, collected Into the extremely resources of production demand classification template, such as will own the PC component sets of " post " under the classification model of " post ".
Task list set is generated, gathers the production schedule of each PC components under the resources of production requirement templet, generation Task list set.
Scheduling parameter regulation, output and parameter according to each PC components generate production planning and sequencing data, adjust each PC components Actual production planning and sequencing parameter.Scheduling parameter is recorded simultaneously, and the purpose of record scheduling parameter is to understand actual production scheduling, example If this moon " post " scheduling is that at full capacity, and " stake " scheduling rate is relatively low, then the Operational preparation for next month provides adjustment foundation.
Form is set, and sets output content and form, for example include what content and figure tableau format.
PC component task lists are issued, task list includes PC components essential information, project information, actual production plan letter Breath and owner information, the essential information include:PC component names, PC scantlings information, material information.
It is of the present invention based on BIM PC components generation task list method by overall BIM models split after PC Component figure element schedule, 4D models are formed, comprising manufacturing schedule information, a design phase can be according to plant requirements Form generation production task book, and pass through mobile Internet application technology and realize and manufacture project management source information data Agreement and process movement cooperation management.With hand woven job order in the prior art, schedule mode compared with, be based on BIM automation job order generation can effectively improve operating efficiency, strengthen the accuracy and science of job order establishment, lifting The uniformity and operability of task forms data.The actual production planning and sequencing parameter of each PC components is adjusted, improves production work efficiency. PC component task lists are uniformly issued by the format and content of setting, PC element factories standardization of information management is realized, unitizes, Solve PC components and manufactured the data source standard in management source to differ problem.
Preferably, also comprise the steps of:
Confirm link, check the availability for examining production planning and sequencing data, check not by then readjusting production planning and sequencing data, prevent Only occur delivering sequence error during formal scheduling, production efficiency is low.Confirm link, the checking of account need to be carried out, tested Whether the biological characteristic of card account matches, and prevents malice from distorting.
Preferably, clicking on the PC component names in the PC components task list will deploy to generate PC component job orders, institute PC component job orders are stated to include:PC components three-dimensionals view, node X-Y scheme, two-dimensional localization figure, project information, Quick Response Code of tracing to the source letter Breath, progress msg, scantling information, material information, technological requirement, quantities information.The Quick Response Code that will trace to the source is stamped described On PC components, by handheld terminal scanning trace to the source Quick Response Code can go directly system database link, obtain the design of the PC components Information, and information is manufactured, provide data basis for follow-up retrospect.
Embodiment two
The computing device of PC components generation task list based on BIM, comprising:
Processor, it is adapted for carrying out each instruction;And
Storage device, suitable for storing a plurality of instruction, the instruction is suitable to be loaded and performed by processor.
The fractionation instruction that the processor is sent is received, the overall BIM models of design are split, are decomposed into each PC The BIM models of component, the BIM models of each PC components include 3-D view, node X-Y scheme, two-dimensional localization figure, scantling Information, material information, technological requirement and quantities information.
The production schedule of the PC components is set based on time conditions.
Establish resources of production demand classification template, according to the characteristics of PC components, production technology establish using PC Component Categories as The resources of production demand classification template of dimension.
The BIM models of each PC components decomposed will be split, carry out classification set by PC Component Categories, be integrated to the life Produce resource requirement classification model.
Gather the production schedule of each PC components under the resources of production requirement templet, generate task list set.
Output and parameter according to each PC components produce production planning and sequencing data, adjust the actual production meter of each PC components Draw.
Output content and form are set.
Task list includes PC components essential information, project information, actual production plan information and owner information, institute Essential information is stated to include:PC component names, PC scantlings information, material information.
The computing device of PC components generation task list of the present invention based on BIM, by the overall BIM models of design Split, be decomposed into each PC components, and include details.The preliminary production schedule is established, institute is set based on time conditions The production schedule of PC components is stated, prevents production delay.The BIM models of each PC components decomposed will be split, by PC Component Categories Classification set is carried out, is integrated to the resources of production demand classification template, improves scheduling production efficiency.Gather the resources of production The production schedule of each PC components under requirement templet, generate task list set.Output and parameter according to each PC components are given birth to Into scheduling planning data, the actual production planning and sequencing parameter of each PC components is adjusted, improves production work efficiency.By setting form and Content uniformly issues PC component task lists, realizes PC element factories standardization of information management, unitized, solution PC component productions The data source standard for manufacturing management source differs problem.
Preferably, also include:
The availability for examining production planning and sequencing data is checked, is checked not by then readjusting production planning and sequencing data.Prevent formal Occur delivering sequence error during scheduling, production efficiency is low.
Preferably, clicking on the PC component names in the PC components task list will deploy to generate PC component job orders, institute PC component job orders are stated to include:PC components three-dimensionals view, node X-Y scheme, two-dimensional localization figure, project information, Quick Response Code of tracing to the source letter The details such as breath, progress msg, scantling information, material information, technological requirement, quantities information, convenient follow-up tracking.
Simply technical scheme is explained in detail for above-mentioned embodiment, the present invention not only only office Be limited to above-described embodiment, it will be understood by those skilled in the art that it is every according to above-mentioned principle and spirit on the basis of the present invention Improve, substitute, all should be within protection scope of the present invention.

Claims (6)

1. the method for the PC components generation task list based on BIM, suitable for being performed in computing device, it is characterised in that include Following steps:
Block mold is split, the overall BIM models of design are split, are decomposed into the BIM models of each PC components, each PC The BIM models of component include 3-D view, node X-Y scheme, two-dimensional localization figure, scantling information, material information, technique will Ask and quantities information;
The preliminary production schedule is established, the production schedule of the PC components is set based on time conditions;
Establish resources of production demand classification template, according to the characteristics of PC components, production technology establish using PC Component Categories as dimension Resources of production demand classification template;
Resources integration, the BIM models of each PC components decomposed will be split, carry out classification set by PC Component Categories, be integrated to The resources of production demand classification template;
Task list set is generated, gathers the production schedule of each PC components under the resources of production requirement templet, generates task List collection;
Scheduling parameter regulation, output and parameter according to each PC components generate production planning and sequencing data, adjust the reality of each PC components Border production planning and sequencing parameter;
Form is set, and sets output content and form;
Issue PC component task lists, task list include PC components essential information, project information, actual production plan information with And owner information, the essential information include:PC component names, PC scantlings information, material information.
2. as claimed in claim 1 based on BIM PC components generation task list method, it is characterised in that also include with Lower step:
Confirm link, check the availability for examining production planning and sequencing data, check not by then readjusting production planning and sequencing data.
3. the method for the PC components generation task list based on BIM as claimed in claim 2, it is characterised in that described in click PC component names in PC component task lists will deploy to generate PC component job orders, and the PC components job order includes:PC structures Part 3-D view, node X-Y scheme, two-dimensional localization figure, project information, 2 D code information of tracing to the source, progress msg, scantling letter Breath, material information, technological requirement, quantities information.
4. the computing device of the PC components generation task list based on BIM, it is characterised in that include:
Processor, it is adapted for carrying out each instruction;And
Storage device, suitable for storing a plurality of instruction, the instruction is suitable to be loaded and performed by processor;
The fractionation instruction that the processor is sent is received, the overall BIM models of design are split, are decomposed into each PC components BIM models, the BIM models of each PC components include 3-D view, node X-Y scheme, two-dimensional localization figure, scantling information, Material information, technological requirement and quantities information;
The production schedule of the PC components is set based on time conditions;
Establish resources of production demand classification template, according to the characteristics of PC components, production technology establish using PC Component Categories as dimension Resources of production demand classification template;
The BIM models of each PC components decomposed will be split, classification set is carried out by PC Component Categories, be integrated to the production money Source demand classification template;
Gather the production schedule of each PC components under the resources of production requirement templet, generate task list set;
Output and parameter according to each PC components produce production planning and sequencing data, adjust the actual production plan of each PC components;
Output content and form are set;
Task list includes PC components essential information, project information, actual production plan information and owner information, the base This packet contains:PC component names, PC scantlings information, material information.
5. the computing device of the PC components generation task list based on BIM as claimed in claim 4, it is characterised in that also wrap Contain:
The availability for examining production planning and sequencing data is checked, is checked not by then readjusting production planning and sequencing data.
6. the computing device of the PC components generation task list based on BIM as claimed in claim 5, it is characterised in that click on PC component names in the PC components task list will deploy to generate PC component job orders, and the PC components job order includes: PC components three-dimensionals view, node X-Y scheme, two-dimensional localization figure, project information, 2 D code information of tracing to the source, progress msg, component chi Very little information, material information, technological requirement, quantities information.
CN201710830148.1A 2017-09-15 2017-09-15 The method and computing device of PC components generation task list based on BIM Pending CN107563089A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710830148.1A CN107563089A (en) 2017-09-15 2017-09-15 The method and computing device of PC components generation task list based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710830148.1A CN107563089A (en) 2017-09-15 2017-09-15 The method and computing device of PC components generation task list based on BIM

Publications (1)

Publication Number Publication Date
CN107563089A true CN107563089A (en) 2018-01-09

Family

ID=60981042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710830148.1A Pending CN107563089A (en) 2017-09-15 2017-09-15 The method and computing device of PC components generation task list based on BIM

Country Status (1)

Country Link
CN (1) CN107563089A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110110431A (en) * 2019-04-30 2019-08-09 中国二十冶集团有限公司 PC stair combine BIM modeling calculation amount method with site concrete
CN111914325A (en) * 2020-07-06 2020-11-10 上海宝冶冶金工程有限公司 BIM technology-based blast furnace body frame structure model information interaction method
CN113012000A (en) * 2021-04-20 2021-06-22 重庆大学 BIM-based intelligent management method and system for assembly type building construction
CN113032872A (en) * 2021-03-12 2021-06-25 北京六建集团有限责任公司 BIM technology-based integrated resource management and control method for assembly type building progress plan

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140121145A (en) * 2013-04-05 2014-10-15 서울대학교산학협력단 BIM based Integrated Management System for Constrcution Data
CN104281729A (en) * 2014-07-02 2015-01-14 哈尔滨工业大学 BIM (building information model) method for digital processing and manufacturing of steel structure buildings
CN106384200A (en) * 2016-09-27 2017-02-08 朱海涛 BIM (Building Information Modeling) technology-based management and application method of construction multidimensional model
CN106600137A (en) * 2016-12-08 2017-04-26 东莞华南设计创新院 Application method of steel structure BIM (building information modeling) informatization platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140121145A (en) * 2013-04-05 2014-10-15 서울대학교산학협력단 BIM based Integrated Management System for Constrcution Data
CN104281729A (en) * 2014-07-02 2015-01-14 哈尔滨工业大学 BIM (building information model) method for digital processing and manufacturing of steel structure buildings
CN106384200A (en) * 2016-09-27 2017-02-08 朱海涛 BIM (Building Information Modeling) technology-based management and application method of construction multidimensional model
CN106600137A (en) * 2016-12-08 2017-04-26 东莞华南设计创新院 Application method of steel structure BIM (building information modeling) informatization platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱瑞添等: "基于BIM技术的装配式建筑设计与制造协同应用研究", 《中国建设信息化》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110110431A (en) * 2019-04-30 2019-08-09 中国二十冶集团有限公司 PC stair combine BIM modeling calculation amount method with site concrete
CN111914325A (en) * 2020-07-06 2020-11-10 上海宝冶冶金工程有限公司 BIM technology-based blast furnace body frame structure model information interaction method
CN111914325B (en) * 2020-07-06 2022-04-22 上海宝冶冶金工程有限公司 BIM technology-based blast furnace body frame structure model information interaction method
CN113032872A (en) * 2021-03-12 2021-06-25 北京六建集团有限责任公司 BIM technology-based integrated resource management and control method for assembly type building progress plan
CN113032872B (en) * 2021-03-12 2023-12-15 北京六建集团有限责任公司 BIM technology-based fabricated building progress plan comprehensive resource management and control method
CN113012000A (en) * 2021-04-20 2021-06-22 重庆大学 BIM-based intelligent management method and system for assembly type building construction

Similar Documents

Publication Publication Date Title
CN107563089A (en) The method and computing device of PC components generation task list based on BIM
CN108971807A (en) A kind of site welding construction technology intelligent management control method and management system
CN106845919A (en) Construction information collection processing method
CN101256647A (en) Item management system being suitable for garden engineering
CN109522527B (en) Method for compiling field construction process by using software system
CN109522661A (en) A kind of Building Information Model component and work breakdown structure (WBS) correlating method and system
CN105160458A (en) Information processing system and method supporting seven-dimensional ledger equipment management
Lee et al. Concurrent material flow analysis by P3R-driven modeling and simulation in PLM
CN112541749A (en) Construction progress management system based on BIM technology
CN107368972A (en) It is a kind of that work platform and its application method are sent based on BIM technology
CN110689214A (en) Material supply intelligent collection management control platform
Melzner BIM-based takt-time planning and takt control: Requirements for digital construction process management
CN109583534B (en) Equipment purchase fee automatic statistical method based on material ID and Internet of things label
CN103136611A (en) Digitization generation method for emergency plan
JP7111909B2 (en) PROJECT MANAGEMENT DEVICE, PROJECT MANAGEMENT METHOD, AND RECORDING MEDIUM
McClymonds et al. Information Exchange for Supporting BIM to Robotic Construction
CN112613849A (en) BIM-based project supervision information management method
CN116663098A (en) Construction scene graphical management method and device based on BIM
CN108256625A (en) It is decomposed based on multilayer in modelling cloud and innovates creative method with the gunz summed up
Xiao et al. Study on Construction Engineering Management Based on BIM from the perspective of big data
Khan et al. A Systematic Review of Risks in Modular Integrated Construction Practice
CN112884455A (en) Task plan processing system, method and device
Teufl et al. Optimised–developing a state of the art system for production planning for industry 4.0 in the construction industry using simulation-based optimisation
Yang et al. Manufacturing of modular buildings: A literature review
CN109344453A (en) A kind of elevator the Automation Design production system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180109

RJ01 Rejection of invention patent application after publication