CN109344453A - A kind of elevator the Automation Design production system - Google Patents
A kind of elevator the Automation Design production system Download PDFInfo
- Publication number
- CN109344453A CN109344453A CN201811055015.2A CN201811055015A CN109344453A CN 109344453 A CN109344453 A CN 109344453A CN 201811055015 A CN201811055015 A CN 201811055015A CN 109344453 A CN109344453 A CN 109344453A
- Authority
- CN
- China
- Prior art keywords
- data
- design
- module
- rule
- elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
The invention discloses a kind of elevator the Automation Design production systems, when handling large batch of order and production, typing is carried out by design requirement of the customer demand collection module to client, the design requirement by preset design rule in data operation module for client handles to obtain production material data again, finally required production material is produced to each supplier or workshop section's station using supply chain management module assignment task, it is intervened in whole process without manpower, only design rule need to be write in data operation module, just the full-automation of elevator design and production is realized, substantially reduce the time of design and producing, improve production efficiency, reduce because artificial treatment data it is improper caused by fault, save manpower and material resources.
Description
Technical field
The invention belongs to automated production fields, and in particular to a kind of elevator the Automation Design production system.
Background technique
As elevator industry or even entire manufacturing industry is increasingly competitive, all trades and professions all are making great efforts to improve to market
Response speed makes the Maximum Satisfaction of client, and along with the arrival of large-scale production, how enterprises pass through the fast of information
Speed exchange has become the major issue to attract attention to improve the design and producing efficiency of elevator.
Traditional elevator design production system excessively relies on artificial operation, and typing design requirement, design, production etc. are each
It is mutually indepedent between link, do not form a rounded system and coherent information flow, so as to cause the problem of be, with
Customer demand and quantity on order increase considerably, and it is slow that traditional elevator design production system gradually exposes processing speed, number
According to error, the low problem of production efficiency is badly in need of a kind of elevator the Automation Design production system for adapting to large-scale production in the market
System.
Summary of the invention
It, can it is an object of the invention in view of the drawbacks of the prior art, provide a kind of elevator the Automation Design production system
With shorten design and produce time, improve production efficiency, reduce because artificial treatment data it is improper caused by make mistakes, save manpower
Material resources.
In order to solve the above technical problems, technical scheme is as follows:
A kind of elevator the Automation Design production system, including customer demand collection module, data operation module, supply chain pipe
Manage module;
The customer demand collection module is used for typing data of design requirements, the data of design requirements is transferred to institute
State data operation module;The data of design requirements includes the type of elevator to be designed, additional configurations;
The data operation module stores preset design rule, is used for according to the design rule to the design need
Data processing is asked to obtain producing required material data;The material data includes type, quantity and the variable of elevator parts
Parameter;The design rule includes that product structure builds rule, parameterized part detail rule, whole terraced manufacturing parameter processing rule
Then;
The supply chain management module stores the preset production rule of correspondence, and the production rule of correspondence includes supplier
Selection rule and process flow rule, the supply chain management module is for receiving the institute that the data operation module arithmetic obtains
Material data is stated, the bill of materials of the elevator to be designed is generated according to the material data, and based on the corresponding rule of the production
Task assignment is then carried out, the material in the bill of materials is assigned to corresponding supplier or workshop section's station, uses correspondence
Process flow produced.
Further, the customer demand collection module further includes client's marketing module;Client's marketing module is used for
It signs a contract with client, and contract information and the data of design requirements in typing contract.
Further, the data of design requirements further includes live civil engineering dimension data, and the data operation module is also wrapped
Include civil engineering data module;
The civil engineering data module stores preset drawing creation rule, for receiving the live civil engineering size number
According to obtaining live buider's work drawing data according to the drawing creation rule process.
It further, further include data storage module;
The data storage module, for store the data of design requirements, the material data, the bill of materials and
The scene buider's work drawing data.
Further, the data storage module further includes enquiry module;
The enquiry module, for inquiring the data stored in the data storage module.
Further, the enquiry module further includes Authority Verification module;
The Authority Verification module, for the identity information of revene lookup person, and according to identity information confirmation
The data query range of inquiry, provides data query service within the scope of the data query for the inquiry.
Further, the data operation module further includes rules modification module;
The rules modification module, for modifying to the preset design rule, add new design rule or
It is to leave out original design rule.
Further, the data operation module further includes non-standard de-sign module;
The non-standard de-sign module, it is described non-for judging whether the data of design requirements is cases of otherwise standard design data
Standard design data is cannot the data of design requirements handled by the preset design rule;
When the data of design requirements is cases of otherwise standard design data, the non-standard de-sign module is the design requirement number
Required material data is produced according to working out new design rule and being handled to obtain, the new design rule is added to institute
It states in preset design rule.
Further, client's marketing module is manageming contacts CRM (Customer Relation
Management) system.
Further, the supply chain management module is Enterprise Resources Plan ERP (Enterprise Resource
Planning) system.
Compared with prior art, advantageous effects of the invention are as follows:
The present invention provides a kind of elevator the Automation Design production systems to lead to when handling large batch of order and production
It crosses customer demand collection module and typing is carried out to the design requirement of client, then pass through preset design rule in data operation module
It handles to obtain production material data for the design requirement of client, finally gives each confession using supply chain management module assignment task
It answers quotient or workshop section's station to produce required production material, is intervened in whole process without manpower, need to only be transported in data
It calculates in module and writes design rule, just realize the full-automation of elevator design and production, substantially reduce design and producing
Time improves production efficiency, reduce because artificial treatment data it is improper caused by fault, save manpower and material resources.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of heretofore described elevator the Automation Design production system.
Fig. 2 is the schematic diagram of heretofore described bill of materials;
Fig. 3 is the structural schematic diagram of elevator the Automation Design production system described in the embodiment of the present invention;
Fig. 4 is the specific workflow diagram of production system described in the embodiment of the present invention.
Specific embodiment
In order to be fully understood from the purpose of the present invention, feature and effect, below with reference to attached drawing to of the invention several excellent
The embodiment of choosing is illustrated.
As shown in Figure 1, the invention discloses a kind of elevator the Automation Design production system, including customer demand collection module
1, data operation module 2, supply chain management module 3;
Customer demand collection module 1 is used for typing data of design requirements, data of design requirements is transferred to data operation mould
Block;Data of design requirements includes the type of elevator to be designed, additional configurations;
Data operation module 2 stores preset design rule, for being handled according to design rule data of design requirements
It obtains producing required material data;Material data includes type, quantity and the variable parameter of elevator parts;Design rule packet
It includes product structure and builds rule, parameterized part detail rule, whole terraced manufacturing parameter processing rule;
Supply chain management module 3, stores the preset production rule of correspondence, and the production rule of correspondence includes that supplier selects rule
It is then regular with process flow, the supply chain management module material data that 2 operation of computing module obtains for receiving data, according to object
Expect that data generate the bill of materials of elevator to be designed, Fig. 2 is the bill of materials that system is handled.And based on the production rule of correspondence
Task assignment is carried out, the material in bill of materials is assigned to corresponding supplier or workshop section's station, uses corresponding technique
Process is produced.
It is needed when handling large batch of order and production by client by above-mentioned elevator the Automation Design production system
It asks collection module to carry out typing to the design requirement of client, then client is directed to by preset design rule in data operation module
Design requirement handle to obtain production material data, finally using supply chain management module assignment task to each supplier or
Workshop section's station produces required production material, intervenes in whole process without manpower, only need to be in data operation module
Design rule is write, the full-automation of elevator design and production is just realized, substantially reduces the time of design and producing, is improved
Production efficiency, reduce because artificial treatment data it is improper caused by fault, save manpower and material resources.
Specifically, customer demand collection module further includes client's marketing module;Client's marketing module is used to sign with client
Contract, and contract information and data of design requirements in typing contract.Specifically, client's marketing module is customer relation management
CRM (Customer Relation Management) system.
By be arranged client's marketing module, can directly sign a contract with client and acquisition contract in design requirement number
According to, realize that sale-design-production is full-automatic, it, can greatly for large batch of order or large-scale production requirement
The speed of fast order processing, improves the efficiency of production, uses manpower and material resources sparingly.
Specifically, data of design requirements further includes live civil engineering dimension data, data operation module further includes civil engineering data
Module;Civil engineering data module stores preset drawing creation rule, raw according to drawing for receiving live civil engineering dimension data
Live buider's work drawing data are obtained at rule process.
By the way that civil engineering data module is arranged, processing generation is carried out to the live civil engineering dimension data in data of design requirements and is applied
Work drawing can construct at the scene according to construction drawing in construction, accelerate the progress of construction, without manually to each
The construction drawing of a order is planned, manpower and material resources are saved.
Specifically, further including data storage module;Data storage module, for store data of design requirements, material data,
Bill of materials and live buider's work drawing data.Data storage module is for storing in above-mentioned elevator the Automation Design production system
All data typing and that processing obtains facilitate access to achieve to data.
Specifically, data storage module further includes enquiry module;Enquiry module is stored for inquiring in data storage module
Data.Personnel in client or our company can inquire data by this module.
Specifically, enquiry module further includes Authority Verification module;Authority Verification module, the identity for revene lookup person are believed
Breath, and according to the data query range of identity information confirmation inquiry, data, which are provided, for inquiry within the scope of data query looks into
Ask service.
By the way that Authority Verification module is arranged, inquiry must verify the identity of oneself in inquiry, and can only inquire oneself
Identity corresponding to data within the scope of data query, the purpose of this setting is, in the data in elevator design production
There are the construction drawing of the data of need for confidentiality or autonomous Design, these data are not needed by customer inquiries, while some
Contract information should not also know by the employee of low level or client, therefore this module is arranged can limit looking into for each identity
The data area that inquiry person can inquire, to protect confidential data while promoting information flow.
Specifically, data operation module further includes rules modification module;Rules modification module, for being advised to preset design
It then modifies, add new design rule or leaves out original design rule.The purpose of this setting is, uses data
When design rule in computing module carries out elevator design according to the design requirement of client, design can be known from design result
Whether rule is reasonable or perfect, and is modified according to design result to design rule, is reached with constantly improve design rule
Best automatic processing effect.
Specifically, data operation module further includes non-standard de-sign module;Non-standard de-sign module, for judging design requirement number
Whether according to being cases of otherwise standard design data, cases of otherwise standard design data are design requirement number handled by the design rule that cannot be predetermined
According to;
When data of design requirements is cases of otherwise standard design data, non-standard de-sign module is that data of design requirements works out new set
It counts rule and is handled to obtain and produce required material data, new design rule is added in preset design rule.
The purpose of this setting is, in elevator design, off-gauge elevator ladder kind needs the need specifically for client
It asks and is designed, therefore in the order for encountering non-standard de-sign, non-standard de-sign module can be used as the formulation of this design requirement
New design rule carries out elevator design, and this design rule is stored in preset design rule, is encountering this later
When class design requirement, it can be handled automatically, it, can be to data operation mould by repeating this process without reformulating
Design rule progress in block is continuous perfect, handles data operation module to all design requirements,
Realize the automation of production.
Specifically, supply chain management module can use Enterprise Resources Plan ERP (Enterprise Resource
Planning) system.ERP system can also be monitored task while the task of distribution and track to material,
Play supervisory role.
Embodiment 1
Next one of embodiment of the invention is illustrated in conjunction with one embodiment:
As shown in figure 3, present embodiment discloses a kind of elevator the Automation Design production systems comprising:
Crm system: Customer Relation Management (abbreviation CRM) CRM system is based on this
Platform realizes the One-to-one marketing relationship with client, realizes the signing of contract and the acquired original of data of design requirements and system
Typing;
EDS system: Elevator Design System (abbreviation EDS) elevator design system collects Parametric designing, contract
The intelligentized design platform that the functions such as processing data processing, data maintenance, process submission, data transmitting are integrated;It is built-in with
Product structure builds rule, parameterized part detail rule, whole terraced manufacturing parameter processing rule, can be to crm system typing
Data of design requirements carries out operation and obtains producing required material data and detail list;
PLM system: Product Lifecycle Management (abbreviation PLM) product life cycle management system,
Function in this linked system is mainly to realize the information storage of EDS system material detail table structure;Play data warehouse, document
And Content Management, workflow and task management functions;
ERP system: Enterprise Resource Planning (abbreviation ERP system) enterprise resource planning, again
Supply-chain management system is, it can be achieved that the task of production material is assigned and production follow-up work;Life is played in this integrated system
Produce data receiver and handling of goods and materials function;
LDS system: Layout Design System (abbreviation LDS) civil Engineering Design system, in integrated linked system
Function, the live civil engineering size in receipt of contract generate and are converted into product site layout project construction layout drawing;
Electronics picture library cloud system: for storing PLM system, EDS system, the related drawing in LDS system, structure detail list
And key parameter output, and inquiry download function is provided.
Specifically, as shown in figure 4, the specific workflow of this system is as follows:
Step 1 carries out data transmitting by XML file form, and pass through by crm system typing data of design requirements
LDS system carries out processing conversion to live civil engineering dimension information therein and obtains live civil construction drawing, in conjunction with design requirement
Parameter is transmitted to EDS system in the form of XML file together by data
Step 2 carries out preliminary parameter by EDS system operation and converts and extract, the ginseng of key needed for being converted into product
Number;And by forming material data after carrying out system convention module arithmetic after manual examination and verification, the basic capsule of material data at this time
Include major components BOM structure needed for product;
Step 3 is transferred to non-standard de-sign process and carries out nonstandard set if occur non-standard de-sign demand in step 2;,
Step 4, correlative data to PLM system further progress are put in storage, and issue electronics Graphic Database System, ERP system is then
Production task appointment/or purchase order operation are carried out according to material data;
The preferred embodiment of the present invention has been described in detail above, it should be understood that those skilled in the art without
It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art
Personnel pass through logic analysis, reasoning or available according to limited experiment according to present inventive concept in prior art basis
Technical solution, should be among the protection scope determined by the claims.
Claims (10)
1. a kind of elevator the Automation Design production system, which is characterized in that including customer demand collection module, data operation mould
Block, supply chain management module;
The customer demand collection module is used for typing data of design requirements, the data of design requirements is transferred to the number
According to computing module;The data of design requirements includes the type of elevator to be designed, additional configurations;
The data operation module stores preset design rule, is used for according to the design rule to the design requirement number
It obtains producing required material data according to processing;The material data includes type, quantity and the variable parameter of elevator parts;
The design rule includes that product structure builds rule, parameterized part detail rule, whole terraced manufacturing parameter processing rule;
The supply chain management module stores the preset production rule of correspondence, and the production rule of correspondence includes supplier's selection
Rule and process flow rule, the supply chain management module is for receiving the object that the data operation module arithmetic obtains
Expect data, generate the bill of materials of the elevator to be designed according to the material data, and based on the production rule of correspondence into
Material in the bill of materials is assigned to corresponding supplier or workshop section's station, uses corresponding work by row task assignment
Skill process is produced.
2. elevator the Automation Design production system according to claim 1, which is characterized in that the customer demand collects mould
Block further includes client's marketing module;Client's marketing module with client for signing a contract, and the contract letter in typing contract
Breath and the data of design requirements.
3. elevator the Automation Design production system according to claim 2, which is characterized in that client's marketing module is
Apparel CRM.
4. elevator the Automation Design production system according to claim 3, which is characterized in that further include data storage mould
Block;
The data storage module, for storing the data of design requirements, the material data, the bill of materials and described
Live buider's work drawing data.
5. elevator the Automation Design production system according to claim 4, which is characterized in that the data storage module is also
Including enquiry module;
The enquiry module, for inquiring the data stored in the data storage module.
6. elevator the Automation Design production system according to claim 5, which is characterized in that the enquiry module further includes
Authority Verification module;
The Authority Verification module confirms the inquiry for the identity information of revene lookup person, and according to the identity information
The data query range of person, provides data query service within the scope of the data query for the inquiry.
7. elevator the Automation Design production system according to claim 1, which is characterized in that the data operation module is also
Including rules modification module;
The rules modification module is added new design rule or is deleted for modifying to the preset design rule
Remove original design rule.
8. elevator the Automation Design production system according to claim 1, which is characterized in that the data operation module is also
Including non-standard de-sign module;
The non-standard de-sign module, it is described non-standard for judging whether the data of design requirements is cases of otherwise standard design data
Design data is cannot the data of design requirements handled by the preset design rule;
When the data of design requirements is cases of otherwise standard design data, the non-standard de-sign module is the data of design requirements system
It orders new design rule and is handled to obtain and produce required material data, the new design rule is added to described pre-
If design rule in.
9. elevator the Automation Design production system according to claim 1, which is characterized in that the data of design requirements is also
Including live civil engineering dimension data, the data operation module further includes civil engineering data module;
The civil engineering data module stores preset drawing creation rule, for receiving the live civil engineering dimension data, root
Live buider's work drawing data are obtained according to the drawing creation rule process.
10. elevator the Automation Design production system according to claim 1, which is characterized in that the supply chain management mould
Block is Enterprise Resource Planning.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811055015.2A CN109344453B (en) | 2018-09-11 | 2018-09-11 | Automatic design production system of elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811055015.2A CN109344453B (en) | 2018-09-11 | 2018-09-11 | Automatic design production system of elevator |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109344453A true CN109344453A (en) | 2019-02-15 |
CN109344453B CN109344453B (en) | 2023-06-27 |
Family
ID=65304842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811055015.2A Active CN109344453B (en) | 2018-09-11 | 2018-09-11 | Automatic design production system of elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109344453B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114118325A (en) * | 2021-11-29 | 2022-03-01 | 康力电梯股份有限公司 | Method for associating debugging table of escalator control cabinet with SAP production data |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030036946A1 (en) * | 2001-08-20 | 2003-02-20 | Li-Kuei Lin | Capacity and material target forecasting system and method |
US20040162768A1 (en) * | 2003-01-31 | 2004-08-19 | Snyder Aaron Francis | System architecture for a vendor management inventory solution |
JP2006065742A (en) * | 2004-08-30 | 2006-03-09 | Toshiba Elevator Co Ltd | Design and production support system |
CN1904919A (en) * | 2006-08-03 | 2007-01-31 | 董学军 | Comprehensive managing system of small power transformer limiting design and measurement automatic recording |
CN103077443A (en) * | 2013-01-02 | 2013-05-01 | 长春宝钢钢材贸易有限公司 | Integral supply chain management system in steel industry and implementing method |
CN103679322A (en) * | 2012-10-24 | 2014-03-26 | 杭州金色能源科技有限公司 | Production data processing method, device thereof, and system thereof |
CN105242912A (en) * | 2014-07-12 | 2016-01-13 | 江苏世轩科技股份有限公司 | Information transfer method of human-computer interaction interface |
CN105631543A (en) * | 2015-12-23 | 2016-06-01 | 武汉宝钢华中贸易有限公司 | Automatic volume matching management information model based on customer data analysis and processing technology |
CN107292036A (en) * | 2017-06-26 | 2017-10-24 | 浙江省特种设备检验研究院 | A kind of many granularity elevator designs based on OWL S calculate Web service and describe method |
-
2018
- 2018-09-11 CN CN201811055015.2A patent/CN109344453B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030036946A1 (en) * | 2001-08-20 | 2003-02-20 | Li-Kuei Lin | Capacity and material target forecasting system and method |
US20040162768A1 (en) * | 2003-01-31 | 2004-08-19 | Snyder Aaron Francis | System architecture for a vendor management inventory solution |
JP2006065742A (en) * | 2004-08-30 | 2006-03-09 | Toshiba Elevator Co Ltd | Design and production support system |
CN1904919A (en) * | 2006-08-03 | 2007-01-31 | 董学军 | Comprehensive managing system of small power transformer limiting design and measurement automatic recording |
CN103679322A (en) * | 2012-10-24 | 2014-03-26 | 杭州金色能源科技有限公司 | Production data processing method, device thereof, and system thereof |
CN103077443A (en) * | 2013-01-02 | 2013-05-01 | 长春宝钢钢材贸易有限公司 | Integral supply chain management system in steel industry and implementing method |
CN105242912A (en) * | 2014-07-12 | 2016-01-13 | 江苏世轩科技股份有限公司 | Information transfer method of human-computer interaction interface |
CN105631543A (en) * | 2015-12-23 | 2016-06-01 | 武汉宝钢华中贸易有限公司 | Automatic volume matching management information model based on customer data analysis and processing technology |
CN107292036A (en) * | 2017-06-26 | 2017-10-24 | 浙江省特种设备检验研究院 | A kind of many granularity elevator designs based on OWL S calculate Web service and describe method |
Non-Patent Citations (4)
Title |
---|
周海波: "以电梯企业为核心的MC供应链的研究", 《上海电气技术》 * |
周海波等: "供应商介入产品创新理论在电梯开发中的应用", 《制造业自动化》 * |
谭建荣等: "集成环境下大批量定制的产品配置设计技术及其应用", 《中国机械工程》 * |
韩海荣等: "基于动态设计结构矩阵的客户需求反馈导航技术", 《浙江大学学报(工学版)》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114118325A (en) * | 2021-11-29 | 2022-03-01 | 康力电梯股份有限公司 | Method for associating debugging table of escalator control cabinet with SAP production data |
Also Published As
Publication number | Publication date |
---|---|
CN109344453B (en) | 2023-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110009172B (en) | Asset full life cycle data modeling method based on SG-CIM model | |
CN109146372A (en) | Global wisdom manufactures sales service system | |
CN109285060A (en) | A kind of buying integrated management system | |
CN110334950B (en) | Iron tower intelligent production and group management and control system | |
US20150149257A1 (en) | Systems and methods for enterprise profit optimization | |
Doh et al. | Systems integration in the lean manufacturing systems value chain to meet industry 4.0 requirements | |
EP3933744A1 (en) | Blockchain-based industrial manufacturing resource sharing method, device and system | |
CN107844936A (en) | Variation, device, terminal and the computer-readable recording medium of BOM | |
CN111260194A (en) | Accurate material supply method and system based on block chain | |
CN110288361A (en) | A kind of have furniture made to order information tracking method and system based on Life cycle | |
CN111507686A (en) | Automatic budget system and method for engineering design change | |
CN111597777A (en) | Material data processing method and device and electronic equipment | |
CN109325644A (en) | Mechanical processing industry production capacity method of commerce, system, integrated system, terminal and storage medium | |
CN109344453A (en) | A kind of elevator the Automation Design production system | |
CN109800833A (en) | A kind of material tracing and positioning management control system based on B/S framework | |
CN116416017A (en) | Order agriculture method and system based on distributed collaboration | |
CN113793111A (en) | Power equipment asset management method, system, device and storage medium | |
CN113327101A (en) | Technical management method for realizing product configuration by using PDM integrated system | |
CN110070249A (en) | A kind of digital factory intelligent platform | |
CN107464161A (en) | A kind of ship SCM system and method | |
CN104850923A (en) | Semiconductor production simulation system | |
CN106529972A (en) | Service platform for quality safety traceability of agricultural products | |
CN115099377A (en) | Bar code-based aviation part manufacturing cooperative management system and method | |
CN108550022A (en) | A kind of multi-disciplinary numerical control equipment co-design and simulation nucleus correcting system and method | |
Gabriel et al. | Analysis of environmental potential by implementing industry 4.0 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |