CN109190317A - A method of rack BIM model is created using Dynamo fast accurate - Google Patents

A method of rack BIM model is created using Dynamo fast accurate Download PDF

Info

Publication number
CN109190317A
CN109190317A CN201811282024.5A CN201811282024A CN109190317A CN 109190317 A CN109190317 A CN 109190317A CN 201811282024 A CN201811282024 A CN 201811282024A CN 109190317 A CN109190317 A CN 109190317A
Authority
CN
China
Prior art keywords
dynamo
frame ball
rod piece
information
ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811282024.5A
Other languages
Chinese (zh)
Other versions
CN109190317B (en
Inventor
朱亚超
白旭军
王志慧
吕修峰
张永亮
崔涛
宋子祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201811282024.5A priority Critical patent/CN109190317B/en
Publication of CN109190317A publication Critical patent/CN109190317A/en
Application granted granted Critical
Publication of CN109190317B publication Critical patent/CN109190317B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Manufacture Of Motors, Generators (AREA)
  • Supply And Installment Of Electrical Components (AREA)

Abstract

The present invention relates to rack BIM model creation method, specifically a kind of method using Dynamo fast accurate creation rack BIM model.The present invention solves the problems, such as that the existing rack BIM model creation Method Modeling period is long, modeling precision is low.It is a kind of to create method this method of rack BIM model using following steps realization using Dynamo fast accurate: 1) to work out component information table;2) creation can join the frame ball race of change and can join the rod piece race of change;3) number information of the coordinate information of frame ball, the specification information of frame ball, frame ball is obtained;4) center point of all frame balls is grouped;5) center point of each frame ball is generated;6) frame ball example is created;7) frame ball BIM model is obtained;8) coordinate information of the frame ball at each rod piece both ends is obtained;9) specification information of rod piece, the number information of rod piece are obtained;10) all rod pieces are grouped;11) rod piece example is created;12) rod piece BIM model is obtained.The present invention is suitable for Construction of The Grids.

Description

A method of rack BIM model is created using Dynamo fast accurate
Technical field
It is specifically a kind of to create rack BIM using Dynamo fast accurate the present invention relates to rack BIM model creation method The method of model.
Background technique
Rack is widely used as puting on display because it has many advantages, such as that space-load is small, light-weight, rigidity is big, anti-seismic performance is good The roof system of the buildings such as shop, gymnasium, railway station, museum.In recent years, with the continuous development of information technology and BIM technology Widely popularize, creation rack BIM model become one of important link in Construction of The Grids.However practice have shown that, existing net Frame BIM model creation method is since itself principle is limited, the problem that generally existing modeling period is long, modeling precision is low, thus Seriously affect Construction of The Grids efficiency and Construction of The Grids quality.Based on this, it is necessary to invent a kind of completely new rack BIM model creation Method, to solve the problems, such as that the existing rack BIM model creation Method Modeling period is long, modeling precision is low.
Summary of the invention
The present invention mentions to solve the problems, such as that the existing rack BIM model creation Method Modeling period is long, modeling precision is low A kind of method using Dynamo fast accurate creation rack BIM model is supplied.
The present invention is achieved by the following technical scheme:
A method of rack BIM model being created using Dynamo fast accurate, this method is realized using following steps:
1) according to Construction of The Grids material table and Construction of The Grids flat sectional drawing, component information table is worked out using Excel;The component letter The content of breath table includes: the coordinate information of frame ball, the specification information of frame ball, the number information of frame ball, the specification of rod piece Information, the number information of rod piece;
2) according to component information table, the frame ball race of change can be joined using Revit creation and the rod piece race of change can be joined;
3) by the visual programming of Dynamo, coordinate information, the rack of frame ball in component information table are obtained with tabular form The number information of the specification information of ball, frame ball;
4) the Python secondary development supported by Dynamo, with the specification information of frame ball in component information table to all nets The center point of frame ball is grouped;
5) by carrying out the calculation process of list in Dynamo, x coordinate value, y-coordinate value, the z coordinate of each frame ball are obtained It is worth, and generates the center point of each frame ball according to the x coordinate value of each frame ball, y-coordinate value, z coordinate value;
6) creating Revit race instant node by Dynamo drives Revit to create frame ball example;
7) specification information, every of the coordinate information of each frame ball in component information table, each frame ball is obtained by Dynamo The number information of a frame ball, and instance properties node is modified by Dynamo and assigns each frame ball, thus obtain frame ball BIM model;
8) by the calculation process of the progress list in Dynamo, the coordinate information of the frame ball at each rod piece both ends is obtained, and Resulting coordinate information is put into list under same index;
9) by the visual programming of Dynamo, the specification information of rod piece in component information table, rod piece are obtained with tabular form Number information;
10) the Python secondary development supported by Dynamo, with the specification information of rod piece in component information table to all bars Part is grouped;
11) creating Revit race instant node by Dynamo drives Revit to create rod piece example;
12) theoretical length of each rod piece is calculated in Dynamo by the Python secondary development that Dynamo is supported, and Instance properties node is modified by Dynamo and assigns each rod piece, thus obtains rod piece BIM model.
Compared with existing rack BIM model creation method, a kind of utilization Dynamo fast accurate creation of the present invention The method of rack BIM model is by realizing quickly, accurately using Revit software, Dynamo software, Python etc. It creates rack BIM model (including frame ball BIM model and rod piece BIM model), thus effectively shortens modeling period, effectively mentions High modeling precision, to effectively increase Construction of The Grids efficiency and Construction of The Grids quality.
The present invention efficiently solves the problems, such as that the existing rack BIM model creation Method Modeling period is long, modeling precision is low, Suitable for Construction of The Grids.
Specific embodiment
A method of rack BIM model being created using Dynamo fast accurate, this method is realized using following steps :
1) according to Construction of The Grids material table and Construction of The Grids flat sectional drawing, component information table is worked out using Excel;The component letter The content of breath table includes: the coordinate information of frame ball, the specification information of frame ball, the number information of frame ball, the specification of rod piece Information, the number information of rod piece;
2) according to component information table, the frame ball race of change can be joined using Revit creation and the rod piece race of change can be joined;
3) by the visual programming of Dynamo, coordinate information, the rack of frame ball in component information table are obtained with tabular form The number information of the specification information of ball, frame ball;
4) the Python secondary development supported by Dynamo, with the specification information of frame ball in component information table to all nets The center point of frame ball is grouped;
5) by carrying out the calculation process of list in Dynamo, x coordinate value, y-coordinate value, the z coordinate of each frame ball are obtained It is worth, and generates the center point of each frame ball according to the x coordinate value of each frame ball, y-coordinate value, z coordinate value;
6) creating Revit race instant node by Dynamo drives Revit to create frame ball example;
7) specification information, every of the coordinate information of each frame ball in component information table, each frame ball is obtained by Dynamo The number information of a frame ball, and instance properties node is modified by Dynamo and assigns each frame ball, thus obtain frame ball BIM model;
8) by the calculation process of the progress list in Dynamo, the coordinate information of the frame ball at each rod piece both ends is obtained, and Resulting coordinate information is put into list under same index;
9) by the visual programming of Dynamo, the specification information of rod piece in component information table, rod piece are obtained with tabular form Number information;
10) the Python secondary development supported by Dynamo, with the specification information of rod piece in component information table to all bars Part is grouped;
11) creating Revit race instant node by Dynamo drives Revit to create rod piece example;
12) theoretical length of each rod piece is calculated in Dynamo by the Python secondary development that Dynamo is supported, and Instance properties node is modified by Dynamo and assigns each rod piece, thus obtains rod piece BIM model.
When it is implemented, the theoretical length of rod piece is equal to the coordinate distance of the frame ball at rod piece both ends in the step 12) Subtract the radius of the frame ball at rod piece both ends.

Claims (2)

1. a kind of method using Dynamo fast accurate creation rack BIM model, it is characterised in that: this method is using as follows What step was realized:
1) according to Construction of The Grids material table and Construction of The Grids flat sectional drawing, component information table is worked out using Excel;The component letter The content of breath table includes: the coordinate information of frame ball, the specification information of frame ball, the number information of frame ball, the specification of rod piece Information, the number information of rod piece;
2) according to component information table, the frame ball race of change can be joined using Revit creation and the rod piece race of change can be joined;
3) by the visual programming of Dynamo, coordinate information, the rack of frame ball in component information table are obtained with tabular form The number information of the specification information of ball, frame ball;
4) the Python secondary development supported by Dynamo, with the specification information of frame ball in component information table to all nets The center point of frame ball is grouped;
5) by carrying out the calculation process of list in Dynamo, x coordinate value, y-coordinate value, the z coordinate of each frame ball are obtained It is worth, and generates the center point of each frame ball according to the x coordinate value of each frame ball, y-coordinate value, z coordinate value;
6) creating Revit race instant node by Dynamo drives Revit to create frame ball example;
7) specification information, every of the coordinate information of each frame ball in component information table, each frame ball is obtained by Dynamo The number information of a frame ball, and instance properties node is modified by Dynamo and assigns each frame ball, thus obtain frame ball BIM model;
8) by the calculation process of the progress list in Dynamo, the coordinate information of the frame ball at each rod piece both ends is obtained, and Resulting coordinate information is put into list under same index;
9) by the visual programming of Dynamo, the specification information of rod piece in component information table, rod piece are obtained with tabular form Number information;
10) the Python secondary development supported by Dynamo, with the specification information of rod piece in component information table to all bars Part is grouped;
11) creating Revit race instant node by Dynamo drives Revit to create rod piece example;
12) theoretical length of each rod piece is calculated in Dynamo by the Python secondary development that Dynamo is supported, and Instance properties node is modified by Dynamo and assigns each rod piece, thus obtains rod piece BIM model.
2. a kind of method using Dynamo fast accurate creation rack BIM model according to claim 1, feature exist In: in the step 12), the coordinate distance that the theoretical length of rod piece is equal to the frame ball at rod piece both ends subtracts the net at rod piece both ends The radius of frame ball.
CN201811282024.5A 2018-10-31 2018-10-31 Method for quickly and accurately creating grid BIM (building information modeling) model by using Dynamo Active CN109190317B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811282024.5A CN109190317B (en) 2018-10-31 2018-10-31 Method for quickly and accurately creating grid BIM (building information modeling) model by using Dynamo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811282024.5A CN109190317B (en) 2018-10-31 2018-10-31 Method for quickly and accurately creating grid BIM (building information modeling) model by using Dynamo

Publications (2)

Publication Number Publication Date
CN109190317A true CN109190317A (en) 2019-01-11
CN109190317B CN109190317B (en) 2022-11-22

Family

ID=64941025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811282024.5A Active CN109190317B (en) 2018-10-31 2018-10-31 Method for quickly and accurately creating grid BIM (building information modeling) model by using Dynamo

Country Status (1)

Country Link
CN (1) CN109190317B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111611675A (en) * 2020-01-09 2020-09-01 中南建筑设计院股份有限公司 Rapid modeling method based on Revit and Dynamo parameterized grid structure model
CN112854758A (en) * 2021-01-12 2021-05-28 中国铁路通信信号上海工程局集团有限公司 BIM-based steel reinforced concrete joint construction method
CN113505424A (en) * 2021-07-12 2021-10-15 南昌大学 Interactive construction method for derived component of linear engineering

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105701318A (en) * 2016-03-02 2016-06-22 中国十九冶集团有限公司 Method for establishing SolidWorks net rack/pipe truss building information model with coordinate value table
CN107103158A (en) * 2017-05-24 2017-08-29 中铁四局集团有限公司 The method that high-speed rail bridge rapid modeling is dynamically changed is realized using DYNAMO
US20170357738A1 (en) * 2016-06-11 2017-12-14 Flux Factory, Inc. Process for Merging Parametric Building Information Models

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105701318A (en) * 2016-03-02 2016-06-22 中国十九冶集团有限公司 Method for establishing SolidWorks net rack/pipe truss building information model with coordinate value table
US20170357738A1 (en) * 2016-06-11 2017-12-14 Flux Factory, Inc. Process for Merging Parametric Building Information Models
CN107103158A (en) * 2017-05-24 2017-08-29 中铁四局集团有限公司 The method that high-speed rail bridge rapid modeling is dynamically changed is realized using DYNAMO

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张洪伟等: "连续梁-钢桁组合桥BIM建模技术研究", 《铁路技术创新》 *
董爱平等: "基于Revit的网架参数化建模", 《土木建筑工程信息技术》 *
车冠宇等: "Revit+Dynamo参数化隧道模型构建体系探析", 《公路交通科技(应用技术版)》 *
郭颖恺等: "基于Revit软件及Dynamo可视化编程实现轻型木结构框架体系快速建模", 《林业机械与木工设备》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111611675A (en) * 2020-01-09 2020-09-01 中南建筑设计院股份有限公司 Rapid modeling method based on Revit and Dynamo parameterized grid structure model
CN111611675B (en) * 2020-01-09 2023-03-21 中南建筑设计院股份有限公司 Rapid modeling method based on Revit and Dynamo parameterized grid structure model
CN112854758A (en) * 2021-01-12 2021-05-28 中国铁路通信信号上海工程局集团有限公司 BIM-based steel reinforced concrete joint construction method
CN113505424A (en) * 2021-07-12 2021-10-15 南昌大学 Interactive construction method for derived component of linear engineering
CN113505424B (en) * 2021-07-12 2022-06-07 南昌大学 Interactive construction method for derived component of linear engineering

Also Published As

Publication number Publication date
CN109190317B (en) 2022-11-22

Similar Documents

Publication Publication Date Title
CN109190317A (en) A method of rack BIM model is created using Dynamo fast accurate
CN106950923B (en) A kind of speed planning method for determining interpolation cycle
CN104440875A (en) Three degree-of-freedom parallel connection mechanism with adjustable working space and adjusting method thereof
CN105489102B (en) A kind of three-dimensional interactive training training system
CN110727972A (en) Automatic power transmission tower modeling method and system based on building informatization model
CN102411792A (en) Multilevel dynamic loading-unloading method for virtual simulation scene
CN103949860B (en) Many mouthfuls of space of pylon single node method of processing flange
CN104794316A (en) Method for disassembling and combining 3D models
CN105589989B (en) Process modeling construction method and system
CN104973215A (en) Global dynamic virtual reality carrying method based on precision database
CN103268378A (en) Globoidal cam motion curve identification method based on multi-order correlation analysis
Peiyong et al. Research on the assembly sequence of a ship block based on the disassembly interference matrix
CN105404240B (en) A kind of AutoCAD map files automatically generate and the method for quicksort position coordinate
CN204475515U (en) A kind of special-shaped distortion steel structure member
CN109977572B (en) Product part knowledge unit relation network construction method
CN106600137A (en) Application method of steel structure BIM (building information modeling) informatization platform
CN104008254B (en) Integrated optimization method of telescopic lifting arm static model
CN107544773A (en) A kind of development approach based on computer software development technique
CN106156443A (en) A kind of laying stiffening ring and method and device of meridian rib on cooling tower
CN206410838U (en) A kind of vibration testing device
CN104345685A (en) System and method for optimizing processing program
CN106372276A (en) Method for establishing static stiffness-based machine tool structure part database
Liu et al. Design for manufacture and integrated manufacturability evaluation system
CN211403673U (en) Simulation training system for variable intelligent production line
CN208409388U (en) A kind of heavy type machining center ray machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant