CN109800509A - A kind of building method of the curved wall based on BIM - Google Patents

A kind of building method of the curved wall based on BIM Download PDF

Info

Publication number
CN109800509A
CN109800509A CN201910060564.7A CN201910060564A CN109800509A CN 109800509 A CN109800509 A CN 109800509A CN 201910060564 A CN201910060564 A CN 201910060564A CN 109800509 A CN109800509 A CN 109800509A
Authority
CN
China
Prior art keywords
curved wall
information
built
constructing operation
staff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910060564.7A
Other languages
Chinese (zh)
Inventor
黄维燕
余浩贾
张永伟
翁凯丞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Southeast Building Design Co Ltd
Original Assignee
Zhejiang Southeast Building Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Southeast Building Design Co Ltd filed Critical Zhejiang Southeast Building Design Co Ltd
Priority to CN201910060564.7A priority Critical patent/CN109800509A/en
Publication of CN109800509A publication Critical patent/CN109800509A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of building methods of curved wall based on BIM, are related to building field, and the masonry for solving curved wall only waits and can find to build the problem in building courses, its key points of the technical solution are that: obtain curved wall information;Drawing and actual ratio A are chosen according to curved wall information, and draws the two-dimentional drawing of curved wall according to drawing and actual ratio A;The threedimensional model BIM of curved wall is established according to the two-dimentional drawing of drafting;Based on BIM, threedimensional model dynamic analog is built to the dynamic process of curved wall, and simulates the constructing operation information and constructing operation points for attention information for being loaded with standard in the dynamic process for building curved wall;Staff is according to the masonry for opening curved wall based on the information in BIM, a kind of building method of curved wall based on BIM of the invention, the dynamic process of curved wall is built by threedimensional model dynamic analog, is found the problem during dynamic analog builds curved wall convenient for staff to correct.

Description

A kind of building method of the curved wall based on BIM
Technical field
The present invention relates to building field, in particular to the building method of a kind of curved wall based on BIM.
Background technique
Building Information Model is the new tool of architecture, engineering science and civil engineering.Building Information Model (Building Information Modeling, abbreviation BIM), it is defined as by constituting completely with insufficient information to support life cycle management, And it can be by building or architectural engineering information model that computer applied algorithm is directly explained.In short, i.e. digital technology support Life cycle management to architectural environment.Existing building construction is assisted using BIM technology, is that the one of construction becomes greatly Gesture.
The masonry of existing curved wall is built according to CAD two dimension drawing, and the best side of construction cannot be obtained Case, and can find to build the problem in only equal building courses, this is time-consuming and laborious for building construction, influences work Cheng Jindu.
Summary of the invention
The object of the present invention is to provide a kind of building methods of curved wall based on BIM, pass through threedimensional model dynamic analog The proposed dynamic process for making curved wall is found the problem convenient for staff during dynamic analog builds curved wall to repair Just.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of building method of the curved wall based on BIM, comprising:
(1), the curved wall information for needing to build is obtained;
(2), the curved wall information built as needed chooses drawing and actual ratio A, and draws according to drawing and actual ratio A The two-dimentional drawing for the curved wall that system needs to build;
(3), the threedimensional model BIM for needing the curved wall built is established according to the two-dimentional drawing of drafting;
(4), it is based on BIM, threedimensional model dynamic analog is built to the dynamic process of curved wall, and simulate and build curved wall The constructing operation information and constructing operation points for attention information of standard are loaded in dynamic process;
(5), staff is according to the masonry for opening curved wall based on the information in BIM.
By using above-mentioned technical proposal, the curved wall for needing to build is drawn according to suitable drawing and actual ratio A Two-dimentional drawing, establish the threedimensional model BIM of curved wall again according to two-dimentional drawing, and threedimensional model dynamic analog builds arc The dynamic process of shape wall is found the problem during dynamic analog builds curved wall convenient for staff to correct;
Simulate the constructing operation information and constructing operation points for attention information for building the dynamic process Plays of curved wall Load, plays and instructs staff's constructing operation effect, reduces unreasonable operation of staff during constructing operation, with Ensure built curved wall quality.
The present invention is further arranged to: the curved wall information that the needs in (1) are built includes the arc for needing to build The geographical location information for the curved wall that the dimension information and needs of shape wall are built.
By using above-mentioned technical proposal, the acquisition of the dimension information for the curved wall that need to be built builds arc convenient for responsible The quantity and completion date of responsible person's reasonable arrangement high level operational personnel of wall, intermediate staff, primary staff; The acquisition of the geographical location information for the curved wall that need to be built, convenient for being responsible for building the responsible person of curved wall according to the geography position Set the good required masonry tool of reasonable arrangement.
The present invention is further arranged to: the constructing operation Step Information in (4) includes: a, curved wall payoff operation Information;B, construction builds operation information.
By using above-mentioned technical proposal, constructing operation Step Information includes: a, curved wall payoff operation information;B, it applies Work builds operation information, is good at the behaviour in each constructing operation step of responsible person's reasonable arrangement convenient for being responsible for building curved wall Make the staff of step, improves working efficiency and quality.
The present invention is further arranged to: curved wall unwrapping wire is operated using string away from method.
By using above-mentioned technical proposal, curved wall line-putting method uses string away from method, to ensure the too long of curved wall of string The construction effect of body.
The present invention is further arranged to: further include:
(6), the constructing operation information that staff builds in this curved wall is obtained;
From the corresponding relationship between pre-set, standard constructing operation information and monitoring center behavioural information, search with The corresponding monitoring center behavioural information of constructing operation information that this described curved wall is built;The monitoring center behavioural information The constructing operation information that this curved wall is built is compared with the constructing operation information of standard: when this curved wall is built The constructing operation information built is consistent with the constructing operation information of standard, gives staff and supports information, when this curved wall The constructing operation information of masonry and the constructing operation information of standard do not give staff then unanimously and oppose information.
By using above-mentioned technical proposal, staff is given in the constructing operation information that this curved wall is built and is marked Quasi- constructing operation information compares, when the constructing operation information of constructing operation information and standard that this curved wall is built It is consistent then give staff support information, when this curved wall build constructing operation information and standard constructing operation believe Breath does not give staff then unanimously and opposes information, convenient for staff according to support information, opposition information to understand itself Constructing operation ability.
The present invention is further arranged to: (6) further include:
Record storage is carried out to monitoring center behavioural information.
By using above-mentioned technical proposal, monitoring center behavioural information carries out record storage, at any time may be used convenient for staff It transfers and checks.
The present invention is further arranged to: (6) further include:
This curved wall build after the completion of according to monitoring center behavioural information to automatically generate to participate in this curved wall The merit rating information of the staff of masonry.
By using above-mentioned technical proposal, monitoring center behavioural information is automatically generated to participation this curved wall masonry The merit rating information of staff, so that staff or the responsible responsible person for building curved wall are directly viewable work people The merit rating information of member, more convenient, intelligence.
The present invention is further arranged to: the constructing operation information that this curved wall of the staff is built includes work The construction operation time information that this curved wall of personnel is built;The constructing operation information of the standard is the constructing operation of standard Temporal information;
When the construction operation time information that this staff's curved wall is built is consistent with the construction operation time information of standard Then give staff support information, when this curved wall build constructing operation information and standard constructing operation information not It is consistent then give staff oppose information.
By using above-mentioned technical proposal, the construction operation time information built to this curved wall of staff is given The construction operation time information of standard compares, and then the construction operation time built to this curved wall is monitored, It avoids the problem that slack, delay engineering occurs in staff, improves the working efficiency of staff.
In conclusion the invention has the following advantages:
1, the threedimensional model BIM of curved wall is established according to two-dimentional drawing, and threedimensional model dynamic analog builds curved wall Dynamic process is found the problem during dynamic analog builds curved wall convenient for staff to correct;
2, the constructing operation information and constructing operation points for attention information of the dynamic process Plays of curved wall are built in simulation Load, play and instruct staff's constructing operation effect, reduce unreasonable operation of staff during constructing operation, To ensure built curved wall quality.
Detailed description of the invention
Fig. 1 is the flow chart of the building method of the curved wall based on BIM.
Specific embodiment
Below in conjunction with attached drawing 1, invention is further described in detail.
The embodiment of the present invention provides a kind of building method of curved wall based on BIM, comprising:
(1), the curved wall information for needing to build is obtained;
(2), the curved wall information built as needed chooses drawing and actual ratio A, and draws according to drawing and actual ratio A The two-dimentional drawing for the curved wall that system needs to build;
(3), the threedimensional model BIM for needing the curved wall built is established according to the two-dimentional drawing of drafting;
(4), it is based on BIM, threedimensional model dynamic analog is built to the dynamic process of curved wall, and simulate and build curved wall The constructing operation information and constructing operation points for attention information of standard are loaded in dynamic process;
(5), staff is according to the masonry for opening curved wall based on the information in BIM.
The two-dimentional drawing for needing the curved wall built is drawn according to suitable drawing and actual ratio A, again according to two Dimension drawing establishes the threedimensional model BIM of curved wall, and threedimensional model dynamic analog builds the dynamic process of curved wall, is convenient for Staff is found the problem during dynamic analog builds curved wall to correct;The dynamic process of curved wall is built in simulation The load of the constructing operation information and constructing operation points for attention information of Plays is played and staff's constructing operation is instructed to imitate Fruit reduces unreasonable operation of staff during constructing operation, to ensure built curved wall quality.
(1) the curved wall information that the needs in are built includes the dimension information and needs for needing the curved wall built The geographical location information of the curved wall of masonry;Namely the arc for needing the size of the curved wall built and needs to build The geographical location of wall.
The acquisition of the size for the curved wall that need to be built is convenient for the responsible responsible person's reasonable arrangement for building curved wall The quantity and completion date of high level operational personnel, intermediate staff, primary staff;The ground for the curved wall that need to be built The acquisition of position is managed, convenient for being responsible for building the responsible person of curved wall according to the good required masonry of the geographical location reasonable arrangement Tool.
(4) the constructing operation Step Information in includes: a, curved wall payoff operation information;B, construction builds operation letter Breath.Wherein, curved wall unwrapping wire is operated using string away from method.String away from method arc fragmenting at several segments, it is then that these are small The endpoint line of section.
The building method of curved wall based on BIM further include:
(6), the constructing operation information that staff builds in this curved wall is obtained;
From the corresponding relationship between pre-set, standard constructing operation information and monitoring center behavioural information, search with The corresponding monitoring center behavioural information of constructing operation information that this curved wall is built;Monitoring center behavioural information is by this arc The constructing operation information of shape building wall is compared with the constructing operation information of standard: when the construction that this curved wall is built Operation information is consistent with the constructing operation information of standard, gives staff and supports information, when what this curved wall was built applies The constructing operation information of work operation information and standard does not give staff then unanimously and opposes information.
Staff is carried out in the constructing operation information that the constructing operation information that this curved wall is built gives standard Comparison, when this curved wall build constructing operation information it is consistent with the constructing operation information of standard, give staff's branch Information is held, when the constructing operation information of constructing operation information and standard that this curved wall is built does not give work people then unanimously Member opposes information, understands the constructing operation ability of itself according to information, opposition information is supported convenient for staff.
The building method of curved wall based on BIM further include: record storage is carried out to monitoring center behavioural information, is convenient for Staff can transfer check at any time.And further include: according to monitoring center behavioural information after the completion of this curved wall is built To automatically generating to the merit rating information for participating in the staff that this curved wall is built, so that staff or responsible The responsible person for building curved wall is directly viewable the merit rating information of staff, more convenient, intelligence.
For avoid the problem that staff occur it is slack, delay engineering, in an alternative embodiment of the invention, staff this The constructing operation information that curved wall is built includes the construction operation time information that this curved wall of staff is built, namely The construction operation time that this curved wall of staff is built;The constructing operation information of standard is the construction operation time of standard Information;When the construction operation time information that this staff's curved wall is built is consistent with the construction operation time information of standard Then give staff support information, when this curved wall build constructing operation information and standard constructing operation information not It is consistent then give staff oppose information;To improve the working efficiency of staff.
The technical solution of the application substantially the part that contributes to existing technology or the technical solution in other words Completely or partially it can be embodied in the form of software products, which is stored in a storage medium, Including some instructions use so that a computer equipment (can be personal computer, server or the network equipment etc.) or The all or part of the steps of processor (processor) the execution each embodiment method of the application.
Above embodiments are only described in detail to the technical solution to the application, but the explanation of above embodiments is only It is to be used to help understand method and its core concept of the invention, should not be construed as limiting the invention.The art In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by technical staff, should all cover in guarantor of the invention Within the scope of shield.

Claims (8)

1. a kind of building method of the curved wall based on BIM characterized by comprising
(1), the curved wall information for needing to build is obtained;
(2), the curved wall information built as needed chooses drawing and actual ratio A, and draws according to drawing and actual ratio A The two-dimentional drawing for the curved wall that system needs to build;
(3), the threedimensional model BIM for needing the curved wall built is established according to the two-dimentional drawing of drafting;
(4), it is based on BIM, threedimensional model dynamic analog is built to the dynamic process of curved wall, and simulate and build curved wall The constructing operation information and constructing operation points for attention information of standard are loaded in dynamic process;
(5), staff is according to the masonry for opening curved wall based on the information in BIM.
2. the building method of a kind of curved wall based on BIM according to claim 1, it is characterized in that: in (1) The curved wall information for needing to build includes the curved wall for needing the dimension information of the curved wall built and needs to build Geographical location information.
3. the building method of a kind of curved wall based on BIM according to claim 1, it is characterized in that: in (4) Constructing operation Step Information includes: a, curved wall payoff operation information;B, construction builds operation information.
4. the building method of a kind of curved wall based on BIM according to claim 3, it is characterized in that: curved wall is put Line is operated using string away from method.
5. a kind of building method of curved wall based on BIM according to claim 1, it is characterized in that: further include:
(6), the constructing operation information that staff builds in this curved wall is obtained;
From the corresponding relationship between pre-set, standard constructing operation information and monitoring center behavioural information, search with The corresponding monitoring center behavioural information of constructing operation information that this described curved wall is built;The monitoring center behavioural information The constructing operation information that this curved wall is built is compared with the constructing operation information of standard: when this curved wall is built The constructing operation information built is consistent with the constructing operation information of standard, gives staff and supports information, when this curved wall The constructing operation information of masonry and the constructing operation information of standard do not give staff then unanimously and oppose information.
6. the building method of a kind of curved wall based on BIM according to claim 5, it is characterized in that: (6) are also wrapped It includes:
Record storage is carried out to monitoring center behavioural information.
7. the building method of a kind of curved wall based on BIM according to claim 5, it is characterized in that: (6) are also wrapped It includes:
This curved wall to participation is automatically generated according to monitoring center behavioural information after the completion of this curved wall is built to build The merit rating information of the staff built.
8. the building method of a kind of curved wall based on BIM according to claim 5, it is characterized in that: the work people The constructing operation information that this curved wall of member is built includes the construction operation time letter that this curved wall of staff is built Breath;The constructing operation information of the standard is the construction operation time information of standard;
When the construction operation time information that this staff's curved wall is built is consistent with the construction operation time information of standard Then give staff support information, when this curved wall build constructing operation information and standard constructing operation information not It is consistent then give staff oppose information.
CN201910060564.7A 2019-01-22 2019-01-22 A kind of building method of the curved wall based on BIM Pending CN109800509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910060564.7A CN109800509A (en) 2019-01-22 2019-01-22 A kind of building method of the curved wall based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910060564.7A CN109800509A (en) 2019-01-22 2019-01-22 A kind of building method of the curved wall based on BIM

Publications (1)

Publication Number Publication Date
CN109800509A true CN109800509A (en) 2019-05-24

Family

ID=66560143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910060564.7A Pending CN109800509A (en) 2019-01-22 2019-01-22 A kind of building method of the curved wall based on BIM

Country Status (1)

Country Link
CN (1) CN109800509A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112700548A (en) * 2021-01-08 2021-04-23 中国南方电网有限责任公司超高压输电公司广州局 Fusion method of BIM (building information modeling) model and video information in visual transformer substation
CN112814146A (en) * 2020-12-31 2021-05-18 湖北创威建筑装饰工程有限公司 BIM technology-based wall green construction method
CN117172426A (en) * 2023-11-01 2023-12-05 浙江东南设计集团有限公司 Low-carbonization construction method, system and storage medium for urban and rural buildings

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107451358A (en) * 2017-07-28 2017-12-08 成都智建新业建筑设计咨询有限公司 A kind of building method of the curved wall based on BIM

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107451358A (en) * 2017-07-28 2017-12-08 成都智建新业建筑设计咨询有限公司 A kind of building method of the curved wall based on BIM

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
全国建设职业教育系列教材: "《建筑结构施工实际操作》", 中国建筑工业出版社, pages: 27 *
姚建南等: "BIM技术在建筑工程施工中的应用", 《江西建材》 *
姚建南等: "BIM技术在建筑工程施工中的应用", 《江西建材》, no. 18, 30 September 2017 (2017-09-30), pages 69 *
陆彪: "BIM对建筑工程施工技术的影响分析", 《建筑施工》 *
陆彪: "BIM对建筑工程施工技术的影响分析", 《建筑施工》, no. 02, 25 February 2017 (2017-02-25), pages 107 - 109 *
陈杨光: "BIM技术在建筑施工安全管理中的应用研究", 《山西建筑》, no. 34, 1 December 2017 (2017-12-01), pages 252 - 253 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814146A (en) * 2020-12-31 2021-05-18 湖北创威建筑装饰工程有限公司 BIM technology-based wall green construction method
CN112700548A (en) * 2021-01-08 2021-04-23 中国南方电网有限责任公司超高压输电公司广州局 Fusion method of BIM (building information modeling) model and video information in visual transformer substation
CN117172426A (en) * 2023-11-01 2023-12-05 浙江东南设计集团有限公司 Low-carbonization construction method, system and storage medium for urban and rural buildings

Similar Documents

Publication Publication Date Title
CN109800509A (en) A kind of building method of the curved wall based on BIM
CN102360535A (en) Three-dimensional visual simulation training system and method
CN106960410A (en) Underground pipe gallery approaches to IM based on BIM and GIS technology
CN103280137B (en) 220KV power transformer 3D modelling system
CN108022039A (en) A kind of Substation Training Simulator based on augmented reality
CN103065513A (en) Three-dimensional virtual training system of transformer equipment
CN101520951A (en) Training system for ultra-high voltage transmission system overvoltage and insulation coordination technology
CN112884290A (en) BIM-based field construction management method
CN108153932A (en) The modeling of Table top type three-dimensional Maintenance Model
CN107679332B (en) Transmission tower BIM model construction method based on Tekla platform
CN106789332B (en) Computer room visualized management operation platform and method
Stanilov Bridging the gap between urban morphology and urban modelling K. Stanilov
CN111428310A (en) Underground pipe gallery model construction method based on BIM and GIS
CN107515966A (en) A kind of radar simulator system layering construction method based on DDS
JP2010183703A (en) Large region power system simulator and simulation method
CN110675072A (en) BIM-based transformer substation construction process control method
CN104050342B (en) Transformer substation soft wire assembling simulating optimization design system
CN103268386A (en) 110kVGL312 sulfur hexafluoride breaker three-dimensional model system
CN103839476A (en) Three-dimensional simulation system for production supervision of assembly of transformer
CN116341064A (en) Modeling system and method of intelligent substation cloud system based on 3DMax modeling
CN111968015B (en) Interactive training method for power transmission and transformation project construction process
CN110502838A (en) Spare parts management strategy optimization model based on emulation
CN202650332U (en) Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks
Gao et al. The Research and Development of Integrated Operation-Maintenance Simulation Training System [J]
CN103268719A (en) Three-dimensional model system of 220 KVGL314 sulphur hexafluoride circuit breaker

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190524