CN107451358A - A kind of building method of the curved wall based on BIM - Google Patents
A kind of building method of the curved wall based on BIM Download PDFInfo
- Publication number
- CN107451358A CN107451358A CN201710631293.7A CN201710631293A CN107451358A CN 107451358 A CN107451358 A CN 107451358A CN 201710631293 A CN201710631293 A CN 201710631293A CN 107451358 A CN107451358 A CN 107451358A
- Authority
- CN
- China
- Prior art keywords
- curved wall
- construction
- bim
- arc
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/062—Forms for curved walls
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Abstract
The invention discloses a kind of building method of the curved wall based on BIM, comprise the following steps:(1) construction drawing, is drawn:Curved wall is split as multiple arcs section;(2) threedimensional model of multiple arcs section, is established;(3), based on BIM, the threedimensional model dynamic analog of modeled multiple arcs section is built to the dynamic process of curved wall, obtains the related data of arc fragment position in suitable arrangement and method for construction, and serialization is carried out to each segmental arc;(4) template of all segmental arcs, is prepared according to related data and construction drawing, building by laying bricks or stones for curved wall is carried out according to template.The present invention is compared with prior art difference, the dynamic process constructed using the building element in building scheme is previewed, the relevant parameter met in actual production can be quantified, data supporting is provided for construction, so that construction meets the requirements and differential without larger technique effect, meet construction demand.
Description
Technical field
The present invention relates to building field, and in particular to a kind of building method of the curved wall based on BIM.
Background technology
BIM is the new tool of architecture, engineering science and civil engineering.BIM (Building
Information Modeling, abbreviation BIM), it is defined as by being formed completely with insufficient information to support life cycle management,
And can be by building or architectural engineering information model that computer applied algorithm is directly explained.In short, i.e. digital technology support
Life cycle management to architectural environment.Existing building construction is aided in using BIM technology, is that the one of construction becomes greatly
Gesture.
Building by laying bricks or stones for existing curved wall is built according to CAD two dimension drawings, it is impossible to obtains the optimal side of construction
Case, and only wait building course in can find build produced problem, this for construction construction waste time and energy, influence work
Cheng Jindu.
The content of the invention
It is an object of the invention to provide a kind of building method of the curved wall based on BIM, the present invention is drawing construction
During drawing, curved wall is divided into multiple arcs section, then three-dimensional modeling is carried out to multiple arcs section, then Mobile state is entered based on BIM
Simulation preview construction, it can be found that problem adjusts the relevant parameter on construction drawing in time during dynamic analog, obtain compared with
For the suitable related data for being used to build construction so that construction can be carried out fast and accurately.The present invention is compared with prior art not
It is with part, has previewed the dynamic process constructed using the building element in building scheme, can will meet actual life
Relevant parameter in production quantifies, and provides data supporting for construction so that construction meets the requirements and without larger technique effect
It is differential, meet construction demand.
The present invention is achieved through the following technical solutions:
A kind of building method of the curved wall based on BIM, comprises the following steps:
(1) construction drawing, is drawn:Curved wall is split as multiple arcs section;
(2) threedimensional model of multiple arcs section, is established;
(3), based on BIM, by the dynamic of the threedimensional model dynamic analog construction curved wall of modeled multiple arcs section
Process, the related data of arc fragment position in suitable arrangement and method for construction is obtained, and serialization is carried out to each segmental arc;
(4) template of all segmental arcs, is prepared according to related data and construction drawing, curved wall is carried out according to template
Build by laying bricks or stones.
Angle data and each arc of the related data between the starting point tangent line and horizontal line of each segmental arc
The arc length of section.
Specific building method is in step (4):According to the related data of arc fragment position, according to the segmental arc through serialization
Setting order is built.
The arc length of segmental arc is 1-3m.
The present invention compared with prior art, has the following advantages and advantages:
The present invention is compared with prior art difference, has previewed what is constructed using the building element in building scheme
Dynamic process, the relevant parameter met in actual production can be quantified, provide data supporting for construction so that construction conforms to
Ask and differential without larger technique effect, meet construction demand.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment, the present invention is made
Further to describe in detail, exemplary embodiment of the invention and its explanation are only used for explaining the present invention, are not intended as to this
The restriction of invention.
Embodiment 1
A kind of building method of the curved wall based on BIM, comprises the following steps:
(1) construction drawing, is drawn:Curved wall is split as multiple arcs section;
(2) threedimensional model of multiple arcs section, is established;
(3), based on BIM, by the dynamic of the threedimensional model dynamic analog construction curved wall of modeled multiple arcs section
Process, the related data of arc fragment position in suitable arrangement and method for construction is obtained, and serialization is carried out to each segmental arc;
(4) template of all segmental arcs, is prepared according to related data and construction drawing, curved wall is carried out according to template
Build by laying bricks or stones.
Embodiment 2
Angle data and each arc of the related data between the starting point tangent line and horizontal line of each segmental arc
The arc length of section.
Specific building method is in step (4):According to the related data of arc fragment position, according to the segmental arc through serialization
Setting order is built.
The arc length of segmental arc is 1-3m.
Above-described embodiment, the purpose of the present invention, technical scheme and beneficial effect are carried out further
Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention
Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc., all should include
Within protection scope of the present invention.
Claims (4)
1. a kind of building method of the curved wall based on BIM, it is characterised in that comprise the following steps:
(1) construction drawing, is drawn:Curved wall is split as multiple arcs section;
(2) threedimensional model of multiple arcs section, is established;
(3), based on BIM, the threedimensional model dynamic analog of modeled multiple arcs section is built to the dynamic process of curved wall,
The related data of arc fragment position in suitable arrangement and method for construction is obtained, and serialization is carried out to each segmental arc;
(4) template of all segmental arcs, is prepared according to related data and construction drawing, the block of curved wall is carried out according to template
Build.
A kind of 2. building method of curved wall based on BIM according to claim 1, it is characterised in that the correlation
The arc length of angle data and each segmental arc of the data between the starting point tangent line and horizontal line of each segmental arc.
3. the building method of a kind of curved wall based on BIM according to claim 1, it is characterised in that in step (4)
Specifically building method is:Built according to the related data of arc fragment position, according to the segmental arc setting order through serialization.
4. the building method of a kind of curved wall based on BIM according to claim 1, it is characterised in that segmental arc
Arc length is 1-3m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710631293.7A CN107451358A (en) | 2017-07-28 | 2017-07-28 | A kind of building method of the curved wall based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710631293.7A CN107451358A (en) | 2017-07-28 | 2017-07-28 | A kind of building method of the curved wall based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107451358A true CN107451358A (en) | 2017-12-08 |
Family
ID=60489552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710631293.7A Pending CN107451358A (en) | 2017-07-28 | 2017-07-28 | A kind of building method of the curved wall based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107451358A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109800509A (en) * | 2019-01-22 | 2019-05-24 | 浙江东南建筑设计有限公司 | A kind of building method of the curved wall based on BIM |
CN112127503A (en) * | 2020-09-30 | 2020-12-25 | 青岛华骐林新型建材有限公司 | Mold, building component and manufacturing method thereof and construction method of curved outer wall |
CN112270034A (en) * | 2020-11-24 | 2021-01-26 | 筑友智造科技投资有限公司 | Wall splitting method, device and system |
CN113609561A (en) * | 2021-08-06 | 2021-11-05 | 天津天一建设集团有限公司 | BIM technology-based brick laying and arranging method and system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1052919A (en) * | 1990-02-12 | 1991-07-10 | 青岛建筑机械厂 | Circular shuttering |
CN203320889U (en) * | 2013-06-25 | 2013-12-04 | 北京金港机场建设有限责任公司 | Arc wall body framework |
US9019269B1 (en) * | 2011-11-28 | 2015-04-28 | Robert Alan Pogue | Interactive rendering of building information model data |
CN105155461A (en) * | 2015-09-24 | 2015-12-16 | 武汉英思工程科技股份有限公司 | High-slope construction dynamic simulation method based on BIM (Building Information Modeling) |
CN205077717U (en) * | 2015-06-15 | 2016-03-09 | 深圳赤晓建筑科技有限公司 | Arc battenboard and arc wall |
CN205840311U (en) * | 2016-06-14 | 2016-12-28 | 中建一局集团第三建筑有限公司 | A kind of curved wall template system |
-
2017
- 2017-07-28 CN CN201710631293.7A patent/CN107451358A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1052919A (en) * | 1990-02-12 | 1991-07-10 | 青岛建筑机械厂 | Circular shuttering |
US9019269B1 (en) * | 2011-11-28 | 2015-04-28 | Robert Alan Pogue | Interactive rendering of building information model data |
CN203320889U (en) * | 2013-06-25 | 2013-12-04 | 北京金港机场建设有限责任公司 | Arc wall body framework |
CN205077717U (en) * | 2015-06-15 | 2016-03-09 | 深圳赤晓建筑科技有限公司 | Arc battenboard and arc wall |
CN105155461A (en) * | 2015-09-24 | 2015-12-16 | 武汉英思工程科技股份有限公司 | High-slope construction dynamic simulation method based on BIM (Building Information Modeling) |
CN205840311U (en) * | 2016-06-14 | 2016-12-28 | 中建一局集团第三建筑有限公司 | A kind of curved wall template system |
Non-Patent Citations (2)
Title |
---|
万利民: "珠海歌剧院变曲率双曲面薄壁弧形墙模板施工技术", 《施工技术》 * |
徐勇戈: "《BIM概论》", 31 October 2016 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109800509A (en) * | 2019-01-22 | 2019-05-24 | 浙江东南建筑设计有限公司 | A kind of building method of the curved wall based on BIM |
CN112127503A (en) * | 2020-09-30 | 2020-12-25 | 青岛华骐林新型建材有限公司 | Mold, building component and manufacturing method thereof and construction method of curved outer wall |
CN112127503B (en) * | 2020-09-30 | 2022-01-28 | 青岛华骐林新型建材有限公司 | Mold, building component and manufacturing method thereof and construction method of curved outer wall |
CN112270034A (en) * | 2020-11-24 | 2021-01-26 | 筑友智造科技投资有限公司 | Wall splitting method, device and system |
CN113609561A (en) * | 2021-08-06 | 2021-11-05 | 天津天一建设集团有限公司 | BIM technology-based brick laying and arranging method and system |
CN113609561B (en) * | 2021-08-06 | 2023-11-24 | 天津天一建设集团有限公司 | BIM technology-based bricklaying brick arranging method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107451358A (en) | A kind of building method of the curved wall based on BIM | |
CN104850709B (en) | Building decoration engineering construction three-dimensional simulation method | |
CN105781064A (en) | Floor tile laying construction method based on building information modeling (BIM) | |
CN104820730B (en) | A kind of method to be conflicted based on BIM solution regular reinforcements with prestress pipe | |
CN107299762A (en) | A kind of concrete pouring procedure based on BIM | |
US10274935B2 (en) | System, method, and computer program for creating geometry-compliant lattice structures | |
CN106777779B (en) | Railway culvert design method based on BIM | |
CN105551077B (en) | The construction method and device of panel beating three-dimensional process model | |
CN106469434A (en) | The method that two-dimentional reinforcement drawing is generated based on three-dimensional rebar model | |
CN110378039A (en) | A kind of aluminum alloy pattern plate design method and system based on Revit | |
CN111177824A (en) | Aluminum alloy formwork construction method based on BIM technology | |
CN108875167A (en) | A kind of construction site three dimensional arrangement optimization method based on BIM technology | |
CN103324806A (en) | Sketchup workshop auto-modeling method on the basis of language Ruby | |
CN114065357A (en) | Revit-based segment assembly bridge modeling method and system | |
CN107092739A (en) | Execution management method therefor during using model to prefabricated components on-site consolidation | |
CN103810310A (en) | Parameterization determination method for pitch foaming module equipment oriented to bituminous mixing plant | |
CN107451356A (en) | A kind of outer-wall building method based on BIM | |
CN108829954A (en) | A kind of reinforcing bar configuration method based on structural model profile features | |
CN109697303B (en) | Building brick paving scheme generation method for plane special-shaped area | |
CN104281727A (en) | Method for designing tire die on basis of Excel and CAD (computer aided design) platform | |
WO2023078353A1 (en) | Generative design method for prefabricated concrete component | |
CN107436984A (en) | A kind of wine cellar construction method based on BIM | |
US9152743B2 (en) | Computer process for determining best-fitting materials for constructing architectural surfaces | |
CN103902750A (en) | Design method for achieving parameterized three-dimensional modeling and two-dimensional diagram conversion of parts similar to main part | |
CN104299267A (en) | GRG three-dimensional digital modeling construction method and system thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171208 |
|
RJ01 | Rejection of invention patent application after publication |