CN107451356A - A kind of outer-wall building method based on BIM - Google Patents

A kind of outer-wall building method based on BIM Download PDF

Info

Publication number
CN107451356A
CN107451356A CN201710629959.5A CN201710629959A CN107451356A CN 107451356 A CN107451356 A CN 107451356A CN 201710629959 A CN201710629959 A CN 201710629959A CN 107451356 A CN107451356 A CN 107451356A
Authority
CN
China
Prior art keywords
perpend
bim
constructional column
building
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710629959.5A
Other languages
Chinese (zh)
Inventor
周江峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Zhi Jian New Architectural Design Consulting Co Ltd
Original Assignee
Chengdu Zhi Jian New Architectural Design Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Zhi Jian New Architectural Design Consulting Co Ltd filed Critical Chengdu Zhi Jian New Architectural Design Consulting Co Ltd
Priority to CN201710629959.5A priority Critical patent/CN107451356A/en
Publication of CN107451356A publication Critical patent/CN107451356A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

The invention discloses a kind of outer-wall building method based on BIM, comprise the following steps:(1), based on architectural drawing, threedimensional model is established;(2), using BIM dynamic analog, and the relevant parameter for the horse tooth trough built by laying bricks or stones on the perpend wall of site operation and the joint face of constructional column is obtained using BIM data analysis, and then determines the scheme of site operation;(3), according to the site operation scheme of determination, building by laying bricks or stones for the joint face between perpend wall, constructional column, perpend wall and constructional column is carried out.The present invention utilizes BIM, by the foundation to model and the dynamic analog of model building, the technical foundation of problem analysis and foreseeable problems is provided for actual production, reduces error generation rate and rework rate, accelerates project progress.

Description

A kind of outer-wall building method based on BIM
Technical field
The present invention relates to building field, and in particular to a kind of outer-wall building method based on BIM.
Background technology
BIM is the new tool of architecture, engineering science and civil engineering.BIM (Building Information Modeling, abbreviation BIM), it is defined as by being formed completely with insufficient information to support life cycle management, And can be by building or architectural engineering information model that computer applied algorithm is directly explained.In short, i.e. digital technology support Life cycle management to architectural environment.Existing building construction is aided in using BIM technology, is that the one of construction becomes greatly Gesture.
The content of the invention
It is an object of the invention to provide a kind of outer-wall building method based on BIM, this method initially sets up Exterior Wall Components Threedimensional model, recycle BIM dynamic analog carry out simulate exterior wall site operation process, obtained using BIM data analysis The relevant parameter for the horse tooth trough built by laying bricks or stones on the perpend wall of site operation and the joint face of constructional column is obtained, and then determines site operation Scheme, the scheme thereby determined that is due to the dynamic analog using actual parameter, therefore the production process of dynamic analog, very Close to true production, pinpoint the problems and solve the problems, such as true production, there is provided analysis solves basis.
The present invention is achieved through the following technical solutions:
A kind of outer-wall building method based on BIM, comprises the following steps:
(1), based on architectural drawing, the perpend wall established in exterior wall, constructional column, the joint face three of perpend wall and constructional column Threedimensional model;
(2), using BIM dynamic analog, with the three of the joint face three of perpend wall, constructional column, perpend wall and constructional column Perpend wall, constructional column and the perpend wall of the construction of dimension module dynamic analog build on-site and the dynamic mistake of the joint face of constructional column Journey, and utilize the phase for the horse tooth trough built by laying bricks or stones on the BIM perpend wall of data analysis acquisition site operation and the joint face of constructional column Related parameter, and then determine the scheme of site operation;
(3), according to the site operation scheme of determination, the connection between perpend wall, constructional column, perpend wall and constructional column is carried out Build by laying bricks or stones in face.
The relevant parameter of horse tooth trough is the length of the sidewall sections beyond perpend wall and the sidewall sections beyond perpend wall The number of brick.
When building by laying bricks or stones, the horizontal mortar joint of upper and lower brick layer is 3-5mm, vertical mortar joint 3-5mm.
Seam and put for dislocation when building by laying bricks or stones, between upper brick layer and lower brick layer.
The inventive concept of the present invention is, initially sets up the threedimensional model of Exterior Wall Components, recycles BIM dynamic analog to enter The site operation process of row simulation exterior wall, the perpend wall of site operation and the connection of constructional column are obtained using BIM data analysis The relevant parameter for the horse tooth trough built by laying bricks or stones on face, so determine site operation scheme, the scheme thereby determined that due to using The dynamic analog of actual parameter, therefore the production process of dynamic analog, very close true production, pinpoint the problems for true production Solve the problems, such as, there is provided analysis solves basis.
The present invention compared with prior art, has the following advantages and advantages:
The present invention utilizes BIM, by the foundation to model and the dynamic analog of model building, is provided point for actual production The technical foundation of analysis problem and foreseeable problems, reduces error generation rate and rework rate, accelerates project progress.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment, the present invention is made Further to describe in detail, exemplary embodiment of the invention and its explanation are only used for explaining the present invention, are not intended as to this The restriction of invention.
Embodiment 1
A kind of outer-wall building method based on BIM, comprises the following steps:
(1), based on architectural drawing, the perpend wall established in exterior wall, constructional column, the joint face three of perpend wall and constructional column Threedimensional model;
(2), using BIM dynamic analog, with the three of the joint face three of perpend wall, constructional column, perpend wall and constructional column Perpend wall, constructional column and the perpend wall of the construction of dimension module dynamic analog build on-site and the dynamic mistake of the joint face of constructional column Journey, and utilize the phase for the horse tooth trough built by laying bricks or stones on the BIM perpend wall of data analysis acquisition site operation and the joint face of constructional column Related parameter, and then determine the scheme of site operation;
(3), according to the site operation scheme of determination, the connection between perpend wall, constructional column, perpend wall and constructional column is carried out Build by laying bricks or stones in face.
Embodiment 2
Similar with embodiment 1, the relevant parameter of horse tooth trough is beyond the length of the sidewall sections of perpend wall and beyond one side The number of the brick of the sidewall sections of wall.
When building by laying bricks or stones, the horizontal mortar joint of upper and lower brick layer is 3-5mm, vertical mortar joint 3-5mm.
Seam and put for dislocation when building by laying bricks or stones, between upper brick layer and lower brick layer.
Above-described embodiment, the purpose of the present invention, technical scheme and beneficial effect are carried out further Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc., all should include Within protection scope of the present invention.

Claims (4)

  1. A kind of 1. outer-wall building method based on BIM, it is characterised in that comprise the following steps:
    (1), based on architectural drawing, the perpend wall established in exterior wall, constructional column, perpend wall and constructional column joint face three three Dimension module;
    (2), using BIM dynamic analog, with the three-dimensional mould of the joint face three of perpend wall, constructional column, perpend wall and constructional column Perpend wall, constructional column and the perpend wall of the construction of type dynamic analog build on-site and the dynamic process of the joint face of constructional column, and The perpend wall ginseng related to the horse tooth trough built by laying bricks or stones on the joint face of constructional column of site operation is obtained using BIM data analysis Number, and then determine the scheme of site operation;
    (3), according to the site operation scheme of determination, joint face between perpend wall, constructional column, perpend wall and constructional column is carried out Build by laying bricks or stones.
  2. A kind of 2. outer-wall building method based on BIM according to claim 1, it is characterised in that the related ginseng of horse tooth trough Number is the length beyond the sidewall sections of perpend wall and the number of the brick of the sidewall sections beyond perpend wall.
  3. A kind of 3. outer-wall building method based on BIM according to claim 1, it is characterised in that when building by laying bricks or stones, upper and lower brick layer Horizontal mortar joint be 3-5mm, vertical mortar joint 3-5mm.
  4. A kind of 4. outer-wall building method based on BIM according to claim 1, it is characterised in that when building by laying bricks or stones, upper brick layer with Seam and put for dislocation between lower brick layer.
CN201710629959.5A 2017-07-28 2017-07-28 A kind of outer-wall building method based on BIM Pending CN107451356A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710629959.5A CN107451356A (en) 2017-07-28 2017-07-28 A kind of outer-wall building method based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710629959.5A CN107451356A (en) 2017-07-28 2017-07-28 A kind of outer-wall building method based on BIM

Publications (1)

Publication Number Publication Date
CN107451356A true CN107451356A (en) 2017-12-08

Family

ID=60489397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710629959.5A Pending CN107451356A (en) 2017-07-28 2017-07-28 A kind of outer-wall building method based on BIM

Country Status (1)

Country Link
CN (1) CN107451356A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537769A (en) * 2018-11-28 2019-03-29 龙元建设集团股份有限公司 Space variable curvature abnormity wall city-wall brick masonry method
CN109680962A (en) * 2018-12-29 2019-04-26 重庆工程职业技术学院 Wall construction method based on BIM technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266767A (en) * 2013-05-27 2013-08-28 中国航天建设集团有限公司 Construction method for preventing and treating cracks between concrete structure and filler wall
CN104712076A (en) * 2015-02-06 2015-06-17 崔新明 Autoclaved sand aerated concrete block wall construction method based on BIM technique
CN105064545A (en) * 2015-07-23 2015-11-18 株洲博尔曼科技发展有限公司 Assembled integral type masonry wall assembling structure and construction method thereof
CN105930600A (en) * 2016-04-28 2016-09-07 广联达软件股份有限公司 Masonry configuration method and masonry configuration system
US20160357881A1 (en) * 2010-03-02 2016-12-08 Illinois Tool Works, Inc. Method, computer program product and apparatus for providing a building options configurator
CN106592974A (en) * 2016-10-14 2017-04-26 北京崇建工程有限公司 Building external wall window masonry construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160357881A1 (en) * 2010-03-02 2016-12-08 Illinois Tool Works, Inc. Method, computer program product and apparatus for providing a building options configurator
CN103266767A (en) * 2013-05-27 2013-08-28 中国航天建设集团有限公司 Construction method for preventing and treating cracks between concrete structure and filler wall
CN104712076A (en) * 2015-02-06 2015-06-17 崔新明 Autoclaved sand aerated concrete block wall construction method based on BIM technique
CN105064545A (en) * 2015-07-23 2015-11-18 株洲博尔曼科技发展有限公司 Assembled integral type masonry wall assembling structure and construction method thereof
CN105930600A (en) * 2016-04-28 2016-09-07 广联达软件股份有限公司 Masonry configuration method and masonry configuration system
CN106592974A (en) * 2016-10-14 2017-04-26 北京崇建工程有限公司 Building external wall window masonry construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卓维松: "《建筑施工技术》", 30 June 2013 *
赵永任: "《工程项目管理》", 31 August 2016 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537769A (en) * 2018-11-28 2019-03-29 龙元建设集团股份有限公司 Space variable curvature abnormity wall city-wall brick masonry method
CN109680962A (en) * 2018-12-29 2019-04-26 重庆工程职业技术学院 Wall construction method based on BIM technology

Similar Documents

Publication Publication Date Title
CN105781064A (en) Floor tile laying construction method based on building information modeling (BIM)
CN104850709B (en) Building decoration engineering construction three-dimensional simulation method
CN103790378B (en) building engineering construction equipment and construction method
WO2021128675A1 (en) Bim technology-based method for constructing underground continuous wall
CN105586995A (en) BIM-based deformation monitoring method for deep foundation pit
CN107451356A (en) A kind of outer-wall building method based on BIM
CN105956257A (en) BIM-based aluminum alloy template deep design method
CN105447278A (en) Method for producing typified form under assistance of BIM (building information modeling) model
CN107220462A (en) The production method and system of a kind of parametrization reinforcing bar applied to prefabricated components
CN103914589A (en) Power tower single-line model fast generating method
CN112231789A (en) BIM (building information modeling) model of blast furnace system and construction method thereof
CN107862105A (en) The method confided a technological secret based on BIM to component working procedure
CN107292060A (en) Basement roadway applications method based on BIM technology
CN103324806A (en) Sketchup workshop auto-modeling method on the basis of language Ruby
CN108416162A (en) A kind of construction method of the spiral formula reinforced concrete structure based on BIM
CN105678006A (en) Method for drawing foundation pit excavation drawing
CN107292058A (en) A kind of brickwork method based on BIM technology
CN107451358A (en) A kind of building method of the curved wall based on BIM
CN112943364A (en) Dynamo and Revit based long tunnel parametric modeling method
CN207281759U (en) A kind of masonry project application system based on BIM
CN108629057A (en) A method of generating BIM models
CN107451357A (en) A kind of balcony construction method of ground based on BIM
CN108647468A (en) A kind of row's of building by laying bricks or stones brick method based on BIM technology
CN111460560A (en) Foundation pit excavation construction method based on BIM
CN108109203B (en) Geological boundary point cloud data extraction method and system based on BIM environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208

RJ01 Rejection of invention patent application after publication