CN101520951A - Training system for ultra-high voltage transmission system overvoltage and insulation coordination technology - Google Patents
Training system for ultra-high voltage transmission system overvoltage and insulation coordination technology Download PDFInfo
- Publication number
- CN101520951A CN101520951A CN200910061408A CN200910061408A CN101520951A CN 101520951 A CN101520951 A CN 101520951A CN 200910061408 A CN200910061408 A CN 200910061408A CN 200910061408 A CN200910061408 A CN 200910061408A CN 101520951 A CN101520951 A CN 101520951A
- Authority
- CN
- China
- Prior art keywords
- training
- high voltage
- master server
- ultra
- voltage transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Electrically Operated Instructional Devices (AREA)
Abstract
The invention relates to a training system for ultra-high voltage transmission system overvoltage and insulation coordination technology. The training system comprises a master server, a training knowledge base connected with the master server, a three-dimensional model database, a mathematical model, an insert, user data and a plurality of client-sides connected with the master server through a local area network, wherein the master server comprises a knowledge simulation system and an operating simulation system and can extend and edit the training content, manage the relevant information of the users and perform on-line training to the users through the training knowledge base, the three-dimensional model database, the mathematical model and the insert, and the client-sides are user operating sides. The training system not only enables the users to visit the system at any moment for knowledge training, but also demonstrates various dangerous simulation operations and the simulation results caused by the incorrect operations so that the users can get more vivid, complete and comprehensive training, i.e., the users can get the optimum training effect under the lower cost.
Description
Technical field
The present invention relates to a kind of training system, especially system for ultra-high voltage transmission superpotential and Insulation Coordination technical training system.
Background technology
Extra-high voltage grid is the highest transmission system of working voltage in the world today, and transmission line of electricity has been had in the Soviet Union and Japan at present.State Network Electric Power Research Institute has carried out years of researches to the gordian technique of UHV transmission engineering, fully assimilating and reference extra-high voltage scientific payoffs both domestic and external and external extra-high voltage operating experience, and sum up on the basis of China 500kV and 750kV operating experience, carried out the 1000kV system superpotential of suitable China's actual conditions and the research of Insulation Coordination.
Because there are the many characteristics that are different from 500kV and 750kV 1000kV AC extra high voltage power network overvoltage and Insulation Coordination aspect, especially the content of system for ultra-high voltage transmission superpotential and Insulation Coordination has been forgiven many principle knowledge, concept nature is stronger, and operating personnel often need very perfect training.And this operating personnel's training can not both be carried out at any time, has significant limitation, some operation can not repeat in actual moving process, have the operation (generation of thunder and lightning, the generation of various accidents etc.) of unpredictability as some, it is led to a phenomenon and the result can not show the user at any time; And actual training has considerable restraint to user's operation, in case some operating mistake, just can cause paralysis to system, even infringement system and cause serious economy loss, even produce serious societal consequence, therefore the user can only accept the training of part, can not be at any time and complete acceptance training.
Under the special environment of this system for ultra-high voltage transmission, be necessary to invent a kind of training system, especially the training system of superpotential and Insulation Coordination technology is to overcome the problems referred to above.
Summary of the invention
The objective of the invention is to design a kind of system for ultra-high voltage transmission superpotential and Insulation Coordination technical training system, make the user not only can visit this system at any time and carry out knowledge training, can also demonstrate out various dangerous simulation operations by system, information with faulty operation, and the simulation result demonstration that brings of some faulty operations, allow the user obtain vivider, more complete, system and more deep training more comprehensively.
Technical scheme of the present invention is: a kind of system for ultra-high voltage transmission superpotential and Insulation Coordination technical training system, comprise a master server, the training knowledge base that links to each other with master server, the three-dimensional modeling data storehouse, mathematical model and plug-in unit, subscriber data, and a plurality of clients that link to each other with this master server by LAN (Local Area Network), described master server comprises knowledge analogue system and operation simulation system, and this master server can be expanded, editor's training contents, the relevant information of leading subscriber, and by the training knowledge base, the three-dimensional modeling data storehouse, mathematical model and plug-in unit carry out online training to the user, and described client is the user operating side.
Described knowledge analogue system comprises the basic theory of superpotential and Insulation Coordination, by combining with example and material object and with the multimedia form of expression user being giveed training.
Described operation simulation system carries out the three-dimensional animation modeling to the system for ultra-high voltage transmission that has built up, and carry out mathematical modeling according to parameters such as the physical size of each member in the system for ultra-high voltage transmission, models, between mathematical model and three-dimensional animation model link is arranged, promptly in the three-dimensional model operates in and also has corresponding operation in the mathematical model.
Description of drawings
Fig. 1 is the structural representation of the embodiment of the invention;
Fig. 2 is the block diagram of embodiment of the invention knowledge analogue system;
Fig. 3 is the block diagram of embodiment of the invention operation simulation system.
Embodiment
Below in conjunction with drawings and Examples the present invention is done further introduction.
Fig. 1 description of symbols: master server 1, training knowledge base 2, three-dimensional modeling data storehouse 3, mathematical model and plug-in unit 4, subscriber data 5, client 6.
Please refer to Fig. 1, system for ultra-high voltage transmission superpotential of the present invention and Insulation Coordination technical training system, comprise a master server 1, the training knowledge base 2 that links to each other with master server, three-dimensional modeling data storehouse 3, mathematical model and plug-in unit 4, subscriber data 5, and a plurality of client 6 that links to each other with this master server by LAN (Local Area Network).Described master server 1 comprises knowledge analogue system and operation simulation system, in order to realize the training of system for ultra-high voltage transmission superpotential and Insulation Coordination technology, and training contents can be expanded, be edited to this master server 1, the relevant information of leading subscriber, and the user is carried out the online training of knowledge emulation and operation simulation by training knowledge base, three-dimensional modeling data storehouse, mathematical model and plug-in unit.
Please refer to Fig. 2, described knowledge analogue system comprises extra-high voltage system internal overvoltage, extra high voltage line and transformer station's lightning surge, Insulation Coordination three part knowledge, these knowledge store are in training knowledge base 2, the basic theory that comprises superpotential and Insulation Coordination, the principle that all kinds superpotential forms, thought and method that superpotential is calculated suppress superpotential correlation technique, measure, principle and actual effect, the Insulation Coordination technical parameter of each apparatus of system, parts etc.The user can be in the plan emulation case or animation information of operation interface, by combining with example and material object and with the multimedia form of expression (merging video, animation, virtual reality technology etc.), carrying out system and go deep into and vivid emulation training.And in operation interface, can watch catalogue earlier; Can select automatic playing function; Can insert label, so that search later on; Find out certain partial content if desired, can carry out full-text search; In addition, unclear to some systemic-function, can click " about " ask for help.
Please refer to Fig. 3, described operation simulation system is divided into software operation simulation system and hardware operation platform, and the software operation platform connects training knowledge base 2, three-dimensional modeling data storehouse 3, mathematical model and plug-in unit 4, subscriber data 5.This operating platform is that a system for ultra-high voltage transmission that has built up is carried out the three-dimensional animation modeling, makes up scene, and carry out mathematical modeling according to parameters such as the physical size of each member in the system for ultra-high voltage transmission, models, and be stored in the superpotential analog computation software that is provided with in the training knowledge base 2, between mathematical model and three-dimensional animation model link is arranged, promptly in the three-dimensional animation operates in and also has corresponding operation in the mathematical model.This hardware operation platform has a lot of operator's console, the corresponding corresponding client of each operator's console, the user is by this operator's console, can carry out various types of operations step and various simulated operation training test to the interface of three-dimensional animation in operative end face, parameters such as superpotential waveform, peak value under this operation can appear behind every suit simulated operation, and remind or the operation error correction with corresponding braking measure, and the inquiry of relevant basic theoretical knowledge is so that more deeply understand this operation superpotential principle of generation and reason.
In sum, system for ultra-high voltage transmission superpotential of the present invention and Insulation Coordination technical training system, the user can carry out all kinds of training on operations in operative end face to the interface of three-dimensional animation at any time, with various simulated operation tests, corresponding parameter under this operation can appear behind every suit simulated operation, and with corresponding braking measure prompting or operation error correction, and the inquiry of relevant basic theoretical knowledge, so that more deeply understand this operation and produce superpotential principle and reason, avoided the loss in the practical operation, solved the user and can only accept the training of part, problem that can not complete acceptance training.
Claims (3)
1, a kind of system for ultra-high voltage transmission superpotential and Insulation Coordination technical training system, the training knowledge base that comprise a master server, links to each other, three-dimensional modeling data storehouse, mathematical model and plug-in unit, subscriber data with master server, and a plurality of by LAN (Local Area Network) and the client that this master server links to each other, it is characterized in that:
Described master server comprises knowledge analogue system and operation simulation system, and training contents can be expanded, be edited to this master server, the relevant information of leading subscriber, and the user is carried out online training by training knowledge base, three-dimensional modeling data storehouse, mathematical model and plug-in unit, described client is the user operating side.
2, system for ultra-high voltage transmission superpotential as claimed in claim 1 and Insulation Coordination technical training system, it is characterized in that: described knowledge analogue system comprises the basic theory of superpotential and Insulation Coordination, by combining with example and material object and with the multimedia form of expression user being giveed training.
3, system for ultra-high voltage transmission superpotential as claimed in claim 1 and Insulation Coordination technical training system, it is characterized in that: described operation simulation system carries out the three-dimensional animation modeling to the system for ultra-high voltage transmission that has built up, and carry out mathematical modeling according to parameters such as the physical size of each member in the system for ultra-high voltage transmission, models, between mathematical model and three-dimensional animation model link is arranged, promptly in the three-dimensional model operates in and also has corresponding operation in the mathematical model.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910061408A CN101520951A (en) | 2009-04-03 | 2009-04-03 | Training system for ultra-high voltage transmission system overvoltage and insulation coordination technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910061408A CN101520951A (en) | 2009-04-03 | 2009-04-03 | Training system for ultra-high voltage transmission system overvoltage and insulation coordination technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101520951A true CN101520951A (en) | 2009-09-02 |
Family
ID=41081520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910061408A Pending CN101520951A (en) | 2009-04-03 | 2009-04-03 | Training system for ultra-high voltage transmission system overvoltage and insulation coordination technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101520951A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101866564A (en) * | 2010-05-28 | 2010-10-20 | 国网电力科学研究院武汉南瑞有限责任公司 | Live working table type simulation training system and method |
CN101984584A (en) * | 2010-12-09 | 2011-03-09 | 中国南方电网有限责任公司 | Network management training system of optical transmission system |
CN102110385A (en) * | 2010-12-07 | 2011-06-29 | 上海申瑞电力科技股份有限公司 | Knowledge library based grid simulation training method |
RU2450334C1 (en) * | 2010-11-09 | 2012-05-10 | Общество с ограниченной ответственностью "ИнтерГрафика" | Method and system for automated collective object simulation |
CN102819971A (en) * | 2012-07-20 | 2012-12-12 | 广州供电局有限公司 | Test experiment training simulation method of power equipment based on internet |
CN103218753A (en) * | 2013-04-11 | 2013-07-24 | 国家电网公司 | Modeling method and information interaction method of ultra-high voltage grid information model |
CN104090816A (en) * | 2014-07-23 | 2014-10-08 | 国家电网公司 | System and method for extra-high-voltage steel tube tower simulating training |
CN107767441A (en) * | 2017-09-20 | 2018-03-06 | 国家电网公司 | Three-dimensional display management method and system |
CN108520663A (en) * | 2018-02-27 | 2018-09-11 | 吉林省行氏动漫科技有限公司 | A kind of automotive lacquer simulation training device |
-
2009
- 2009-04-03 CN CN200910061408A patent/CN101520951A/en active Pending
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101866564A (en) * | 2010-05-28 | 2010-10-20 | 国网电力科学研究院武汉南瑞有限责任公司 | Live working table type simulation training system and method |
CN101866564B (en) * | 2010-05-28 | 2011-12-28 | 国网电力科学研究院武汉南瑞有限责任公司 | Live working table type simulation training system and method |
RU2450334C1 (en) * | 2010-11-09 | 2012-05-10 | Общество с ограниченной ответственностью "ИнтерГрафика" | Method and system for automated collective object simulation |
CN102110385A (en) * | 2010-12-07 | 2011-06-29 | 上海申瑞电力科技股份有限公司 | Knowledge library based grid simulation training method |
CN101984584A (en) * | 2010-12-09 | 2011-03-09 | 中国南方电网有限责任公司 | Network management training system of optical transmission system |
CN102819971A (en) * | 2012-07-20 | 2012-12-12 | 广州供电局有限公司 | Test experiment training simulation method of power equipment based on internet |
CN103218753A (en) * | 2013-04-11 | 2013-07-24 | 国家电网公司 | Modeling method and information interaction method of ultra-high voltage grid information model |
CN103218753B (en) * | 2013-04-11 | 2016-05-18 | 国家电网公司 | A kind of modeling method of extra-high voltage grid information model and information interacting method |
CN104090816A (en) * | 2014-07-23 | 2014-10-08 | 国家电网公司 | System and method for extra-high-voltage steel tube tower simulating training |
CN104090816B (en) * | 2014-07-23 | 2017-08-29 | 国家电网公司 | A kind of extra-high voltage steel tube tower simulation training system and method |
CN107767441A (en) * | 2017-09-20 | 2018-03-06 | 国家电网公司 | Three-dimensional display management method and system |
CN108520663A (en) * | 2018-02-27 | 2018-09-11 | 吉林省行氏动漫科技有限公司 | A kind of automotive lacquer simulation training device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101520951A (en) | Training system for ultra-high voltage transmission system overvoltage and insulation coordination technology | |
CN104598671B (en) | A kind of digital electric network construction method based on online data | |
CN102819861A (en) | Power system three-dimensional device scene modeling method | |
CN103050048B (en) | Generation method and system of training lesson plan of dispatcher training simulation system | |
CN106920432A (en) | The simulation training system and emulation training method of substation equipment maintenance | |
CN105576660B (en) | Local distribution network in-circuit emulation analytical equipment and system | |
CN104299464B (en) | Electric power safety technical ability simulation training system | |
CN201812399U (en) | Table type simulation training system for live-wire work | |
CN102831792B (en) | Distribution Network Failure analogue system and emulation mode thereof | |
CN202221628U (en) | Simulation system for power grid of hybrid transformer substation | |
CN104463465B (en) | A kind of real time monitoring clustering methods based on distributed model | |
CN105006191A (en) | Method and system for training simulation based on PMU device and WAMS main station | |
CN104331570A (en) | System and method for simulating power transformation equipment for inspection | |
CN103984795A (en) | IEC (international electro-technical commission) 61850-based on-line partial discharge monitoring equipment communication simulation method | |
CN102567572A (en) | Sand-table exercising system for power grid simulation | |
CN104834788B (en) | A kind of 500kV shaft towers divide the real-time construction method of grounded-line threedimensional model more more times | |
CN108875103A (en) | A kind of powernet analogue system and method | |
Chang et al. | A training simulation system for substation equipments maintenance | |
CN114676569A (en) | Power grid simulation analysis example, and generation method, generation system, equipment and medium thereof | |
CN104167017A (en) | Method and system for realizing data compression of transformer substation three-dimensional model | |
CN102479359A (en) | Power grid overhauling plan compilation method based on graphic operations | |
CN104091480A (en) | Transmission line condition-based maintenance simulation training method | |
JP2010183703A (en) | Large region power system simulator and simulation method | |
CN116206499A (en) | Power equipment scene simulation method and device for power grid maintenance training | |
CN202650332U (en) | Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20090902 |