CN107067172A - The method that rapid translating building decoration material can be realized - Google Patents
The method that rapid translating building decoration material can be realized Download PDFInfo
- Publication number
- CN107067172A CN107067172A CN201710235733.7A CN201710235733A CN107067172A CN 107067172 A CN107067172 A CN 107067172A CN 201710235733 A CN201710235733 A CN 201710235733A CN 107067172 A CN107067172 A CN 107067172A
- Authority
- CN
- China
- Prior art keywords
- construction
- model
- cost
- building decoration
- decoration material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000463 material Substances 0.000 title claims abstract description 112
- 238000005034 decoration Methods 0.000 title claims abstract description 39
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000010276 construction Methods 0.000 claims abstract description 52
- 230000008859 change Effects 0.000 claims description 11
- 238000006243 chemical reaction Methods 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 abstract description 7
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses the method that can realize rapid translating building decoration material, comprise the following steps:The building decoration material quality data information of different structure is obtained according to construction drawing;Model is set up using BIM modeling softwares, and by above- mentioned information input model;Each different structure is numbered in a model, and will each number imparting its corresponding material;The data message of material specification, total consumption and the cost of each different structure can be obtained from the model.The present invention can realize the method for rapid translating building decoration material, BUILDINGS MODELS is set up by BIM technology, it can intuitively, rapidly obtain progress, constructed residual amount of each structure in construction, it is easy to the overall arrangement of unit in charge of construction to specify arrangement and method for construction, accelerate efficiency of construction, can constantly it be modified according to actual conditions in work progress simultaneously, the accuracy definitely constructed.
Description
Technical field
The present invention relates to a kind of building field technology, and in particular to can realize the side of rapid translating building decoration material
Method.
Background technology
Building and ornament materials, also known as building facing material, refer to lay or are painted on building surface and play decoration and beautify
The material of environmental activity.Building and ornament materials are to integrate material, technique, shape-designing, the material of aesthetics, and it is building dress
Adorn the important substance basis of engineering.The whole structure of building decoration and the realization of building decoration function, are built in degree
The restriction of ornament materials, is particularly subject to the influence of the decorating features such as gloss, quality, texture, pattern, the decorative pattern of ornament materials.Cause
This, but it is familiar with performance, the feature of various ornament materials, according to building and use environment condition, reasonable selection ornament materials,
Could material to the greatest extent its can, make the best use of everything, preferably design of expression is intended to, and embodies building decoration with other indoor auxiliary products
Property.
In building construction process, decoration that typically all can be in the good building of designed in advance required for each structure member
Material.And in work progress, often find to be changed from less reasonable need in some local charge materials, or
In the case that person considers other factors such as economic dispatch, certain structures are also required to alternate material, but in this case, construction
Fang Wufa quickly obtains the factor for changing workload required after ornament materials, price, cost etc. each side, so as to influence
Construction speed.
The content of the invention
The technical problems to be solved by the invention are in work progress, often to find in some local charge materials
Changed from less reasonable need, or in view of other factors such as economic dispatch in the case of, certain structures are also required to replace
Conversion materials, but in this case, construction party can not quickly obtain change workload needed for after ornament materials, price,
The factor of cost etc. each side, so as to influence construction speed, it is therefore intended that offer can realize rapid translating building decoration material
The method of matter, BUILDINGS MODELS is set up by BIM technology, can intuitively, rapidly obtain progress of each structure in construction,
Constructed residual amount, is easy to the unit in charge of construction when needing to change decoration material being capable of overall arrangement formulation arrangement and method for construction, quickening construction
Efficiency, while can be constantly modified according to actual conditions in work progress, the accuracy definitely constructed.
The present invention is achieved through the following technical solutions:
The method that rapid translating building decoration material can be realized, comprises the following steps:Obtained according to construction drawing
The building decoration material quality data information of different structure;Model is set up using BIM modeling softwares, and by above- mentioned information input model
In;Each different structure is numbered in a model, and will each number imparting its corresponding material;Can from the model
Obtain the data message of material specification, total consumption and the cost of each different structure;According to construction speed, in real time by building decoration
Progress is with material usage input model, obtaining the data of the specification for not completing construction part material requested, total consumption and cost
Information;The structure number of conversion building decoration material will be needed by obtaining, the material after input is changed in a model;From described mould
The data message of material specification, total consumption and cost in type after acquisition replacing material needed for the structure.
The present invention can realize the method for rapid translating building decoration material, and BUILDINGS MODELS is set up by BIM technology, can
Intuitively, progress, constructed residual amount of each structure in construction are rapidly obtained, is easy to apply when needing and changing decoration material
Arrangement and method for construction is formulated in the enough overall arrangements of work order potential energy, accelerates efficiency of construction, while can be according to actual conditions in work progress
Constantly it is modified, the accuracy definitely constructed.When needing to change the decoration material of some structure, by changing in a model
Become the material of the structure, you can be rapidly obtained about the structure ornament materials construction all situations and according to change material
The information needed for new construction is quickly provided after material, so as to quickly make new arrangement and method for construction, quickening construct into
Degree.
According to the condition of construction of decorative scene material, the specification of material therefor, size, consumption in practice of construction are obtained, it is defeated
Enter and be modified in the model, obtain the data message of the specification of material requested, total consumption and cost after amendment.
The replacing building decoration material, comprises the following steps:Suitable replacing material quality data information is obtained by model;
Obtain and change the structure construction progress before material, draw the structure after quantities, cost and replacing material that the structure is done over again
The data message of required material specification, total consumption and cost.The material that will have been constructed in the past is needed in some structures all
Changed, being easy to quickly make needs the workload done over again, cost with changing the letter such as workload, cost after material
Breath, is easy to specifying for arrangement and method for construction.
The cost includes workman's cost and material cost.
The present invention compared with prior art, has the following advantages and advantages:
1st, the method that the present invention can realize rapid translating building decoration material, the present invention can realize that rapid translating is built
The method for decorating material, sets up BUILDINGS MODELS by BIM technology, can intuitively, rapidly obtain each structure in construction
Progress, constructed residual amount, be easy to need change decoration material when unit in charge of construction can overall arrangement formulate arrangement and method for construction, plus
Fast efficiency of construction, while can be constantly modified according to actual conditions in work progress, the accuracy definitely constructed;
2nd, the method that the present invention can realize rapid translating building decoration material, the condition of construction of decorative scene material is obtained
The specification of material therefor, size, consumption in practice of construction are taken, inputs and is modified in the model, material needed for after amendment is obtained
The data message of the specification of material, total consumption and cost.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment, to present invention work
Further to describe in detail, exemplary embodiment and its explanation of the invention is only used for explaining the present invention, is not intended as to this
The restriction of invention.
Embodiment
The present invention can realize the method for rapid translating building decoration material, comprise the following steps:According to architectural working drawing
Paper obtains the building decoration material quality data information of different structure;Model is set up using BIM modeling softwares, and above- mentioned information is inputted
In model;Each different structure is numbered in a model, and will each number imparting its corresponding material;From the model
In can obtain each different structure material specification, total consumption and cost data message;, in real time will building according to construction speed
Decoration progress is with material usage input model, obtaining the specification for not completing construction part material requested, total consumption and cost
Data message;The structure number of conversion building decoration material will be needed by obtaining, the material after input is changed in a model;From described
Model in obtain the data message for changing material specification after material needed for the structure, total consumption and cost.
The present invention can realize the method for rapid translating building decoration material, and BUILDINGS MODELS is set up by BIM technology, can
Intuitively, progress, constructed residual amount of each structure in construction are rapidly obtained, is easy to the overall arrangement of unit in charge of construction to specify
Arrangement and method for construction, accelerates efficiency of construction, while can be constantly modified according to actual conditions in work progress, definitely constructs
Accuracy.When needing to change the decoration material of some structure, by the material for changing the structure in a model, you can quick
Get about the structure ornament materials construction all situations and according to quickly providing new construction after more conversion materials
Required information, so as to quickly make new arrangement and method for construction, accelerating construction progress.
It is preferred that, according to the condition of construction of decorative scene material, obtain the specification of material therefor in practice of construction, size,
Consumption, inputs and is modified in the model, obtains the data message of the specification of material requested, total consumption and cost after amendment.
It is preferred that, the replacing building decoration material comprises the following steps:Suitable replacing material number is obtained by model
It is believed that breath;Obtain and change the structure construction progress before material, draw after quantities, cost and replacing material that the structure is done over again
The data message of material specification, total consumption and cost needed for the structure.Need to have constructed in the past in some structures
Material will be changed, be easy to quickly make need do over again workload, cost with change material after workload, into
The information such as this, is easy to specifying for arrangement and method for construction.
It is preferred that, the cost includes workman's cost and material cost.
Above-described embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect
Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention
Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc. all should be included
Within protection scope of the present invention.
Claims (4)
1. the method for rapid translating building decoration material can be realized, it is characterised in that comprise the following steps:According to construction
Drawing obtains the building decoration material quality data information of different structure;Model is set up using BIM modeling softwares, and above- mentioned information is defeated
Enter in model;Each different structure is numbered in a model, and will each number imparting its corresponding material;From the mould
The data message of material specification, total consumption and the cost of each different structure can be obtained in type;According to construction speed, it will build in real time
Decoration progress is built with material usage input model, obtaining specification, total consumption and the cost for not completing construction part material requested
Data message;The structure number of conversion building decoration material will be needed by obtaining, the material after input is changed in a model;From institute
The data message of material specification, total consumption and cost in the model stated after acquisition replacing material needed for the structure.
2. the method according to claim 1 that rapid translating building decoration material can be realized, it is characterised in that according to existing
The condition of construction of field ornament materials, obtains the specification of material therefor, size, consumption in practice of construction, inputs and enter in the model
Row amendment, obtains the data message of the specification of material requested, total consumption and cost after amendment.
3. the method according to claim 1 that rapid translating building decoration material can be realized, it is characterised in that it is described more
Building decoration material is changed, is comprised the following steps:Suitable replacing material quality data information is obtained by model;Obtain and change before material
The structure construction progress, draw quantities, cost that the structure does over again and change material specification after material needed for the structure,
The data message of total consumption and cost.
4. the method according to claim 1 that rapid translating building decoration material can be realized, it is characterised in that it is described into
This includes workman's cost and material cost.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710235733.7A CN107067172A (en) | 2017-04-12 | 2017-04-12 | The method that rapid translating building decoration material can be realized |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710235733.7A CN107067172A (en) | 2017-04-12 | 2017-04-12 | The method that rapid translating building decoration material can be realized |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107067172A true CN107067172A (en) | 2017-08-18 |
Family
ID=59602678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710235733.7A Pending CN107067172A (en) | 2017-04-12 | 2017-04-12 | The method that rapid translating building decoration material can be realized |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107067172A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110728422A (en) * | 2019-09-03 | 2020-01-24 | 广州轨道交通建设监理有限公司 | Building information model, method, device and settlement system for construction project |
-
2017
- 2017-04-12 CN CN201710235733.7A patent/CN107067172A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110728422A (en) * | 2019-09-03 | 2020-01-24 | 广州轨道交通建设监理有限公司 | Building information model, method, device and settlement system for construction project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103407319B (en) | A kind of manufacture method of stereo art painting | |
CN108763754A (en) | A kind of interior decoration design method based on BIM | |
CN109740245A (en) | A kind of application method in the prefabricated middle BIM technology of bar desk Combinatorial resolution | |
CN102085773A (en) | Silk polished lacquer painting and preparation method thereof | |
CN107067172A (en) | The method that rapid translating building decoration material can be realized | |
CN106114037A (en) | A kind of building block engraving process | |
CN102267803A (en) | Processing method of stereo and colorized cryolite glass | |
Qu et al. | Artificial intelligence empowered visual communication graphic design | |
CN106349875A (en) | White board powder coating and preparing method thereof | |
CN110179191A (en) | A kind of cement artificial tree and terrain effect manufacture craft | |
CN107856467A (en) | A kind of woodcarving method | |
CN103963508B (en) | Finishing Technology for American Style Furniture antique-imitation method | |
CN206186655U (en) | Building outer wall decorative board and preparation facilities are drawn to rock colored drawing | |
Li | Study on the application of “3D printing” in interior decoration | |
CN204732057U (en) | A kind of farm equipment simulation training system | |
CN205970584U (en) | Piece three -dimensional sculpture drawing together | |
CN108978991A (en) | Construction material, building materials production method, building decoration method | |
CN203795763U (en) | Cream-travertine-imitating decorating coating heat preservation composite plate | |
CN201756028U (en) | Fish-skin embossed embroidery art ware | |
CN1626363A (en) | Method for preparing stickup paint from stone powder and sandstone through graphic arts process | |
Xyntarianos-Tsiropinas et al. | DDArtS: Towards designing digitally enhanced street art tools | |
KR20120053851A (en) | Stank model using adhesive sheet and method for producing green of stank model | |
Cheng et al. | The Artistic Features of Iron Painting and Its Development Status | |
CN205853712U (en) | The extension picture structure that 3D prints | |
CN203795756U (en) | Sandstone-imitating inner-outer wall decorating plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170818 |
|
RJ01 | Rejection of invention patent application after publication |