CN108428110A - A kind of acquisition methods of construction-engineering project management information - Google Patents
A kind of acquisition methods of construction-engineering project management information Download PDFInfo
- Publication number
- CN108428110A CN108428110A CN201810149294.2A CN201810149294A CN108428110A CN 108428110 A CN108428110 A CN 108428110A CN 201810149294 A CN201810149294 A CN 201810149294A CN 108428110 A CN108428110 A CN 108428110A
- Authority
- CN
- China
- Prior art keywords
- management information
- information
- server
- client
- permission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 68
- 238000007726 management method Methods 0.000 claims description 213
- 230000009471 action Effects 0.000 claims description 26
- 238000003860 storage Methods 0.000 claims description 20
- 238000004590 computer program Methods 0.000 claims description 15
- 239000000463 material Substances 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 238000004364 calculation method Methods 0.000 claims description 2
- 238000009472 formulation Methods 0.000 claims 1
- 239000000203 mixture Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 26
- 230000008569 process Effects 0.000 description 13
- 238000012545 processing Methods 0.000 description 12
- 238000010586 diagram Methods 0.000 description 9
- 238000005516 engineering process Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 7
- 230000008859 change Effects 0.000 description 5
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 238000007619 statistical method Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
Abstract
An embodiment of the present invention provides the acquisition methods of construction-engineering project management information and device, method therein includes:The request for obtaining Project Management Information is sent to server, the request is identified including at least client identification and information category, so that the server can determine the permission of the client based on the client identification;Receive the first management information that the server is returned according to the permission and described information classification logotype of the client;Wherein, Project Management Information is pre-stored in the server, and first management information is the information to match with described information classification logotype.The present invention realizes the technique effect for improving the efficiency that Project Management Information obtains.
Description
Technical field
The present invention relates to construction engineering technical field more particularly to a kind of acquisition sides of construction-engineering project management information
Method.
Background technology
With flourishing for Large Scale Construction Engineering, engineering construction gradually shows the diversification of investment subjects, technical matters
The features such as complication.And for a large-scale construction engineering project, quality safety is to ensure that engineering is smoothed out, safety makes
Important foundation, thus construction-engineering project management is particularly important.
In traditional construction project management process, the relevant information of project management is typically recorded in papery data.
The implementation of management process needs various paper documents manually to carry out transmission exchange, and management process data needs artificial collect to file
And it is for statistical analysis, however, Project Management Information is obtained by manual read's papery data, since Project Management Information relates to
And each process to construction project, type is various, contains much information, and only relies on the mode for statistical analysis that artificially collects, effect
Rate is low, influences being smoothed out for architectural engineering.
As it can be seen that there are the low technical problems of efficiency for the existing mode for obtaining Project Management Information.
Invention content
An embodiment of the present invention provides a kind of acquisition methods of construction-engineering project management information, for solving existing obtain
Taking the mode of Project Management Information, there are the low technical problems of efficiency.
In a first aspect, the present invention provides a kind of acquisition methods of construction-engineering project management information, including:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and letter
Classification logotype is ceased, so that the server can determine the permission of the client based on the client identification;
The server is received according to the first management that the permission and described information classification logotype of the client return to be believed
Breath;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
Optionally, the server is received according to the return of the permission and described information classification logotype of the client described
The first management information after, the method further includes:
Judge whether first management information meets preset condition;
If it is not, then formulating the corrective action to first management information;
And the corrective action is sent to the server, so that the server can be based on the corrective action to institute
The first management information is stated to be corrected.
Optionally, described to formulate to the corrective action of first management information just, including:
Determine the influence index to first management information;
The corrective action of first management information is formulated according to the influence index.
Optionally, described to receive what the server was returned according to the permission and described information classification logotype of the client
First management information, including:
The information category that the client can obtain is determined according to the permission of the client;
When described information classification and described information classification logotype match, then return opposite with described information classification logotype
First management information answered.
Optionally, the Project Management Information includes quality information, security information, production information, technical information and goods and materials
Information.
Based on same inventive concept, second aspect of the present invention provides a kind of acquisition of construction-engineering project management information
Method, including:
The request being used for for obtaining Project Management Information that client is sent is received, the request includes at least client
Mark and information category mark,
The permission of the client is determined based on the client identification;
The first management information is obtained according to the permission of the client and described information classification logotype;
First management information is sent to the client;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
Based on same inventive concept, third aspect present invention provides a kind of acquisition of construction-engineering project management information
Device, including:
Sending module, for sending the request for obtaining Project Management Information to server, the request includes at least
Client identification and information category mark, so that the server can determine the power of the client based on the client identification
Limit;
Receiving module is returned for receiving the server according to the permission and described information classification logotype of the client
The first management information;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
Optionally, described device further includes judgment module, is used for:
Judge whether first management information meets preset condition;
If it is not, then formulating the corrective action to first management information;
And the corrective action is sent to the server, so that the server can be based on the corrective action to institute
The first management information is stated to be corrected.
Based on same inventive concept, fourth aspect present invention provides a kind of computer readable storage medium, deposits thereon
Computer program is contained, which realizes following steps when being executed by processor:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and letter
Classification logotype is ceased, so that the server can determine the permission of the client based on the client identification;
The server is received according to the first management that the permission and described information classification logotype of the client return to be believed
Breath;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
Based on same inventive concept, fifth aspect present invention provides a kind of computer equipment, including memory, processing
On a memory and the computer program that can run on a processor, when processor execution described program, is realized for device and storage
Following steps:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and letter
Classification logotype is ceased, so that the server can determine the permission of the client based on the client identification;
The server is received according to the first management that the permission and described information classification logotype of the client return to be believed
Breath;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
Said one in the embodiment of the present application or multiple technical solutions at least have following one or more technology effects
Fruit:
In the technical solution of the embodiment of the present invention, user end to server is sent for obtaining asking for Project Management Information
It asks, client identification is included at least in above-mentioned request and information category identifies, so that the server can be based on the client
Mark determines the permission of the client;Then permission and described information classification of the server according to the client can be received
Identify the first management information returned;Wherein, Project Management Information is pre-stored in the server, the first management letter
Breath is the information to match with described information classification logotype.Since in the above method, Project Management Information is to be pre-stored within clothes
It is engaged in device, server can determine corresponding first management information according to the mark of client and the information category mark of request,
On the one hand corresponding management information can be obtained by the request of client automatically, improves the efficiency of acquisition of information, another party
The management information in face, storage is corresponding with the permission of client and request classification logotype, in the need for meeting different clients
While asking, the safety of management information is also improved.
Description of the drawings
Fig. 1 is the flow chart of the acquisition methods of the construction-engineering project management information of one side in the embodiment of the present invention;
Fig. 2 is the flow chart of the acquisition methods of the construction-engineering project management information of another aspect of the embodiment of the present invention;
Fig. 3 is the structure diagram of the acquisition device of the construction-engineering project management information of one side in the embodiment of the present invention;
Fig. 4 is the structural frames of the acquisition device of the construction-engineering project management information of another aspect in the embodiment of the present invention
Figure;
Fig. 5 is the structure diagram of Computer readable storage medium storing program for executing of the embodiment of the present invention;
Fig. 6 is the structure diagram of Computer equipment of the embodiment of the present invention.
Specific implementation mode
The acquisition methods of construction-engineering project management information provided in an embodiment of the present invention, for solving existing acquisition item
There are the low technical problems of efficiency for the mode of mesh management information.
In order to solve the above-mentioned technical problem, the technical solution general thought that one embodiment of the invention provides is as follows:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and letter
Classification logotype is ceased, so that the server can determine the permission of the client based on the client identification;Receive the clothes
The first management information that business device is returned according to the permission and described information classification logotype of the client;Wherein, project management is believed
Breath is pre-stored in the server, and first management information is the information to match with described information classification logotype.
Since in the above method, Project Management Information is pre-stored in server, server can be according to client
Mark and the information category mark of request determine corresponding first management information, on the one hand by the request of client can from
It is dynamic to obtain corresponding management information, the efficiency of acquisition of information is improved, on the other hand, the management information of storage is and client
Permission and request classification logotype are corresponding, while meeting the needs of different clients, also improve the peace of management information
Quan Xing.
Technical solution of the present invention is described in detail below by attached drawing and specific embodiment, it should be understood that the application
Specific features in embodiment and embodiment are the detailed description to technical scheme, rather than to present techniques
The restriction of scheme, in the absence of conflict, the technical characteristic in the embodiment of the present application and embodiment can be combined with each other.
The terms "and/or", only a kind of incidence relation of description affiliated partner, indicates that there may be three kinds of passes
System, for example, A and/or B, can indicate:Individualism A exists simultaneously A and B, these three situations of individualism B.In addition, this
Character "/" in text, it is a kind of relationship of "or" to typically represent forward-backward correlation object.
Embodiment one
First aspect of the embodiment of the present invention provides a kind of acquisition methods of construction-engineering project management information, is applied to visitor
Family end, referring to FIG. 1, for the flow chart of the acquisition methods of Project Management Information in the embodiment of the present invention.This method includes:
Step S101 is first carried out:The request for obtaining Project Management Information is sent to server, the request is at least
It is identified including client identification and information category, so that the server can determine the client based on the client identification
Permission.
Then step S102 is executed:Receive permission and described information classification logotype of the server according to the client
The first management information returned, wherein Project Management Information is pre-stored in the server, and first management information is
The information to match with described information classification logotype.
Specifically, Project Management Information is relevant information in construction-engineering project, including in project construction process
The information of various aspects, such as may include quality information, security information, production information, technical information and material information etc..Client
End mark may include the identity information of client, be determined for the identity of client.Information category is identified as project pipe
The mark for managing a certain middle information in information, can be determined a kind of Project Management Information.Server is receiving client hair
After the management information sent obtains request, the identity of client can be determined according to the client identification in request, and according to information
Classification logotype determines corresponding management information.
More specifically, server client mark determines that the permission of client can be determined by following manner, visitor
Family end is identified as identity information, and identity information may include the type of user, according to the type of each unit in work progress into
Row setting, such as surveying unit, supervisor, material set supplying unit, unit in charge of construction, expenses management unit etc., additionally can be with
The permission of each internal institution, such as administrator, registration user and tourist etc. are further set so that the permission of different personnel
Difference can improve the safety of information storage.
In specific implementation process, can be realized by Internet technology, for example, by wechat platform, individually
APP is realized.By the realization of wechat platform for, can be by the leader of project group for some enterprises
It is set as administrator right, can be modified to project information, and reading permission is then arranged in the other staff of enterprise;To foreign promotion
When biography, other staff can be by scan service Quick Response Code into a subtle way+system demonstration block, to check that project management is believed
Breath, such as check the procedural informations such as actual measurement actual quantities, inspection of quality, security protection.In server the storage of Project Management Information with
Operation can realize that the above process is include the database of management process by the management of database, the update of database with
Modification can be realized by the program in mobile device, such as wechat platform,.Project management is obtained by above-mentioned wechat platform
Following function may be implemented in information:
First, obtain house property distribution map
Based on specifically can be with Building Information Model (Building Information Modeling, abbreviation BIM),
The structure of buildings model is established in every relevant information data of engineering project, and digital information analogue simulation building institute is passed through
The real information having.Building Information Model can be used for showing whole building life cycle, include construction process and operation
Process.Formation is interactive visual with feedback between isomorphic product, and it is visual to make whole process all, realizes the exhibition of design sketch
Show, Project design, construction, communication, discussion, decision etc. during operation.
Second, examination is transferred in construction video recording fact
Non- construction personnel can transfer construction site video monitoring system by wechat platform, have permission and cried out by local voice
Words warning and remote monitoring construction, the similar high-tension line that destroys cause construction accident, the condition of construction qualification detection in building site to apply
Work worker's personal safety relevant issues etc. can pass through the reasonable efficient detection in wireless video monitoring site construction scene.
Third, construction cost amount to
It can directly be had a prescription priced by realizing construction material on wechat barcode scanning platform, intelligent Cost evaluating, cost are verified, account
The approach such as open realize that working sources rationally effectively utilize.
4th, project planning
Planning details in project everywhere can be presented to the user by it, in conjunction with the datagram of BIM technology processing, give engineering
With theoretical support.
5th, it is environmentally protective
Environmentally protective information in project planning is reached the standard grade, completed green engineering amount will be uploaded at present for exhibition daily
Show, advocates environmentally friendly theme.
6th, construction personnel's publication
The project manager in each area of engineering, chief engineer's list are reached the standard grade immediately, personnel are occurred and are changed immediate updating, convenient in engineering
Rewarding and punishing.
7th, knotty problem processing
The knotty problem encountered in work progress is uploaded into wechat platform in time, seeks expert's help, joint work.
The content of above-mentioned seven aspects can realize by the way that the different corresponding relevant item management informations of number are arranged,
Such as user's reply 1 can then obtain house property distribution map, reply 2 can then carry out construction video recording fact and transfer examination, reply 3 then
The content of construction cost total can be obtained, and so on, it realizes the acquisition to each side's face data, improves the efficiency of acquisition.
In order to further improve the security, the mode for reading information can be set to single sweep operation to log in through wechat reading
It takes, and not reproducible and forwarding, meanwhile, different period selective openings and closing can be set.Pass through wechat platform reality
The existing above method, may be implemented the information interchange, networking and virtualization of project management, promotes project management water
Flat raising and research is goed deep into.
In existing method, above-mentioned project management is typically the document and data of papery, and various information are more disperseed, and are deposited
It is being not easy to obtain, is obtaining the low problem of efficiency.And the method in the present embodiment, Project Management Information are pre-stored within the clothes
It is engaged in device, first management information is the information to match with described information classification logotype, also just says in server and stores
The corresponding relation of various category management information and its information category mark, also stores between client identification and management information
Effective storage to management information may be implemented in relationship in this way, is also conducive to client and obtains management information, when server receives
Information acquisition request and by the information in analysis request after, you can with the corresponding management information of determination, and return it into, greatly
Improve the efficiency of information acquisition and the accuracy of information greatly.The mode for solving acquisition Project Management Information in the prior art is deposited
In the low technical problem of efficiency.
As a kind of optional embodiment, permission and described information class of the server according to the client are being received
After the first management information for not identifying return, the method further includes:
Judge whether first management information meets preset condition;
If it is not, then formulating the corrective action to first management information;
And the corrective action is sent to the server, so that the server can be based on the corrective action to institute
The first management information is stated to be corrected.
Specifically, preset condition can be configured according to actual conditions, such as according to related to the first management information
The empirical data of index be configured, then the setting value of some parameter value judges whether the first management information meets setting
Value shows that project information is normal if meeting, if conditions are not met, if can formulate corrective action to the first management information, then
It is back to server.
It is described to formulate to the corrective action of first management information just as a kind of optional embodiment, including:
Determine the influence index to first management information;
The corrective action of first management information is formulated according to the influence index.
Specifically, such as the first management information is the construction period, then determination first can influence the influence of construction period and refer to
Mark, such as goods and materials, weather, personnel etc., then consider above-mentioned influence index, formulate corresponding measure so that the construction period
Meet preset condition, such as it is 90 days the duration that preset condition, which is,.It of courses, it, can also when the first management information is other information
It is configured according to aforesaid way.Through the above scheme, the use of different rights per family can to relative management information into
Row is checked, and is exercised supervision, so that project can smoothly be implemented, ensure that the quality of project construction.
It is described to receive permission and described information of the server according to the client as a kind of optional embodiment
The first management information that classification logotype returns, including:
The information category that the client can obtain is determined according to the permission of the client;
When described information classification and described information classification logotype match, then return opposite with described information classification logotype
First management information answered.
Specifically, different permissions corresponds to different information categories, such as the permission of some client is unit in charge of construction,
Then its information category obtained is then the relevant information of constructing, then judge in information category whether include and the information in request
The information category of classification logotype, if so, then returning to relevant information.
Embodiment two
Based on inventive concept same as the acquisition methods of construction-engineering project management information in aforementioned first aspect, this hair
Bright embodiment two additionally provides the acquisition methods of another construction-engineering project management information, is applied to server, such as Fig. 2 institutes
Show, including:
Step S201:The request being used for for obtaining Project Management Information that client is sent is received, the request is at least
It is identified including client identification and information category,
Step S202:The permission of the client is determined based on the client identification;
Step S203:The first management information is obtained according to the permission of the client and described information classification logotype;
Step S204:First management information is sent to the client;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.Determining that the first management information retransmits due to having elaborated server in embodiment one kind
To the specific implementation mode of the process of client, therefore details are not described herein.
The various change mode of the acquisition methods of construction-engineering project management information in 1 embodiment of earlier figures and specific reality
The method that example is equally applicable to the present embodiment passes through retouching in detail for the aforementioned acquisition methods to construction-engineering project management information
It stating, those skilled in the art are clear that the embodiment of method in the present embodiment, so in order to illustrate the succinct of book,
This will not be detailed here.
Embodiment three
Based on inventive concept same as the acquisition methods of construction-engineering project management information in aforementioned implementation one, the present invention
Embodiment five additionally provides the acquisition device of construction-engineering project management information, the device client, as shown in figure 3, including:
Sending module 301, for sending the request for obtaining Project Management Information to server, the request is at least wrapped
Client identification and information category mark are included, so that the server can determine the client based on the client identification
Permission;
Receiving module 302, for receiving permission and described information classification logotype of the server according to the client
The first management information returned;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
As a kind of optional embodiment, the device of the present embodiment further includes judgment module, is used for:
Judge whether first management information meets preset condition;
If it is not, then formulating the corrective action to first management information;
And the corrective action is sent to the server, so that the server can be based on the corrective action to institute
The first management information is stated to be corrected.
As a kind of optional embodiment, the device of the present embodiment, the judgment module is additionally operable to:
Determine the influence index to first management information;
The corrective action of first management information is formulated according to the influence index.
As a kind of optional embodiment, the device of the present embodiment, the receiving module is additionally operable to:
The information category that the client can obtain is determined according to the permission of the client;
When described information classification and described information classification logotype match, then return opposite with described information classification logotype
First management information answered.
As a kind of optional embodiment, the device of the present embodiment, the Project Management Information includes quality information, safety
Information, production information, technical information and material information.
The various change mode of the acquisition methods of construction-engineering project management information in 1 embodiment of earlier figures and specific reality
Example is equally applicable to the device of the present embodiment, passes through retouching in detail for the aforementioned acquisition methods to construction-engineering project management information
It stating, those skilled in the art are clear that the acquisition device of Project Management Information in the present embodiment, so in order to illustrate
Book it is succinct, this will not be detailed here.
Example IV
Based on inventive concept same as the acquisition methods of construction-engineering project management information in embodiment two, the present invention is real
The acquisition device that example four additionally provides construction-engineering project management information is applied, which is server, as shown in figure 4, including:
Receiving module, the request being used for for obtaining Project Management Information for receiving client transmission, the request
It is identified including at least client identification and information category,
Determining module, the permission for determining the client based on the client identification;
Module is obtained, for obtaining the first management information according to the permission and described information classification logotype of the client;
Sending module, for first management information to be sent to the client;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
The various change mode of the acquisition methods of construction-engineering project management information in 2 embodiment of earlier figures and specific reality
Example is equally applicable to the device of the present embodiment, by the detailed description of the aforementioned acquisition to construction-engineering project management information, originally
Field technology personnel are clear that the acquisition device of construction-engineering project management information in the present embodiment, so in order to say
Bright book it is succinct, this will not be detailed here.
Embodiment five
Based on inventive concept same as the acquisition methods of construction-engineering project management information in previous embodiment one, this hair
Bright embodiment five additionally provides a kind of computer readable storage medium 500, as shown in figure 5, being stored thereon with computer program
511, which realizes following steps when being executed by processor:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and letter
Classification logotype is ceased, so that the server can determine the permission of the client based on the client identification;
The server is received according to the first management that the permission and described information classification logotype of the client return to be believed
Breath;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
The various change mode of the acquisition methods of construction-engineering project management information in 1 embodiment of earlier figures and specific reality
Example is equally applicable to the computer readable storage medium of the present embodiment, passes through the aforementioned acquisition to construction-engineering project management information
The detailed description of method, those skilled in the art are clear that the implementation of the present embodiment Computer readable storage medium storing program for executing
Method, so in order to illustrate the succinct of book, this will not be detailed here.
Embodiment six
Based on inventive concept same as the acquisition methods of one construction-engineering project management information of previous embodiment, the present invention
Embodiment six additionally provides a kind of computer equipment, including memory 601, processor 602 and storage are on a memory and can be
The computer program 603 run on processor, the processor realize following steps when executing described program:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and letter
Classification logotype is ceased, so that the server can determine the permission of the client based on the client identification;
The server is received according to the first management that the permission and described information classification logotype of the client return to be believed
Breath;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information
The information that classification logotype matches.
For convenience of description, it illustrates only and does not disclose, ask with the relevant part of the embodiment of the present invention, particular technique details
With reference to present invention method part.Memory 601 can be used for storing computer program 603, and above computer program includes
Software program, module and data, processor 602 execute the computer program 603 for being stored in memory 601 by running, to
Execute various function application and the data processing of electronic equipment.
In specific implementation process, memory 601 can be used for storing software program and module, processor 602 pass through
Operation is stored in the software program and module of memory 601, to execute the various function application and data of electronic equipment
Processing.Memory 601 can include mainly storing program area and storage data field, wherein storing program area can storage program area,
Application program etc. needed at least one function;Storage data field can be stored uses created data according to electronic equipment
Deng.In addition, memory 601 may include high-speed random access memory, can also include nonvolatile memory, for example, at least
One disk memory, flush memory device or other volatile solid-state parts.Processor 802 is the control of electronic equipment
Center is stored in memory using the various pieces of various interfaces and the entire electronic equipment of connection by running or executing
Software program in 601 and/or module, and the data being stored in memory 601 are called, execute the various work(of electronic equipment
Data can and be handled, to carry out integral monitoring to electronic equipment.Optionally, processor 602 may include one or more processing
Unit;Preferably, processor 602 can integrate application processor, wherein the main processing operation system of application processor, Yong Hujie
Face and application program etc..
The various change mode of the acquisition methods of construction-engineering project management information in 1 embodiment of earlier figures and specific reality
Example is equally applicable to the computer equipment of the present embodiment, passes through the detailed of the aforementioned acquisition methods to construction-engineering project management information
Thin description, those skilled in the art are clear that the implementation of the present embodiment Computer equipment, so in order to say
Bright book it is succinct, this will not be detailed here.
Similarly, for the acquisition methods of the construction-engineering project management information in embodiment two, can equally have and realize it
The computer readable storage medium and computer equipment of method, this will not be detailed here.
Said one in the embodiment of the present application or multiple technical solutions at least have following one or more technology effects
Fruit:
In the technical solution of the embodiment of the present invention, user end to server is sent for obtaining asking for Project Management Information
It asks, client identification is included at least in above-mentioned request and information category identifies, so that the server can be based on the client
Mark determines the permission of the client;Then permission and described information classification of the server according to the client can be received
Identify the first management information returned;Wherein, Project Management Information is pre-stored in the server, the first management letter
Breath is the information to match with described information classification logotype.Since in the above method, Project Management Information is to be pre-stored within clothes
It is engaged in device, server can determine corresponding first management information according to the mark of client and the information category mark of request,
On the one hand corresponding management information can be obtained by the request of client automatically, improves the efficiency of acquisition of information, another party
The management information in face, storage is corresponding with the permission of client and request classification logotype, in the need for meeting different clients
While asking, the safety of management information is also improved.
It should be understood by those skilled in the art that, the embodiment of the present invention can be provided as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention
Apply the form of example.Moreover, the present invention can be used in one or more wherein include computer usable program code computer
The computer program production implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.)
The form of product.
The present invention be with reference to according to the method for the embodiment of the present invention, the flow of equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions every first-class in flowchart and/or the block diagram
The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided
Instruct the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine so that the instruction executed by computer or the processor of other programmable data processing devices is generated for real
The device for the function of being specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works so that instruction generation stored in the computer readable memory includes referring to
Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device so that count
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, in computer or
The instruction executed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one
The step of function of being specified in a box or multiple boxes.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
God and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (10)
1. a kind of acquisition methods of construction-engineering project management information, which is characterized in that including:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and info class
It does not identify, so that the server can determine the permission of the client based on the client identification;
Receive the first management information that the server is returned according to the permission and described information classification logotype of the client;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information classification
Identify the information to match.
2. the method as described in claim 1, which is characterized in that receive power of the server according to the client described
After the first management information that limit and described information classification logotype return, the method further includes:
Judge whether first management information meets preset condition;
If it is not, then formulating the corrective action to first management information;
And the corrective action is sent to the server, so that the server can be based on the corrective action to described the
One management information is corrected.
3. method as claimed in claim 2, which is characterized in that corrective action of the formulation to first management information
Just, including:
Determine the influence index to first management information;
The corrective action of first management information is formulated according to the influence index.
4. the method as described in claim 1, which is characterized in that described to receive permission of the server according to the client
The first management information returned with described information classification logotype, including:
The information category that the client can obtain is determined according to the permission of the client;
When described information classification and described information classification logotype match, then return corresponding with described information classification logotype
First management information.
5. the method as described in claim 1, which is characterized in that the Project Management Information include quality information, security information,
Production information, technical information and material information.
6. a kind of acquisition methods of construction-engineering project management information, which is characterized in that including:
The request being used for for obtaining Project Management Information that client is sent is received, the request includes at least client identification
It is identified with information category,
The permission of the client is determined based on the client identification;
The first management information is obtained according to the permission of the client and described information classification logotype;
First management information is sent to the client;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information classification
Identify the information to match.
7. a kind of acquisition device of construction-engineering project management information, which is characterized in that including:
Sending module, for sending the request for obtaining Project Management Information to server, the request includes at least client
End mark and information category mark, so that the server can determine the permission of the client based on the client identification;
Receiving module, returned according to the permission and described information classification logotype of the client for receiving the server
One management information;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information classification
Identify the information to match.
8. device as claimed in claim 7, which is characterized in that described device further includes judgment module, is used for:
Judge whether first management information meets preset condition;
If it is not, then formulating the corrective action to first management information;
And the corrective action is sent to the server, so that the server can be based on the corrective action to described the
One management information is corrected.
9. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is held by processor
Following steps are realized when row:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and info class
It does not identify, so that the server can determine the permission of the client based on the client identification;
Receive the first management information that the server is returned according to the permission and described information classification logotype of the client;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information classification
Identify the information to match.
10. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor
Calculation machine program, which is characterized in that the processor realizes following steps when executing described program:
The request for obtaining Project Management Information is sent to server, the request includes at least client identification and info class
It does not identify, so that the server can determine the permission of the client based on the client identification;
Receive the first management information that the server is returned according to the permission and described information classification logotype of the client;
Wherein, Project Management Information is pre-stored in the server, and first management information is and described information classification
Identify the information to match.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810149294.2A CN108428110A (en) | 2018-02-13 | 2018-02-13 | A kind of acquisition methods of construction-engineering project management information |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810149294.2A CN108428110A (en) | 2018-02-13 | 2018-02-13 | A kind of acquisition methods of construction-engineering project management information |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108428110A true CN108428110A (en) | 2018-08-21 |
Family
ID=63156984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810149294.2A Pending CN108428110A (en) | 2018-02-13 | 2018-02-13 | A kind of acquisition methods of construction-engineering project management information |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108428110A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109447589A (en) * | 2018-11-05 | 2019-03-08 | 珠海格力电器股份有限公司 | Project management method, device, system and computer readable storage medium |
CN110264042A (en) * | 2019-05-25 | 2019-09-20 | 深圳市元征科技股份有限公司 | A kind of method and relevant apparatus of project management |
CN112116318A (en) * | 2020-09-04 | 2020-12-22 | 北京安锐卓越信息技术股份有限公司 | Method, device and storage medium for tracking project progress |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844451A (en) * | 2016-04-15 | 2016-08-10 | 中交上海三航科学研究院有限公司 | Construction informatization management method, system and service terminal |
CN106228208A (en) * | 2016-07-21 | 2016-12-14 | 重庆工程职业技术学院 | Control system based on BIM and method |
CN106779585A (en) * | 2016-11-25 | 2017-05-31 | 泰康保险集团股份有限公司 | Method, system and mobile terminal for supervising architectural engineering |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
-
2018
- 2018-02-13 CN CN201810149294.2A patent/CN108428110A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844451A (en) * | 2016-04-15 | 2016-08-10 | 中交上海三航科学研究院有限公司 | Construction informatization management method, system and service terminal |
CN106228208A (en) * | 2016-07-21 | 2016-12-14 | 重庆工程职业技术学院 | Control system based on BIM and method |
CN106779585A (en) * | 2016-11-25 | 2017-05-31 | 泰康保险集团股份有限公司 | Method, system and mobile terminal for supervising architectural engineering |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
Non-Patent Citations (1)
Title |
---|
王婷 等: "基于BIM的施工资料管理系统平台架构研究", 《工程管理学报》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109447589A (en) * | 2018-11-05 | 2019-03-08 | 珠海格力电器股份有限公司 | Project management method, device, system and computer readable storage medium |
CN109447589B (en) * | 2018-11-05 | 2021-12-03 | 珠海格力电器股份有限公司 | Engineering management method, device, system and computer readable storage medium |
CN110264042A (en) * | 2019-05-25 | 2019-09-20 | 深圳市元征科技股份有限公司 | A kind of method and relevant apparatus of project management |
CN112116318A (en) * | 2020-09-04 | 2020-12-22 | 北京安锐卓越信息技术股份有限公司 | Method, device and storage medium for tracking project progress |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111598379A (en) | Project management method, platform, device, computer equipment and storage medium | |
Couillard et al. | The logical framework approach-millennium | |
Serpell et al. | Construction process improvement methodology for construction projects | |
CN105989443A (en) | Intelligent-mobile-terminal-based communication line inspection system | |
Arayici et al. | A system engineering perspective to knowledge transfer: A case study approach of BIM adoption | |
CN106447156A (en) | Attendance management method and system | |
CN114140999B (en) | Project supervision system based on communication of Internet of things | |
CN108428110A (en) | A kind of acquisition methods of construction-engineering project management information | |
Fernandes | Advantages and disadvantages of BIM platforms on construction site | |
CN107248045A (en) | A kind of intelligent management, apparatus and system evaluated and conserve active service bridge | |
CN106997524A (en) | A kind of cold rolled automobile sheet product design and development system | |
CN111178680A (en) | Wind power plant engineering quality overall process management system, method and equipment | |
CN112365152A (en) | Water delivery tunnel full life cycle risk influence assessment method and system | |
Salzano et al. | Existing assets maintenance management: Optimizing maintenance procedures and costs through BIM tools | |
Kisi | Estimation of optimal productivity in labor-intensive construction operations | |
Achille et al. | Towards an advanced conservation strategy: A structured database for sharing 3D documentation between expert users | |
Kelsey et al. | Understanding the project planning process: requirements capture for the virtual construction site | |
CN103578049B (en) | A kind of nuclear power plant in-service inspection system and method based on technology of Internet of things | |
Croce et al. | Seismic damage evaluation and decisions on interventions supported by UAV-based surveys | |
Pheng et al. | Project life cycles, stakeholders and organizations | |
Di Giulio et al. | Innovative management tools of quality performance over time for historical and monumental buildings | |
CN112967132B (en) | Bank information management system and method based on big data cascading | |
KR102635926B1 (en) | Facility Crack Measuring System | |
Di Giulio et al. | Nuovi strumenti di gestione della qualità nel tempo per gli edifici storici e monumentali | |
Weber-Lewerenz | Use cases—Empirical values from user practice |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180821 |
|
RJ01 | Rejection of invention patent application after publication |