CN106779585A - Method, system and mobile terminal for supervising architectural engineering - Google Patents

Method, system and mobile terminal for supervising architectural engineering Download PDF

Info

Publication number
CN106779585A
CN106779585A CN201611067946.5A CN201611067946A CN106779585A CN 106779585 A CN106779585 A CN 106779585A CN 201611067946 A CN201611067946 A CN 201611067946A CN 106779585 A CN106779585 A CN 106779585A
Authority
CN
China
Prior art keywords
information
entry
relevant
live
relevant information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611067946.5A
Other languages
Chinese (zh)
Other versions
CN106779585B (en
Inventor
王靖元
于江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taikang Home (beijing) Investment Co Ltd
Taikang Insurance Group Co Ltd
Original Assignee
Taikang Home (beijing) Investment Co Ltd
Taikang Insurance Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taikang Home (beijing) Investment Co Ltd, Taikang Insurance Group Co Ltd filed Critical Taikang Home (beijing) Investment Co Ltd
Priority to CN201611067946.5A priority Critical patent/CN106779585B/en
Publication of CN106779585A publication Critical patent/CN106779585A/en
Application granted granted Critical
Publication of CN106779585B publication Critical patent/CN106779585B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

A kind of method for supervising architectural engineering of disclosure, system and mobile terminal.The method includes:Current location is positioned, positional information is generated;Response user's operation, generates the relevant information of live first image information and issue entry, and the relevant information includes number information;And send the positional information, live first image information and the relevant information to server.Method for supervising architectural engineering of the invention, system and mobile terminal can be accurately positioned engineering problem, and realize the quality monitoring in architectural engineering complete period.

Description

Method, system and mobile terminal for supervising architectural engineering
Technical field
The present invention relates to field of information processing, in particular to a kind of method for supervising architectural engineering, system and Mobile terminal.
Background technology
Project management refer to be engaged in the enterprise of project management (can be such as by Party A:Owner or enterprise) commission, Arrange as agreed, representing organizing and implementing of the Party A to engineering project carries out the management and service in overall process or some stages.With As a example by construction management, in architectural engineering, because the classification that engineering is related to is numerous, can be for example, engineering classification may include, stake Base, main body, waterproof, elevator, intellectuality, water power, fire-fighting, curtain wall etc..Each operation further relates to numerous operations, example simultaneously Such as, the operation of main body classification may include:Tie up muscle, formwork, pour, until building binds, the operation of waterproof classification may include: Including roof waterproof, toilet bath room waterproof, retaining inspection, fish tail and waterproof layer, then retaining inspection etc..In construction-engineering project, Each step is required for checking it and being supervised.
Current construction inspection and monitoring process is that the quality problems found by supervision companies remember quality problems Record and take pictures and report Party A.Quality problems are informed into unit in charge of construction by supervision companies or Party A simultaneously, unit in charge of construction is carried out Corresponding rectification, takes pictures rectification effect after rectification, returns to supervision companies.In due to construction project, especially for large-scale For housing group or shopping mall, the classification being related to is numerous, and for unit in charge of construction, unit in charge of construction carries out rectification process In, the problem be given to supervision companies accurately positions relatively difficult;For supervision companies, from numerous rectification pictures, pin To certain problem, veritified for the rectification result that unit in charge of construction is given it is also highly difficult, and, present in construction Can problem, accomplish that the correspondence of 100% closing examines also relatively difficult.
Accordingly, it would be desirable to a kind of new method for supervising architectural engineering, system and mobile terminal.
Above- mentioned information is only used for strengthening the understanding to background of the invention, therefore it disclosed in the background section Can include not constituting the information to prior art known to persons of ordinary skill in the art.
The content of the invention
In view of this, the present invention provides a kind of method for supervising architectural engineering, system and mobile terminal, can be accurate Positioning engineering problem, and realize the quality monitoring in complete period.
Other characteristics of the invention and advantage will be apparent from by following detailed description, or partially by the present invention Practice and acquistion.
According to an aspect of the invention, it is proposed that a kind of method for supervising architectural engineering, the method includes:To present bit Put and positioned, generate positional information;Response user's operation, generates the correlation of live first image information and issue entry Information, the relevant information includes number information;And send the positional information, live first image information and The relevant information is to server.
In a kind of exemplary embodiment of the disclosure, current location is positioned, generate positional information, including:It is logical Architectural drawing, the geographical position of engineering are crossed, current location is positioned, generate positional information.
In a kind of exemplary embodiment of the disclosure, relevant information also includes:The description information of issue entry.
In a kind of exemplary embodiment of the disclosure, also include:The prompting message of issue entry is generated, and is sent to To related personnel.
In a kind of exemplary embodiment of the disclosure, also include:According to user right information, receive right by server The engineering information answered.
According to an aspect of the invention, it is proposed that a kind of method for supervising architectural engineering, the method includes:Acquisition problem The relevant information of entry, relevant information includes number information and positional information;According to positional information in working site orientation problem Entry;Response user's operation, generates live second image information and processing information;And send the second image information, treatment letter Breath and number information are to server.
In a kind of exemplary embodiment of the disclosure, also include:Judge processing information whether hit the target;And If processing information hit the target, number information is sent with predetermined code to server.
In a kind of exemplary embodiment of the disclosure, relevant information also includes:First image information of issue entry, Description information.
According to an aspect of the invention, it is proposed that a kind of method for supervising architectural engineering, the method includes:Receiver Problem The positional information of entry, live first image information and relevant information;Storage location information, live first image information, with And relevant information;Second image information of Receiver Problem entry, processing information and number information;According to number information, update The relevant information of its corresponding issue entry.
In a kind of exemplary embodiment of the disclosure, also include:The number information and predetermined code of Receiver Problem entry; According to predetermined code and the number information corresponding problem of closing.
In a kind of exemplary embodiment of the disclosure, also include:After closing problem, its corresponding issue entry is changed State, and push state to related personnel.
In a kind of exemplary embodiment of the disclosure, also include:According to user right information, corresponding engineering letter is sent Cease to client.
In a kind of exemplary embodiment of the disclosure, also include:Using big data analysis method process problem entry Relevant information, generates analyze data.
In a kind of exemplary embodiment of the disclosure, also include:Initialization server.
According to an aspect of the invention, it is proposed that a kind of mobile terminal, the mobile terminal includes:Processor;Memory, storage For the instruction of the following operation of processor control:Current location is positioned, positional information is generated;Response user's operation, it is raw Into live first image information and the relevant information of issue entry, relevant information includes number information;And send position letter Breath, live first image information and relevant information to server.
According to an aspect of the invention, it is proposed that a kind of mobile terminal, the mobile terminal includes:Processor;Memory, storage For the instruction of the following operation of processor control:The relevant information of issue entry is obtained, relevant information includes number information and position Confidence ceases;According to positional information in working site orientation problem entry;Response user's operation, generate live second image information and Processing information;And send the second image information, processing information and number information to server.
According to an aspect of the invention, it is proposed that a kind of system for supervising architectural engineering, the system includes:First receives Module, positional information, live first image information and relevant information for Receiver Problem entry;Storage module, for storing up Deposit positional information, live first image information and relevant information;Second receiver module, for the second of Receiver Problem entry Image information, processing information and number information;Update module, for according to number information, updating its corresponding issue entry Relevant information.
In a kind of exemplary embodiment of the disclosure, also include:3rd receiver module, for the volume of Receiver Problem entry Number information and predetermined code;Closing problem module, for according to predetermined code and the number information corresponding problem of closing.
Method for supervising architectural engineering of the invention, system and mobile terminal, can be accurately positioned engineering and ask Topic, and realize the quality monitoring in complete period.
It should be appreciated that the general description of the above and detailed description hereinafter are only exemplary, this can not be limited Invention.
Brief description of the drawings
Its example embodiment is described in detail by referring to accompanying drawing, above and other target of the invention, feature and advantage will Become more fully apparent.Drawings discussed below is only some embodiments of the present invention, for the ordinary skill of this area For personnel, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of flow chart for supervising the method for architectural engineering according to an exemplary embodiment.
Fig. 2 is that a kind of client location for supervising architectural engineering according to another exemplary embodiment is illustrated Figure.
Fig. 3 is a kind of flow chart for supervising the method for architectural engineering according to another exemplary embodiment.
Fig. 4 is a kind of flow chart for supervising the method for architectural engineering according to another exemplary embodiment.
Fig. 5 is that a kind of client-side issue for supervising architectural engineering according to another exemplary embodiment describes to show It is intended to.
Fig. 6 is a kind of schematic diagram for supervising the method for architectural engineering according to another exemplary embodiment.
Fig. 7 is a kind of flow chart for supervising the method for architectural engineering according to another exemplary embodiment.
Fig. 8 is a kind of block diagram for supervising the mobile terminal of architectural engineering according to another exemplary embodiment.
Fig. 9 is a kind of block diagram for supervising the mobile terminal of architectural engineering according to another exemplary embodiment.
Figure 10 is a kind of block diagram for supervising the system of architectural engineering according to another exemplary embodiment.
Specific embodiment
Example embodiment is described more fully with referring now to accompanying drawing.However, example embodiment can be real in a variety of forms Apply, and be not understood as limited to embodiment set forth herein;Conversely, thesing embodiments are provided so that the present invention will be comprehensively and complete It is whole, and the design of example embodiment is comprehensively conveyed into those skilled in the art.Identical reference is represented in figure Same or similar part, thus repetition thereof will be omitted.
Additionally, described feature, structure or characteristic can be combined in one or more implementations in any suitable manner In example.In the following description, there is provided many details fully understand so as to be given to embodiments of the invention.However, It will be appreciated by persons skilled in the art that it is one or more during technical scheme can be put into practice without specific detail, Or can be using other methods, constituent element, device, step etc..In other cases, it is not shown in detail or describes known square Method, device, realization operate to avoid fuzzy each aspect of the present invention.
Block diagram shown in accompanying drawing is only functional entity, not necessarily must be corresponding with physically separate entity. I.e., it is possible to realize these functional entitys using software form, or realized in one or more hardware modules or integrated circuit These functional entitys, or these functional entitys are realized in heterogeneous networks and/or processor device and/or microcontroller device.
Flow chart shown in accompanying drawing is merely illustrative, it is not necessary to including all of content and operation/step, It is not required to be performed by described order.For example, some operation/steps can also be decomposed, and some operation/steps can be closed And or part merge, therefore the actual order for performing is possible to be changed according to actual conditions.
It should be understood that although herein various assemblies may be described using term first, second, third, etc., these groups Part should not be limited by these terms.These terms are to distinguish a component with another component.Therefore, first group for being discussed herein below Part can be described as teaching of second component without departing from disclosure concept.As used herein, term " and/or " include it is associated The all combinations for listing any one and one or more in project.
It will be understood by those skilled in the art that accompanying drawing is the schematic diagram of example embodiment, module or flow in accompanying drawing Not necessarily implement the present invention necessary, therefore cannot be used for limiting the scope of the invention.
Fig. 1 is a kind of flow chart for supervising the method for architectural engineering according to an exemplary embodiment.
As shown in figure 1, in S102, being positioned to current location, positional information is generated.
In architectural engineering, when finding to have problem to be solved, current location is positioned first, given birth to by positioning The positional information being a problem.Problem to be solved can be for example, report problem, failure problems, security hidden trouble etc. for repairment.The present invention is not As limit.Can also be for example, the information such as construction drawing by building, generates positional information.Can be for example, by being carried in mobile terminal The building construction drawing of confession, user's selection is selected by clicking on, into the classification of related problem, and then by corresponding construction drawing Generation positional information.
In S 104, response user's operation generates the relevant information of live first image information and issue entry, phase Pass information includes number information;
To the position for having construction problem, the operation carried out by user generates the first image information.First image is believed Breath, may be, for example, pictorial information, also may be, for example, video information.The related information of problem is recorded simultaneously, and the problem is generated A unique number information.In order to ensure number information uniqueness in systems, can be by current time, current Position and current problem generic, generate the number information of problem.The invention is not restricted to this.
In S 106, positional information, live first image information and the relevant information to server are sent.
In the present embodiment, mainly there are six class role (general headquarters, project management department, management, Zong Bao, subpackage, three in engineering project Side), above-mentioned six class roles can find responsible project problem, general headquarters, project management department can check all items problem Details, rectification record.Total bag, subpackage, third party, management can only see itself responsible project.Above-mentioned six classes role By generating positional information, and then the associative operation of the generation problem information of next step is carried out, then send the related letter of problem Cease to server.But the present invention is not limited.
Method for supervising architectural engineering of the invention, by the way that engineering problem is corresponding with the position of the problem of generation The mode got up, enables to construction supervision side, construction problem accurately is passed into construction party in detail, and then improve at problem Reason efficiency.
It will be clearly understood that the present disclosure describe how being formed and use particular example, but principle of the invention is not limited to Any details of these examples.Conversely, the teaching based on present disclosure, these principles can be applied to many other Embodiment.
In a kind of exemplary embodiment of the disclosure, current location is positioned, generate positional information, including:It is logical Architectural drawing, the geographical position of engineering are crossed, current location is positioned, generate the positional information.Can be for example, in client The page as shown in Figure 2 is provided, by the prompting of the page, is clicked on landscape map or pile foundation figure is directly entered drawing page, clicks on building number Enter drawing page into facade/floor selection page, selection facade or floor, can work as example, mark green is optional floor Front position, length presses drawing, generates current location information.
In a kind of exemplary embodiment of the disclosure, the relevant information also includes:The description information of issue entry. In order that obtain solve problem shooting the arrow at the target, issue entry information can also for example include, the associated description information of problem.Description information In can include problem produce time, and problem Producing reason initial analysis, for the problem information of potential safety hazard class, The issue-resolution recommended can be also included in problem description information.
In a kind of exemplary embodiment of the disclosure, also include:Generate described problem entry prompting message, and by its Send to related personnel.Can for example, generation prompting message be sent to corresponding unit in charge of construction, for reminding unit in charge of construction that unit is held Row rectification.Can also for example, generation prompting message be sent to general headquarters, for reminding general headquarters to collect problem, tracking problem.
In a kind of exemplary embodiment of the disclosure, also include:According to user right information, received by the server Corresponding engineering information.
Refer to flow chart as shown in Figure 3, client user (general headquarters, project management department, management, Zong Bao, subpackage, the 3rd Side) can be under the conditions of wifi, permission download authority respective items purpose essential information, building information, the drawing letter according to user Cease, the data such as company information of taking part in building to local, to check, position drawing using equipment under the conditions of without net, find, solution, Check, unlock hidden danger.Whole drawings can be downloaded, it is also possible to specific to the figure of a certain floor for downloading certain certain building of project Paper.If non-wifi network, user is pointed out " you are currently in use non-wifi network, if continue ", point "Yes" then uses flow Download, point "No" is then returned not to be downloaded.
Problem can also under the conditions of without net for client user (general headquarters, project management department, management, Zong Bao, subpackage, third party) Checked using equipment, position drawing, found, solve, check, unlock hidden danger.Result keep in it is local, under the conditions of wifi Local result batch synchronization will be kept in in database.If non-wifi network, user is pointed out " you are currently in use Non- wifi network, if continue ", point "Yes" then uses flow batch synchronization data, and point "No" is then returned does not do synchronization
Fig. 4 is a kind of flow chart for supervising the method for architectural engineering according to another exemplary embodiment.
As shown in figure 4, in S402, obtaining the relevant information of issue entry, relevant information includes number information and position Information.Can be for example, when construction party carries out issue handling, the function of being provided by client obtains issue entry to be solved Relevant information.Number information comprising project in relevant information, for the related information as issue handling.
In S404, according to positional information in working site orientation problem entry.Also include positional information in relevant information, By positional information, the position to problem is accurately positioned.Can be for example, the functional entrance provided according to client, be arranged by task Table page has two into the mode of solve problem page, can also be for example, using in construction drawing, the mark on corresponding diagram page is clicked through Enter the page of problem to be solved.The present invention is not limited.
In S406, response user's operation generates live second image information and processing information.Rectified and improved to problem Afterwards, the issue entry after rectification is taken pictures or is shot the mode of video, generated the second image information.Can also for example, According to the related information of issue handling, problem is described accordingly, generated processing information.
In S408, the second image information, processing information and number information to server are sent.In the present embodiment, Undertaking the construction of Fang Zongbao, the class role (present invention is not limited) of subpackage two can check issue entry information to be solved, according to asking Relevant information in topic entry carries out the rectification of problem, and after the completion of rectification, upload rectification result of taking pictures submits to the problem of checking Side.
Method for supervising architectural engineering of the invention, by the way that engineering problem is corresponding with the position of the problem of generation The mode got up, enables to the rectification personnel that construct, and engineering problem is accurately positioned in construction, improves efficiency of construction.
In a kind of exemplary embodiment of the disclosure, also include:Judge the processing information whether hit the target; And if the processing information reaches the desired indicator, then number information is sent with predetermined code to the server. In the present embodiment, in department as described above, project management department, supervision companies check to be checked in the task list of oneself Task, searches at rectification problem, such as Resolving probiems according to problem relevant information, can close for example, send predetermined code to server The problem is closed, such as problem is not solved, then the click for being provided by client is return button and problem is return into solve problem automatically Side.Can also for example, the task of checking can when, can be taken pictures upload pictures in the former angle of problem, upload onto the server, give over to veritification Object information.
In a kind of exemplary embodiment of the disclosure, relevant information also includes:First image information of issue entry, Description information.When construction party is constructed, the first image information can be also obtained, for contrasting engineering problem, can also be for example, such as Shown in Fig. 5, the description information of issue entry is obtained, as reference frame, launch construction.
Fig. 6 is a kind of schematic diagram for supervising the method for architectural engineering according to another exemplary embodiment.
As shown in fig. 6, Fig. 6 is the exemplary description of Responsibility of Staff in method as discussed above.In the stream of the present embodiment In journey figure, laterally:With to incident management as bar line.Vertically:It is bar line with management level.
1) pinpoint the problems:Six class roles (general headquarters, project management department, management, Zong Bao, subpackage, third party) can have found in project Responsible project problem, general headquarters, project management department can check all items problem details, rectification record.Zong Bao, point Bag, third party, management can only see itself responsible project.
2) solve problem:Undertaking the construction of Fang Zongbao, the class role of subpackage two can check the rectification task of oneself, detailed according to problem Information is rectified and improved, and after the completion of rectification, upload rectification result of taking pictures is submitted to and checks problem side.
3) problem is checked:Task to be checked is checked in the task list of oneself by project management department, supervision companies, according to problem Details are searched at rectification problem, such as Resolving probiems, can former angle take pictures upload, and closing problem, such as problem are not solved, Button is then return by click problem is return into solve problem side automatically.
4) problem is unlocked:General headquarters, project management department, management/consultant firm possess the authority of unblock problem, and all roles can The all problems on drawing checked in be responsible for project, general headquarters, project management department, management/consultant firm's Three role are as checked Problem finds that rectification is not completed, then this Three role personnel can unlock problem, is returned to rectification problem side and continues to rectify and improve.
Fig. 7 is a kind of flow chart for supervising the method for architectural engineering according to another exemplary embodiment.
As shown in fig. 7, in S702, the positional information of Receiver Problem entry, live first image information and related letter Breath.Server receives the issue entry relevant information from client.
In S704, storage location information, live first image information and relevant information.Server is believed according to correlation Breath, the issue entry of newly-built corresponding server end, and corresponding information is stored.
In S706, the second image information of Receiver Problem entry, processing information and number information.Server is received and From the issue handling relevant information of client.
In S708, according to number information, the relevant information of its corresponding described problem entry is updated.According to problem information Numbering, corresponding issue entry is positioned in server end, according to the relevant information for receiving, to original issue entry content It is updated.
Method for supervising architectural engineering of the invention, by number information by the corresponding of engineering problem The mode that process step is associated is solved, enables to management side, construction party and project Party A dynamic and visual to understand item The information in mesh complete period, moreover it is possible to reduce the probability of rectification problem omission.
In a kind of exemplary embodiment of the disclosure, also include:Receive the number information of described problem entry and make a reservation for Code;According to the code and the number information corresponding problem of closing.Service end receives the predetermined generation of veritification side's transmission Code information, according to predetermined code information and the issue entry coding information for receiving, corresponding operation is carried out in server end, The operation may be, for example, to close corresponding problem.
In a kind of exemplary embodiment of the disclosure, also include:After described problem is closed, its is changed corresponding described The state of issue entry, and push the state to related personnel.
In a kind of exemplary embodiment of the disclosure, also include:According to user right information, corresponding engineering letter is sent Cease to client.
In a kind of exemplary embodiment of the disclosure, also include:Described problem bar is processed using big data analysis method Relevant information described in purpose, generates analyze data.Using existing big data treatment technology, various dimensions can be longitudinally, laterally waited to enter Construction quality data are analyzed.According to analyze data, may also provide problem data, by project statistics (or whole project), Supplier (or whole suppliers), time interval, can include:Problematic amount;Regional issue quantity;Problem closing rate;Problem Close, can also be for example, can also be such as, there is provided the statistics such as people's effect statistics, personal work amount, teamwork amount.
In a kind of exemplary embodiment of the disclosure, also include:Initialization server.Initialization server can for example, Including obtaining a series of base attribute of projects, such as title of project, birds-eye view, building information data.Can also be for example, bag Containing following information.
1) building information management:Addition building.Including building name, the ground number of plies, subterranean layer for initializing floor in batches Number, can be with customized interlayer, facade, state and description.
2) project entity's binding:Company and project individually safeguard, each project can bind multiple and take part in building company.Ginseng Company is built to be selected from the company list that state is issue.
3) project role personnel assignment:Establishment of item success and Project Manager after the company of taking part in building is bound and has needed initialization The role employee of project simultaneously completes binding.
4) project management of blueprint:Project Manager is complete in establishment of item when using engineering quality control server of the system Into needing upload project drawing after the completion of project role's personnel assignment.Drawing is uploaded to obtain, be may be, for example, pile foundation figure, elevation, put down Face figure, landscape map.
It will be appreciated by those skilled in the art that realizing that all or part of step of above-described embodiment is implemented as being performed by CPU Computer program.When the computer program is performed by CPU, the above-mentioned work(that the above method of present invention offer is limited is performed Energy.Described program can be stored in a kind of computer-readable recording medium, and the storage medium can be read-only storage, magnetic Disk or CD etc..
Further, it should be noted that above-mentioned accompanying drawing is only the place included by method according to an exemplary embodiment of the present invention That manages schematically illustrates, rather than limitation purpose.It can be readily appreciated that above-mentioned treatment shown in the drawings is not intended that or limits at these The time sequencing of reason.In addition, being also easy to understand, these treatment for example can be performed either synchronously or asynchronously in multiple modules.
Following is apparatus of the present invention embodiment, can be used for performing the inventive method embodiment.For apparatus of the present invention reality The details not disclosed in example is applied, the inventive method embodiment is refer to.
Fig. 8 is a kind of block diagram for supervising the mobile terminal of architectural engineering according to an exemplary embodiment.
As shown in figure 8, memory 820 can store the instruction for the treatment of the control operation of processor 810.Memory 820 can Including volatibility or nonvolatile memory, such as static RAM (SRAM), the read-only storage of electrically erasable Device (EEPROM), Erasable Programmable Read Only Memory EPROM (EPROM), programmable read only memory (PROM), read-only storage (ROM) etc., the present invention is not limited in this respect.
Processor 810 can call the instruction control associative operation stored in memory 820.According to an embodiment, memory 820 store the instruction that following operation is controlled for processor 810:Current location is positioned, positional information is generated;Response is used Family operates, and generates the relevant information of live first image information and issue entry, and the relevant information includes number information; And send the positional information, live first image information and the relevant information to server.
Fig. 9 is a kind of block diagram for supervising the mobile terminal of architectural engineering according to another exemplary embodiment.
As shown in figure 9, memory 920 can store the instruction for the treatment of the control operation of processor 910.Memory 920 can Including volatibility or nonvolatile memory, such as static RAM (SRAM), the read-only storage of electrically erasable Device (EEPROM), Erasable Programmable Read Only Memory EPROM (EPROM), programmable read only memory (PROM), read-only storage (ROM) etc., the present invention is not limited in this respect.
Processor 910 can call the instruction control associative operation stored in memory 920.According to an embodiment, memory 920 store the instruction that following operation is controlled for processor 910:Obtain the relevant information of issue entry, the relevant information bag Include number information and positional information;Described problem entry is positioned in working site according to the positional information;Response user's operation, Generate live second image information and processing information;And send second image information, the processing information and described Number information is to server.
Figure 10 is a kind of block diagram for supervising the system of architectural engineering according to another exemplary embodiment.As schemed Shown in 10, the system 100 for supervising architectural engineering includes:
First receiver module 1002 is used for positional information, live first image information and the correlation of Receiver Problem entry Information.
Storage module 1004 is used for storage location information, live first image information and relevant information.
Second receiver module 1006 is used for the second image information, processing information and the number information of Receiver Problem entry.
Update module 1008 is used for according to number information, updates the relevant information of its corresponding issue entry.
3rd receiver module 1010 is used for the number information and predetermined code of Receiver Problem entry.
Closing problem module 1012 is used for according to code and the number information corresponding problem of closing.
It will be appreciated by those skilled in the art that above-mentioned each module can be distributed in device according to the description of embodiment, also may be used Uniquely it is different from one or more devices of the present embodiment with carrying out respective change.The module of above-described embodiment can be merged into One module, it is also possible to be further split into multiple submodule.
The description of the embodiment more than, those skilled in the art is it can be readily appreciated that example embodiment described herein Can be realized by software, it is also possible to realized by way of software is with reference to necessary hardware.Therefore, implemented according to the present invention The technical scheme of example can be embodied in the form of software product, and the software product can be stored in a non-volatile memories In medium (can be CD-ROM, USB flash disk, mobile hard disk etc.) or on network, including some instructions are causing that a computing device (can Being personal computer, server, mobile terminal or network equipment etc.) perform method according to embodiments of the present invention.
Detailed description more than, those skilled in the art are it can be readily appreciated that according to embodiments of the present invention for supervising The method of pipe architectural engineering, system and mobile terminal have one or more of the following advantages.
According to some embodiments, the method for supervising architectural engineering of the invention is asked by by engineering problem with generation The mode that the position of topic is mapped, enables to construction supervision side, and construction problem accurately is passed into construction party in detail, enters And improve issue handling efficiency.
According to other embodiments, the method for supervising architectural engineering of the invention, by by engineering problem with produce The mode that the position of problem is mapped, enables to the rectification personnel that construct, and engineering problem is accurately positioned in construction, and raising is applied Work efficiency rate.
According to still other embodiments, the method for supervising architectural engineering of the invention is asked engineering by number information The mode that the corresponding solution treatment of topic is associated, enables to management side, construction party and project Party A dynamically may be used Information depending on changing the understanding project complete period, moreover it is possible to reduce the probability of rectification problem omission.
More than it is particularly shown and described exemplary embodiment of the invention.It should be appreciated that the invention is not restricted to Detailed construction described herein, set-up mode or implementation method;On the contrary, it is intended to cover be included in appended claims Various modifications and equivalence setting in spirit and scope.
Additionally, structure, ratio, size shown by this specification Figure of description etc., is only used to coordinate specification institute Disclosure, for skilled in the art realises that with reading, be not limited to the enforceable qualifications of the disclosure, therefore Do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influenceing the disclosure Under the technique effect that can be generated and achieved purpose, all should still fall obtain and can cover in the technology contents disclosed in the disclosure In the range of.Meanwhile, in this specification it is cited such as " on ", " first ", the term of " second " and " ", be also only and be easy to Narration understands, and is not used to limit the enforceable scope of the disclosure, and its relativeness is altered or modified, without substantive change Under technology contents, when being also considered as enforceable category of the invention.

Claims (18)

1. a kind of method for supervising architectural engineering, it is characterised in that including:
Current location is positioned, positional information is generated;
Response user's operation, generates the relevant information of live first image information and issue entry, and the relevant information includes Number information;And
Send the positional information, live first image information and the relevant information to server.
2. the method for claim 1, it is characterised in that positioned to current location, generates positional information, including:
By the architectural drawing of engineering, geographical position, current location is positioned, generate the positional information.
3. the method for claim 1, it is characterised in that the relevant information, also includes:
The description information of issue entry.
4. the method for claim 1, it is characterised in that also include:
The prompting message of described problem entry is generated, and sends it to related personnel.
5. the method for claim 1, it is characterised in that also include:
According to user right information, corresponding engineering information is received by the server.
6. a kind of method for supervising architectural engineering, it is characterised in that including:
The relevant information of issue entry is obtained, the relevant information includes number information and positional information;
Described problem entry is positioned in working site according to the positional information;
Response user's operation, generates live second image information and processing information;And
Send second image information, the processing information and the number information to server.
7. method as claimed in claim 6, it is characterised in that also include:
Judge the processing information whether hit the target;And
If the processing information reaches the desired indicator, the number information is sent with predetermined code to the service Device.
8. method as claimed in claim 6, it is characterised in that the relevant information, also includes:
First image information of described problem entry, description information.
9. a kind of method for supervising architectural engineering, it is characterised in that including:
The positional information of Receiver Problem entry, live first image information and relevant information;
Store the positional information, live first image information and the relevant information;
Receive the second image information, processing information and the number information of described problem entry;And
According to the number information, the relevant information of its corresponding described problem entry is updated.
10. method as claimed in claim 9, it is characterised in that also include:
Receive the number information and predetermined code of described problem entry;And
According to the predetermined code and the number information corresponding problem of closing.
11. methods as claimed in claim 10, it is characterised in that also include:
After described problem is closed, the state of its corresponding described problem entry is changed, and push the state to related personnel.
12. methods as claimed in claim 9, it is characterised in that also include:
According to user right information, corresponding engineering information to client is sent.
13. methods as claimed in claim 9, it is characterised in that also include:
The relevant information of described problem entry is processed using big data analysis method, analyze data is generated.
14. methods as claimed in claim 9, it is characterised in that also include:
Initialization server.
A kind of 15. mobile terminals, it is characterised in that including:
Processor;
Memory, stores the instruction for the following operation of processor control:
Current location is positioned, positional information is generated;
Response user's operation, generates the relevant information of live first image information and issue entry, and the relevant information includes Number information;And
Send the positional information, live first image information and the relevant information to server.
A kind of 16. mobile terminals, it is characterised in that including:
Processor;
Memory, stores the instruction for the following operation of processor control:
The relevant information of issue entry is obtained, the relevant information includes number information and positional information;
Described problem entry is positioned in working site according to the positional information;
Response user's operation, generates live second image information and processing information;And
Send second image information, the processing information and the number information to server.
A kind of 17. systems for supervising architectural engineering, it is characterised in that including:
First receiver module, positional information, live first image information and relevant information for Receiver Problem entry;
Storage module, for storing the positional information, live first image information and the relevant information;
Second receiver module, the second image information, processing information and number information for receiving described problem entry;And
Update module, for according to the number information, updating the relevant information of its corresponding described problem entry.
18. systems as claimed in claim 17, it is characterised in that also include:
3rd receiver module, number information and predetermined code for receiving described problem entry;And
Closing problem module, for according to the predetermined code and the number information corresponding problem of closing.
CN201611067946.5A 2016-11-25 2016-11-25 Method, system and mobile terminal for supervising building engineering Active CN106779585B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611067946.5A CN106779585B (en) 2016-11-25 2016-11-25 Method, system and mobile terminal for supervising building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611067946.5A CN106779585B (en) 2016-11-25 2016-11-25 Method, system and mobile terminal for supervising building engineering

Publications (2)

Publication Number Publication Date
CN106779585A true CN106779585A (en) 2017-05-31
CN106779585B CN106779585B (en) 2021-01-15

Family

ID=58902342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611067946.5A Active CN106779585B (en) 2016-11-25 2016-11-25 Method, system and mobile terminal for supervising building engineering

Country Status (1)

Country Link
CN (1) CN106779585B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107423895A (en) * 2017-07-20 2017-12-01 浙江之江工程项目管理有限公司 A kind of quality control system of house fine fitment
CN108269071A (en) * 2018-03-15 2018-07-10 叶枫 The method that buildings model is shared cloud platform and project management is carried out using platform
CN108428110A (en) * 2018-02-13 2018-08-21 武汉科技大学 A kind of acquisition methods of construction-engineering project management information
CN108549988A (en) * 2018-04-17 2018-09-18 万翼科技有限公司 The treating method and apparatus of problem
CN108769226A (en) * 2018-06-05 2018-11-06 北京智行者科技有限公司 The OAT upgrade methods and car-mounted terminal of vehicle
CN109345103A (en) * 2018-09-25 2019-02-15 北京地厚云图科技有限公司 Process receipt control method and storage medium
CN109697547A (en) * 2017-10-24 2019-04-30 上海嘉实(集团)有限公司 The management method and management system of safe mass inspection

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102176252A (en) * 2011-01-26 2011-09-07 新疆中钜电子科技有限公司 Equipment and facility safety inspection intelligent patrolling operation system and application method thereof
CN203012782U (en) * 2012-11-27 2013-06-19 天津航大航安科技有限公司 Airport safety managing system
CN103514621A (en) * 2013-07-17 2014-01-15 宝鸡翼迅网络科技有限公司 Case and event scene all-true dynamic 3D representation method and reconstruction system
KR20150114106A (en) * 2014-03-31 2015-10-12 (주)세이프텍리서치 The plant field operators outfit for plant operation by using augmented reality and the method for providing information for plant operator
CN204990411U (en) * 2015-09-30 2016-01-20 南京坤拓土木工程科技有限公司 Engineering construction safety inspection handheld device
CN105512856A (en) * 2015-11-27 2016-04-20 清华大学 Wechat-based potential safety hazard management method and system for large-scale civil engineering
CN105991771A (en) * 2016-06-01 2016-10-05 深圳市嘉泰智能科技有限公司 Internet of things fire fighting system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102176252A (en) * 2011-01-26 2011-09-07 新疆中钜电子科技有限公司 Equipment and facility safety inspection intelligent patrolling operation system and application method thereof
CN203012782U (en) * 2012-11-27 2013-06-19 天津航大航安科技有限公司 Airport safety managing system
CN103514621A (en) * 2013-07-17 2014-01-15 宝鸡翼迅网络科技有限公司 Case and event scene all-true dynamic 3D representation method and reconstruction system
KR20150114106A (en) * 2014-03-31 2015-10-12 (주)세이프텍리서치 The plant field operators outfit for plant operation by using augmented reality and the method for providing information for plant operator
CN204990411U (en) * 2015-09-30 2016-01-20 南京坤拓土木工程科技有限公司 Engineering construction safety inspection handheld device
CN105512856A (en) * 2015-11-27 2016-04-20 清华大学 Wechat-based potential safety hazard management method and system for large-scale civil engineering
CN105991771A (en) * 2016-06-01 2016-10-05 深圳市嘉泰智能科技有限公司 Internet of things fire fighting system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107423895A (en) * 2017-07-20 2017-12-01 浙江之江工程项目管理有限公司 A kind of quality control system of house fine fitment
CN109697547A (en) * 2017-10-24 2019-04-30 上海嘉实(集团)有限公司 The management method and management system of safe mass inspection
CN108428110A (en) * 2018-02-13 2018-08-21 武汉科技大学 A kind of acquisition methods of construction-engineering project management information
CN108269071A (en) * 2018-03-15 2018-07-10 叶枫 The method that buildings model is shared cloud platform and project management is carried out using platform
CN108549988A (en) * 2018-04-17 2018-09-18 万翼科技有限公司 The treating method and apparatus of problem
CN108769226A (en) * 2018-06-05 2018-11-06 北京智行者科技有限公司 The OAT upgrade methods and car-mounted terminal of vehicle
CN109345103A (en) * 2018-09-25 2019-02-15 北京地厚云图科技有限公司 Process receipt control method and storage medium

Also Published As

Publication number Publication date
CN106779585B (en) 2021-01-15

Similar Documents

Publication Publication Date Title
CN106779585A (en) Method, system and mobile terminal for supervising architectural engineering
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN105989443A (en) Intelligent-mobile-terminal-based communication line inspection system
WO2019226729A1 (en) Spatial linking visual navigation system and method of using the same
CN108765239A (en) Land resource information management system
KR20140032205A (en) System and method for disaster damage investigation based on mobile
CN109360123B (en) Multi-professional construction management method and system based on room
CN1484180A (en) Work progress rate management method and system
CN107076562A (en) Measure (getting a bird's eye view) type navigation system
CN106878232A (en) A kind of construction project moves observation system
CN101014021B (en) Method, system and client for searching user in instant messaging client
US20200143591A1 (en) System and method for creating interactive gps-integrated, 3d-modelled spaces
US20230031314A1 (en) Fencing brokering arrangement and method
CN116307658A (en) Emergency flow management method, system, electronic equipment and storage medium
CN115062940A (en) Intelligent visual inspection method and system for launching pad based on digital twins
CN112650659B (en) Buried point setting method and device, computer equipment and storage medium
Alam An innovative project management system
Lin et al. Development and Application of the Real-Time Individual Asset Attribute Collection Tool
Gupta et al. Ground water quality monitoring using wireless sensors and machine learning
CN110222935A (en) Natural calamity loss appraisal method and apparatus
Pine Research needs to support the emergency manager of the future
CN106780158A (en) Photo localization method and system
Sonnleitner et al. A crowd-sourcing approach for area-wide on-line building assessment towards earthquake engineering
Lin et al. Field data collection framework development and applications
CN110414870A (en) Well monitoring system and method based on the path GIS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant