CN110222935A - Natural calamity loss appraisal method and apparatus - Google Patents

Natural calamity loss appraisal method and apparatus Download PDF

Info

Publication number
CN110222935A
CN110222935A CN201910381743.0A CN201910381743A CN110222935A CN 110222935 A CN110222935 A CN 110222935A CN 201910381743 A CN201910381743 A CN 201910381743A CN 110222935 A CN110222935 A CN 110222935A
Authority
CN
China
Prior art keywords
loss
parameter
risk
target
assessment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910381743.0A
Other languages
Chinese (zh)
Other versions
CN110222935B (en
Inventor
叶有华
陈晓意
曾祉祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhongda Environmental Science And Technology Innovation Engineering Center Co Ltd
Original Assignee
Shenzhen Zhongda Environmental Science And Technology Innovation Engineering Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhongda Environmental Science And Technology Innovation Engineering Center Co Ltd filed Critical Shenzhen Zhongda Environmental Science And Technology Innovation Engineering Center Co Ltd
Priority to CN201910381743.0A priority Critical patent/CN110222935B/en
Publication of CN110222935A publication Critical patent/CN110222935A/en
Application granted granted Critical
Publication of CN110222935B publication Critical patent/CN110222935B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present application discloses a kind of natural calamity loss appraisal method and apparatus, and method includes: to obtain the natural calamity parameter in target region to be assessed, and natural calamity parameter includes risk parameter and loss parameter;Risk assessment is carried out based on risk parameter, obtains risk evaluation result, Risk Assessment Report is generated based on risk evaluation result;Loss appraisal is carried out based on loss parameter, obtains loss appraisal as a result, based on loss appraisal result generational loss assessment report;Export the corresponding Risk Assessment Report in displaying target region to be assessed and loss appraisal report.It can realize to lose natural calamity using the embodiment of the present application and carry out accurate evaluation.

Description

Natural calamity loss appraisal method and apparatus
Technical field
This application involves field of computer technology, and in particular to a kind of natural calamity loss appraisal method and apparatus.
Background technique
Capitalization of Natural Resources publicity and research increasingly increase, but technically still immature.Capitalization of Natural Resources project Natural calamity lose this how to assess no technology can be for reference.Currently, being commented using manual type natural calamity loss Estimate, it is not high that this mode assesses low efficiency, accuracy, it is therefore desirable to which a kind of lose for natural calamity carries out accurate evaluation Technology.
Summary of the invention
The embodiment of the present application provides a kind of natural calamity loss appraisal method and apparatus, for natural calamity lose into Row accurate evaluation.
The first aspect of the embodiment of the present application provides a kind of natural calamity loss appraisal method, which comprises
The natural calamity parameter in target region to be assessed is obtained, the natural calamity parameter includes risk parameter and loss Parameter;
Risk assessment is carried out based on the risk parameter, obtains risk evaluation result, it is raw based on the risk evaluation result At Risk Assessment Report;
Loss appraisal is carried out based on the loss parameter, obtains loss appraisal as a result, raw based on the loss appraisal result It is reported at loss appraisal;
Output shows the corresponding Risk Assessment Report in target region to be assessed and loss appraisal report.
In conjunction with the embodiment of the present application in a first aspect, in the first possible implementation of the first aspect, the N A target risk parameter includes target geological parameter, target hydrologic parameter and target climate parameter, described to be joined based on the risk Number carries out risk assessment, obtains risk evaluation result, comprising:
The target geological parameter, the target hydrologic parameter and the target climate parameter are inputted into risk assessment mould Type, for the risk evaluation model for determining risk size and risk of loss based on risk parameter, the risk evaluation model is pre- First it is stored with the mapping relations of geologic parameter and risk probability of happening, the mapping relations of hydrologic parameter and risk probability of happening, gas Wait mapping relations, risk size formula and the risk of loss formula of parameter and risk probability of happening;
The target geological parameter corresponding is determined with the mapping relations of risk probability of happening based on the geologic parameter One risk probability of happening;
The target hydrologic parameter corresponding is determined with the mapping relations of risk probability of happening based on the hydrologic parameter Two risk probability of happening;
The target climate parameter corresponding is determined with the mapping relations of risk probability of happening based on the climate parameter Three risk probability of happening;
Based on the first risk probability of happening, the second risk probability of happening, the third risk probability of happening and The risk size formula determines the corresponding target risk size of N number of target risk parameter;
Determine that N number of target risk parameter is corresponding based on the target risk size and the risk of loss formula Target risk loss;
It regard the target risk size and target risk loss as the risk evaluation result.
In conjunction with the first possible implementation of the embodiment of the present application first aspect, second in first aspect can In the implementation of energy, the M loss parameter includes building loss parameter, life line system loss parameter, provides naturally Source loss of assets parameter and production suspension induced losses parameter, it is described that loss appraisal is carried out based on the loss parameter, obtain loss appraisal knot Fruit, comprising:
By the building loss parameter, the life line system loss parameter, natural resource assets loss ginseng The several and production suspension induced losses parameter entrance loss assessment models, the loss evaluation model are used to determine based on loss parameter straight Loss and indirect loss are connect, the loss evaluation model is previously stored with building loss formula, life line system loss public affairs Formula, natural resource assets loss formula and production suspension induced losses formula;
Target region to be assessed is determined based on the building loss parameter and building loss formula Corresponding target structures house loss;
Determine that the target is to be assessed based on the life line system loss parameter and life line system loss formula The corresponding targeted vital line system loss in region;
Determine that the target waits for based on the natural resource assets loss parameter and natural resource assets loss formula The corresponding target natural resource assets loss of assessment area;
Key equipment loss and extraneoas loss are obtained, target structures house loss, the targeted vital linear system are united The sum of loss, target natural resource assets loss, key equipment loss and described extraneoas loss are used as the target The corresponding target direct losses in region to be assessed;
The corresponding mesh in target region to be assessed is determined based on the production suspension induced losses parameter and the production suspension induced losses formula Mark production suspension induced losses;
The disaster relief and post-disaster reconstruction loss are obtained, the target production suspension induced losses and the disaster relief and post-disaster reconstruction are lost it With as the corresponding target indirect loss in target area to be assessed;
Using the target direct losses and the target indirect loss as the loss appraisal result.
The second aspect of the embodiment of the present application provides a kind of natural calamity loss appraisal device, and described device includes obtaining Unit, the first assessment unit, the first generation unit, the second assessment unit, the second generation unit and output display unit are taken, In:
The acquiring unit, for obtaining the natural calamity parameter in target region to be assessed, the natural calamity parameter packet Include risk parameter and loss parameter;
First assessment unit obtains risk evaluation result for carrying out risk assessment based on the risk parameter;
First generation unit, for generating Risk Assessment Report based on the risk evaluation result;
Second assessment unit obtains loss appraisal result for carrying out loss appraisal based on the loss parameter;
Second generation unit, for being based on the loss appraisal result generational loss assessment report;
The output display unit shows the corresponding risk assessment report in the target region to be assessed for exporting It accuses and the loss appraisal is reported.
In conjunction with the second aspect of the embodiment of the present application, in the first possible implementation of the second aspect, it is being based on The risk parameter carries out risk assessment, and in terms of obtaining risk evaluation result, first assessment unit is specifically used for:
The target geological parameter, the target hydrologic parameter and the target climate parameter are inputted into risk assessment mould Type, for the risk evaluation model for determining risk size and risk of loss based on risk parameter, the risk evaluation model is pre- First it is stored with the mapping relations of geologic parameter and risk probability of happening, the mapping relations of hydrologic parameter and risk probability of happening, gas Wait mapping relations, risk size formula and the risk of loss formula of parameter and risk probability of happening;
The target geological parameter corresponding is determined with the mapping relations of risk probability of happening based on the geologic parameter One risk probability of happening;
The target hydrologic parameter corresponding is determined with the mapping relations of risk probability of happening based on the hydrologic parameter Two risk probability of happening;
The target climate parameter corresponding is determined with the mapping relations of risk probability of happening based on the climate parameter Three risk probability of happening;
Based on the first risk probability of happening, the second risk probability of happening, the third risk probability of happening and The risk size formula determines the corresponding target risk size of N number of target risk parameter;
Determine that N number of target risk parameter is corresponding based on the target risk size and the risk of loss formula Target risk loss;
It regard the target risk size and target risk loss as the risk evaluation result.
In conjunction with the first possible implementation of the embodiment of the present application second aspect, second in second aspect can In the implementation of energy, loss appraisal is being carried out based on the loss parameter, in terms of obtaining loss appraisal result, described second Assessment unit is specifically used for:
By the building loss parameter, the life line system loss parameter, natural resource assets loss ginseng The several and production suspension induced losses parameter entrance loss assessment models, the loss evaluation model are used to determine based on loss parameter straight Loss and indirect loss are connect, the loss evaluation model is previously stored with building loss formula, life line system loss public affairs Formula, natural resource assets loss formula and production suspension induced losses formula;
Target region to be assessed is determined based on the building loss parameter and building loss formula Corresponding target structures house loss;
Determine that the target is to be assessed based on the life line system loss parameter and life line system loss formula The corresponding targeted vital line system loss in region;
Determine that the target waits for based on the natural resource assets loss parameter and natural resource assets loss formula The corresponding target natural resource assets loss of assessment area;
Key equipment loss and extraneoas loss are obtained, target structures house loss, the targeted vital linear system are united The sum of loss, target natural resource assets loss, key equipment loss and described extraneoas loss are used as the target The corresponding target direct losses in region to be assessed;
The corresponding mesh in target region to be assessed is determined based on the production suspension induced losses parameter and the production suspension induced losses formula Mark production suspension induced losses;
The disaster relief and post-disaster reconstruction loss are obtained, the target production suspension induced losses and the disaster relief and post-disaster reconstruction are lost it With as the corresponding target indirect loss in target area to be assessed;
Using the target direct losses and the target indirect loss as the loss appraisal result.
The embodiment of the present application third aspect provide a kind of electronic equipment, including processor, memory, communication interface and One or more programs, said one or multiple programs are stored in above-mentioned memory, and are configured by above-mentioned processor It executes, above procedure includes for some or all of executing in method described in the embodiment of the present application first aspect step Instruction.
The embodiment of the present application fourth aspect provides a kind of computer readable storage medium, above-mentioned computer-readable storage Medium is used to store the computer program of electronic data interchange, wherein above-mentioned computer program makes computer execute such as this Shen It please step some or all of described in method described in embodiment first aspect.
The 5th aspect of the embodiment of the present application provides a kind of computer program product, and above-mentioned computer program product includes The non-transient computer readable storage medium of computer program is stored, above-mentioned computer program is operable to make computer Step some or all of described in method of the execution as described in the embodiment of the present application first aspect.The computer program produces Product can be a software installation packet.
As can be seen that in the embodiment of the present application, natural calamity loss appraisal device obtains the natural calamity in area to be assessed Evil parameter, natural calamity parameter include risk parameter and loss parameter, carry out risk assessment based on risk parameter, obtain risk Assessment result, generates Risk Assessment Report based on risk evaluation result, carries out loss appraisal based on loss parameter, is lost Assessment result, is based on loss appraisal result generational loss assessment report, and the corresponding risk in output displaying target area to be assessed is commented Estimate report and loss appraisal report.Natural calamity loss is assessed compared to using manual type, in the embodiment of the present application In, the natural calamity parameter based on target region to be assessed obtains the Risk Assessment Report in target region to be assessed and loss is commented Estimate report, and export display Risk Assessment Report and loss appraisal report, has been achieved and natural calamity loss is carried out accurately Assessment.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application or in background technique, below will be to the application reality Attached drawing needed in example or background technique is applied to be illustrated.
Figure 1A is a kind of flow diagram of natural calamity loss appraisal method provided by the embodiments of the present application;
Figure 1B is a kind of acquisition interface schematic diagram of natural calamity parameter provided by the embodiments of the present application;
Fig. 1 C is a kind of schematic diagram of Risk Assessment Report provided by the embodiments of the present application;
Fig. 1 D is a kind of schematic diagram of loss appraisal report provided by the embodiments of the present application;
Fig. 2 is the flow diagram of another natural calamity loss appraisal method provided by the embodiments of the present application;
Fig. 3 is a kind of functional unit composition block diagram of natural calamity loss appraisal device provided by the embodiments of the present application;
Fig. 4 is the structural schematic diagram of a kind of electronic equipment provided by the embodiments of the present application.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on Embodiment in the application, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall in the protection scope of this application.
The description and claims of this application and term " first " in above-mentioned attached drawing, " second " etc. are for area Not different objects, are not use to describe a particular order.In addition, term " includes " and " having " and their any deformations, meaning Figure, which is to cover, non-exclusive includes.Such as contain the process, method, system, product or equipment of a series of steps or units It is not limited to listed step or unit, but optionally further comprising the step of not listing or unit, or optionally also Including other step or units intrinsic for these process, methods, product or equipment.
" embodiment " mentioned in this application is it is meant that a particular feature, structure, or characteristic described can be in conjunction with the embodiments Included at least one embodiment of the application., which there is the phrase, in each position in the description to be each meant Identical embodiment, nor the independent or alternative embodiment with other embodiments mutual exclusion.Those skilled in the art are explicit Ground and implicitly understand, embodiments described herein can be combined with other embodiments.
Natural calamity loss appraisal device involved by the embodiment of the present application can integrate in the electronic device, and electronics is set Standby may include the various handheld devices with wireless communication function, mobile unit, wearable device, calculating equipment or connection To other processing equipments of radio modem and various forms of user equipmenies (user equipment, UE), move Dynamic platform (mobile station, MS), terminal device (terminal device) etc..It is above-mentioned for convenience of description Equipment is referred to as electronic equipment.
Figure 1A is please referred to, Figure 1A is that a kind of process of natural calamity loss appraisal method provided by the embodiments of the present application is shown It is intended to, executing subject is natural calamity loss appraisal device, which includes step 101-104, tool Body is as follows:
101: obtain target region to be assessed natural calamity parameter, the natural calamity parameter include risk parameter and Loss parameter.
Wherein, risk parameter includes geologic parameter, hydrologic parameter and climate parameter, and loss parameter includes building damage Lose parameter, life line system loss parameter, natural resource assets loss parameter and production suspension induced losses parameter.Geology refers to soil Form quality;The hydrology refers to the various phenomenons of variation, movement of water etc. in nature;Weather refers to local many years Weather long-run average;Building refers in planning and designing place, provides for user or investor and lives, produces, work Work or other movable entities;Life line system refers to maintaining city existence function system and has great shadow to national economy Loud engineering;Natural resource assets refer to country possess or control, expection can bring economic interests to the country and people , can be with the general name of the various material wealth elements of the nature of monetary measurement.
In a possible example, the natural calamity parameter in target region to be assessed is obtained, comprising:
It is inputted in the display screen display area label to be assessed of natural calamity loss appraisal device and region to be assessed Frame;
When detecting the first input operation for the region input frame to be assessed, the first input behaviour is obtained Make corresponding target region to be assessed;
Show that N number of risk parameter label and N number of risk parameter input frame, the N are greater than 1 on the display screen Integer;
When detecting the second input operation for N number of risk parameter input frame, the second input behaviour is obtained Make corresponding N number of target risk parameter;
Show that M loss parameter label and M loss parameter input frame, the M are greater than 1 on the display screen Integer;
When detecting the third input operation for the M loss parameter input frame, the third input behaviour is obtained Make corresponding M target loss parameter.
Wherein, area label to be assessed, which is used to indicate, inputs region to be assessed in region input frame to be assessed;One wind The corresponding risk parameter input frame of dangerous parameter tags, risk parameter label is used to indicate to be inputted in its corresponding risk parameter Risk parameter is inputted in frame;The corresponding loss parameter input frame of one loss parameter label, loss parameter label are used to indicate The entrance loss parameter in its corresponding loss parameter input frame.
For example, as shown in Figure 1B, Figure 1B is the acquisition interface schematic diagram of natural calamity parameter, is damaged in natural calamity Lose the display screen display area label to be assessed and region input frame to be assessed, 3 risk parameter labels and 3 of assessment device A risk parameter input frame and 4 loss parameter labels and 4 loss parameter input frames, 3 risk parameter labels include ground Matter parameter tags, hydrologic parameter label and weather parameter tags, 3 risk parameter input frames include geologic parameter input frame, water Literary parameter input frame and climate parameter input frame, 4 loss parameter labels include building loss parameter label, lifeline System loss parameter tags, natural resource assets loss parameter label and production suspension induced losses parameter tags, 4 loss parameter inputs Frame includes that building loss parameter input frame, life line system loss parameter input frame, natural resource assets loss parameter are defeated Enter frame and production suspension induced losses parameter input frame.
102: risk assessment being carried out based on the risk parameter, obtains risk evaluation result, is based on the risk assessment knot Fruit generates Risk Assessment Report.
In a possible example, N number of target risk parameter includes target geological parameter, target hydrologic parameter and mesh Climate parameter is marked, risk assessment is carried out based on the risk parameter, obtains risk evaluation result, comprising:
The target geological parameter, the target hydrologic parameter and the target climate parameter are inputted into risk assessment mould Type, for the risk evaluation model for determining risk size and risk of loss based on risk parameter, the risk evaluation model is pre- First it is stored with the mapping relations of geologic parameter and risk probability of happening, the mapping relations of hydrologic parameter and risk probability of happening, gas Wait mapping relations, risk size formula and the risk of loss formula of parameter and risk probability of happening;
The target geological parameter corresponding is determined with the mapping relations of risk probability of happening based on the geologic parameter One risk probability of happening;
The target hydrologic parameter corresponding is determined with the mapping relations of risk probability of happening based on the hydrologic parameter Two risk probability of happening;
The target climate parameter corresponding is determined with the mapping relations of risk probability of happening based on the climate parameter Three risk probability of happening;
Based on the first risk probability of happening, the second risk probability of happening, the third risk probability of happening and The risk size formula determines the corresponding target risk size of N number of target risk parameter;
Determine that N number of target risk parameter is corresponding based on the target risk size and the risk of loss formula Target risk loss;
It regard the target risk size and target risk loss as the risk evaluation result.
Wherein, risk size formula are as follows:
P=A1×α1+A2×α2+A3×α3,
P is the corresponding risk size of risk parameter, A1For the corresponding risk probability of happening of geologic parameter, α1For geologic parameter Corresponding weight, A2For the corresponding risk probability of happening of hydrologic parameter, α2For the corresponding weight of hydrologic parameter, A3For climate parameter Corresponding risk probability of happening, α3For the corresponding weight of climate parameter.
Wherein, α123=1, α1、α2And α3It is customized to can be user, is also possible to natural calamity loss appraisal Device is customized.
Wherein, risk of loss formula are as follows:
Q=B × P,
Q is the corresponding risk of loss of risk parameter, and B is the corresponding standard risk loss in region to be assessed, and P is risk ginseng The corresponding risk size of number.
In a possible example, Risk Assessment Report is generated based on the risk evaluation result, comprising:
The first report name, first organization unit's title and the first date are obtained, first report name, institute are based on It states first organization unit's title and first date generates the cover of the Risk Assessment Report;
First consigner's information and first assessment side's information are obtained, the first consigner information and described first are based on Assessment side's information generates the inside front cover of the Risk Assessment Report;
Obtain historic geology parameter, history hydrologic parameter, the historical climate parameter, first in target region to be assessed Assess principle, the first assessment foundation and the first assessment result;
Based on the target geological parameter, the target hydrologic parameter, the target climate parameter, the historic geology Parameter, the history hydrologic parameter, the historical climate parameter, the first assessment principle, the first assessment foundation, institute It states target risk size, target risk loss and first assessment result and generates the main of the Risk Assessment Report Content;
The inside front cover and the Risk Assessment Report of cover, the Risk Assessment Report based on the Risk Assessment Report Main contents form the Risk Assessment Report.
Specifically, obtain the first report name, first organization unit's title and the embodiment on the first date can be with are as follows: The first report name label and the first report name input frame, first organization unit's name label and are shown on a display screen One organization unit's title input frame and the first date tag and the first date entry box, the first report name label is for referring to Show and input the first report name in the first report name input frame, first organization unit's name label is used to indicate first First organization unit's title is inputted in organization unit's title input frame, the first date tag is used to indicate to be inputted on the first date Inputted for the first date in frame;The first report name input frame, first organization unit's title input frame and first are directed to when detecting When the 4th input operation of date entry box, obtains the 4th input and operate corresponding first report name, the first organization unit name Claim and the first date.
Specifically, the embodiment for obtaining first consigner's information and first assessment side's information can be with are as follows: on a display screen Show first consigner's information labels and first consigner's information input frame and first assessment side's information labels and the first assessment Square information input frame, first consigner's information labels are used to indicate the first commission of input in first consigner's information input frame Square information, first assessment side's information labels are used to indicate first assessment side's information of input in first assessment side's information input frame; When detecting the 5th input operation for first consigner's information input frame and first assessment side's information input frame, obtain 5th input operates corresponding first consigner information and first assessment side's information.
Wherein, first consigner's information includes client's title, client's legal representative's title, the first assessment side Information includes assessment organization, assessment unit legal representative title, project leader's information (name, post, academic title), skill Art responsible person information (name, post, academic title), auditor's information (name, post, academic title) and several participant's information (surnames Name, post, academic title).
Specifically, the historic geology parameter in target region to be assessed, history hydrologic parameter and historical climate parameter are obtained Embodiment can be with are as follows: sends and carries the risk parameter in target region to be assessed and request to risk parameter platform, risk parameter is asked Ask the historic geology parameter for being used to indicate risk parameter platform feedback target region to be assessed, history hydrologic parameter and history gas Wait parameter;Risk parameter platform is received to be directed to the historic geology parameter in the target region to be assessed that risk parameter request is sent, go through History hydrologic parameter and historical climate parameter.
Specifically, it obtains the first of target region to be assessed and assesses principle, the first assessment foundation and the first assessment result Embodiment can be with are as follows: show on a display screen the first assessment principle label and the first assessment principle input frame, the first assessment according to According to label and the first assessment according to input frame and the first assessment result label and the first assessment result input frame, the first assessment Principle label is used to indicate the first assessment of input principle, the first assessment in the first assessment principle input frame and is used for according to label In the first assessment according to the first assessment of input foundation in input frame, the first assessment result label is used to indicate to be commented first for instruction Estimate and inputs the first assessment result in conclusion input frame;It is assessed for the first assessment principle input frame, first according to defeated when detecting When entering the 6th input operation of frame and the first assessment result input frame, obtain the corresponding first assessment principle of the 6th input operation, First assessment foundation and the first assessment result.
Wherein, the first assessment principle includes legal conjunction rule principle, the preferential principle of the ecology, scientific and reasonable principle and independent visitor Principle is seen, the first assessment is according to including identified risk, the progress of project, the property of project and scale and data Accuracy and reliability.
For example, as shown in Figure 1 C, Fig. 1 C be Risk Assessment Report schematic diagram, Risk Assessment Report include cover, Inside front cover and main contents, cover include the first report name, first organization unit's title and the first date, and inside front cover includes first Consigner and first assessment side's information, main contents include target geological parameter, target hydrologic parameter, target climate parameter, go through History geologic parameter, history hydrologic parameter, historical climate parameter, first assessment principle, first assessment foundation, target risk size, Target risk loss and the first assessment result.
103: loss appraisal being carried out based on the loss parameter, obtains loss appraisal as a result, based on the loss appraisal knot Fruit generational loss assessment report.
In a possible example, M loss parameter includes building loss parameter, life line system loss ginseng Number, natural resource assets loss parameter and production suspension induced losses parameter carry out loss appraisal based on the loss parameter, are lost Assessment result, comprising:
By the building loss parameter, the life line system loss parameter, natural resource assets loss ginseng The several and production suspension induced losses parameter entrance loss assessment models, the loss evaluation model are used to determine based on loss parameter straight Loss and indirect loss are connect, the loss evaluation model is previously stored with building loss formula, life line system loss public affairs Formula, natural resource assets loss formula and production suspension induced losses formula;
Target region to be assessed is determined based on the building loss parameter and building loss formula Corresponding target structures house loss;
Determine that the target is to be assessed based on the life line system loss parameter and life line system loss formula The corresponding targeted vital line system loss in region;
Determine that the target waits for based on the natural resource assets loss parameter and natural resource assets loss formula The corresponding target natural resource assets loss of assessment area;
Key equipment loss and extraneoas loss are obtained, target structures house loss, the targeted vital linear system are united The sum of loss, target natural resource assets loss, key equipment loss and described extraneoas loss are used as the target The corresponding target direct losses in region to be assessed;
The corresponding mesh in target region to be assessed is determined based on the production suspension induced losses parameter and the production suspension induced losses formula Mark production suspension induced losses;
The disaster relief and post-disaster reconstruction loss are obtained, the target production suspension induced losses and the disaster relief and post-disaster reconstruction are lost it With as the corresponding target indirect loss in target area to be assessed;
Using the target direct losses and the target indirect loss as the loss appraisal result.
Wherein, building loses formula are as follows:
D1For building loss, i is part zone number to be assessed, and total n part region to be assessed, s is building room Room type number, totally 4 classes (residential architecture, public building, industrial building, farm buildings), j are to destroy Grade numbers, total k Grade, TsIt (i) is i-th of component assesses region s class floor space, λs(i, j) is i-th of house j grades of component assesses region s class The destruction ratio of destruction, BsFor s class house unit area cost, ηsIt (j) is the loss ratio of house j grades of s class destruction.
Wherein, life line system loses formula are as follows:
D2For life line system loss, s is lifeline type number, total n class, LsFor the destruction length of s class lifeline, Bs Reparation or resetting unit price for s class lifeline, RsFor the resetting unit price of s class monomer structure, ηsFor the loss of s class monomer structure Than.
Wherein, natural resource assets lose formula are as follows:
D4For natural resource assets loss, i is natural resource assets number, and total n class, j is value number in kind, total m Class, NijFor the loss amount that jth class material object under i class natural resource assets is worth, QijIt is real for jth class under i class natural resource assets The unit price of price value.
Wherein, production suspension induced losses formula are as follows:
I2=(B-A) × D,
I2For production suspension induced losses, B is the odd-numbered day output value before the calamity of enterprise, and A is the odd-numbered day output value after the calamity of enterprise, and D is that enterprise is disaster-stricken The halt production of influence or underproduction number of days.
Specifically, the embodiment for obtaining key equipment loss, extraneoas loss and the disaster relief and post-disaster reconstruction loss can be with Are as follows: key equipment loss label and key equipment loss input frame, extraneoas loss label and extraneoas loss are shown on a display screen Input frame is lost in input frame and the disaster relief and post-disaster reconstruction loss label and the disaster relief and post-disaster reconstruction, and key equipment loses label It is used to indicate the input key equipment loss in key equipment loss input frame, extraneoas loss label, which is used to indicate, additionally to be damaged Extraneoas loss is inputted in mistake input frame, the disaster relief and post-disaster reconstruction loss label are used to indicate defeated in the disaster relief and post-disaster reconstruction loss Enter to input the disaster relief and post-disaster reconstruction loss in frame;When detect for key equipment loss input frame, extraneoas loss input frame and When the 7th input operation of input frame is lost in the disaster relief and post-disaster reconstruction, the corresponding key equipment loss of the 7th input operation of acquisition, Extraneoas loss and the disaster relief and post-disaster reconstruction loss.
In a possible example, it is based on the loss appraisal result generational loss assessment report, comprising:
The second report name, second organization unit's title and the second date are obtained, second report name, institute are based on It states second organization unit's title and second date generates the cover of the loss appraisal report;
Second consigner's information and second assessment side's information are obtained, the second consigner information and described second are based on Assessment side's information generates the inside front cover of the loss appraisal report;
The natural calamity information that obtains target region to be assessed, the natural calamity information are to natural resources capital The influence information of change project, the second assessment principle, the second assessment foundation and the second assessment result;
Based on the natural calamity information, the influence information, it is described second assessment principle, it is described second assessment according to, The target direct losses, the target indirect loss and second assessment result generate the master of the loss appraisal report Want content;
The inside front cover of cover, loss appraisal report based on loss appraisal report and loss appraisal report Main contents form loss appraisal report.
Wherein, the second report name, second organization unit's title and the embodiment on the second date and acquisition first are obtained Report name, first organization unit's title are identical with the embodiment on the first date, no longer describe herein.
Wherein, it obtains the embodiment of second consigner's information and second assessment side's information and obtains the first consigner letter Breath is identical with the embodiment of first assessment side's information, no longer describes herein.
Wherein, second consigner's information includes client's title, client's legal representative's title, the second assessment side Information includes assessment organization, assessment unit legal representative title, project leader's information (name, post, academic title), skill Art responsible person information (name, post, academic title), auditor's information (name, post, academic title) and several participant's information (surnames Name, post, academic title).
Specifically, the embodiment for obtaining the natural calamity information in target region to be assessed can be with are as follows: sends and carries target For the information request in region to be assessed to natural calamity information platform, information request is used to indicate natural calamity information platform feedback The natural calamity information in target region to be assessed;It is to be evaluated to receive the target that nature disaster information platform is sent for information request Estimate the natural calamity information in region.
Wherein, capitalization of Natural Resources refers to promote natural resources value preserving and appreciation, according to relevant laws and regulations policy, Institutional mechanisms and technical method are innovated, natural resources is designed as product and enters the process that market is converted into income, including nature Resource Property Right is determining, natural resources assets v alue assesses accounting, natural resource assets circulation trading, natural resource assets finance The contents such as service, natural resource assets capitalization Mechanism Design.
Specifically, the embodiment for obtaining influence information of the nature disaster information to capitalization of Natural Resources project can be with Are as follows: showing on a display screen influences information labels and influences information input frame, influences information labels and is used to indicate in influence information Input influences information in input frame;When detecting for the 8th input operation for influencing information input frame, the 8th input is obtained Operate influence information of the corresponding natural calamity information to capitalization of Natural Resources project.
Wherein, the embodiment and acquisition first of the second assessment principle, the second assessment foundation and the second assessment result are obtained It is identical with the embodiment of the first assessment result to assess principle, the first assessment foundation, no longer describes herein.
Wherein, the second assessment principle is identical as the first assessment principle, and the second assessment is assessed according to first according to identical.
For example, as shown in figure iD, Fig. 1 D be loss appraisal report schematic diagram, loss appraisal report include cover, Inside front cover and main contents, cover include the second report name, second organization unit's title and the second date, and inside front cover includes second Consigner's information and second assessment side's information, main contents include natural calamity information, natural calamity information to natural resources money The influence information of this change project, the second assessment principle, the second assessment foundation, target direct losses, target indirect loss and second Assessment result.
104: output shows the corresponding Risk Assessment Report in target region to be assessed and the loss appraisal report It accuses.
As can be seen that in the embodiment of the present application, natural calamity loss appraisal device obtains the natural calamity in area to be assessed Evil parameter, natural calamity parameter include risk parameter and loss parameter, carry out risk assessment based on risk parameter, obtain risk Assessment result, generates Risk Assessment Report based on risk evaluation result, carries out loss appraisal based on loss parameter, is lost Assessment result, is based on loss appraisal result generational loss assessment report, and the corresponding risk in output displaying target area to be assessed is commented Estimate report and loss appraisal report.Natural calamity loss is assessed compared to using manual type, in the embodiment of the present application In, the natural calamity parameter based on target region to be assessed obtains the Risk Assessment Report in target region to be assessed and loss is commented Estimate report, and export display Risk Assessment Report and loss appraisal report, has been achieved and natural calamity loss is carried out accurately Assessment.
The embodiment of the present invention, natural calamity loss appraisal device obtain the natural calamity parameter in area to be assessed, natural calamity Evil parameter includes risk parameter and loss parameter, carries out risk assessment based on risk parameter, obtains risk evaluation result, be based on Risk evaluation result generates Risk Assessment Report, carries out loss appraisal based on loss parameter, obtains loss appraisal as a result, being based on Loss appraisal result generational loss assessment report, the corresponding Risk Assessment Report in output displaying target area to be assessed and loss Assessment report.Natural calamity loss is assessed compared to using manual type, in the embodiment of the present application, is based on target The natural calamity parameter in region to be assessed obtains Risk Assessment Report and the loss appraisal report in target region to be assessed, and defeated Risk Assessment Report and loss appraisal report are shown out, have been achieved and progress accurate evaluation is lost to natural calamity.
It is consistent with above-mentioned embodiment shown in figure 1A, referring to Fig. 2, Fig. 2 is another kind provided by the embodiments of the present application The flow diagram of natural calamity loss appraisal method, executing subject are natural calamity loss appraisal device, natural calamity damage Losing appraisal procedure includes step 201-215, specific as follows:
201: obtain target region to be assessed natural calamity parameter, the natural calamity parameter include risk parameter and Loss parameter, the loss parameter include building loss parameter, life line system loss parameter, natural resource assets damage Lose parameter and production suspension induced losses parameter.
202: risk assessment being carried out based on the risk parameter, obtains risk evaluation result, is based on the risk assessment knot Fruit generates Risk Assessment Report.
203: the building loss parameter, the life line system loss parameter, the natural resource assets are damaged Parameter and the production suspension induced losses parameter entrance loss assessment models are lost, the loss evaluation model is used for true based on loss parameter Determine direct losses and indirect loss, the loss evaluation model is previously stored with building loss formula, life line system damage Lose formula, natural resource assets loss formula and production suspension induced losses formula.
204: determining that the target is to be assessed based on the building loss parameter and building loss formula The corresponding target structures house loss in region.
205: determining that the target waits for based on the life line system loss parameter and life line system loss formula The corresponding targeted vital line system loss of assessment area.
206: the mesh is determined based on the natural resource assets loss parameter and natural resource assets loss formula Mark the corresponding target natural resource assets loss in region to be assessed.
207: key equipment loss and extraneoas loss are obtained, by target structures house loss, the targeted vital line Described in the sum of system loss, target natural resource assets loss, key equipment loss and described extraneoas loss are used as The corresponding target direct losses in target region to be assessed.
208: determining that target region to be assessed is corresponding based on the production suspension induced losses parameter and the production suspension induced losses formula Target production suspension induced losses.
209: obtaining the disaster relief and post-disaster reconstruction loss, the target production suspension induced losses and the disaster relief and post-disaster reconstruction are damaged The sum of mistake is as the corresponding target indirect loss in target area to be assessed.
210: using the target direct losses and the target indirect loss as loss appraisal result.
211: obtaining the second report name, second organization unit's title and the second date, be based on second report name Claim, the cover of second organization unit title and the second date generational loss assessment report.
212: obtaining second consigner's information and the second assessment side information, be based on the second consigner information and described Second assessment side's information generates the inside front cover of the loss appraisal report.
213: the natural calamity information that obtains target region to be assessed, the natural calamity information are to natural resources The influence information of capitalization project, the second assessment principle, the second assessment foundation and the second assessment result, based on the natural calamity Evil information, the influences information, the second assessment principle, described second assess foundation, the target direct losses, described Target indirect loss and second assessment result generate the main contents of the loss appraisal report.
214: the inside front cover and the loss appraisal of cover, loss appraisal report based on loss appraisal report The main contents of report form the loss appraisal report.
215: output shows the corresponding Risk Assessment Report in target region to be assessed and the loss appraisal report It accuses.
It should be noted that the specific implementation process of each step of method shown in Fig. 2 can be found in described in the above method Specific implementation process, no longer describe herein.
Referring to Fig. 3, Fig. 3 is a kind of functional unit of natural calamity loss appraisal device provided by the embodiments of the present application Composition block diagram, the natural calamity loss appraisal device 300 include acquiring unit 301, the first assessment unit 302, first generation list First 303, second assessment unit 304, the second generation unit 305 and output display unit 306, in which:
Acquiring unit 301, for obtaining the natural calamity parameter in target region to be assessed, the natural calamity parameter packet Include risk parameter and loss parameter;
First assessment unit 302 obtains risk evaluation result for carrying out risk assessment based on the risk parameter;
First generation unit 303, for generating Risk Assessment Report based on the risk evaluation result;
Second assessment unit 304 obtains loss appraisal result for carrying out loss appraisal based on the loss parameter;
Second generation unit 305, for being based on the loss appraisal result generational loss assessment report;
Display unit 306 is exported, shows the corresponding Risk Assessment Report in the target region to be assessed for exporting It is reported with the loss appraisal.
As can be seen that in the embodiment of the present application, natural calamity loss appraisal device obtains the natural calamity in area to be assessed Evil parameter, natural calamity parameter include risk parameter and loss parameter, carry out risk assessment based on risk parameter, obtain risk Assessment result, generates Risk Assessment Report based on risk evaluation result, carries out loss appraisal based on loss parameter, is lost Assessment result, is based on loss appraisal result generational loss assessment report, and the corresponding risk in output displaying target area to be assessed is commented Estimate report and loss appraisal report.Natural calamity loss is assessed compared to using manual type, in the embodiment of the present application In, the natural calamity parameter based on target region to be assessed obtains the Risk Assessment Report in target region to be assessed and loss is commented Estimate report, and export display Risk Assessment Report and loss appraisal report, has been achieved and natural calamity loss is carried out accurately Assessment.
In a possible example, in terms of the natural calamity parameter for obtaining target region to be assessed, above-mentioned acquisition list Member 301 is specifically used for:
It is inputted in the display screen display area label to be assessed of natural calamity loss appraisal device and region to be assessed Frame;
When detecting the first input operation for the region input frame to be assessed, the first input behaviour is obtained Make corresponding target region to be assessed;
Show that N number of risk parameter label and N number of risk parameter input frame, the N are greater than 1 on the display screen Integer;
When detecting the second input operation for N number of risk parameter input frame, the second input behaviour is obtained Make corresponding N number of target risk parameter;
Show that M loss parameter label and M loss parameter input frame, the M are greater than 1 on the display screen Integer;
When detecting the third input operation for the M loss parameter input frame, the third input behaviour is obtained Make corresponding M target loss parameter.
In a possible example, risk assessment is being carried out based on the risk parameter, is obtaining risk evaluation result side Face, above-mentioned first assessment unit 302 are specifically used for:
The target geological parameter, the target hydrologic parameter and the target climate parameter are inputted into risk assessment mould Type, for the risk evaluation model for determining risk size and risk of loss based on risk parameter, the risk evaluation model is pre- First it is stored with the mapping relations of geologic parameter and risk probability of happening, the mapping relations of hydrologic parameter and risk probability of happening, gas Wait mapping relations, risk size formula and the risk of loss formula of parameter and risk probability of happening;
The target geological parameter corresponding is determined with the mapping relations of risk probability of happening based on the geologic parameter One risk probability of happening;
The target hydrologic parameter corresponding is determined with the mapping relations of risk probability of happening based on the hydrologic parameter Two risk probability of happening;
The target climate parameter corresponding is determined with the mapping relations of risk probability of happening based on the climate parameter Three risk probability of happening;
Based on the first risk probability of happening, the second risk probability of happening, the third risk probability of happening and The risk size formula determines the corresponding target risk size of N number of target risk parameter;
Determine that N number of target risk parameter is corresponding based on the target risk size and the risk of loss formula Target risk loss;
It regard the target risk size and target risk loss as the risk evaluation result.
In a possible example, in terms of generating Risk Assessment Report based on the risk evaluation result, above-mentioned the One generation unit 303 is specifically used for:
The first report name, first organization unit's title and the first date are obtained, first report name, institute are based on It states first organization unit's title and first date generates the cover of the Risk Assessment Report;
First consigner's information and first assessment side's information are obtained, the first consigner information and described first are based on Assessment side's information generates the inside front cover of the Risk Assessment Report;
Obtain historic geology parameter, history hydrologic parameter, the historical climate parameter, first in target region to be assessed Assess principle, the first assessment foundation and the first assessment result;
Based on the target geological parameter, the target hydrologic parameter, the target climate parameter, the historic geology Parameter, the history hydrologic parameter, the historical climate parameter, the first assessment principle, the first assessment foundation, institute It states target risk size, target risk loss and first assessment result and generates the main of the Risk Assessment Report Content;
The inside front cover and the Risk Assessment Report of cover, the Risk Assessment Report based on the Risk Assessment Report Main contents form the Risk Assessment Report.
In a possible example, loss appraisal is being carried out based on the loss parameter, is obtaining loss appraisal result side Face, above-mentioned second assessment unit 304 are specifically used for:
By the building loss parameter, the life line system loss parameter, natural resource assets loss ginseng The several and production suspension induced losses parameter entrance loss assessment models, the loss evaluation model are used to determine based on loss parameter straight Loss and indirect loss are connect, the loss evaluation model is previously stored with building loss formula, life line system loss public affairs Formula, natural resource assets loss formula and production suspension induced losses formula;
Target region to be assessed is determined based on the building loss parameter and building loss formula Corresponding target structures house loss;
Determine that the target is to be assessed based on the life line system loss parameter and life line system loss formula The corresponding targeted vital line system loss in region;
Determine that the target waits for based on the natural resource assets loss parameter and natural resource assets loss formula The corresponding target natural resource assets loss of assessment area;
Key equipment loss and extraneoas loss are obtained, target structures house loss, the targeted vital linear system are united The sum of loss, target natural resource assets loss, key equipment loss and described extraneoas loss are used as the target The corresponding target direct losses in region to be assessed;
The corresponding mesh in target region to be assessed is determined based on the production suspension induced losses parameter and the production suspension induced losses formula Mark production suspension induced losses;
The disaster relief and post-disaster reconstruction loss are obtained, the target production suspension induced losses and the disaster relief and post-disaster reconstruction are lost it With as the corresponding target indirect loss in target area to be assessed;
Using the target direct losses and the target indirect loss as the loss appraisal result.
In a possible example, based in terms of the loss appraisal result generational loss assessment report, above-mentioned the Two generation units 305 are specifically used for:
The second report name, second organization unit's title and the second date are obtained, second report name, institute are based on It states second organization unit's title and second date generates the cover of the loss appraisal report;
Second consigner's information and second assessment side's information are obtained, the second consigner information and described second are based on Assessment side's information generates the inside front cover of the loss appraisal report;
The natural calamity information that obtains target region to be assessed, the natural calamity information are to natural resources capital The influence information of change project, the second assessment principle, the second assessment foundation and the second assessment result;
Based on the natural calamity information, the influence information, it is described second assessment principle, it is described second assessment according to, The target direct losses, the target indirect loss and second assessment result generate the master of the loss appraisal report Want content;
The inside front cover of cover, loss appraisal report based on loss appraisal report and loss appraisal report Main contents form loss appraisal report.
It is consistent with above-mentioned Figure 1A and embodiment shown in Fig. 2, referring to Fig. 4, Fig. 4 is provided by the embodiments of the present application The structural schematic diagram of a kind of electronic equipment, the electronic equipment 400 include processor, memory, communication interface and one or more A program, said one or multiple programs are stored in above-mentioned memory, and are configured to be executed by above-mentioned processor, on Stating program includes the instruction for executing following steps:
The natural calamity parameter in target region to be assessed is obtained, the natural calamity parameter includes risk parameter and loss Parameter;
Risk assessment is carried out based on the risk parameter, obtains risk evaluation result, it is raw based on the risk evaluation result At Risk Assessment Report;
Loss appraisal is carried out based on the loss parameter, obtains loss appraisal as a result, raw based on the loss appraisal result It is reported at loss appraisal;
Output shows the corresponding Risk Assessment Report in target region to be assessed and loss appraisal report.
As can be seen that in the embodiment of the present application, electronic equipment obtains the natural calamity parameter in area to be assessed, it is natural Disaster parameter includes risk parameter and loss parameter, carries out risk assessment based on risk parameter, obtains risk evaluation result, base Risk Assessment Report is generated in risk evaluation result, loss appraisal is carried out based on loss parameter, obtains loss appraisal as a result, base In loss appraisal result generational loss assessment report, the corresponding Risk Assessment Report in displaying target area to be assessed and damage are exported Lose assessment report.Natural calamity loss is assessed compared to using manual type, in the embodiment of the present application, is based on mesh The natural calamity parameter for marking region to be assessed obtains Risk Assessment Report and the loss appraisal report in target region to be assessed, and Output display Risk Assessment Report and loss appraisal report, have been achieved and have lost progress accurate evaluation to natural calamity.
In a possible example, in terms of the natural calamity parameter for obtaining target region to be assessed, above procedure packet Include the instruction for being specifically used for executing following steps:
It is inputted in the display screen display area label to be assessed of natural calamity loss appraisal device and region to be assessed Frame;
When detecting the first input operation for the region input frame to be assessed, the first input behaviour is obtained Make corresponding target region to be assessed;
Show that N number of risk parameter label and N number of risk parameter input frame, the N are greater than 1 on the display screen Integer;
When detecting the second input operation for N number of risk parameter input frame, the second input behaviour is obtained Make corresponding N number of target risk parameter;
Show that M loss parameter label and M loss parameter input frame, the M are greater than 1 on the display screen Integer;
When detecting the third input operation for the M loss parameter input frame, the third input behaviour is obtained Make corresponding M target loss parameter.
In a possible example, risk assessment is being carried out based on the risk parameter, is obtaining risk evaluation result side Face, above procedure include the instruction specifically for executing following steps:
The target geological parameter, the target hydrologic parameter and the target climate parameter are inputted into risk assessment mould Type, for the risk evaluation model for determining risk size and risk of loss based on risk parameter, the risk evaluation model is pre- First it is stored with the mapping relations of geologic parameter and risk probability of happening, the mapping relations of hydrologic parameter and risk probability of happening, gas Wait mapping relations, risk size formula and the risk of loss formula of parameter and risk probability of happening;
The target geological parameter corresponding is determined with the mapping relations of risk probability of happening based on the geologic parameter One risk probability of happening;
The target hydrologic parameter corresponding is determined with the mapping relations of risk probability of happening based on the hydrologic parameter Two risk probability of happening;
The target climate parameter corresponding is determined with the mapping relations of risk probability of happening based on the climate parameter Three risk probability of happening;
Based on the first risk probability of happening, the second risk probability of happening, the third risk probability of happening and The risk size formula determines the corresponding target risk size of N number of target risk parameter;
Determine that N number of target risk parameter is corresponding based on the target risk size and the risk of loss formula Target risk loss;
It regard the target risk size and target risk loss as the risk evaluation result.
In a possible example, in terms of generating Risk Assessment Report based on the risk evaluation result, above-mentioned journey Sequence includes the instruction specifically for executing following steps:
The first report name, first organization unit's title and the first date are obtained, first report name, institute are based on It states first organization unit's title and first date generates the cover of the Risk Assessment Report;
First consigner's information and first assessment side's information are obtained, the first consigner information and described first are based on Assessment side's information generates the inside front cover of the Risk Assessment Report;
Obtain historic geology parameter, history hydrologic parameter, the historical climate parameter, first in target region to be assessed Assess principle, the first assessment foundation and the first assessment result;
Based on the target geological parameter, the target hydrologic parameter, the target climate parameter, the historic geology Parameter, the history hydrologic parameter, the historical climate parameter, the first assessment principle, the first assessment foundation, institute It states target risk size, target risk loss and first assessment result and generates the main of the Risk Assessment Report Content;
The inside front cover and the Risk Assessment Report of cover, the Risk Assessment Report based on the Risk Assessment Report Main contents form the Risk Assessment Report.
In a possible example, loss appraisal is being carried out based on the loss parameter, is obtaining loss appraisal result side Face, above procedure include the instruction specifically for executing following steps:
By the building loss parameter, the life line system loss parameter, natural resource assets loss ginseng The several and production suspension induced losses parameter entrance loss assessment models, the loss evaluation model are used to determine based on loss parameter straight Loss and indirect loss are connect, the loss evaluation model is previously stored with building loss formula, life line system loss public affairs Formula, natural resource assets loss formula and production suspension induced losses formula;
Target region to be assessed is determined based on the building loss parameter and building loss formula Corresponding target structures house loss;
Determine that the target is to be assessed based on the life line system loss parameter and life line system loss formula The corresponding targeted vital line system loss in region;
Determine that the target waits for based on the natural resource assets loss parameter and natural resource assets loss formula The corresponding target natural resource assets loss of assessment area;
Key equipment loss and extraneoas loss are obtained, target structures house loss, the targeted vital linear system are united The sum of loss, target natural resource assets loss, key equipment loss and described extraneoas loss are used as the target The corresponding target direct losses in region to be assessed;
The corresponding mesh in target region to be assessed is determined based on the production suspension induced losses parameter and the production suspension induced losses formula Mark production suspension induced losses;
The disaster relief and post-disaster reconstruction loss are obtained, the target production suspension induced losses and the disaster relief and post-disaster reconstruction are lost it With as the corresponding target indirect loss in target area to be assessed;
Using the target direct losses and the target indirect loss as the loss appraisal result.
In a possible example, in terms of based on the loss appraisal result generational loss assessment report, above-mentioned journey Sequence includes the instruction specifically for executing following steps:
The second report name, second organization unit's title and the second date are obtained, second report name, institute are based on It states second organization unit's title and second date generates the cover of the loss appraisal report;
Second consigner's information and second assessment side's information are obtained, the second consigner information and described second are based on Assessment side's information generates the inside front cover of the loss appraisal report;
The natural calamity information that obtains target region to be assessed, the natural calamity information are to natural resources capital The influence information of change project, the second assessment principle, the second assessment foundation and the second assessment result;
Based on the natural calamity information, the influence information, it is described second assessment principle, it is described second assessment according to, The target direct losses, the target indirect loss and second assessment result generate the master of the loss appraisal report Want content;
The inside front cover of cover, loss appraisal report based on loss appraisal report and loss appraisal report Main contents form loss appraisal report.
The embodiment of the present application also provides a kind of computer storage medium, and the computer storage medium is for storing electron number According to the computer program of exchange, which execute computer such as either record in above method embodiment Some or all of method step, above-mentioned computer include electronic equipment.
The embodiment of the present application also provides a kind of computer program product, and above-mentioned computer program product includes storing meter The non-transient computer readable storage medium of calculation machine program, above-mentioned computer program are operable to execute computer as above State some or all of either record method step in embodiment of the method.The computer program product can be a software Installation kit, above-mentioned computer include electronic equipment.
It should be noted that for the various method embodiments described above, for simple description, therefore, it is stated as a systems The combination of actions of column, but those skilled in the art should understand that, the application is not limited by the described action sequence, Because some steps may be performed in other sequences or simultaneously according to the application.Secondly, those skilled in the art also answer This knows that the embodiments described in the specification are all preferred embodiments, and related actions and modules is not necessarily originally Necessary to application.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment Point, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed device, it can be by others side Formula is realized.For example, the apparatus embodiments described above are merely exemplary, such as the division of said units, only one Kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or It is desirably integrated into another system, or some features can be ignored or not executed.Another point, it is shown or discussed it is mutual it Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of device or unit It connects, can be electrical or other forms.
Above-mentioned unit as illustrated by the separation member may or may not be physically separated, as unit The component of display may or may not be physical unit, it can and it is in one place, or may be distributed over more In a network unit.Some or all of unit therein can be selected to realize this embodiment scheme according to the actual needs Purpose.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If above-mentioned integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer-readable access to memory.Based on this understanding, the technical solution of the application is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a memory, including some instructions are with so that a computer is set Standby (can be personal computer, server or network equipment etc.) execute each embodiment above method of the application whole or Part steps.And memory above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
Those of ordinary skill in the art will appreciate that all or part of the steps in the various methods of above-described embodiment is can It is completed with instructing relevant hardware by program, which can store in a computer-readable memory, memory May include: flash disk, read-only memory (English: Read-Only Memory, referred to as: ROM), random access device (English: Random Access Memory, referred to as: RAM), disk or CD etc..
The embodiment of the present application is described in detail above, principle of the specific case to the application used herein And embodiment is expounded, the present processes that the above embodiments are only used to help understand and its core are thought Think;At the same time, for those skilled in the art, according to the thought of the application, in specific implementation and application range There will be changes, to sum up above-mentioned, and the contents of this specification should not be construed as limiting the present application.

Claims (10)

1. a kind of natural calamity loss appraisal method, which is characterized in that the described method includes:
The natural calamity parameter in target region to be assessed is obtained, the natural calamity parameter includes risk parameter and loss parameter;
Risk assessment is carried out based on the risk parameter, obtains risk evaluation result, wind is generated based on the risk evaluation result Dangerous assessment report;
Loss appraisal is carried out based on the loss parameter, obtains loss appraisal as a result, generating damage based on the loss appraisal result Lose assessment report;
Output shows the corresponding Risk Assessment Report in target region to be assessed and loss appraisal report.
2. the method according to claim 1, wherein the natural calamity ginseng for obtaining target region to be assessed Number, comprising:
In the display screen display area label to be assessed and region input frame to be assessed of natural calamity loss appraisal device;
When detecting the first input operation for the region input frame to be assessed, obtains the first input operation and correspond to Target region to be assessed;
Show that N number of risk parameter label and N number of risk parameter input frame, the N are the integer greater than 1 on the display screen;
When detecting the second input operation for N number of risk parameter input frame, the second input operation pair is obtained The N number of target risk parameter answered;
Show that M loss parameter label and M loss parameter input frame, the M are the integer greater than 1 on the display screen;
When detecting the third input operation for the M loss parameter input frame, the third input operation pair is obtained The M target loss parameter answered.
3. according to the method described in claim 2, it is characterized in that, N number of target risk parameter include target geological parameter, Target hydrologic parameter and target climate parameter, it is described that risk assessment is carried out based on the risk parameter, risk evaluation result is obtained, Include:
The target geological parameter, the target hydrologic parameter and the target climate parameter are inputted into risk evaluation model, institute Risk evaluation model is stated for determining risk size and risk of loss based on risk parameter, the risk evaluation model is stored in advance There are the mapping relations of geologic parameter and risk probability of happening, the mapping relations of hydrologic parameter and risk probability of happening, climate parameter With mapping relations, risk size formula and the risk of loss formula of risk probability of happening;
Corresponding first wind of the target geological parameter is determined based on the geologic parameter and the mapping relations of risk probability of happening Dangerous probability of happening;
Corresponding second wind of the target hydrologic parameter is determined based on the hydrologic parameter and the mapping relations of risk probability of happening Dangerous probability of happening;
The corresponding third wind of the target climate parameter is determined based on the climate parameter and the mapping relations of risk probability of happening Dangerous probability of happening;
Based on the first risk probability of happening, the second risk probability of happening, the third risk probability of happening and described Risk size formula determines the corresponding target risk size of N number of target risk parameter;
The corresponding target wind of N number of target risk parameter is determined based on the target risk size and the risk of loss formula Danger loss;
It regard the target risk size and target risk loss as the risk evaluation result.
4. according to the method described in claim 3, it is characterized in that, described generate risk assessment based on the risk evaluation result Report, comprising:
The first report name, first organization unit's title and the first date are obtained, first report name, described first are based on Organization unit's title and first date generate the cover of the Risk Assessment Report;
First consigner's information and first assessment side's information are obtained, the first consigner information and the first assessment side are based on Information generates the inside front cover of the Risk Assessment Report;
Obtain historic geology parameter, history hydrologic parameter, historical climate parameter, the first assessment original in target region to be assessed Then, the first assessment foundation and the first assessment result;
Based on the target geological parameter, the target hydrologic parameter, the target climate parameter, the historic geology parameter, The history hydrologic parameter, the historical climate parameter, the first assessment principle, the first assessment foundation, the target Risk size, target risk loss and first assessment result generate the main contents of the Risk Assessment Report;
The inside front cover of cover, the Risk Assessment Report based on the Risk Assessment Report and the Risk Assessment Report it is main Content forms the Risk Assessment Report.
5. according to the method described in claim 2, it is characterized in that, the M loss parameter include building loss parameter, Life line system loss parameter, natural resource assets loss parameter and production suspension induced losses parameter, it is described based on the loss parameter into Row loss appraisal obtains loss appraisal result, comprising:
By the building loss parameter, the life line system loss parameter, the natural resource assets loss parameter and The production suspension induced losses parameter entrance loss assessment models, the loss evaluation model are used to determine direct losses based on loss parameter And indirect loss, the loss evaluation model are previously stored with building loss formula, life line system loss formula, nature Resource assets lose formula and production suspension induced losses formula;
Determine that target region to be assessed is corresponding based on the building loss parameter and building loss formula Target structures house loss;
Target region to be assessed is determined based on the life line system loss parameter and life line system loss formula Corresponding targeted vital line system loss;
Determine that the target is to be assessed based on the natural resource assets loss parameter and natural resource assets loss formula The corresponding target natural resource assets loss in region;
Obtain key equipment loss and extraneoas loss, by target structures house loss, the targeted vital line system loss, The target natural resource assets loss, key equipment loss and the sum of the extraneoas loss are to be assessed as the target The corresponding target direct losses in region;
Determine that the corresponding target in target region to be assessed is stopped based on the production suspension induced losses parameter and the production suspension induced losses formula Produce loss;
The disaster relief and post-disaster reconstruction loss are obtained, by the conduct of the sum of the target production suspension induced losses and the disaster relief and post-disaster reconstruction loss The corresponding target indirect loss in the target area to be assessed;
Using the target direct losses and the target indirect loss as the loss appraisal result.
6. according to the method described in claim 5, it is characterized in that, described assessed based on the loss appraisal result generational loss Report, comprising:
The second report name, second organization unit's title and the second date are obtained, second report name, described second are based on Organization unit's title and second date generate the cover of the loss appraisal report;
Second consigner's information and second assessment side's information are obtained, the second consigner information and the second assessment side are based on Information generates the inside front cover of the loss appraisal report;
The natural calamity information that obtains target region to be assessed, the natural calamity information are to capitalization of Natural Resources project Influence information, the second assessment principle, the second assessment foundation and the second assessment result;
Based on the natural calamity information, the influence information, it is described second assessment principle, it is described second assessment according to, it is described Target direct losses, the target indirect loss and second assessment result generate the main interior of the loss appraisal report Hold;
The inside front cover and the loss appraisal of cover, loss appraisal report based on loss appraisal report are reported main Content forms the loss appraisal report.
7. a kind of natural calamity loss appraisal device, which is characterized in that described device include acquiring unit, the first assessment unit, First generation unit, the second assessment unit, the second generation unit and output display unit, in which:
The acquiring unit, for obtaining the natural calamity parameter in target region to be assessed, the natural calamity parameter includes wind Dangerous parameter and loss parameter;
First assessment unit obtains risk evaluation result for carrying out risk assessment based on the risk parameter;
First generation unit, for generating Risk Assessment Report based on the risk evaluation result;
Second assessment unit obtains loss appraisal result for carrying out loss appraisal based on the loss parameter;
Second generation unit, for being based on the loss appraisal result generational loss assessment report;
The output display unit shows the corresponding Risk Assessment Report in the target region to be assessed and institute for exporting State loss appraisal report.
8. device according to claim 7, which is characterized in that in the natural calamity parameter side for obtaining target region to be assessed Face, the acquiring unit are specifically used for:
In the display screen display area label to be assessed and region input frame to be assessed of natural calamity loss appraisal device;
When detecting the first input operation for the region input frame to be assessed, obtains the first input operation and correspond to Target region to be assessed;
Show that N number of risk parameter label and N number of risk parameter input frame, the N are the integer greater than 1 on the display screen;
When detecting the second input operation for N number of risk parameter input frame, the second input operation pair is obtained The N number of target risk parameter answered;
Show that M loss parameter label and M loss parameter input frame, the M are the integer greater than 1 on the display screen;
When detecting the third input operation for the M loss parameter input frame, the third input operation pair is obtained The M target loss parameter answered.
9. a kind of electronic equipment, which is characterized in that including processor, memory, communication interface, and one or more programs, One or more of programs are stored in the memory, and are configured to be executed by the processor, described program packet Include the instruction for some or all of executing in as the method according to claim 1 to 6 step.
10. a kind of computer readable storage medium, which is characterized in that the computer readable storage medium is for storing computer Program, the computer program are executed by processor, to realize as the method according to claim 1 to 6.
CN201910381743.0A 2019-05-08 2019-05-08 Natural disaster damage assessment method and device Active CN110222935B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910381743.0A CN110222935B (en) 2019-05-08 2019-05-08 Natural disaster damage assessment method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910381743.0A CN110222935B (en) 2019-05-08 2019-05-08 Natural disaster damage assessment method and device

Publications (2)

Publication Number Publication Date
CN110222935A true CN110222935A (en) 2019-09-10
CN110222935B CN110222935B (en) 2021-11-30

Family

ID=67820699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910381743.0A Active CN110222935B (en) 2019-05-08 2019-05-08 Natural disaster damage assessment method and device

Country Status (1)

Country Link
CN (1) CN110222935B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815103A (en) * 2020-05-18 2020-10-23 深圳市第一反应信息科技有限公司 Method and equipment for determining outdoor risk assessment information
CN116433031A (en) * 2023-04-26 2023-07-14 中国农业科学院农业环境与可持续发展研究所 Dynamic loss evaluation method for realizing natural disasters based on input-output model
CN117876362A (en) * 2024-03-11 2024-04-12 国任财产保险股份有限公司 Deep learning-based natural disaster damage assessment method and device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040236676A1 (en) * 2003-03-14 2004-11-25 Kabushiki Kaisha Toshiba Disaster risk assessment system, disaster risk assessment support method, disaster risk assessment service providing system, disaster risk assessment method, and disaster risk assessment service providing method
WO2011088891A1 (en) * 2010-01-19 2011-07-28 Swiss Reinsurance Company Method and system for automated location dependent natural disaster forecast
CN103218522A (en) * 2013-04-01 2013-07-24 民政部国家减灾中心 Method and device for grading flood risk
CN105260603A (en) * 2015-10-14 2016-01-20 成都信息工程大学 Climatic event risk evaluation method and system
CN105788178A (en) * 2014-12-26 2016-07-20 黑龙江宏宇电站设备有限公司 Disaster prevention power station monitoring early warning system and monitoring method
CN106716477A (en) * 2014-08-26 2017-05-24 瑞士再保险有限公司 Disaster risk management and financing system, and corresponding method thereof
CN106940840A (en) * 2017-03-14 2017-07-11 东南大学 A kind of urban waterlogging calamity source appraisal procedure
CN108108587A (en) * 2017-12-28 2018-06-01 中国地震局工程力学研究所 Lifeline engineering subregion classification seismic direct economic loss appraisal procedure
CN109376996A (en) * 2018-09-18 2019-02-22 中国水利水电科学研究院 Flood losses appraisal procedure and system based on statistical yearbook and geography information
CN109544386A (en) * 2018-11-07 2019-03-29 北京科技大学 A kind of building concentration earthquake insurance rating method based on Building Information Model

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040236676A1 (en) * 2003-03-14 2004-11-25 Kabushiki Kaisha Toshiba Disaster risk assessment system, disaster risk assessment support method, disaster risk assessment service providing system, disaster risk assessment method, and disaster risk assessment service providing method
WO2011088891A1 (en) * 2010-01-19 2011-07-28 Swiss Reinsurance Company Method and system for automated location dependent natural disaster forecast
CN103218522A (en) * 2013-04-01 2013-07-24 民政部国家减灾中心 Method and device for grading flood risk
CN106716477A (en) * 2014-08-26 2017-05-24 瑞士再保险有限公司 Disaster risk management and financing system, and corresponding method thereof
CN105788178A (en) * 2014-12-26 2016-07-20 黑龙江宏宇电站设备有限公司 Disaster prevention power station monitoring early warning system and monitoring method
CN105260603A (en) * 2015-10-14 2016-01-20 成都信息工程大学 Climatic event risk evaluation method and system
CN106940840A (en) * 2017-03-14 2017-07-11 东南大学 A kind of urban waterlogging calamity source appraisal procedure
CN108108587A (en) * 2017-12-28 2018-06-01 中国地震局工程力学研究所 Lifeline engineering subregion classification seismic direct economic loss appraisal procedure
CN109376996A (en) * 2018-09-18 2019-02-22 中国水利水电科学研究院 Flood losses appraisal procedure and system based on statistical yearbook and geography information
CN109544386A (en) * 2018-11-07 2019-03-29 北京科技大学 A kind of building concentration earthquake insurance rating method based on Building Information Model

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜兴: "地震灾害间接经济损失评估方法研究", 《中国优秀硕士学位论文全文数据库 (基础科学辑)》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815103A (en) * 2020-05-18 2020-10-23 深圳市第一反应信息科技有限公司 Method and equipment for determining outdoor risk assessment information
CN116433031A (en) * 2023-04-26 2023-07-14 中国农业科学院农业环境与可持续发展研究所 Dynamic loss evaluation method for realizing natural disasters based on input-output model
CN117876362A (en) * 2024-03-11 2024-04-12 国任财产保险股份有限公司 Deep learning-based natural disaster damage assessment method and device
CN117876362B (en) * 2024-03-11 2024-05-28 国任财产保险股份有限公司 Deep learning-based natural disaster damage assessment method and device

Also Published As

Publication number Publication date
CN110222935B (en) 2021-11-30

Similar Documents

Publication Publication Date Title
Pradhan et al. The COVID‐19 pandemic not only poses challenges, but also opens opportunities for sustainable transformation
Eckhardt et al. Systematic literature review of methodologies for assessing the costs of disasters
Hassanzadeh et al. Interactive approach for GIS-based earthquake scenario development and resource estimation (Karmania hazard model)
Salgado-Gálvez et al. Urban seismic risk index for Medellín, Colombia, based on probabilistic loss and casualties estimations
Komendantova et al. Multi-risk approach and urban resilience
Ahmed et al. An evaluation framework for assessing resilience of post-disaster housing
Kirton Caribbean regional disaster response and management mechanisms: Prospects and challenges
Kapucu Disaster resilience and adaptive capacity in Central Florida, US, and in Eastern Marmara Region, Turkey
Aleskerov et al. A cluster‐based decision support system for estimating earthquake damage and casualties
CN110222935A (en) Natural calamity loss appraisal method and apparatus
Porter et al. Effect of seismic risk on lifetime property value
Abenayake et al. Applicability of extra-local methods for assessing community resilience to disasters: A case of Sri Lanka
Opabola et al. A mixed-mode data collection approach for building inventory development: application to school buildings in Central Sulawesi, Indonesia
Ghasemi et al. Perception and communication of seismic risk: Design and implementation of a functional tool
Coates et al. Agent-based modelling and inundation prediction to enable the identification of businesses affected by flooding
Ogbenjuwa et al. Shortages of skills & competences; constraint to private sector real estate funding in the emerging economies
Grossi et al. Sources, nature, and impact of uncertainties on catastrophe modeling
Chen et al. Evaluation of earthquake disaster recovery patterns and influencing factors: a case study of the 2008 Wenchuan earthquake
Asghar et al. Categorization of disaster decision support needs for the development of an integrated model for DMDSS
Adhikari et al. Measuring the Disaster Resilience of Municipalities in Nepal: A Case Study of Rampur Municipality, Palpa
Chang-Richards et al. Effects of disasters on displaced workers
Chang-Richards et al. Building natural disaster response capacity: Sound workforce strategies for recovery and reconstruction in APEC economies
Coppola Participants–Multilateral Organizations and International Financial Institutions
Ofei-Manu et al. Disaster Risk Reduction Capacity Assessment: Conceptualizing a Systematic Capacity (Assessment) Framework for Japan
Schneider et al. Seismology, Global Earthquake Model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant