CN108269071A - The method that buildings model is shared cloud platform and project management is carried out using platform - Google Patents
The method that buildings model is shared cloud platform and project management is carried out using platform Download PDFInfo
- Publication number
- CN108269071A CN108269071A CN201810213803.3A CN201810213803A CN108269071A CN 108269071 A CN108269071 A CN 108269071A CN 201810213803 A CN201810213803 A CN 201810213803A CN 108269071 A CN108269071 A CN 108269071A
- Authority
- CN
- China
- Prior art keywords
- model
- cloud platform
- project
- module
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 7
- 238000013461 design Methods 0.000 claims abstract description 35
- 238000012545 processing Methods 0.000 claims abstract description 15
- 238000004891 communication Methods 0.000 claims abstract description 9
- 238000007726 management method Methods 0.000 claims description 41
- 238000010276 construction Methods 0.000 claims description 20
- 238000012550 audit Methods 0.000 claims description 5
- 238000004364 calculation method Methods 0.000 claims description 5
- 230000008859 change Effects 0.000 claims description 5
- 244000028344 Primula vulgaris Species 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 230000004048 modification Effects 0.000 abstract description 3
- 238000012986 modification Methods 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000009430 construction management Methods 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000011960 computer-aided design Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000019771 cognition Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/101—Collaborative creation, e.g. joint development of products or services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
A kind of method shared cloud platform the present invention relates to buildings model and project management is carried out using platform, belongs to engineering construction management technical field.A kind of buildings model shares cloud platform, it is characterised in that:Cloud platform includes data processing system, Rights Management System, database and the network communication module of installation on the server;Wherein data processing system can load layout design module, modeling module, cost information module, project management module and file modular converter, after user terminal is by network connection network communication module login service device, project can be established in the database of cloud platform, and layout design, buildings model making, Project Management are carried out using each module of data processing system loading, result is preserved in the database.The present invention makes the project Fang Junneng that respectively takes part in building participate in buildings model and make, in in-depth and modification, to ensure that buildings model meets the actual needs for each side that takes part in building, reduces each side in software and hardware input and the cost of follow-up maintenance upgrading.
Description
Technical field
Cloud platform is shared the present invention relates to a kind of buildings model more particularly to a kind of buildings model shares cloud platform and utilization
The method that platform carries out project management.
Background technology
Building Information Model (BIM) is the abbreviation of English " Building Information Modeling ", as engineering
The data tool of design, by during the relevant information of project is integrated into designs a model, in the Life cycle of project into
It goes and transmits and share, make engineers and technicians that various architecture informations are made with correctly understanding and coped with efficient, building item
Mu Ge units of taking part in building cooperate, improve production efficiency, cost-effective and shorten the construction period etc. and to play a role.
Building Information Model currently at home in there are mainly three types of application model:First, company's root by offer professional service
The Building Information Model of professional software making is used according to drawing of engineering design, user is supplied to use;Second is that Architecture Design Institute exists
It carries out carrying out Building Information Model making while engineering design, profession inside designing institute is additionally operable in addition to except being supplied to user
Between coordination;Third, construction enterprises according to construction unit require carry out Building Information Model making, one as completion information
Point.Since the user for carrying out the unit of Building Information Model making and needing respectively has deviation to the cognition of Building Information Model, use
Family can not correctly propose the clear and definite demand that Building Information Model is made and used, and each production unit makes Building Information Model
When only according to oneself need, without considering other unit, to cause the model produced with practical design, construction, management system not
Enough it is consistent, it is difficult to reach project and take part in building the depth that each side can use, to play its due so as to limit Building Information Model
Effect.Although have Some Enterprises to prepare to build relevant platform in therein, but still there are it is of high cost, efficiency is low etc. lacks
Point.And making Building Information Model needs higher software and hardware configuration and the personnel for being familiar with operation and limitation middle-size and small-size
The big threshold that enterprise uses.
Invention content
Cloud platform is shared the purpose of the present invention is to provide a kind of buildings model and the side of project management is carried out using platform
Method meets multiple units of taking part in building and simultaneously participates in design drawing, make Building Information Model, carry out the needs of Project Management.
Technical solution:
A kind of buildings model shares cloud platform, and cloud platform includes installation data processing system on the server, permission pipe
Reason system, database and network communication module;Wherein data processing system can load layout design module, modeling module, cost
Information module, project management module and file modular converter, user terminal pass through network connection network communication module login service
After device, project can be established in the database of cloud platform, and using data processing system loading each module carry out layout design,
Buildings model makes, Project Management, and result is preserved in the database.
Server can access two and above user terminal simultaneously, while preserve, run two and above project, protect
It holds between each user and project space independently of each other, the different user in same project can share what is respectively created or upload
File, drawing, model, managerial data, and the different rights set according to Rights Management System are to file, drawing, model, management
Data is accessed, changes, audits, is downloaded.
Data processing system audits different user in server end, modified file and managerial data carry out version more
Newly, the drawing or model different user is made, changed integrate, and the Outcome Document of formation is supplied what is had permission in project
Users to share uses.
Layout design module includes computer aided design software (CAD), sketch great master (Sketch Up);Modeling module
Including Building Information Model (BIM) Software for producing;Cost information module include engineering valuation software, reinforcement detailing calculation amount software,
Template turns over sample calculation amount software;Engineering management module includes Microsoft Project, Primavera 6;File modular converter energy
By the file progress format conversion of user's upload different-format and uniformly.
A kind of method that cloud platform progress project management is shared using above-mentioned buildings model, using following steps:
Step S1, layout design is carried out in cloud platform, establish basic model by design side;
Step S2, construction in-depth model is made according to basic model in cloud platform by total Bao Fang;It is put down by subcontractor in cloud
Subpackage layout design is carried out according to the drawing of designing institute and basic model on platform and modelling is deepened in subpackage;
Step S3, each side's Deepen Design drawing and in-depth model through related side after the approval, put down by general contracting unit in cloud
Each in-depth model is integrated on platform;
Step S4, after the change occurred in construction is approved after examination through management side, by moving party's revisions on drawings and model, most
End form is into completion model;
Step S5, directly using the drawing of final version and the output of completion model as completion information after being completed, for archives
It achieves, the operational management model used for the building operation phase is converted to by loading intelligent management system.
Advantageous effect:
1) present invention changes individually carries out Building Information Model production method with some unit at present, by shared and
Rights management make project respectively take part in building Fang Junneng participated in cloud platform buildings model cooperation make, in-depth and modification, it is ensured that
The buildings model produced meets the actual needs of each side's work.
2) all layout designs of a construction project, buildings model make, Project Management operation takes beyond the clouds
Business device is completed, and the speed of service is fast, space is big, and each unit of taking part in building does not need to purchase software and hardware respectively, reduces each side that takes part in building
The cost of input and follow-up maintenance upgrading on software and hardware.
3) all softwares needed for platform offer project, and the file of identical function different-format can be turned into row format
It changes, breaks barrier between different software.
4) it provides since construction project plans until the total Managed Solution that project comes into operation, has penetrated through project pipe
Upstream and downstream is managed, information-based application level is improved for China's construction project and has established solid foundation.
Description of the drawings
Fig. 1 buildings models share the structure chart of cloud platform;
The project space schematic diagram established in Fig. 2 databases;
Fig. 3 shares the flow chart of cloud platform progress project management using buildings model;
Wherein:100 be server, 110 be data processing system, 111 be layout design module, 112 be modeling module,
113 it is file modular converter, 114 be cost information module, 115 be project management module, 120 be Rights Management System, 130 is
Network communication module, 140 be database, 200 be user terminal.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings:
A kind of buildings model shares cloud platform as shown in Figure 1 and Figure 2, and cloud platform includes the data being mounted on server 100
Processing system 110, Rights Management System 120, database 140 and network communication module 130;Wherein 110 energy of data processing system
Load layout design module 111, modeling module 112, cost information module 114, project management module 115 and file modular converter
113, it, can be in the database of cloud platform after user terminal 200 is by 130 login service device 100 of network connection network communication module
Project is established in 140, and layout design, buildings model making, project are carried out using each module that data processing system 110 loads
Result is stored in database 140 by management work.
The server can access two and above user terminal 200 simultaneously, while preserves, runs two and above
Project is kept between each user and project space independently of each other, and the different user in same project can share respective establishment
Or file, drawing, model, the managerial data uploaded, and according to the different rights that Rights Management System 120 is set to file, figure
Paper, model, managerial data are accessed, change, audit, are downloaded.
Data processing system 110 audits different user in server end, modified file and managerial data carry out version
This update, the drawing or model different user is made, changed integrate, and by the Outcome Document of formation for having the right in project
The users to share of limit uses.
Layout design module 111 includes computer aided design software (CAD), sketch great master (Sketch Up);Model mould
Block 112 includes Building Information Model (BIM) Software for producing;Cost information module 114 includes engineering valuation software, reinforcement detailing is calculated
Amount software, template turn over sample calculation amount software;Engineering management module 115 includes Microsoft Project, Primavera 6;File
The file that user can be uploaded different-format by modular converter 113 carries out format conversion and uniformly.
Cloud platform is shared using above-mentioned buildings model as shown in Figure 3 and carry out project management, using following steps:
Step S1, layout design is carried out in cloud platform, establish basic model by design side;
Step S2, construction in-depth model is made according to basic model in cloud platform by total Bao Fang;It is put down by subcontractor in cloud
Subpackage layout design is carried out according to the drawing of designing institute and basic model on platform and modelling is deepened in subpackage;
Step S3, each side's Deepen Design drawing and in-depth model through related side after the approval, put down by general contracting unit in cloud
Each in-depth model is integrated on platform;
Step S4, after the change occurred in construction is approved after examination through management side, by moving party's revisions on drawings and model, most
End form is into completion model;
Step S5, directly using the drawing of final version and the output of completion model as completion information after being completed, for archives
It achieves, the operational management model used for the building operation phase is converted to by loading intelligent management system.
Embodiment one, user log in cloud platform by network remote, create project, and construction project related personnel is added in simultaneously
Different permissions is set, by designing unit's complete design drawing and basic model, by unit in charge of construction and professional subpackage unit in-depth
Model integrates after construction unit's examination and recognition in cloud platform, and respectively the side of taking part in building constructs by this;The manager of unit of taking part in building can lead to simultaneously
Cross cost information module and project management module and carry out tracing control to the investment of entire project, progress, unit in charge of construction submit into
Degree plan and charge plan, after being audited on platform via supervisor and construction unit, each side is performed by this, and can be according to reality
Border situation is corrected at any time, and the Fang Junneng that respectively takes part in building after one party amendment sees;It, can be in cloud as design alteration occurs in construction
It modifies on platform to drawing or buildings model and is sent to relevant unit;As-built drawing can be not only directly obtained after completion and is completed
Work model, moreover it is possible to which the settlement price of construction project is obtained by cost information module;Project enters after the operation phase by loading intelligence
System can be managed completion model can be switched to operational management model and continue on for estate management.
Embodiment two, user have had design drawing and buildings model, and by network cloud platform, establishment project simultaneously uploads phase
Pass data, can free converting data form, and shared according to permission and other users in project, keep the money that respectively side of taking part in building obtains
The consistency of material.
Embodiment three, user can be reduced in self-built internal entries management platform Data Migration to cloud platform soft or hard
The cost safeguarded on part, upgraded.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to restrict the invention, all originals in the present invention
Then with all any modification, equivalent and improvement made within spirit etc., should all be included in the protection scope of the present invention.
Claims (5)
1. a kind of buildings model shares cloud platform, it is characterised in that:Cloud platform is included at the data being mounted on server (100)
Reason system (110), Rights Management System (120), database (140) and network communication module (130);Wherein data processing system
(110) layout design module (111), modeling module (112), cost information module (114), project management module can be loaded
(115) and file modular converter (113), user terminal (200) pass through network connection network communication module (130) login service device
(100) after, project, and each module loaded using data processing system (110) can be established in the database (140) of cloud platform
Layout design, buildings model making, Project Management are carried out, result is stored in database (140).
2. buildings model as described in claim 1 shares cloud platform, it is characterised in that:The server can access simultaneously two and
Above user terminal (200), while preserve, run two and above project, keep between each user and project space it
Between independently of each other, the different user in same project can share respectively create or upload file, drawing, model, managerial data,
And according to the different rights that Rights Management System (120) is set to file, drawing, model, managerial data access, change,
Audit is downloaded.
3. buildings model as described in claim 1 shares cloud platform, it is characterised in that:The data processing system (110) is taking
Different user is audited at business device end, modified file and managerial data carry out version updating, and different user is made, is changed
Drawing or model are integrated, and the Outcome Document of formation is used for the users to share being had permission in project.
4. buildings model as described in claim 1 shares cloud platform, it is characterised in that:The layout design module (111) includes
Computer aided design software, sketch great master;Modeling module (112) includes Building Information Model Software for producing;Cost information mould
Block (114) turns over sample calculation amount software including engineering valuation software, reinforcement detailing calculation amount software, template;Engineering management module (115) is wrapped
Include Microsoft Project, Primavera 6;File modular converter (113) can by user upload different-format file into
Row format convert and uniformly.
5. a kind of buildings model using described in one of Claims 1-4 4 shares the method that cloud platform carries out project management, special
Sign is:Using following steps:
Step S1, layout design is carried out in cloud platform, establish basic model by design side;
Step S2, construction in-depth model is made according to basic model in cloud platform by total Bao Fang;By subcontractor in cloud platform
Subpackage layout design and subpackage in-depth modelling are carried out according to the drawing of designing institute and basic model;
Step S3, each side's Deepen Design drawing and in-depth model through related side after the approval, by general contracting unit in cloud platform
Each in-depth model is integrated;
Step S4, after the change occurred in construction is approved after examination through management side, by moving party's revisions on drawings and model, most end form
Into completion model;
Step S5, directly the drawing of final version and completion model are exported as completion information after being completed, achieved for archives,
The operational management model used for the building operation phase is converted to by loading intelligent management system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810213803.3A CN108269071A (en) | 2018-03-15 | 2018-03-15 | The method that buildings model is shared cloud platform and project management is carried out using platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810213803.3A CN108269071A (en) | 2018-03-15 | 2018-03-15 | The method that buildings model is shared cloud platform and project management is carried out using platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108269071A true CN108269071A (en) | 2018-07-10 |
Family
ID=62774888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810213803.3A Pending CN108269071A (en) | 2018-03-15 | 2018-03-15 | The method that buildings model is shared cloud platform and project management is carried out using platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108269071A (en) |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109240656A (en) * | 2018-08-02 | 2019-01-18 | 中衡设计集团股份有限公司 | A kind of Structure Calculation and analysis system based on web |
CN109657270A (en) * | 2018-11-08 | 2019-04-19 | 上海建工五建集团有限公司 | Drawing creation method and system |
CN109886645A (en) * | 2019-01-29 | 2019-06-14 | 杭州凌望建筑科技有限公司 | Multidimensional mould based on BIM examines platform |
CN109977496A (en) * | 2019-03-09 | 2019-07-05 | 佰模伝信息科技(厦门)有限公司 | Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate |
CN110110465A (en) * | 2019-05-16 | 2019-08-09 | 洛阳众智软件科技股份有限公司 | Management system for urban design |
CN110503321A (en) * | 2019-08-13 | 2019-11-26 | 湖北省水利水电规划勘测设计院 | General contract of civil engineering project management system |
CN110688356A (en) * | 2019-09-30 | 2020-01-14 | 深圳市华阳国际工程设计股份有限公司 | Information sharing method and device based on BIM platform and computer storage medium |
CN110879907A (en) * | 2019-11-15 | 2020-03-13 | 上海宝冶集团有限公司 | BIM model collaborative creation method |
CN111475874A (en) * | 2020-02-25 | 2020-07-31 | 中森(深圳)建筑幕墙咨询有限公司 | Method, system, computing device and computer-readable storage medium for implementing architectural maintenance structure design |
CN111582704A (en) * | 2020-04-30 | 2020-08-25 | 重庆世创工程管理有限公司 | Shared EPC + system |
CN111709081A (en) * | 2020-06-22 | 2020-09-25 | 苏州柝创智慧建筑科技有限公司 | Construction cost control system based on BIM technology |
CN112232760A (en) * | 2020-09-27 | 2021-01-15 | 广西绿能电力勘察设计有限公司 | Infrastructure management system and method |
CN112381529A (en) * | 2020-12-04 | 2021-02-19 | 升维科技有限公司 | BIM-based deep design process diagram generation method |
CN112528374A (en) * | 2020-12-09 | 2021-03-19 | 四川蓉信开工程设计有限公司 | Water treatment engineering design system |
CN112541490A (en) * | 2020-12-03 | 2021-03-23 | 广州城市规划技术开发服务部有限公司 | Archive image information structured construction method and device based on deep learning |
CN112580128A (en) * | 2020-11-02 | 2021-03-30 | 安徽富煌钢构股份有限公司 | Assembled steel construction building house type management platform |
CN112597568A (en) * | 2020-12-15 | 2021-04-02 | 浙江互创建筑工程有限公司 | Green building engineering design system |
CN112685710A (en) * | 2020-11-14 | 2021-04-20 | 刘坤 | CAD (computer-aided design) cooperative office platform |
CN113542249A (en) * | 2021-07-08 | 2021-10-22 | 昆明学院 | Multi-protocol data issuing system |
CN113590249A (en) * | 2021-07-29 | 2021-11-02 | 江南造船(集团)有限责任公司 | Ship outfitting data management method, system, medium and electronic equipment |
CN114066396A (en) * | 2021-10-26 | 2022-02-18 | 中建一局集团第二建筑有限公司 | Method for managing version of building information model by using block chain technology |
CN115439023A (en) * | 2022-11-08 | 2022-12-06 | 壹仟零壹艺网络科技(北京)有限公司 | BIM technology-based application method of distribution box/cabinet in operation management stage |
CN116011066A (en) * | 2022-12-21 | 2023-04-25 | 浙江柒和环境艺术设计有限公司 | Building design method and system based on BIM technology |
CN116091174A (en) * | 2023-04-07 | 2023-05-09 | 湖南工商大学 | Recommendation policy optimization system, method and device and related equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
CN105868440A (en) * | 2016-03-21 | 2016-08-17 | 扬州大学 | Construction engineering data modeling method based on BIM (Building Information Modeling) technology |
CN106779585A (en) * | 2016-11-25 | 2017-05-31 | 泰康保险集团股份有限公司 | Method, system and mobile terminal for supervising architectural engineering |
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
-
2018
- 2018-03-15 CN CN201810213803.3A patent/CN108269071A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
CN105868440A (en) * | 2016-03-21 | 2016-08-17 | 扬州大学 | Construction engineering data modeling method based on BIM (Building Information Modeling) technology |
CN106779585A (en) * | 2016-11-25 | 2017-05-31 | 泰康保险集团股份有限公司 | Method, system and mobile terminal for supervising architectural engineering |
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
Non-Patent Citations (1)
Title |
---|
孔祯荣: "大型城市综合体施工总承包管理研究" * |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109240656B (en) * | 2018-08-02 | 2021-09-21 | 中衡设计集团股份有限公司 | Web-based structural calculation and analysis system |
CN109240656A (en) * | 2018-08-02 | 2019-01-18 | 中衡设计集团股份有限公司 | A kind of Structure Calculation and analysis system based on web |
CN109657270A (en) * | 2018-11-08 | 2019-04-19 | 上海建工五建集团有限公司 | Drawing creation method and system |
CN109886645A (en) * | 2019-01-29 | 2019-06-14 | 杭州凌望建筑科技有限公司 | Multidimensional mould based on BIM examines platform |
CN109977496A (en) * | 2019-03-09 | 2019-07-05 | 佰模伝信息科技(厦门)有限公司 | Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate |
CN110110465B (en) * | 2019-05-16 | 2023-04-07 | 洛阳众智软件科技股份有限公司 | Management system for city design |
CN110110465A (en) * | 2019-05-16 | 2019-08-09 | 洛阳众智软件科技股份有限公司 | Management system for urban design |
CN110503321B (en) * | 2019-08-13 | 2023-06-30 | 湖北省水利水电规划勘测设计院 | Project total contractor management system |
CN110503321A (en) * | 2019-08-13 | 2019-11-26 | 湖北省水利水电规划勘测设计院 | General contract of civil engineering project management system |
CN110688356A (en) * | 2019-09-30 | 2020-01-14 | 深圳市华阳国际工程设计股份有限公司 | Information sharing method and device based on BIM platform and computer storage medium |
CN110879907A (en) * | 2019-11-15 | 2020-03-13 | 上海宝冶集团有限公司 | BIM model collaborative creation method |
CN111475874A (en) * | 2020-02-25 | 2020-07-31 | 中森(深圳)建筑幕墙咨询有限公司 | Method, system, computing device and computer-readable storage medium for implementing architectural maintenance structure design |
CN111582704A (en) * | 2020-04-30 | 2020-08-25 | 重庆世创工程管理有限公司 | Shared EPC + system |
CN111709081A (en) * | 2020-06-22 | 2020-09-25 | 苏州柝创智慧建筑科技有限公司 | Construction cost control system based on BIM technology |
CN112232760A (en) * | 2020-09-27 | 2021-01-15 | 广西绿能电力勘察设计有限公司 | Infrastructure management system and method |
CN112580128A (en) * | 2020-11-02 | 2021-03-30 | 安徽富煌钢构股份有限公司 | Assembled steel construction building house type management platform |
CN112685710A (en) * | 2020-11-14 | 2021-04-20 | 刘坤 | CAD (computer-aided design) cooperative office platform |
CN112541490A (en) * | 2020-12-03 | 2021-03-23 | 广州城市规划技术开发服务部有限公司 | Archive image information structured construction method and device based on deep learning |
CN112381529A (en) * | 2020-12-04 | 2021-02-19 | 升维科技有限公司 | BIM-based deep design process diagram generation method |
CN112528374A (en) * | 2020-12-09 | 2021-03-19 | 四川蓉信开工程设计有限公司 | Water treatment engineering design system |
CN112597568A (en) * | 2020-12-15 | 2021-04-02 | 浙江互创建筑工程有限公司 | Green building engineering design system |
CN113542249A (en) * | 2021-07-08 | 2021-10-22 | 昆明学院 | Multi-protocol data issuing system |
CN113590249A (en) * | 2021-07-29 | 2021-11-02 | 江南造船(集团)有限责任公司 | Ship outfitting data management method, system, medium and electronic equipment |
CN114066396A (en) * | 2021-10-26 | 2022-02-18 | 中建一局集团第二建筑有限公司 | Method for managing version of building information model by using block chain technology |
CN114066396B (en) * | 2021-10-26 | 2022-08-02 | 中建一局集团第二建筑有限公司 | Method for managing version of building information model by using block chain technology |
CN115439023A (en) * | 2022-11-08 | 2022-12-06 | 壹仟零壹艺网络科技(北京)有限公司 | BIM technology-based application method of distribution box/cabinet in operation management stage |
CN116011066A (en) * | 2022-12-21 | 2023-04-25 | 浙江柒和环境艺术设计有限公司 | Building design method and system based on BIM technology |
CN116011066B (en) * | 2022-12-21 | 2023-07-11 | 浙江柒和环境艺术设计有限公司 | Building design method and system based on BIM technology |
CN116091174A (en) * | 2023-04-07 | 2023-05-09 | 湖南工商大学 | Recommendation policy optimization system, method and device and related equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108269071A (en) | The method that buildings model is shared cloud platform and project management is carried out using platform | |
US9009006B2 (en) | Generating active links between model objects | |
CN103500372A (en) | Collaborative design method and system based on SOA | |
CN103838706A (en) | Flexible management information system with process and form customization function | |
CN112257160B (en) | BIM-based standardized forward design method for garbage incineration power plant | |
CN101169716A (en) | Emulated procedure information modeling and maintenance method based on product structural tree | |
CN102033848A (en) | SOA-based three-dimensional design system integrating method and system | |
CN114186984B (en) | Two-dimensional and three-dimensional integrated collaborative design system for architectural design enterprise | |
CN103678815A (en) | Mechanical product collaborative simulation platform system and simulation method thereof | |
CN103646303A (en) | A flexible management information system used for customizing processes and forms in a ship enterprise | |
CN105930344B (en) | A kind of database application system quick development platform based on product development process | |
CN111008762A (en) | Business center design method for power marketing service system | |
CN101673358B (en) | Method and device for managing authority in workflow component based on authority component | |
CN102023859B (en) | Digital development environment-oriented software integration method with reliability, maintainability and supportability | |
CN105550431A (en) | Three-dimensional layout design data integration method and system for nuclear power plant | |
CN112148672A (en) | Rapid reservoir building method and system for land survey | |
CN103971225A (en) | Workflow dynamic expanding method and system | |
CN101308518B (en) | Topology element name corresponding method for copy type synergic modeling system | |
CN102646119A (en) | Method for realizing integration of standardized system and information system | |
CN105988786A (en) | Method for establishing data flow integration model by using UML and XML mapping | |
CN112613849A (en) | BIM-based project supervision information management method | |
CN102073500A (en) | Furniture design system integration method and system based on SOA (service oriented architecture) | |
CN106557601A (en) | A kind of transmission line of electricity emulation mode | |
Halfawy et al. | Development of model based systems for integrated design of highway bridges | |
Maruna et al. | The business process transformation framework implementation through metamodel extension |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180710 |