CN109034736A - Project management system and operating platform based on BIM - Google Patents
Project management system and operating platform based on BIM Download PDFInfo
- Publication number
- CN109034736A CN109034736A CN201810754204.2A CN201810754204A CN109034736A CN 109034736 A CN109034736 A CN 109034736A CN 201810754204 A CN201810754204 A CN 201810754204A CN 109034736 A CN109034736 A CN 109034736A
- Authority
- CN
- China
- Prior art keywords
- intelligent terminal
- operating platform
- bim
- construction
- identification code
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 100
- 239000000463 material Substances 0.000 claims description 7
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 18
- 230000008569 process Effects 0.000 description 12
- 238000005516 engineering process Methods 0.000 description 10
- 230000004048 modification Effects 0.000 description 9
- 238000012986 modification Methods 0.000 description 9
- 230000006870 function Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000008439 repair process Effects 0.000 description 2
- 230000018199 S phase Effects 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 230000032696 parturition Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 238000002834 transmittance Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- General Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the present invention provides a kind of project management system and operating platform based on BIM, is related to the project management technical field based on BIM.The system comprises operating platforms and intelligent terminal: operating platform has imported BIM and relevant information, and operating platform is used to generate identification code to the object module object in BIM according to BIM model and relevant information;Intelligent terminal is used to access BIM by identification code.The invention has the benefit that making buildings model information generate model specific information identification code by operating platform, it can be adapted for the construction of any section of any component in construction site.When each component, which is constructed, to be completed, operating platform reports information that can carry out virtual construction in real time according to intelligent terminal.
Description
Technical field
The invention belongs to the project management technical fields based on BIM, and in particular to a kind of engineering project based on BIM
Management system and operating platform.
Background technique
BIM (architecture information model, Building Information Modeling) for giving birth to engineering project entirely
Engineering information, process and the resources integration of each different phase in the period are ordered in a model, is facilitated by each participant of engineering
It uses, which provides phase by real information possessed by 3-dimensional digital technical modelling building for engineering design and construction
Mutually coordinate, internally consistent information model.
The management system or management program combined in current BIM use process with construction is all by the modeling personnel of profession
Operation, various construction informations, which need to model, to carry out the increase of model relevant information after personnel check collection to construction site and repairs
The operation such as change, be later presented the information such as construction speed in BIM platform, journey of correcting one's mistakes to the professional requirement of modeling personnel compared with
Height, human factor is too big, and in construction information transmittance process it is difficult to ensure that in BIM information accuracy, BIM can not be made
Model information really directly acts in construction management, make BIM platform information no matter in quality or construction speed embody
On all in passive delaying state, the real-time update for situations such as project progress and management can not be embodied in real time, further, since construction
Administrative staff need that modeling personnel is cooperated to collect construction information, keep BIM platform larger to the management system interference of original maturation, make
It obtains administrative staff's workload to increase, BIM management platform is difficult to be carried out engineer application extensively.
Summary of the invention
In order to solve the problems, such as that BIM real-time of the existing technology is poor, accuracy difference and managerial confusion, the present invention provide
A kind of project management system and operating platform based on BIM, with strong real-time, accuracy is high and is easy management etc.
Feature.
On the one hand, the object of the present invention is to provide a kind of project management system based on BIM, the system comprises behaviour
Make platform and intelligent terminal:
The operating platform has imported BIM and relevant information, and the operating platform is used for according to the BIM model and correlation
Information generates identification code to the object module object in the BIM;
The intelligent terminal;For accessing the BIM by the identification code.
Preferably, in conjunction with the above content, in a kind of possible implementation of the application, the object module object exists
Paste the corresponding identification code on the corresponding material object in construction site, the object module object include Work sectors, various components,
Component section and a variety of materials.
Preferably, in conjunction with the above content, in a kind of possible implementation of the application, the Work sectors include
It builds up Work sectors and does not build up Work sectors, the intelligent terminal reads the identification code at the scene, passes through the identification code
Access the BIM, comprising:
The operating platform is built when showing the corresponding object module object of the identification code by the intelligent terminal
It is differently shown at the object module object of Work sectors with the object module object for not building up Work sectors;
The intelligent terminal uploads construction to the operating platform and completes letter after the completion of not building up Work sectors construction
Breath, the operating platform is when showing the construction completion corresponding Work sectors of information by the intelligent terminal, by the region
Corresponding object module object is converted to the mode that construction is completed that represents.
Preferably, in conjunction with the above content, in a kind of possible implementation of the application, the intelligent terminal passes through institute
Stating the identification code access BIM includes:
According to the selection of the intelligent terminal, the operating platform by the relevant information of the object module object selected into
Row display.
Preferably, in conjunction with the above content, in a kind of possible implementation of the application, the intelligent terminal passes through institute
It states identification code and accesses the BIM further include:
The operating platform repairs the data of respective objects model object according to the input information of the intelligent terminal
Change.
Preferably, in conjunction with the above content, in a kind of possible implementation of the application, the intelligent terminal passes through institute
It states identification code and accesses the BIM further include:
The intelligent terminal reads the identification code, while sending access authority information to the operating platform;
The operating platform is only permitted when showing the corresponding object module object of the identification code by the intelligent terminal
Perhaps the described intelligent terminal accesses the related content in the access authority.
On the other hand, the embodiment of the present invention provides a kind of project management operating platform based on BIM, and the operation is flat
Platform has imported BIM and relevant information, and the operating platform is used for according to the BIM model and relevant information in the BIM
Object module object generates identification code, and when intelligent terminal reads the identification code, receives the access of the intelligent terminal.
Preferably, in conjunction with the above content, in a kind of possible implementation of the application, the Work sectors include
It builds up Work sectors and does not build up Work sectors;
The operating platform is built when showing the corresponding object module object of the identification code by the intelligent terminal
It is differently shown at the object module object of Work sectors with the object module object for not building up Work sectors;
The intelligent terminal uploads construction to the operating platform and completes letter after the completion of not building up Work sectors construction
Breath, the operating platform is when showing the construction completion corresponding Work sectors of information by the intelligent terminal, by the region
Corresponding object module object is converted to the mode that construction is completed that represents.
Preferably, in conjunction with the above content, in a kind of possible implementation of the application, the operating platform is also used to
It is modified according to the input information of the intelligent terminal to the data of respective objects model object.
Preferably, in conjunction with the above content, in a kind of possible implementation of the application, the operating platform hair is received
The access request sent includes the access authority information of the intelligent terminal in the access request;
The operating platform is only permitted when showing the corresponding object module object of the identification code by the intelligent terminal
Perhaps the described intelligent terminal accesses the related content in the access authority.
The invention has the benefit that a kind of project management system based on BIM provided in an embodiment of the present invention and
Operating platform can be realized the versatility of BIM model platform, make buildings model information generate model by operating platform dedicated
Message identification code can be adapted for the construction of any section of any component in construction site.When each component, which is constructed, to be completed, operation
Platform reports information that can carry out virtual construction in real time according to intelligent terminal, does not need modeling personnel and carries out model modification.Subtract
Few interference to other mature engineering management processes and system, the statistics for only doing model information is perfect, realize data, person liable,
The trackability of work progress.Increase the binding character of construction site construction and administrative staff.So that construction is truly realized knot
Close the virtual construction that management work is carried out.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is that a kind of project management system design and function based on BIM provided in an embodiment of the present invention uses stream
Journey schematic diagram;
Fig. 2 is display mode when beam slab Work sectors do not start to construct in the embodiment of the present invention in operating platform;
Display mode when Fig. 3 is beam slab Work sectors hot work in progress in the embodiment of the present invention in operating platform;
Fig. 4 is that the construction of beam slab Work sectors is completed in the embodiment of the present invention, and wall column Work sectors construction member does not start to apply
Display mode of the working hour in operating platform;
Display side when Fig. 5 is wall column Work sectors construction member hot work in progress in the embodiment of the present invention in operating platform
Formula;
Fig. 6 is the display side when construction of wall column Work sectors construction member is completed in the embodiment of the present invention in operating platform
Formula.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical solution of the present invention will be carried out below
Detailed description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art are obtained all without making creative work
Other embodiment belongs to the range that the present invention is protected.
In order to solve the problems such as existing BIM technology flexibility is poor, big using difficulty, the embodiment of the present invention provides one kind and is based on
The project management system of BIM, the system include operating platform and intelligent terminal, and the system design flow is referring to Fig. 1:
Operating platform has imported BIM and relevant information, and operating platform is used for according to BIM model and relevant information in BIM
Object module object generate identification code;
Intelligent terminal;For passing through the BIM in identification code access operation platform.
In order to preferably be managed to engineering project, an operating platform associated with BIM model, intelligence are initially set up
Energy terminal can be smart phone, by applying APP software in mobile phone terminal load operating platform, shows construction speed, constructs
Live overall picture waits models, can also consult model, component construction information in all directions, it should be noted that the present embodiments relate to
APP software implementation, can by those skilled in the art according to engineering project needs be designed exploitation, do not do herein
It limits, also without repeating.
Engineering project starts initial stage, at this point, operating platform establishes BIM model by engineering department related personnel (modeling personnel)
(structural elements, part, material and region etc.) and by the associated information input of BIM model into operating platform, utilize operation
Platform generates site operation two dimensional code by these BIM models and information.Each site operation two dimensional code corresponds to correlation model pair
As technical information (information inputted in modeling), construction technology, person in charge of the technology aspect, contact method, scheme and secure attention thing
?.
As a kind of preferred embodiment of the present embodiment, identification code therein can be two dimensional code, be also possible to it
It can be as the other forms of identification intermediary, and the embodiment of the present invention is without limitation.Existing BIM platform is only to existing two dimensional code
Component carry out typing and storage, operating platform is that any possible object in construction site generates identification code in this case, is made in this case
The project management system based on BIM can more comprehensively to construction object be managed.
Live progress is directly fed back in platform model by two dimensional code after the processing of the management means at scene.And it can be with
Any model and its information are converted into two dimensional code, and two dimensional code can be turned to model of the feedback into platform.During this
Groundwork is exactly to establish model and addition relevant information.The work at scene is exactly to scan to report.Compared to present pure artificial work
It is more simple, convenient, efficient to make mode.Conducive to popularizing.
Intelligent terminal therein can be the smart machines such as mobile phone, computer, and concrete function is realized by runs software, this hair
Bright embodiment without limitation, can be researched and developed the realization of software function as needed by those skilled in the art.
It about BIM, can be established by related technical personnel, related data can be inputted by technical staff in operating platform
Modification or other staff pass through the operations such as intelligent terminal input modification.
It is further alternative, object module object at the construction field (site) it is corresponding material object on paste corresponding identification code, target mould
Type object includes Work sectors, various components, component section and a variety of materials, wherein Work sectors refer to appointing for construction site
What region can be any part of construction object, such as can be a floor, be also possible to a room or one
Frame;Component section is similar with the selection mode of Work sectors, and details are not described herein again;Construction material can be cement, steel etc.,
For not building up the identification code of Work sectors, can be arranged in such a way that corresponding position is hung.
Further alternative, Work sectors include being completed Work sectors and not building up Work sectors, and intelligent terminal is existing
The identification code of certain Work sectors is read in field, leads to identification code and accesses BIM, can be following procedure:
Engineering project carries out a period of time, and the construction site-Fig. 6 has partial region construction to complete referring to fig. 2, for the ease of making
User distinguishes, and showing the indexs such as construction speed more has legibility, and operating platform is showing identification code by intelligent terminal
When corresponding object module object, it is completed the object module objects of Work sectors, the Work sectors in building and applies with not building up
Work area section object module object be differently shown, wherein the method distinctly displayed can by those skilled in the art according to
Actual conditions are chosen, and herein without limitation, can such as be distinguished, can also be distinguished by shape, lines etc. by color;
Fig. 2-Fig. 4 show Beam-Slab Construction section never open the construction stage to, building the construction stage to construction the completion stage
Process, the content can in intelligent terminal query display, can also operating platform carry out query display, Beam-Slab Construction section identification
The position that code is suspended on convenient for reading.
Fig. 4 -- Fig. 6 show wall column Work sectors, construction member never open the construction stage to building the construction stage to construction
The process in completion stage, the content can also carry out query display, wall column construction in operating platform in intelligent terminal query display
The position that section, construction member identification code are suspended on convenient for reading.
Intelligent terminal uploads construction to operating platform and completes information, operation is flat after the completion of not building up Work sectors construction
Platform is when showing that the corresponding Work sectors of information are completed in the construction by intelligent terminal, by the corresponding object module object in the region
Be converted to the mode that construction is completed that represents.
For example, before two dimensional code generation (i.e. corresponding site component is not also true builds), by modeling personnel or technology
Personnel carry out the foundation of component model, after model foundation, in the overall model that is shown in platform or cell phone application end, referring to
Fig. 2, rigid established component model position (component of corresponding position) are shown as the green (but also other colors) of pre- construction.
Referring to Fig. 3, other have been built the model finished and have been shown as normal color or required color.
Further alternative, intelligent terminal accesses the BIM by identification code and includes:
According to the selection of intelligent terminal, operating platform shows the relevant information of the object module object selected.
Further alternative, intelligent terminal accesses BIM by identification code further include:
Operating platform modifies to the data of respective objects model object according to the input information of intelligent terminal.
In order to make information in operating platform keep in real time and effective, allow user by intelligent terminal in operating platform
Relevant information is modified, and user sends modification request and modification content, related management people to operating platform by intelligent terminal
Member can request modification by operating platform and modification content is audited, and after the approval, operating platform is according to intelligence
The input information of terminal modifies to the data of respective objects model object.
It is further alternative, it is at the construction field (site), more accurate in order to launch information, it can be the intelligence that different people person uses
Different access authority is arranged in energy terminal, and intelligent terminal accesses BIM by identification code further include:
Intelligent terminal reads identification code, while sending access authority information to operating platform;
Operating platform only allows intelligent terminal to visit in object module object corresponding by intelligent terminal display identification code
Ask the related content in permission.
About model information classification display, for example, inputting work number after worker scans, so that it may see: safety notice,
Construction technology, person in charge of the technology aspect and contact method, scheme and the information relevant to worker's construction such as tell somebody what one's real intentions are;Site administrator sweeps
Work number is inputted after retouching, in figure 5 it can be seen that worker's information construction responsible person's information, scheme, is told somebody what one's real intentions are, gauge size etc. and scanning people's phase
The information of pass.These information have the meaning of guiding construction quality, safety in the construction process.
On the one hand the construction site two dimensional code that operating platform generates can show construction model, component model, another aspect
It can show relevant information.These models and information can show in platform, consult.Two dimension is only carried out at cell phone application end
Model, component after code scanning are checked and relevant information checks work.After the administrative staff having permission can scan the two-dimensional code
Carry out the upload of necessary information.Two-dimensional barcode information classification display correlation rank can see information, and specific aim is stronger, improves construction and refers to
The validity led.
Construction site section to be onstructed or hot work in progress section need to hang the construction two dimensional code of corresponding site, for
Anyone is scanned access information.
It is specified to have permission site administrator and scanned the two-dimensional code using dedicated APP after the completion of construction, and make a report on correlation
Administrative staff's information, site operation procedural information record, process photo record.After the completion of making a report on, APP information, which uploads, carries out platform
Information mutual communication is corresponding, and platform becomes pre- construction component or section normally to complete color automatically.
Subsequent handling building course and so on.Implementation model increases in real time.
It can check that selection is checked in platform, APP model, built modeling type, built plus unfounded model, whole models and effect
Fruit.And the details of correlation model component.(personnel, producer, acceptance inspeciton responsible person, contact method, process program, scene
Construction personnel, environmental information, timing node information, duration statistics)
A kind of project management system based on BIM provided in an embodiment of the present invention, can be realized BIM model platform
Versatility makes buildings model information generate model specific information identification code, can be adapted for construction site by operating platform
The construction of any any section of component.When each component, which is constructed, to be completed, operating platform reports information can according to intelligent terminal
Virtual construction is carried out in real time, is not needed modeling personnel and is carried out model modification.The interference to existing mature technology is reduced, mould is only done
The statistics of type information is perfect, realize data, person liable, work progress trackability.Increase construction site construction and management
The binding character of personnel.So that construction is truly realized the virtual construction carried out in conjunction with management work.
The embodiment of the present invention also provides a kind of project management operating platform based on BIM, and operating platform has imported BIM
And relevant information, operating platform are used to generate identification code to the object module object in BIM according to BIM model and relevant information,
And when intelligent terminal reads identification code, receive the access of intelligent terminal.
Further alternative, Work sectors include built Work sectors and do not build up Work sectors;
Operating platform is completed Work sectors in object module object corresponding by intelligent terminal display identification code
Object module object is differently shown with the object module object for not building up Work sectors;
Intelligent terminal uploads construction to operating platform and completes information, operation is flat after the completion of not building up Work sectors construction
Platform is when showing that the corresponding Work sectors of information are completed in the construction by intelligent terminal, by the corresponding object module object in the region
Be converted to the mode that construction is completed that represents.
Further alternative, operating platform is also used to the input information according to intelligent terminal to respective objects model object
Data are modified.
It is further alternative, the access request that operating platform is sent is received, includes the access of intelligent terminal in access request
Authority information;
Operating platform only allows intelligent terminal to visit in object module object corresponding by intelligent terminal display identification code
Ask the related content in permission.
It should be noted that function possessed by intelligent terminal, operating platform can all be realized in above scheme, the present invention
Embodiment repeats no more.
It is flat to can be realized BIM model for a kind of project management operating platform based on BIM provided in an embodiment of the present invention
The versatility of platform makes buildings model information generate model specific information identification code, can be adapted for constructing by operating platform
The construction of any any section of component in scene.When each component, which is constructed, to be completed, operating platform reports information according to intelligent terminal
Virtual construction can be carried out in real time, do not needed modeling personnel and carried out model modification.Relative to other management platform technologys, this hair
The bright interference reduced to workflows other in process of engineering management, avoid in management increase personnel work load and
Learning burden, the statistics that the present invention only does model information is perfect, realize data, person liable, work progress trackability.Increase
The binding character of construction site construction and administrative staff.It is virtually built so that construction is truly realized in conjunction with what management work was carried out
It makes.
In conclusion above-mentioned project management operating system and platform based on BIM has following superiority:
(1) effective combination of model and live practice of construction progress is realized by the means of two dimensional code, it can be in platform
The construction speed and situation for embodying scene in real time, solve existing BIM cannot achieve construction speed situation and platform model and
Management is effectively combined problem.
(2) work progress data logging is improved, and forms the timely and effectively retrospective system of information, responsibility, after being convenient for
Phase operation and maintenance.
(3) quick-moving in technical scheme.Information is conveyed in time, is connected close, orderly between model, between process,
Solves the process challenge that information is consulted, reported.
(4) it can according to need the extra accuracyization construction for carrying out model, carry out model building for thin portion and form two dimensional code,
There is larger directive significance to necessary working procedure;Realize model building and the management of arbitrary accuracy.
(5) subsequent supplement and management with information and permission may be implemented more effective management, such as industry be added
The permissions such as master, management, quality inspection, safety check, capital construction commission are managed.Cost information, artificial information, quality condition information, energy consumption is added
Information, progress comparison, indices analysis etc. form the big data of construction.
(6) with the general increase of the application of the invention, this system can be applied to conglomerate, the construction of aspect, production, matter
The management of amount etc..
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.
Claims (10)
1. a kind of project management system based on BIM, which is characterized in that the system comprises operating platform and intelligence eventually
End:
The operating platform has imported BIM and relevant information, and the operating platform is used for according to the BIM model and relevant information
Identification code is generated to the object module object in the BIM;
The intelligent terminal;For accessing the BIM by the identification code.
2. system according to claim 1, which is characterized in that in object module object reality corresponding with construction site
The corresponding identification code is set on object, and the object module object includes Work sectors, various components, component section and various materials
Material.
3. system according to claim 2, which is characterized in that the Work sectors include being completed Work sectors and not building
At Work sectors, the intelligent terminal reads the identification code at the scene, accesses the BIM by the identification code, comprising:
In the operating platform and when the intelligent terminal shows the corresponding object module object of the identification code, it is completed and applies
The object module object of work area section is differently shown with the object module object for not building up Work sectors;
The intelligent terminal uploads construction to the operating platform and completes information, institute after the completion of not building up Work sectors construction
When stating operating platform and the intelligent terminal and showing that the corresponding Work sectors of information are completed in the construction, by the corresponding target in the region
Model object is converted to the mode that construction is completed that represents.
4. system according to claim 1-3, which is characterized in that the intelligent terminal is visited by the identification code
Ask that the BIM includes:
According to the selection of the intelligent terminal, the operating platform shows the relevant information of the object module object selected
Show.
5. system according to claim 4, which is characterized in that the intelligent terminal passes through described in identification code access
BIM further include:
The operating platform modifies to the data of respective objects model object according to the input information of the intelligent terminal.
6. system according to claim 1-3, which is characterized in that the intelligent terminal is visited by the identification code
Ask the BIM further include:
The intelligent terminal reads the identification code, while sending access authority information to the operating platform;
The operating platform only allows institute when showing the corresponding object module object of the identification code by the intelligent terminal
It states intelligent terminal and accesses related content in the access authority.
7. a kind of project management operating platform based on BIM, which is characterized in that the operating platform has imported BIM and phase
Information is closed, the operating platform is used to generate according to the BIM model and relevant information to the object module object in the BIM
Identification code, and when intelligent terminal reads the identification code, receive the access of the intelligent terminal.
8. platform according to claim 7, which is characterized in that the Work sectors include being completed Work sectors and not building
At Work sectors;
The operating platform is completed and applies when showing the corresponding object module object of the identification code by the intelligent terminal
The object module object of work area section is differently shown with the object module object for not building up Work sectors;
The intelligent terminal uploads construction to the operating platform and completes information, institute after the completion of not building up Work sectors construction
Operating platform is stated when showing that the corresponding Work sectors of information are completed in the construction by the intelligent terminal, the region is corresponding
Object module object is converted to the mode that construction is completed that represents.
9. platform according to claim 8, which is characterized in that the operating platform is also used to according to the intelligent terminal
Input information modifies to the data of respective objects model object.
10. platform according to claim 8, which is characterized in that the access request that the operating platform is sent is received, it is described
It include the access authority information of the intelligent terminal in access request;
The operating platform only allows institute when showing the corresponding object module object of the identification code by the intelligent terminal
It states intelligent terminal and accesses related content in the access authority.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810754204.2A CN109034736A (en) | 2018-07-10 | 2018-07-10 | Project management system and operating platform based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810754204.2A CN109034736A (en) | 2018-07-10 | 2018-07-10 | Project management system and operating platform based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109034736A true CN109034736A (en) | 2018-12-18 |
Family
ID=64641937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810754204.2A Pending CN109034736A (en) | 2018-07-10 | 2018-07-10 | Project management system and operating platform based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109034736A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110442905A (en) * | 2019-06-29 | 2019-11-12 | 万翼科技有限公司 | A kind of method, apparatus and computer readable storage medium based on BIM model management |
CN110457801A (en) * | 2019-07-30 | 2019-11-15 | 上海建工集团股份有限公司 | The monitoring method and system of assembled project component |
CN111667224A (en) * | 2019-03-05 | 2020-09-15 | 王民峰 | APP for dynamically managing engineering construction based on project division at multiple terminals |
CN112149210A (en) * | 2020-09-18 | 2020-12-29 | 上海琸域环境工程有限公司 | Underground water restoration intelligent management method based on two-dimensional code |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100196264A1 (en) * | 2007-05-18 | 2010-08-05 | The Brigham And Women's Hospital, Inc. | Use of somatostatin analogs in myocardial perfusion imaging |
CN104573999A (en) * | 2015-01-30 | 2015-04-29 | 浙江精工钢结构集团有限公司 | Application method of steel structure BIM (building information modeling) information platform |
CN106845919A (en) * | 2016-12-16 | 2017-06-13 | 上海建工集团股份有限公司 | Construction information collection processing method |
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
CN106919765A (en) * | 2017-03-08 | 2017-07-04 | 朱海涛 | Component processing method based on BIM and mobile terminal |
CN107292068A (en) * | 2017-08-21 | 2017-10-24 | 上海中建东孚投资发展有限公司 | A kind of assembled architecture BIM model treatments method and processing system |
-
2018
- 2018-07-10 CN CN201810754204.2A patent/CN109034736A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100196264A1 (en) * | 2007-05-18 | 2010-08-05 | The Brigham And Women's Hospital, Inc. | Use of somatostatin analogs in myocardial perfusion imaging |
CN104573999A (en) * | 2015-01-30 | 2015-04-29 | 浙江精工钢结构集团有限公司 | Application method of steel structure BIM (building information modeling) information platform |
CN106845919A (en) * | 2016-12-16 | 2017-06-13 | 上海建工集团股份有限公司 | Construction information collection processing method |
CN106919765A (en) * | 2017-03-08 | 2017-07-04 | 朱海涛 | Component processing method based on BIM and mobile terminal |
CN106920049A (en) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | A kind of Project Management System platform based on BIM network technologies |
CN107292068A (en) * | 2017-08-21 | 2017-10-24 | 上海中建东孚投资发展有限公司 | A kind of assembled architecture BIM model treatments method and processing system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111667224A (en) * | 2019-03-05 | 2020-09-15 | 王民峰 | APP for dynamically managing engineering construction based on project division at multiple terminals |
CN110442905A (en) * | 2019-06-29 | 2019-11-12 | 万翼科技有限公司 | A kind of method, apparatus and computer readable storage medium based on BIM model management |
CN110457801A (en) * | 2019-07-30 | 2019-11-15 | 上海建工集团股份有限公司 | The monitoring method and system of assembled project component |
CN112149210A (en) * | 2020-09-18 | 2020-12-29 | 上海琸域环境工程有限公司 | Underground water restoration intelligent management method based on two-dimensional code |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106200983B (en) | A kind of system of combination virtual reality and BIM realization virtual reality scenario architectural design | |
CN109034736A (en) | Project management system and operating platform based on BIM | |
CN103530826B (en) | BIM (Building Information Modeling)-based shield method tunnel construction management method | |
Getuli et al. | A BIM-based construction supply chain framework for monitoring progress and coordination of site activities | |
CN109446668A (en) | A kind of component Schedule monitoring system and method based on threedimensional model | |
CN110276555A (en) | Residential housing entity Life cycle analysis method based on internet and BIM | |
WO2020056669A1 (en) | Control method and apparatus for unmanned aerial vehicle cruise based on prefabricated building platform | |
CN106920049A (en) | A kind of Project Management System platform based on BIM network technologies | |
CN107832498A (en) | A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method | |
CN109388910A (en) | A kind of engineering construction construction technology management system and method based on BIM | |
CN107833503B (en) | Distribution core job augmented reality simulation training system | |
CN108388711A (en) | A kind of engineering design based on BIM and management system | |
CN103646154A (en) | Three-dimensional digitization final assembly technology collaborative design system | |
CN109544675A (en) | Threedimensional model status visualization method based on holographic data processing transformer equipment | |
CN107464064A (en) | Project Management System platform based on BIM network technologies | |
Teizer et al. | A serious gaming approach to integrate BIM, IoT, and lean construction in construction education | |
Fernandes | Advantages and disadvantages of BIM platforms on construction site | |
CN110428223A (en) | Method, system and the BIM+VR that construction safety is told somebody what one's real intentions are manage platform | |
CN108427802A (en) | A kind of Deepen Design technique drawing generating method and device based on BIM | |
Wang et al. | The problem analysis and solution suggestion in the process of city information model construction | |
CN110096814A (en) | A kind of digitlization bridge construction system based on BIM model | |
CN109299504A (en) | A kind of wisdom Project Management System based on BIM platform | |
CN107515966A (en) | A kind of radar simulator system layering construction method based on DDS | |
CN110069826A (en) | A kind of project management method based on BIM, system and storage medium | |
Xiao | The construction path of university smart library based on digital twin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |
|
RJ01 | Rejection of invention patent application after publication |