CN110276555A - Residential housing entity Life cycle analysis method based on internet and BIM - Google Patents
Residential housing entity Life cycle analysis method based on internet and BIM Download PDFInfo
- Publication number
- CN110276555A CN110276555A CN201910562089.3A CN201910562089A CN110276555A CN 110276555 A CN110276555 A CN 110276555A CN 201910562089 A CN201910562089 A CN 201910562089A CN 110276555 A CN110276555 A CN 110276555A
- Authority
- CN
- China
- Prior art keywords
- bim
- analysis
- internet
- physical items
- life cycle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004458 analytical method Methods 0.000 title claims abstract description 101
- 238000005516 engineering process Methods 0.000 claims abstract description 96
- 238000000034 method Methods 0.000 claims abstract description 45
- 230000008569 process Effects 0.000 claims abstract description 19
- 238000004088 simulation Methods 0.000 claims abstract description 19
- 238000010276 construction Methods 0.000 claims description 50
- 238000013461 design Methods 0.000 claims description 36
- 238000007726 management method Methods 0.000 claims description 21
- 238000005265 energy consumption Methods 0.000 claims description 13
- 238000001514 detection method Methods 0.000 claims description 11
- 238000009826 distribution Methods 0.000 claims description 11
- 230000000694 effects Effects 0.000 claims description 11
- 238000013439 planning Methods 0.000 claims description 11
- 238000012544 monitoring process Methods 0.000 claims description 9
- 238000012800 visualization Methods 0.000 claims description 9
- 238000003860 storage Methods 0.000 claims description 8
- 238000009430 construction management Methods 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 238000011161 development Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 3
- 238000004134 energy conservation Methods 0.000 claims description 3
- 238000010438 heat treatment Methods 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 3
- 238000003786 synthesis reaction Methods 0.000 claims description 3
- 238000009423 ventilation Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 239000000843 powder Substances 0.000 abstract description 2
- 230000008901 benefit Effects 0.000 description 10
- 238000011160 research Methods 0.000 description 6
- 230000007246 mechanism Effects 0.000 description 5
- 238000012423 maintenance Methods 0.000 description 4
- 238000004590 computer program Methods 0.000 description 3
- 238000005034 decoration Methods 0.000 description 3
- 238000007794 visualization technique Methods 0.000 description 3
- 241000208340 Araliaceae Species 0.000 description 2
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 2
- 235000003140 Panax quinquefolius Nutrition 0.000 description 2
- 231100000749 chronicity Toxicity 0.000 description 2
- 239000004035 construction material Substances 0.000 description 2
- 238000012938 design process Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 235000008434 ginseng Nutrition 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000003325 tomography Methods 0.000 description 2
- 239000008186 active pharmaceutical agent Substances 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- BTCSSZJGUNDROE-UHFFFAOYSA-N gamma-aminobutyric acid Chemical compound NCCCC(O)=O BTCSSZJGUNDROE-UHFFFAOYSA-N 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000013468 resource allocation Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000012916 structural analysis Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Geometry (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Computer Hardware Design (AREA)
- Game Theory and Decision Science (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Evolutionary Computation (AREA)
- Water Supply & Treatment (AREA)
- Biodiversity & Conservation Biology (AREA)
- Public Health (AREA)
- Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention belongs to residential housing entity Life cycle electric powder predictions, disclose a kind of residential housing entity Life cycle analysis method based on internet and BIM, establish the analysis method of Digital Architecture concept;The number emulated from total factor, Whole Process Simulation builds the influence factor of angle analysis physical items in each stage;By establishing the application method of physical items and compared with technical result, key influence factor and physical items that internet+BIM technology develop in building trade are obtained with the value of BIM technology, obtains the exploitation of physical items and the reference scheme of engineer application.The present invention is by establishing the application method of physical items and comparing with technical result, key influence factor and physical items that internet+BIM technology develop in building trade are obtained with the value of BIM technology, obtains the exploitation of physical items and the reference scheme of engineer application.
Description
Technical field
The invention belongs to residential housing entity Life cycle electric powder prediction, more particularly to it is a kind of based on internet and
The residential housing entity Life cycle analysis method of BIM.
Background technique
Currently, the immediate prior art:
In recent years, with economic globalization, marketization fusion and development, the increasingly developed specific gravity in production of science and technology
It is more and more obvious, it is to solve Industrial Efficiency that the experience greatly improved from the Industrial Efficiency of manufacturing industry, industry, which can be seen that informationization,
Low direct approach, so how effectively to use information technology in construction industry has been that building field needs emphasis to capture instantly
The problem of.
Application to internet+BIM technology in physical items Life cycle is studied, in analysis BIM technology application
On the basis of, the application to the different cycles BIM technology of physical items is carried out, the research method of " Digital Architecture " concept is explored;With
Based on existing technical software, the number emulated from total factor, Whole Process Simulation builds angle analysis physical items in each rank
The subjectivity of section and objective influence factor;The result analyzed by physical items application BIM technology embodies internet+BIM technology and exists
The value that architectural entity project is used, provides important references for the exploitation and engineer application of physical items, this will be more conducive to build
If the target value of project is realized, the efficiency of construction industry, which is improved, has certain value and significance.
The data acquisition of many enterprises still relies on artificial enquiry, uploads to system manually at present.This method is not only all
Phase is long, and precision is low, also very unfavorable to follow-up data and the interaction of data, data and docking for model.It is understood that each family
Data requirements, data format and the form of enterprise are all different.
Problem of the existing technology is:
(1) due to the complexity of project, chronicity and particularity, internet+BIM technology application study, compared to it
There are biggish lag for the application study of his software.In the research and design of physical items Life cycle, often do not examine
Consider the problem of detached island of information between each participant of construction project, multiple information sources information tomography exchanged and application system,
This expection comprehensive benefit that will lead to physical items reduces, and designed BIM technology on this basis can only be a kind of sky
Shell.
(2) as the construction scale of construction-engineering project becomes larger, construction technology tends to complicated data in BIM database
Information is also complex, and data information of the different participant of engineering project needed for different phase is also not quite similar.BIM
Standard includes the regulation to fineness, depth, content and the format for delivering transmitting data between different participant etc., entire standard
Formulate can typing to entire information and transmitting form a unified regular building enterprise, architecture information mould in the prior art
Type is not perfect in practical projects, puts into Building Information Model level of organization larger.
For BIM software research presently, there are some BIM softwares beginner is made due to its complicated operation and interface
Not easy to get started, this not only lowers the experience properties of user, waste the working time of BIM technology personnel.The two of BIM software
User's use feeling is not able to satisfy in secondary development process.
Existing BIM technology utilizes in the application of construction project Life cycle, there has been no the analysis of the data of holonomic system,
It is merely resting on summary of experience level.
Currently how under internet+BIM technology environment, realizes the upgrading of the lifecycle management of physical items, build
Can it be to need Important Problems urgently to be resolved in the application of current entity project informationization that Industry Innovation be built and be developed.
(3) it is necessary to have the collections of huge database to build for the existing residential housing Life cycle application model based on BIM
The information data for building project each stage, taxonomic revision again after uniformly being encoded, and have the energy consumption analysis built and
The functional characteristics that each participant of project can participate in real time.The key technology of this model has the API for being able to carry out specialty analysis
Interface and IPD collaboration platform, and Omniclass coded system is selected to be applied in model.
Solve the difficulty of above-mentioned technical problem:
1) it is necessary to have huge databases to collect building item for the residential housing Life cycle application model based on BIM
The information data in mesh each stage, taxonomic revision again after uniformly being encoded, and there is the energy consumption analysis built and project
The functional characteristics that each participant can participate in real time.The key technology of this model has the api interface for being able to carry out specialty analysis
With IPD collaboration platform, and select Omniclass coded system be applied to model in.
2) BIM technology is applied to each stage value analysis standard of life cycle environment assessment and reference frame.
3) project entity information collects and analyzes comparison, the emerging skill that BIM technology will be greatly developed as building trade future
Art, needs and the combination of the technologies such as big data, facilitates the storage and selection of information in database, makes information in engineering project
It collects more convenient with management.But the prior art has difficulties for the practical application of big data.
Solve the meaning of above-mentioned technical problem:
The present invention is based on the green building Life cycle application model of BIM, it is necessary to have the collections of huge database to build
The information data for building project each stage, taxonomic revision again after uniformly being encoded, and have the energy consumption analysis built and
The functional characteristics that each participant of project can participate in real time, it is main by carrying out special analysis using BIM technology to specific project
It to include energy consumption analysis, the Collision detection of design phase, the progress control in work progress and the Dynamic Cost Control etc. built,
BIM technology is verified in the feasibility and convenience of building overall process application, analyzes the organic linking in life cycle each stage, system
Summarize advantage and application value of the BIM technology in building trade.
Summary of the invention
In view of the problems of the existing technology, the present invention provides a kind of residential housing entity based on internet and BIM
Life cycle analysis method, BIM technology of the invention establish three using the information collected by construction project Life cycle
Dimension module analyzes software by external BIM special project and carries out energy consumption analysis and Collision detection, the specific quality identified project, cost,
The targets such as progress carry out reasonable resource allocation in advance.The green building application system based on BIM technology is constructed, and BIM is soft
Part gets up with the application contacts in practical engineering project, and application of the BIM technology in green building Life cycle is made to pass through work
Journey real data is goed deep into summary, summarizes each stage method advantage, verifying BIM technology green building overall process apply can
Row and convenience, highlight the organic linking in life cycle each stage, and have widened BIM technology being applicable in building trade
Field.
The invention is realized in this way a kind of residential housing entity Life cycle analysis side based on internet and BIM
Method, comprising:
Step 1 carries out the application to the different cycles BIM technology of physical items on analysis BIM technology application foundation,
Carry out the analysis of Digital Architecture concept.
Step 2, the number emulated from total factor, Whole Process Simulation build the shadow of angle analysis physical items in each stage
The factor of sound.
Step 3 obtains internet+BIM by establishing the application method of physical items and comparing with technical result
Key influence factor and physical items that technology develops in building trade use the value of BIM technology, obtain opening for physical items
The reference scheme of hair and engineer application.
Further, step 1 is in the application of the different cycles BIM technology of physical items, comprising:
Planning stage:, can in the preconsolidation stress stage of project since BIM system has the collection classification feature of data information
To carry out project amount estimation and preliminary investment estimate with it, to carry out the investment ratio of different schemes;According to project amount
Variation calculates the variation of cost rapidly, to carry out the selection of different schemes.For using oneself building mould for building up of CAD software
Type can be importing directly into BIM modeling software, while application BIM technology, using Distribution GIS by quantity
Numerous place information are classified, and are stored in BIM database, help rapidly to make reasonable site analysis and side
Case selection.
Design phase: carrying out three dimensional dynamic FEM design with BIM, is that traditional areal model is formed novel three-dimensional
Stereoscopic effect is shown.When by the way that collision detection can be carried out after synthesis between pipeline, various equipment, pipeline and structure.
Construction stage: the three-dimensional visualization effect of BIM model can constantly optimize planar cloth with construction progress
It sets, construction material is piled up to the transport of materials for reducing construction site in place.BIM4D Construction simulation technology can be quasi-
Construction speed in the true entire construction site horizontal layout Project Process of assurance, by by actual progress with it is expected that progress carries out
Compare time update arrangement and method for construction, reasonable distribution working sources.BIM5D Cost information model, Cost information model may be implemented
The dynamic of capital investment and resource distribution is controlled in the construction process.
Operation stage: carrying out escape simulation in BIM model, and during the operation of the later period of building, monitoring is answered at any time
Whether escape vent is able to use, guarantee really accident occurs when escape route it is unobstructed.
Further, step 2 builds angle analysis physical items in each rank from the number that total factor, Whole Process Simulation emulate
In the influence factor of section,
In the planning stage, BIM technology is mainly used in investment estimate, imports model and site analysis.
In the design phase, BIM technology is applied to three-dimensional visualization, Collision detection and energy consumption analysis.
In the construction stage, BIM technology is applied to construction horizontal layout, quality management, progress control, cost control, and peace
Full management.
In the O&M stage, BIM technology is applied to equipment management, emergency disposal, and formulates Green Operation plan.
Further, step 3 obtains the exploitation of physical items and the reference scheme of engineer application specifically includes:
BIM technology is applied to each stage value analysis standard of life cycle environment assessment and reference frame, and there has been no the unified marks of profession
Standard, general analysis using core modeling software Revit carries out basic modeling after being, on the basis of this model, then carry out it is each specially
The foundation of industry submodel carries out civil engineering and electromechanical Collision detection, energy consumption point using three-dimensional visualization technique according to these models
Analysis etc. the design phases fundamental analysis, find as early as possible the design phase there are the problem of, avoid having an impact follow-up work, with
This compares the time saved with traditional design process and cost.The wherein construction stage, using Visualization Platform carry out project into
Degree control and cost control by the current progress of monitoring understanding project, and then analyze the advantage with traditional cost progress monitoring
And value.
Further, the residential housing entity Life cycle analysis method based on internet and BIM further comprises:
Application model of the BIM technology in planning and design phase: the first step establishes model, Sunlight Analysis, building energy conservation point
Analysis, ventilation and temperature and humidity simulation, Analysis of Human Comfort, tropical island effect analysis and light pollution analysis;
Application model of the BIM technology in construction stage and decoration stage: second step carries out cost budgeting, Deepen Design, 4D
Construction management, 5D construction management and integrated application, and using BIM technology application value as foundation, in planning and design phase application
On the basis of the model of Model Establishment, other factors are introduced.
Introduce time and cost factor i.e.: BIM4D Construction simulation technology can accurately hold entire construction site plane
Construction speed during arranged items, by with it is expected that progress compares time update arrangement and method for construction, closing actual progress
Reason distribution working sources.BIM5D Cost information model, Cost information model may be implemented in the construction process to capital investment and
The dynamic of resource distribution controls.
Third step establishes rapidly estate management database using completion BIM data, supports property IT application in management;Finally
By establishing the application method of physical items and being compared with technical result, obtains internet+BIM technology and sent out in building trade
The key influence factor and physical items of exhibition use the value of BIM technology, obtain the exploitation of physical items and the ginseng of engineer application
Examine scheme.
Further, in the first step, according to application model analysis and practical operation, building, structure, hot-water heating electricity BIM modeling, base are established
It is interacted in BIM model with design requirement.
Another object of the present invention is to provide a kind of terminal, realize that the residential housing based on internet and BIM is real
The controller of body Life cycle analysis method.
Another object of the present invention is to provide a kind of computer readable storage mediums, including instruction, when it is in computer
When upper operation, so that computer executes the residential housing entity Life cycle analysis method based on internet and BIM.
Another object of the present invention is to provide the residential housing entity based on internet and BIM described in a kind of implementation is complete
Life Cycle Analysis analyzes analogue system based on the residential housing entity Life cycle of internet and BIM.
In conclusion advantages of the present invention and good effect are as follows:
The present invention provides the residential housing Life cycle application model based on BIM, collects construction project according to database
The information data in each stage, taxonomic revision, and the energy consumption analysis built again after uniformly being encoded, each participant of project
It can participate in real time.The present invention has the api interface and IPD collaboration platform for being able to carry out specialty analysis, and selects
Omniclass coded system is applied in model.
The present invention carries out the application to the different cycles BIM technology of physical items on analysis BIM technology application foundation,
The method for exploring " Digital Architecture " concept;Based on existing technical software, from total factor, the number of Whole Process Simulation emulation
Build the subjectivity and objective influence factor of angle analysis physical items in each stage;Pass through the effective aspect of application BIM technology analysis
The value that existing internet+BIM technology is used in architectural entity project, provides important ginseng for the exploitation and engineer application of physical items
It examines.
The method that the present invention establishes application of the internet+BIM technology to physical items Life cycle.
Obtain influence factor and mechanism of the different phase using internet+BIM technology to physical items Life cycle.
Analysis illustrates the value that physical items use BIM technology.
Basic modeling is carried out using core modeling software Revit, on the basis of this model, then carries out each professional submodel
Foundation, utilize three-dimensional visualization technique to carry out the design such as civil engineering and electromechanical Collision detection, energy consumption analysis according to these models
The fundamental analysis in stage, find as early as possible the design phase there are the problem of, avoid having an impact follow-up work;In construction rank
Section carries out the progress control and cost control of project using Visualization Platform, by monitoring the current progress of understanding project, according to
The own completed amount that platform is fed back carries out rapidly resource distribution, and in BIM collaborative platform, each participant of project
Exchanges and cooperation are even closer, accessible;Finally, the powerful storage characteristic of BIM database is also the later period operation maintenance of project
It provides convenience, the Life cycle of the project is made to obtain effective monitoring.BIM technology constantly is popularized, allows more projects
It benefits from it, makes building that can accomplish visualization, parametrization, intelligent and greatest benefit in Life cycle each stage, allow
BIM technology becomes the strength boost motor of Sustainable Construction Industry.BIM technology of the invention has great application value and hair
Exhibition has a extensive future.
Detailed description of the invention
Fig. 1 is the residential housing entity Life cycle analysis side provided in an embodiment of the present invention based on internet and BIM
Method flow chart.
Fig. 2 is the residential housing entity Life cycle analysis side provided in an embodiment of the present invention based on internet and BIM
Method schematic diagram.
Fig. 3 is the BIM application model analytical effect figure of architectural entity project full lifetime provided in an embodiment of the present invention.
Fig. 4 is the BIM technology software application effect of Main Stage in Whole Life Cycle of Projects provided in an embodiment of the present invention
Figure.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
Due to the complexity, chronicity and particularity of project, the application study of internet+BIM technology is soft compared to other
There are biggish lag for the application study of part.In the research and design of physical items Life cycle, often do not account for
Problem of detached island of information between each participant of construction project, multiple information sources information tomography exchanged and application system, this will
Leading to the expection comprehensive benefit of physical items reduces, and designed BIM technology on this basis can only be a kind of ghost.When
Preceding to realize the upgrading of the lifecycle management of physical items how under internet+BIM technology environment, building trade is innovated
Can be developed be to need Important Problems urgently to be resolved in the application of current entity project informationization.
To solve the above problems, below with reference to concrete scheme, the present invention is described in detail.
As shown in Figure 1, the residential housing entity Life cycle provided in an embodiment of the present invention based on internet and BIM point
Analysis method includes:
S101 build the application of the different cycles BIM technology of physical items on analysis BIM technology application foundation
The analysis method of vertical " Digital Architecture " concept;Based on existing technical software, from total factor, the number of Whole Process Simulation emulation
Word builds the influence factor of angle analysis physical items in each stage.
S102, by establishing the application study method of physical items and being compared with technical result, acquisition internet+
Key influence factor and physical items that BIM technology develops in building trade use the value of BIM technology, obtain physical items
The reference scheme of exploitation and engineer application.
In embodiments of the present invention, step S101 is in the application of the different cycles BIM technology of physical items, comprising:
Planning stage:, can in the preconsolidation stress stage of project since BIM system has the collection classification feature of data information
To carry out project amount estimation and preliminary investment estimate with it, to carry out the investment ratio of different schemes;According to project amount
Variation calculates the variation of cost rapidly, to carry out the selection of different schemes.For using oneself building mould for building up of CAD software
Type can be importing directly into BIM modeling software, while application BIM technology, using Distribution GIS by quantity
Numerous place information are classified, and are stored in BIM database, help rapidly to make reasonable site analysis and side
Case selection.
Design phase: carrying out three dimensional dynamic FEM design with BIM, is that traditional areal model is formed novel three-dimensional
Stereoscopic effect is shown.When by the way that collision detection can be carried out after synthesis between pipeline, various equipment, pipeline and structure.
Construction stage: the three-dimensional visualization effect of BIM model can constantly optimize planar cloth with construction progress
It sets, construction material is piled up to the transport of materials for reducing construction site in place.BIM4D Construction simulation technology can be quasi-
Construction speed in the true entire construction site horizontal layout Project Process of assurance, by by actual progress with it is expected that progress carries out
Compare time update arrangement and method for construction, reasonable distribution working sources.BIM5D Cost information model, Cost information model may be implemented
The dynamic of capital investment and resource distribution is controlled in the construction process.
Operation stage: carrying out escape simulation in BIM model, and during the operation of the later period of building, monitoring is answered at any time
Whether escape vent is able to use, guarantee really accident occurs when escape route it is unobstructed.
In embodiments of the present invention, step S101 builds angle analysis reality from the number that total factor, Whole Process Simulation emulate
In the influence factor of body project in each stage, planning stage, BIM technology is mainly used in investment estimate, imports model and place
Analysis.
In the design phase, BIM technology is applied to three-dimensional visualization, Collision detection and energy consumption analysis.
In the construction stage, BIM technology is applied to construction horizontal layout, quality management, progress control, cost control, and peace
Full management.
In the O&M stage, BIM technology is applied to equipment management, emergency disposal, and formulates Green Operation plan.
In embodiments of the present invention, step S102 obtains the exploitation of physical items and the reference scheme of engineer application specifically wraps
It includes:
BIM technology is applied to each stage value analysis standard of life cycle environment assessment and reference frame, and there has been no the unified marks of profession
Standard, general analysis using core modeling software Revit carries out basic modeling after being, on the basis of this model, then carry out it is each specially
The foundation of industry submodel carries out civil engineering and electromechanical Collision detection, energy consumption point using three-dimensional visualization technique according to these models
Analysis etc. the design phases fundamental analysis, find as early as possible the design phase there are the problem of, avoid having an impact follow-up work, with
This compares the time saved with traditional design process and cost.The wherein construction stage, using Visualization Platform carry out project into
Degree control and cost control by the current progress of monitoring understanding project, and then analyze the advantage with traditional cost progress monitoring
And value.
The invention will be further described combined with specific embodiments below.
Embodiment 1,
The present invention establishes internet+BIM technology and gives birth to entirely to physical items using existing BIM technology software application as background
Order the research method of the application in period.Obtain shadow of the different phase using internet+BIM technology to physical items Life cycle
The factor of sound and mechanism.Analysis shows that physical items use the value of BIM technology.
The method of proposed adoption system comprehensive study of the present invention, i.e. software practical operation research, application model theory analysis and BIM are soft
Part application combines, and on the basis of existing BIM application software and BIM application standard, the BIM for exploring building Life cycle is answered
With mode, physical items are studied in the application and its value of different phase.
As shown in Fig. 2, the present invention is in terms of software application method and theory analysis, it then follows principle from simple to complex,
It devises a series of application standard of research physical items different phases and embodies value.Firstly, BIM technology is being planned and is being designed
The application model in stage: model, Sunlight Analysis, building energy conservation analysis, ventilation and temperature and humidity simulation, Analysis of Human Comfort, heat are established
Island effect analysis and light pollution analysis.According to application model analysis and practical operation, building, structure, hot-water heating electricity BIM modeling, base are established
It is linked up in time in BIM model with designer, implements design requirement.Then, BIM technology is in construction stage and decoration stage
Application model: cost budgeting, Deepen Design, 4D construction management, 5D construction management and integrated application, and with BIM technology application valence
Value is foundation, on the basis of before to plan the model established with design phase application model, introduces other factors.It is last its
He applies and its value, as operation maintenance and integrated project delivery establish rapidly estate management data using completion BIM data
Property IT application in management is supported in library.It compares eventually by the application study method for establishing physical items and with technical result,
Key influence factor and physical items that internet+BIM technology develop in building trade are obtained with the value of BIM technology, is obtained
Obtain the exploitation of physical items and the reference scheme of engineer application.
Embodiment 2
The BIM application model that the present invention carries out architectural entity project full lifetime analyzes (such as Fig. 3).
1) architectural entity project content analysis of BIM application model in Life cycle includes:
PLAN (planning stage): status modeling, cost budgeting, periodic plan, planning, site analysis
DESIGN (design phase): design review, design setting model, energy consumption analysis, structural analysis, Sunlight Analysis, machinery
Analysis, other specialty analysis, Green Evaluation, specification verification
CONSTRUCT (construction, decoration stage): the coordination utilization of area plan based on threedimensional model, Deepen Design, number
Word assembly, control and plan based on threedimensional model
OPERATE (operation and maintenance stage): record cast, maintenance arrangement, building system analysis, asset management, space
Management/trace, the plan of taking precautions against natural calamities
2) in Whole Life Cycle of Projects Main Stage BIM technology software application (such as Fig. 4).
Under current existence conditions, corresponding BIM technology software is applied for the content of different phase BIM application model.
Design phase: the visual design (Navisworks, 3dMax, Maya), Sustainable Design (PKPM/IES,
Ecotect、GBS)。
Construction stage: construction site management (Navisworks), 4 dimensions construction simulation (Navisworks), three-dimensional pipeline
Comprehensive (Navisworks), prefabricated component processing (Inventor/Revit), arrangement and method for construction optimize (NavisworksInventor/
3ds Max)。
3) under different phase internet+BIM technology to the influence factor of physical items and the method for mechanism.
Using the BIM model that has built up of the present invention, using physical items presently, there are influence, obtain internet+BIM
Influence factor and mechanism of the technology to physical items Life cycle.
For under different software used in project different phase, using BIM technology principle, to the influence factor of physical items
It is analyzed with mechanism.Obtained result can establish certain basis with the value displaying of BIM technology for physical items below.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real
It is existing.When using entirely or partly realizing in the form of a computer program product, the computer program product include one or
Multiple computer instructions.When loading on computers or executing the computer program instructions, entirely or partly generate according to
Process described in the embodiment of the present invention or function.The computer can be general purpose computer, special purpose computer, computer network
Network or other programmable devices.The computer instruction may be stored in a computer readable storage medium, or from one
Computer readable storage medium is transmitted to another computer readable storage medium, for example, the computer instruction can be from one
A web-site, computer, server or data center pass through wired (such as coaxial cable, optical fiber, Digital Subscriber Line (DSL)
Or wireless (such as infrared, wireless, microwave etc.) mode is carried out to another web-site, computer, server or data center
Transmission).The computer-readable storage medium can be any usable medium or include one that computer can access
The data storage devices such as a or multiple usable mediums integrated server, data center.The usable medium can be magnetic Jie
Matter, (for example, floppy disk, hard disk, tape), optical medium (for example, DVD) or semiconductor medium (such as solid state hard disk Solid
State Disk (SSD)) etc..
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (8)
1. a kind of residential housing entity Life cycle analysis method based on internet and BIM, which is characterized in that described to be based on
The residential housing entity Life cycle analysis method of internet and BIM includes:
Step 1 carries out the analysis of Digital Architecture concept using the different cycles BIM technology of physical items;
Step 2, the number emulated from total factor, Whole Process Simulation build the influence in each stage of angle analysis physical items because
Element;
Step 3 obtains internet+BIM technology by establishing the application method of physical items and comparing with technical result
Use the value of BIM technology in the key influence factor and physical items of building trade development, obtain the exploitations of physical items with
The reference scheme of engineer application.
2. the residential housing entity Life cycle analysis method based on internet and BIM as described in claim 1, feature
It is, step 1 is using in the different cycles BIM technology of physical items, comprising:
Planning stage: being importing directly into BIM modeling software using the buildings model that CAD software is built up, and utilizes geography information system
System GIS classifies large number of place information, is stored in BIM database, carries out reasonable site analysis and scheme
Selection;
Design phase: carrying out three dimensional dynamic FEM design with BIM, and areal model formation novel three-dimensional stereoscopic effect is showed
Out;When by carrying out collision detection after synthesis between pipeline, various equipment, pipeline and structure;
Construction stage: by BIM4D by actual progress with it is expected that progress compares time update arrangement and method for construction, reasonable distribution is applied
Wage source;By BIM5D Cost information model, realizes and the dynamic of capital investment and resource distribution is controlled in the construction process;
Operation stage: carrying out escape simulation in BIM model, and during the operation of the later period of building, monitoring is met an urgent need out at any time
Whether mouth is able to use.
3. the residential housing entity Life cycle analysis method based on internet and BIM as described in claim 1, feature
Be, step 2 from the number that total factor, Whole Process Simulation emulate build the influence in each stage of angle analysis physical items because
In element, in the planning stage, carries out investment estimate, imports model and site analysis;
In the design phase, three-dimensional visualization, Collision detection and energy consumption analysis are carried out;
In the construction stage, construction horizontal layout, quality management, progress control, cost control and safety management are carried out;
In the O&M stage, equipment management, emergency disposal are carried out, and formulates Green Operation.
4. the residential housing entity Life cycle analysis method based on internet and BIM as described in claim 1, feature
It is, the residential housing entity Life cycle analysis method based on internet and BIM further comprises:
The first step establishes model using BIM technology, carries out Sunlight Analysis, building energy conservation analysis, ventilation and temperature and humidity simulation, relaxes
Appropriateness analysis, tropical island effect analysis and light pollution analysis;
Second step carries out cost budgeting, Deepen Design, 4D construction management, 5D construction management and integrated application using BIM technology,
And using BIM technology application value as foundation, on the basis of the model that planning and design phase application model are established, the time is introduced
And cost factor;
Third step establishes estate management database using completion BIM data, supports property IT application in management;Eventually by foundation
The application method of physical items is simultaneously compared with technical result, obtains the key that internet+BIM technology develops in building trade
Influence factor and physical items use the value of BIM technology, obtain the exploitation of physical items and the reference scheme of engineer application.
5. the residential housing entity Life cycle analysis method based on internet and BIM as claimed in claim 4, feature
It is, in the first step, according to application model analysis and practical operation, establishes building, structure, hot-water heating electricity BIM modeling, be based on BIM model
It is interacted with design requirement.
6. a kind of implement the residential housing entity Life cycle analysis method described in claim 1 based on internet and BIM
Based on the residential housing entity Life cycle of internet and BIM analyze analogue system.
7. a kind of terminal, which is characterized in that the terminal realizes the full life of residential housing entity based on internet and BIM
The controller of period Analysis.
8. a kind of computer readable storage medium, including instruction, when run on a computer, so that described in computer execution
The residential housing entity Life cycle analysis method based on internet and BIM.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910562089.3A CN110276555A (en) | 2019-06-26 | 2019-06-26 | Residential housing entity Life cycle analysis method based on internet and BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910562089.3A CN110276555A (en) | 2019-06-26 | 2019-06-26 | Residential housing entity Life cycle analysis method based on internet and BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110276555A true CN110276555A (en) | 2019-09-24 |
Family
ID=67963296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910562089.3A Pending CN110276555A (en) | 2019-06-26 | 2019-06-26 | Residential housing entity Life cycle analysis method based on internet and BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110276555A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110991882A (en) * | 2019-12-03 | 2020-04-10 | 中交第二航务工程勘察设计院有限公司 | Project construction fine management method based on BIM5D |
CN111383000A (en) * | 2020-03-10 | 2020-07-07 | 中建八局第二建设有限公司 | Method for improving building engineering project management |
CN112184057A (en) * | 2020-10-19 | 2021-01-05 | 安徽天润建筑工程集团有限公司 | Intelligent simulation construction process and information management system thereof |
CN112800523A (en) * | 2021-02-04 | 2021-05-14 | 中建科工集团有限公司 | High-wind-pressure steel assembly type residence comfort system model selection method and system |
CN112884290A (en) * | 2021-01-26 | 2021-06-01 | 青岛国信海天中心建设有限公司 | BIM-based field construction management method |
CN113268904A (en) * | 2021-05-08 | 2021-08-17 | 中铁建工集团有限公司 | Risk control method for full reverse construction period of single-layer flat plate reticulated shell roof structure |
CN113408854A (en) * | 2021-05-19 | 2021-09-17 | 常州大学 | BIM technology-based building full-life-cycle environmental impact evaluation management method |
CN113449371A (en) * | 2021-07-17 | 2021-09-28 | 武昌工学院 | Lighting analysis method based on BIM residential building full life cycle analysis |
CN113886921A (en) * | 2021-10-08 | 2022-01-04 | 中铁七局集团有限公司 | Conversion and integration method of GIS (geographic information System) model and BIM (building information modeling) model of highway engineering |
CN114077764A (en) * | 2021-10-08 | 2022-02-22 | 中铁七局集团有限公司 | Method for establishing temporary model based on three-dimensional GIS and BIM integration and application |
CN115689373A (en) * | 2022-11-11 | 2023-02-03 | 东南大学 | Near-modern building heritage protection and utilization method based on MHBIM |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106022587A (en) * | 2016-05-12 | 2016-10-12 | 广州络维建筑信息技术咨询有限公司 | BIM project progress and cost management system based on earned value theory |
KR101847111B1 (en) * | 2016-11-29 | 2018-05-28 | 서울시립대학교 산학협력단 | Management Apparatus and Management Method using BPS based E-Mmanual Module, and General Construction Project Management information System |
-
2019
- 2019-06-26 CN CN201910562089.3A patent/CN110276555A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106022587A (en) * | 2016-05-12 | 2016-10-12 | 广州络维建筑信息技术咨询有限公司 | BIM project progress and cost management system based on earned value theory |
KR101847111B1 (en) * | 2016-11-29 | 2018-05-28 | 서울시립대학교 산학협력단 | Management Apparatus and Management Method using BPS based E-Mmanual Module, and General Construction Project Management information System |
Non-Patent Citations (2)
Title |
---|
张林等: "BIM技术在PC建筑全生命周期中的应用", 《建筑技术开发》 * |
许强等: "基于BIM的工程项目全生命周期项目管理研究", 《科技创新导报》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110991882A (en) * | 2019-12-03 | 2020-04-10 | 中交第二航务工程勘察设计院有限公司 | Project construction fine management method based on BIM5D |
CN111383000A (en) * | 2020-03-10 | 2020-07-07 | 中建八局第二建设有限公司 | Method for improving building engineering project management |
CN112184057A (en) * | 2020-10-19 | 2021-01-05 | 安徽天润建筑工程集团有限公司 | Intelligent simulation construction process and information management system thereof |
CN112884290A (en) * | 2021-01-26 | 2021-06-01 | 青岛国信海天中心建设有限公司 | BIM-based field construction management method |
CN112800523A (en) * | 2021-02-04 | 2021-05-14 | 中建科工集团有限公司 | High-wind-pressure steel assembly type residence comfort system model selection method and system |
CN113268904A (en) * | 2021-05-08 | 2021-08-17 | 中铁建工集团有限公司 | Risk control method for full reverse construction period of single-layer flat plate reticulated shell roof structure |
CN113408854A (en) * | 2021-05-19 | 2021-09-17 | 常州大学 | BIM technology-based building full-life-cycle environmental impact evaluation management method |
CN113408854B (en) * | 2021-05-19 | 2024-07-09 | 常州大学 | Building full life cycle environment influence evaluation management method based on BIM technology |
CN113449371A (en) * | 2021-07-17 | 2021-09-28 | 武昌工学院 | Lighting analysis method based on BIM residential building full life cycle analysis |
CN113449371B (en) * | 2021-07-17 | 2022-05-24 | 武昌工学院 | Lighting analysis method based on BIM residential building full life cycle analysis |
CN113886921A (en) * | 2021-10-08 | 2022-01-04 | 中铁七局集团有限公司 | Conversion and integration method of GIS (geographic information System) model and BIM (building information modeling) model of highway engineering |
CN114077764A (en) * | 2021-10-08 | 2022-02-22 | 中铁七局集团有限公司 | Method for establishing temporary model based on three-dimensional GIS and BIM integration and application |
CN114077764B (en) * | 2021-10-08 | 2024-07-05 | 中铁七局集团有限公司 | Three-dimensional GIS and BIM integration-based temporary modeling type establishment method and application |
CN115689373A (en) * | 2022-11-11 | 2023-02-03 | 东南大学 | Near-modern building heritage protection and utilization method based on MHBIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110276555A (en) | Residential housing entity Life cycle analysis method based on internet and BIM | |
Pan et al. | Integrating BIM and AI for smart construction management: Current status and future directions | |
Yang et al. | Adopting building information modeling (BIM) for the development of smart buildings: a review of enabling applications and challenges | |
Hu et al. | Construction and facility management of large MEP projects using a multi-Scale building information model | |
Chi et al. | BIM-enabled structural design: impacts and future developments in structural modelling, analysis and optimisation processes | |
Jiang | Intelligent building construction management based on BIM digital twin | |
Ni et al. | Blockchain-based BIM digital project management mechanism research | |
Chen et al. | Investigation of interoperability between building information modelling (BIM) and building energy simulation (BES) | |
WO2022222432A1 (en) | Bim-based dynamic and intelligent building lifecycle management system and method | |
Saraireh et al. | Understanding the conceptual of building information modeling: a literature review | |
CN110019435A (en) | Data processing method and system based on assembled architecture platform | |
CN115033380A (en) | Building engineering intelligent integrated cloud platform based on BIM technology | |
Mourshed et al. | ArDOT: a tool to optimise environmental design of buildings | |
Yang et al. | Advancing bridge construction monitoring: AI-based building information modeling for intelligent structural damage recognition | |
Alsharif | A review on the challenges of BIM-based BEM automated application in AEC industry | |
Jianfeng et al. | Construction of intelligent building design system based on BIM and AI | |
Noack et al. | Technical challenges and approaches to transfer building information models to building energy | |
Huang et al. | Research on 4D Visual BIM Technology in Dynamic Decora-tion Building Site Construction | |
Yao et al. | Building simulation | |
Liao et al. | Improving construction schedule and cost information feedback in building information modelling | |
Osan et al. | The BIM revolution | |
Bajracharya | An assessment of Building Energy Management Systems (BEMS) and Data-driven Life cycle engineering (LCE) in AEC projects | |
Hong | Geometric Accuracy of BIM-BEM Transformation Workflows: Bridging the State-of-the-Art and Practice | |
Liu et al. | Identify information exchanges by mapping and analyzing the integrated heating, ventilating, and air conditioning (HVAC) design process | |
CN108446492A (en) | BIM is calculated in the method for different software Internal conversion, reservoir and terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190924 |
|
WD01 | Invention patent application deemed withdrawn after publication |